CREACION DEL BOULEVARD PEATONAL EN LA PROLONGACION DE LA AVENIDA WENCESLAO GALVEZ DEL BARRIO SAN
MIGUEL EN EL DISTRITO DE CACHICADAN, SANTIAGO DE CHUCO - LA LIBERTAD"
Item
Descripcin
01
GRADERIA
01.01
Und.
Metrado
Precio S/.
Parcial S/.
27,494.53
OBRAS PROVISIONALES
10,261.13
01.01.01
UND
1.00
1,267.40
01.01.02
mes
2.00
250.00
500.00
01.01.03
GLB
1.00
3,000.00
3,000.00
01.01.04
GLB
1.00
227.60
227.60
01.01.05
ton
50.00
100.00
5,000.00
M2
374.83
0.71
266.13
01.01.06
01.02
TRABAJOS PRELIMINARES
112.32
01.02.01
M2
52.00
0.71
01.02.02
TRAZO Y REPLANTEO
M2
52.00
1.45
01.03
1,267.40
MOVIMIENTO DE TIERRAS
36.92
75.40
2,706.10
01.03.01
M2
90.00
9.12
820.80
01.03.02
M3
1.24
20.64
25.59
01.03.03
M2
13.75
3.91
53.76
01.03.04
M3
25.00
41.91
1,047.75
01.03.05
M2
48.15
3.34
160.82
01.03.06
M3
20.25
29.50
01.04
CONCRETO SIMPLE
597.38
4,401.67
01.04.01
M2
14.88
31.38
466.93
01.04.02
M3
9.89
397.85
3,934.74
M2
52.01
91.72
45.00
116.51
01.05
01.05.01
01.06
01.06.01
02
02.01
PISOS Y PAVIMENTOS
REVESTIMIENTO CON PIEDRA LAJA ORNAMENTAL
4,770.36
VARIOS
BARANDA DE SEGURIDAD DE ACERO GALVANIZADO DE 2"
4,770.36
5,242.95
SARDINELES
5,242.95
15,077.34
TRABAJOS PRELIMINARES
268.35
02.01.01
M2
21.30
0.71
15.12
02.01.02
144.70
1.75
253.23
02.02
MOVIMIENTO DE TIERRAS
1,348.26
02.02.01
DEMOLICION DE SARDINELES
56.54
5.86
331.32
02.02.02
M3
15.94
20.64
329.00
02.02.03
M3
23.32
29.50
02.03
CONCRETO ARMADO
687.94
9,429.71
02.03.01
M2
57.46
27.96
1,606.58
02.03.02
kg
397.06
4.45
1,766.92
02.03.03
M3
15.52
390.22
6,056.21
M2
43.72
91.72
7.15
2.94
02.04
02.04.01
02.05
02.05.01
03
03.01
4,010.00
VARIOS
JUNTAS ASFALTICAS
21.02
EMPEDRADO
TRABAJOS PRELIMINARES
345.42
M2
159.92
0.71
03.01.02
TRAZO Y REPLANTEO
M2
159.92
1.45
MOVIMIENTO DE TIERRAS
RELLENO Y COMPACTACION CON MATERIAL DE PRSTAMO
M3
98.09
41.91
03.02.02
M2
159.92
3.34
03.03.01
03.03.02
03.04
03.04.01
04
04.01
CONCRETO SIMPLE
ENCOFRADO Y DESENCOF. DE PISO
CONCRETO F'c=175 kg/cm2 EN PISO
PILETA
TRABAJOS PRELIMINARES
231.88
4,110.95
534.13
5,976.17
M2
M3
1.22
15.29
28.26
388.60
M2
170.86
91.72
PISOS Y PAVIMENTOS
REVESTIMIENTO CON PIEDRA LAJA ORNAMENTAL
113.54
4,645.08
03.02.01
03.03
21.02
26,637.95
03.01.01
03.02
4,010.00
34.48
5,941.69
15,671.28
15,671.28
