AUTOMATION PHASE III( AGS & ORPAK)

NO OF ROS
TOTAL
ALL DUS / TANKS
CONNECTED
DATA PUSHED DAILY TO
SERVER
WITH AUTOMATION ISSUES
29 2 0 26
DETAILS OF ROs INDICATED ABOVE & ISSUES THEREIN
S. NO. NAME OF RO DESCRIPTION OF ISSUE EXPECTED DATE OF RESOLUTION
1 M/s KSS Enterprises
1.DU-1 Midco junction box required
2.DU5 L&T Z-LINE Y Gland required
2
M/s Sri Venkatesa Traders

1.DU-1,4 L&T ZLINE Y Gland required
2.DU-3 L&T sprint Control card
problem.3.DU-5 Midco, junction box
required.
3.DU-6 Not working from last 2 years

3 M/s Selvam Fuels
1.DU-1 Midco PI card required
2.DU-2 Tokhem PI card required
3.DU-3 Tokhem quantum PI card
required
4 M/s Devi Traders
1.DU-1 Gilbarco newly added
2.DU-3 Tokhem quantum PI card
problem.
3.DU-3 Wayne series newly installed


AUTOMATION PHASE III( AGS & ORPAK)
NO OF ROS
TOTAL
ALL DUS / TANKS
CONNECTED
DATA PUSHED DAILY TO
SERVER
WITH AUTOMATION ISSUES
29 1 0 28
DETAILS OF ROs INDICATED ABOVE & ISSUES THEREIN
S. NO. NAME OF RO DESCRIPTION OF ISSUE EXPECTED DATE OF RESOLUTION
5 M/s Sonasun Traders
1.DU-1 L&T ZLINE Y Gland required
2.DU-2 Midco, keypad not working
3.DU-3Midco, junction box required


6
M/s KMB Fuels & Oils

1.DU-2 Midco,series Control card
problem
3.DU-4 Tokhem quantum Signal
range too low

7

M/s PCM Petroleum Agencies

1.DU-1Midco, Control card problem
2.DU-2,3 Wayne make Control card
problem

8 M/s kannan Service Station
1.DU-2,3 L&T ZLINE Mechanical
Pumps
2.DU-4 L&T pace maker Control card
problem
3.DU-5 Midco, Pump not working
4.DU-6Midco, Control card problem

9 M/s Sakthi Fules All Pumps are integrated
AUTOMATION PHASE III( AGS & ORPAK)
NO OF ROS
TOTAL
ALL DUS / TANKS
CONNECTED
DATA PUSHED DAILY TO
SERVER
WITH AUTOMATION ISSUES
29 1 0 28
DETAILS OF ROs INDICATED ABOVE & ISSUES THEREIN
S. NO. NAME OF RO DESCRIPTION OF ISSUE EXPECTED DATE OF RESOLUTION
10

M/s Visa Agencies

1.DU-1,3 ,4 L&T ZLINE Y gland
required (Pump also not working)
2.DU-6 Gilbarco Sprint
Note: Integration not
checked(UPS problem)
11 M/s Guber Agencies
1.DU-1 Gilbarco veedroot newly
replaced
2.DU-3 Wayne series newly replaced
Note: Pump Integration not
checked(UPS is not working from
October 2012 )

12 M/s Rasipuram Lorry owners Association
1.DU-4 Midco, Mechanical pump
Note: BOS CPU not Available in RO

13

M/s State Lorry owners fedaration

1.DU-1 Aplab swades pump not
working
2.DU-2,3 ,4 L&T ZLINE Mechanical
pumps

14 M/s Sri Venkateswara Service station
1.DU-1,L&T Sprint Signal problem
2.DU-5 Midco, Control card problem
3.DU-6 Gilbarco veed root , newly
installed

AUTOMATION PHASE III( AGS & ORPAK)
NO OF ROS
TOTAL
ALL DUS / TANKS
CONNECTED
DATA PUSHED DAILY TO
SERVER
WITH AUTOMATION ISSUES
29 1 0 28
DETAILS OF ROs INDICATED ABOVE & ISSUES THEREIN
S. NO. NAME OF RO DESCRIPTION OF ISSUE EXPECTED DATE OF RESOLUTION
15 M/s Sri Venkateswara Agencies
1.DU-1 Midco, Junction box required
1.DU-2 Midco, Control card problem
16 M/s Sri Ram Tailor Service
1.DU-1,2,6 Midco, Junction box
required
2.DU-5 Aplab Swades Keypad
Problem

17 M/s S R Anandaraman & Sons
1.DU-1 L&T pace maker Keypad not
working.
2.DU-2 Dresser Wayne newly added
3.DU-1 L&T pace maker pump not
working
18

M/s Uma Maheswari Agencies

1.DU-3 Gilbarco veedroot Over
voltage problem
2.DU-4, Tokhem quantum over
voltage
19 M/s Sangameswari Fuels
BOS System not configured yet.
(So integration not checked)
20 M/s ARS Agency - Uthangarai
1.DU-1,2,3 L&T ZLINE Y Gland
required
2.DU-5 L&T pace maker pump not
working
AUTOMATION PHASE III( AGS & ORPAK)
NO OF ROS
TOTAL
ALL DUS / TANKS
CONNECTED
DATA PUSHED DAILY TO
SERVER
WITH AUTOMATION ISSUES
29 1 0 28
DETAILS OF ROs INDICATED ABOVE & ISSUES THEREIN
S. NO. NAME OF RO DESCRIPTION OF ISSUE EXPECTED DATE OF RESOLUTION
21 M/s GSN FULES
1.DU-3 L&T ZLINE Y Gland required
2.Dresser Wayne make DUs 2 no's
newly added
(BOS system not configured)
22 M/s Veyess & Co
1.DU-1 Gilbarco veedroot newly
replaced
2.DU-2 Aplab Swades Control
Problem
3.DU-3 Dresser Wayne newly added
4.DU-4 Midco Pump not working.

23 M/s Shree shirdi sai fules
BOS System not configured yet.
(So integration not checked)
24
M/s Ramesh Babu Agency

1.DU-1 L&T ZLINE Pump not working
2. DU-2,3 Midco Control Card
problem .
3.DU-7 Aplab Pump not working

25 M/s Sri Bharati Agencies
1.DU-1L&T ZLINE Mechanical Pump.
2. DU-2,3 Gilbarco newly added
4.DU-5L&T ZLINE Mechanical pump.
26 M/s T.Rangappan & Sons
1.DU-1 Gilbarco veedroot newly
replaced
2.DU-3 L&T ZLINE Y Gland required