8,629.90
10.09
04.01.01
M2
4.67
0.71
04.01.02
TRAZO Y REPLANTEO
M2
4.67
1.45
04.02
MOVIMIENTO DE TIERRAS
6.77
41.41
04.02.01
M3
0.72
20.64
04.02.02
M3
0.90
29.50
04.03
3.32
CONCRETO ARMADO
14.86
26.55
6,395.75
04.03.01
M2
19.84
44.91
04.03.02
kg
111.66
4.45
496.89
04.03.03
M3
11.17
448.33
5,007.85
04.04
REVOQUES Y ENLUCIDOS
891.01
2,182.65
04.04.01
M2
28.67
17.49
501.44
04.04.02
M2
28.67
58.64
1,681.21
05
05.01
BALCON
42,269.48
TRABAJOS PRELIMINARES
56.61
05.01.01
M2
26.21
0.71
05.01.02
TRAZO Y REPLANTEO
M2
26.21
1.45
05.02
MOVIMIENTO DE TIERRAS
18.61
38.00
2,614.42
05.02.01
M3
5.22
55.55
05.02.02
M3
15.58
20.64
321.57
05.02.03
M3
47.79
41.91
2,002.88
05.03
GRADAS
289.97
1,515.35
05.03.01
M2
8.48
31.38
266.10
05.03.02
M3
3.14
397.85
1,249.25
05.04
1,354.58
05.04.01
M3
2.55
244.09
05.04.02
M3
3.15
232.43
05.05
622.43
732.15
29,252.42
05.05.01
M2
22.97
20.88
479.61
05.05.02
kg
1,608.34
4.45
7,157.11
05.05.03
M2
103.81
41.64
4,322.65
05.05.04
M3
38.88
444.78
17,293.05
M2
81.51
91.72
05.06
05.06.01
06
06.01
PISOS Y PAVIMENTOS
REVESTIMIENTO CON PIEDRA LAJA ORNAMENTAL
7,476.10
INSTALACIONES SANITARIAS
7,476.10
982.88
SALIDAS
982.88
06.01.01
pto
9.00
27.99
251.91
06.01.02
RED DE DISTRIBUCIN C/TUBERIA PVC SAP AGUA FRIA C-10 1/2" x 5m.
67.92
8.12
551.51
06.01.03
UND
6.00
29.91
179.46
07
INSTALACIONES ELECTRICAS
728.62
07.01
31.60
5.00
158.00
07.02
TENDIDO DE CABLE
31.60
14.26
450.62
07.03
UND
1.00
120.00
08
MOBILIARIO URBANO
120.00
19,548.28
08.01
M3
0.21
429.73
90.24
08.02
08.03
POSTE ORNAMENTAL
BANCA ORNAMENTAL
UND
UND
10.00
10.00
1,319.41
482.53
13,194.10
4,825.30
TACHO DE BASURA
UND
4.00
359.66
1,438.64
08.04
09
AREAS VERDES
3,164.98
09.01
M2
86.82
22.36
1,941.30
09.02
M2
86.82
11.93
1,035.76
09.03
UND
12.00
15.66
COSTO DIRECTO
Gastos Generales (10%)
Costo de Obra
Mitigacion (2%)
Costo de expediente
Supervision (6%CD)
MONTO TOTAL DE INVERSION
SON :
187.92
144,533.96
14,453.40
158,987.36
2,890.68
6,000.00
8,672.04
176,550.07
Presupuesto ALTERNATIVA 02
CREACION DEL BOULEVARD PEATONAL EN LA PROLONGACION DE LA AVENIDA WENCESLAO GALVEZ DEL BARRIO SAN
MIGUEL EN EL DISTRITO DE CACHICADAN, SANTIAGO DE CHUCO - LA LIBERTAD"
Item
Descripcin
01
GRADERIA
01.01
Und.
Metrado
Precio S/.
Parcial S/.
26,145.42
OBRAS PROVISIONALES
10,261.13
01.01.01
UND
1.00
1,267.40
01.01.02
mes
2.00
250.00
500.00
01.01.03
GLB
1.00
3,000.00
3,000.00
01.01.04
GLB
1.00
227.60
227.60
01.01.05
ton
50.00
100.00
5,000.00
M2
374.83
0.71
266.13
01.01.06
01.02
TRABAJOS PRELIMINARES
112.32
01.02.01
M2
52.00
0.71
01.02.02
TRAZO Y REPLANTEO
M2
52.00
1.45
01.03
MOVIMIENTO DE TIERRAS
DEMOLICION DE GRADAS E=0.15 m.
M2
01.03.02
01.03.03
01.03.04
01.03.05
01.04
36.92
75.40
2,706.10
01.03.01
01.03.06
1,267.40
90.00
9.12
820.80
M3
1.24
20.64
25.59
M2
13.75
3.91
53.76
M3
25.00
41.91
1,047.75
M2
48.15
3.34
160.82
M3
20.25
29.50
CONCRETO SIMPLE
597.38
4,401.67
01.04.01
M2
14.88
31.38
466.93
01.04.02
M3
9.89
397.85
3,934.74
M2
52.05
65.73
45.00
116.51
01.05
01.05.01
01.06
01.06.01
02
02.01
PISOS Y PAVIMENTOS
PISO DE CERAMICO 30X30 CM COLOR
3,421.25
VARIOS
BARANDA DE SEGURIDAD DE ACERO GALVANIZADO DE 2"
3,421.25
5,242.95
SARDINELES
5,242.95
14,215.32
TRABAJOS PRELIMINARES
268.35
02.01.01
M2
21.30
0.71
15.12
02.01.02
144.70
1.75
253.23
02.02
MOVIMIENTO DE TIERRAS
1,348.26
02.02.01
DEMOLICION DE SARDINELES
56.54
5.86
331.32
02.02.02
M3
15.94
20.64
329.00
02.02.03
M3
23.32
29.50
02.03
CONCRETO ARMADO
687.94
9,429.71
02.03.01
M2
57.46
27.96
1,606.58
02.03.02
kg
397.06
4.45
1,766.92
02.03.03
M3
15.52
390.22
6,056.21
02.04
02.04.01
02.05
02.05.01
03
03.01
3,147.98
M2
52.05
60.48
7.15
2.94
VARIOS
JUNTAS ASFALTICAS
21.02
EMPEDRADO
TRABAJOS PRELIMINARES
345.42
M2
159.92
0.71
03.01.02
TRAZO Y REPLANTEO
M2
159.92
1.45
MOVIMIENTO DE TIERRAS
21.02
22,197.30
03.01.01
03.02
3,147.98
113.54
231.88
4,645.08
03.02.01
M3
98.09
41.91
03.02.02
M2
159.92
3.34
03.03
03.03.01
03.03.02
03.04
03.04.01
04
04.01
04.01.01
04.01.02
04.02
CONCRETO SIMPLE
ENCOFRADO Y DESENCOF. DE PISO
CONCRETO F'c=175 kg/cm2 EN PISO
534.13
5,976.17
M2
M3
1.22
15.29
28.26
388.60
PISOS Y PAVIMENTOS
PISO DE CERAMICO 30X30 CM COLOR
4,110.95
34.48
5,941.69
11,230.63
M2
170.86
65.73
PILETA
11,230.63
8,446.15
TRABAJOS PRELIMINARES
10.09
M2
4.67
0.71
TRAZO Y REPLANTEO
M2
4.67
1.45
MOVIMIENTO DE TIERRAS
3.32
6.77
41.41
04.02.01
M3
0.72
20.64
14.86
04.02.02
M3
0.90
29.50
26.55
04.03
CONCRETO ARMADO
6,395.75
04.03.01
M2
19.84
44.91
04.03.02
kg
111.66
4.45
496.89
04.03.03
M3
11.17
448.33
5,007.85
04.04
REVOQUES Y ENLUCIDOS
891.01
1,998.90
04.04.01
M2
17.82
17.49
311.67
04.04.02
M2
28.67
58.85
1,687.23
05
05.01
BALCON
40,151.03
TRABAJOS PRELIMINARES
56.61
05.01.01
M2
26.21
0.71
05.01.02
TRAZO Y REPLANTEO
M2
26.21
1.45
05.02
MOVIMIENTO DE TIERRAS
18.61
38.00
2,614.42
05.02.01
M3
5.22
55.55
05.02.02
M3
15.58
20.64
321.57
05.02.03
M3
47.79
41.91
2,002.88
M2
8.48
31.38
266.10
M3
3.14
397.85
1,249.25
05.03
05.03.01
05.03.02
05.04
GRADAS
289.97
1,515.35
1,354.58
05.04.01
M3
2.55
244.09
622.43
05.04.02
M3
3.15
232.43
732.15
05.05
29,252.42
05.05.01
M2
22.97
20.88
479.61
05.05.02
kg
1,608.34
4.45
7,157.11
05.05.03
M2
103.81
41.64
4,322.65
M3
38.88
444.78
17,293.05
M2
81.51
65.73
05.05.04
05.06
05.06.01
06
06.01
PISOS Y PAVIMENTOS
PISO DE CERAMICO 30X30 CM COLOR
5,357.65
INSTALACIONES SANITARIAS
5,357.65
982.88
SALIDAS
982.88
06.01.01
pto
9.00
27.99
251.91
06.01.02
RED DE DISTRIBUCIN C/TUBERIA PVC SAP AGUA FRIA C-10 1/2" x 5m.
67.92
8.12
551.51
06.01.03
UND
6.00
29.91
179.46
07
INSTALACIONES ELECTRICAS
728.62
07.01
31.60
5.00
158.00
07.02
TENDIDO DE CABLE
31.60
14.26
450.62
07.03
UND
1.00
120.00
08
08.01
MOBILIARIO URBANO
CONCRETO f'c=210 kg/cm2 PARA ANCLAJES EN POSTES ORNAMENTALES
120.00
19,548.28
M3
0.21
429.73
90.24
08.02
08.03
POSTE ORNAMENTAL
BANCA ORNAMENTAL
UND
UND
10.00
10.00
1,319.41
482.53
13,194.10
4,825.30
08.04
TACHO DE BASURA
UND
4.00
359.66
1,438.64
09
AREAS VERDES
3,164.98
09.01
M2
86.82
22.36
1,941.30
09.02
M2
86.82
11.93
1,035.76
09.03
UND
12.00
15.66
187.92
COSTO DIRECTO
Gastos Generales (10%)
Costo de Obra
Mitigacion (2%)
Costo de expediente
Supervision (6%CD)
SON :
CIENTO SESENTA Y CINCO MIL NOVECIENTOS OCHENTA Y CUATRO Y 38/100 NUEVOS SOLES
135,579.98
13,558.00
149,137.98
2,711.60
6,000.00
8,134.80
165,984.38
S10
001
14/04/2014
131003
Cdigo
Recurso
0147010001
0147010002
0147010003
0147010004
0147010005
CAPATAZ
OPERARIO
OFICIAL
PEON
TOPOGRAFO
Cantidad
Precio S/.
63.2346
924.2914
545.5251
1,321.9302
3.3061
13.29
12.08
9.65
8.50
13.29
M2
UND
91.1610
16.0000
6.00
90.00
kg
kg
kg
kg
kg
kg
UND
mes
32.4361
40.1391
1.0000
41.2469
1.0000
1,237.7190
6.0000
3.0000
3.92
3.92
4.30
4.30
4.30
3.10
3.71
250.00
M3
M3
M3
M3
M3
gln
gln
M3
pza
pza
UND
UND
BOL
M2
M3
BOL
BOL
BOL
BOL
M
rll
UND
gln
kg
M3
M3
UND
p2
p2
ton
gln
UND
UND
4.9426
0.6000
15.4540
38.4052
23.9663
0.0263
0.0230
48.4018
3.0880
3.0880
6.0000
1.0000
754.1450
221.2600
3.9802
10.5120
2.5980
2.0995
0.5737
4.0000
3.8600
12.0000
0.2488
223.1100
0.5000
54.9382
1.0000
391.2570
303.6525
55.7100
0.2893
16.7832
6.0000
140.00
30.00
50.00
135.00
100.00
25.00
12.00
150.00
20.00
18.00
17.50
120.00
18.90
57.60
105.00
43.00
35.00
38.00
14.00
0.15
20.00
6.00
149.00
8.00
115.00
5.50
450.00
6.30
6.30
159.00
34.80
8.75
35.00
Unidad
MANO DE OBRA
hh
hh
hh
hh
hh
MATERIALES
0202010032
0202010033
0202040010
0202040064
0202100064
0202100098
0202100099
0203030090
0203030091
0203030102
0204000000
0204000001
0204000002
0205010004
0205010007
0205010008
0205010009
0205030007
0207010033
0207010034
0210010075
0217000015
0221000000
0224010089
0224010090
0224010091
0224010092
0224010093
0229030008
0229040004
0229040007
0229050013
0230460014
0230470003
0238000000
0239050000
0239050004
0243920001
0243920004
0249040044
0254030028
0272080011
0272140002
GRASS NACIONAL
FAROLA ESFERICA CON LAMPARA DE VAPOR DE SODIO DE
ALTA PRESIN DE 70W
ALAMBRE NEGRO N8
ALAMBRE NEGRO N16
CLAVO 4"
CLAVOS
CLAVO 3/4"
FIERRO Fy=4200 KG/CM2
PERNO 3/4" X 6" C/TUERCA
ALQUILER DE LOCAL PARA OFICINA DE ALMACEN, CASETA Y
GUARDIANIA INC. SS.HH
ARENA FINA
TIERRA DE CHACRA
TIERRA SELECCIONADA CON MATERIAL ORGANICO
ARENA GRUESA
AFIRMADO DE BASE
ASFALTO RC 250
KEROSENE INDUSTRIAL
PIEDRA CHANCADA
TERMINALES PARA CABLE NYY 2x10mm2
EMPALME RECTO PARA CABLE NYY 2x10mm2
LLAVE DE GRIFO 1/2"
MURETE PORTA MEDIDOR INC. ACABADOS E=0.25m, H=1.20m
CEMENTO PORTLAND TIPO I (42.5KG)
PIEDRA LAJA
PIEDRA LABRADA
PIEDRA DECORATIVA 1"a 2"
PIEDRA DECORATIVA 3"a 8"
PIEDRA DECORATIVA 2"a 6"
YESO EN BOLSAS DE 25 KG
CINTA SEALIZADORA
CINTA VULCANIZANTE
PLANTA ORNAMENTAL LOCAL
PEGAMENTO PARA PVC FORDUIT
COMPOST
HORMIGON
AGUA
GIGANTOGRAFIA DE 2.40 X 3.60 M
MADERA DE ENCOFRADOS
MADERA TORNILLO
FLETE TERRESTRE
PINTURA ESMALTE
TUB. PVC P/AGUA SIMPLE PRESION C-10 DE 1/2" X 5m.
CONOS DE SEGURIDAD
0272140003
0272140004
0272140005
0272530080
0272530091
0298010090
0298010091
0298010093
BANDERINES
CHALECOS DE SEGURIDAD
BANCA ORNAMENTAL
TEKNOPORT 2.40 X 1.20 X 1"
CODO PVC P/AGUA S.P. C-10 1/2"X90
CABLE ELECTRICO NYY 2x1x10 mm2
POSTE ORNAMENTAL
TACHO DE BASURA
UND
UND
UND
UND
UND
M
UND
UND
4.0000
2.0000
10.0000
0.0140
9.2700
69.8000
8.0000
5.0000
15.00
8.50
200.00
20.00
1.40
21.00
1,000.00
350.00
0337010001
0348040024
0348110004
0349020007
0349020102
0349020104
0349040012
0349040023
0349040024
0349040044
0349040045
0349100007
0349520001
0349520004
0349520005
0349520100
0398010037
HERRAMIENTAS MANUALES
CAMION CISTERNA 4X2 (AGUA) 122 HP 2,000
VOLQUETE DE 10 M3
COMPRESORA NEUMATICA 76 HP 125-175 PCM
MARTILLO NEUMATICO DE 25 KG
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP
MOTONIVELADORA 125 HP
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS
CARGADOR S/LLANTAS 125 HP - 2.5YD3
RODILLO V.L.A 101-135 HP DE 10-12 Ton.
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
MIRAS Y JALONES
TEODOLITO
NIVEL
VIBRADOR DE CONCRETO 4 HP
HERRAMIENTA MANUAL
%MO
hm
hm
hm
hm
hm
hm
GLB
GLB
hm
hm
hm
HE
HE
HE
hm
%PU
0.4793
7.6984
7.7180
15.4300
24.4613
0.9732
1.0000
1.0000
2.1096
0.9732
38.3193
3.3061
3.3061
2.9602
25.8882
160.00
240.00
80.00
6.20
17.50
200.00
1,500.00
1,500.00
200.70
190.00
13.90
1.80
8.75
6.88
8.00
0398010087
HERRAMIENTAS MANUALES
%MO
EQUIPOS
Total
Fecha :
S/.
21/04/2014 01:09:03 PM
Pgina :
Parcial S/.
995.93
12,946.74
5,581.55
9,508.01
113.17
29,145.40
546.97
1,440.00
127.15
157.35
4.30
177.36
4.30
3,836.93
22.26
750.00
691.96
18.00
772.70
5,184.70
2,396.63
0.66
0.28
7,260.27
61.76
55.58
105.00
120.00
14,253.34
12,744.58
417.92
452.02
90.93
79.78
8.03
0.60
77.20
72.00
37.07
1,784.88
57.50
302.16
450.00
2,464.92
1,913.01
8,857.89
10.07
146.85
210.00
60.00
17.00
2,000.00
0.28
12.98
1,465.80
8,000.00
1,750.00
106,545.76
579.29
76.69
1,847.62
617.44
95.67
428.07
194.64
1,500.00
1,500.00
423.40
184.91
532.64
5.95
28.93
20.37
207.11
0.00
760.81
8,822.24
144,513.40
21/04/2014 01:09:03 PM
115,388.56
S10
001
14/04/2014
131003
Cdigo
Recurso
0147010001
0147010002
0147010003
0147010004
0147010005
CAPATAZ
OPERARIO
OFICIAL
PEON
TOPOGRAFO
Cantidad
Precio S/.
44.7487
648.6025
386.6282
880.4221
3.3061
13.29
12.08
9.65
8.50
13.29
M2
UND
91.1610
16.0000
6.00
90.00
kg
kg
kg
kg
kg
kg
UND
mes
42.2026
40.1391
1.0000
51.0134
1.0000
1,237.7190
6.0000
3.0000
3.92
3.92
4.30
4.30
4.30
3.10
3.71
250.00
M3
M3
M3
M3
M3
gln
gln
M3
pza
pza
UND
UND
BOL
BOL
M
rll
UND
gln
kg
M3
M3
UND
p2
p2
p2
ton
gln
UND
UND
UND
UND
UND
UND
2.3855
0.6000
15.4540
46.3922
34.2263
0.4639
0.4047
53.1144
3.0880
3.0880
6.0000
1.0000
850.5135
0.5737
4.0000
3.8600
12.0000
0.2488
223.1100
0.5000
43.8710
1.0000
2.5268
391.2570
343.8675
55.7100
0.2893
16.7832
6.0000
4.0000
2.0000
10.0000
0.2468
140.00
30.00
50.00
135.00
100.00
25.00
12.00
150.00
20.00
18.00
17.50
120.00
18.90
14.00
0.15
20.00
6.00
149.00
8.00
115.00
5.50
450.00
6.30
6.30
6.30
159.00
34.80
8.75
35.00
15.00
8.50
200.00
20.00
Unidad
MANO DE OBRA
hh
hh
hh
hh
hh
MATERIALES
0202010032
0202010033
0202040010
0202040064
0202100064
0202100098
0202100099
0203030090
0203030091
0203030102
0204000000
0204000001
0204000002
0205010004
0205010007
0205010008
0205010009
0205030007
0207010033
0207010034
0210010075
0217000015
0221000000
0229030008
0229040004
0229040007
0229050013
0230460014
0230470003
0238000000
0239050000
0239050004
0243160052
0243920001
0243920004
0249040044
0254030028
0272080011
0272140002
0272140003
0272140004
0272140005
0272530080
GRASS NACIONAL
FAROLA ESFERICA CON LAMPARA DE VAPOR DE SODIO DE
ALTA PRESIN DE 70W
ALAMBRE NEGRO N8
ALAMBRE NEGRO N16
CLAVO 4"
CLAVOS
CLAVO 3/4"
FIERRO Fy=4200 KG/CM2
PERNO 3/4" X 6" C/TUERCA
ALQUILER DE LOCAL PARA OFICINA DE ALMACEN, CASETA Y
GUARDIANIA INC. SS.HH
ARENA FINA
TIERRA DE CHACRA
TIERRA SELECCIONADA CON MATERIAL ORGANICO
ARENA GRUESA
AFIRMADO DE BASE
ASFALTO RC 250
KEROSENE INDUSTRIAL
PIEDRA CHANCADA
TERMINALES PARA CABLE NYY 2x10mm2
EMPALME RECTO PARA CABLE NYY 2x10mm2
LLAVE DE GRIFO 1/2"
MURETE PORTA MEDIDOR INC. ACABADOS E=0.25m, H=1.20m
CEMENTO PORTLAND TIPO I (42.5KG)
YESO EN BOLSAS DE 25 KG
CINTA SEALIZADORA
CINTA VULCANIZANTE
PLANTA ORNAMENTAL LOCAL
PEGAMENTO PARA PVC FORDUIT
COMPOST
HORMIGON
AGUA
GIGANTOGRAFIA DE 2.40 X 3.60 M
REGLA DE MADERA
MADERA DE ENCOFRADOS
MADERA TORNILLO
FLETE TERRESTRE
PINTURA ESMALTE
TUB. PVC P/AGUA SIMPLE PRESION C-10 DE 1/2" X 5m.
CONOS DE SEGURIDAD
BANDERINES
CHALECOS DE SEGURIDAD
BANCA ORNAMENTAL
TEKNOPORT 2.40 X 1.20 X 1"
0272530091
0298010090
0298010091
0298010093
UND
M
UND
UND
9.2700
69.8000
8.0000
5.0000
1.40
21.00
1,000.00
350.00
0337010001
0348040024
0348110004
0349020007
0349020102
0349020104
0349040012
0349040023
0349040024
0349040044
0349040045
0349100007
0349520001
0349520004
0349520005
0349520100
0398010037
HERRAMIENTAS MANUALES
CAMION CISTERNA 4X2 (AGUA) 122 HP 2,000
VOLQUETE DE 10 M3
COMPRESORA NEUMATICA 76 HP 125-175 PCM
MARTILLO NEUMATICO DE 25 KG
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP
MOTONIVELADORA 125 HP
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS
CARGADOR S/LLANTAS 125 HP - 2.5YD3
RODILLO V.L.A 101-135 HP DE 10-12 Ton.
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
MIRAS Y JALONES
TEODOLITO
NIVEL
VIBRADOR DE CONCRETO 4 HP
HERRAMIENTA MANUAL
%MO
hm
hm
hm
hm
hm
hm
GLB
GLB
hm
hm
hm
HE
HE
HE
hm
%PU
0.5090
7.6461
7.7180
15.4300
15.0133
1.0335
1.0000
1.0000
2.1810
1.0335
39.2001
3.3061
3.3061
2.9602
32.7810
160.00
240.00
80.00
6.20
17.50
200.00
1,500.00
1,500.00
200.70
190.00
13.90
1.80
8.75
6.88
8.00
0398010087
HERRAMIENTAS MANUALES
%MO
EQUIPOS
Total
Fecha :
S/.
21/04/2014 01:09:38 PM
Pgina :
Parcial S/.
1,101.33
11,102.37
3,342.00
8,858.81
113.17
24,517.68
546.97
1,440.00
165.43
157.35
4.30
219.36
4.30
3,836.93
22.26
750.00
333.97
18.00
772.70
6,262.95
3,422.63
11.60
4.86
7,967.16
61.76
55.58
105.00
120.00
16,074.71
8.03
0.60
77.20
72.00
37.07
1,784.88
57.50
241.29
450.00
15.92
2,464.92
2,166.37
8,857.89
10.07
146.85
210.00
60.00
17.00
2,000.00
4.94
12.98
1,465.80
8,000.00
1,750.00
102,360.47
758.03
81.44
1,835.06
617.44
95.67
262.73
206.70
1,500.00
1,500.00
437.73
196.37
544.88
5.95
28.93
20.37
262.25
0.00
109.88
8,683.39 111,062.30
135,561.54
21/04/2014 01:09:38 PM
Presupuesto
CREACION DEL BOULEVARD PEATONAL EN LA PROLONGACION DE LA AVENIDA
WENCESLAO GALVEZ DEL BARRIO SAN MIGUEL EN EL DISTRITO DE CACHICADAN,
SANTIAGO DE CHUCO - LA LIBERTAD"
Item
Descripcin
01
02
03
05
06
07
08
09
10
GRADERIA
SARDINELES
EMPEDRADO
PILETA
BALCON
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
MOBILIARIO URBANO
AREAS VERDES
COSTO DIRECTO
Gastos Generales (10%)
Costo de Obra
Mitigacion (2%)
Costo de expediente
Supervision (6%CD)
MONTO TOTAL DE INVERSION
Parcial S/.
27,494.53
15,077.34
26,637.95
8,629.90
42,269.48
982.88
728.62
19,548.28
3,164.98
144,533.96
14,453.40
158,987.36
2,890.68
6,000.00
8,672.04
176,550.07
Presupuesto
CREACION DEL BOULEVARD PEATONAL EN LA PROLONGACION DE LA
AVENIDA WENCESLAO GALVEZ DEL BARRIO SAN MIGUEL EN EL DISTRITO DE
CACHICADAN, SANTIAGO DE CHUCO - LA LIBERTAD"
Item
Descripcin
01
02
03
04
05
06
07
08
09
GRADERIA
SARDINELES
PISO DE CONCRETO
PILETA
BALCON
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
MOBILIARIO URBANO
AREAS VERDES
COSTO DIRECTO
Gastos Generales (10%)
Costo de Obra
Mitigacion (2%)
Costo de expediente
Supervision (6%CD)
MONTO TOTAL DE INVERSION
Parcial S/.
26,145.42
14,215.32
22,197.30
8,446.15
40,151.03
982.88
728.62
19,548.28
3,164.98
135,579.98
13,558.00
149,137.98
2711.60
6000.00
8134.80
165,984.38
PARMETROS
Poblacin Ao 2007 (hab.)
Nmero de Viviendas
Tasa de Crecimiento Promedio Anual (%)
Densidad Poblacional (hab./viv.)
VALOR
2,339
468
2.50%
5
ANALISIS DE LA DEMANDA
ESTIMACIONES Y PROYECCIONES DE LA POBLACION 2014-2024
N DE
HABITANTES
AO
POBLACION ACTUAL
2014
2,780
AOS
HABITANTES
2015
2,850
2007
2339
2016
2,921
2008
2397
2017
2,994
2009
2457
2018
3,069
2010
2519
2019
3,146
2011
2582
2020
3,224
2012
2646
2021
3,305
2013
2713
2022
3,388
2014
2780
2023
3,472
10
2024
3,559
3,155
CACHICADAN
Ao
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
ANALISIS DE LA DEMANDA
OFERTA SIN
PROYECTO
(5%)
DEMANDA
INSATISFECHA
SIN PROYECTO
573
278
2,502
588
285
2,565
602
292
2,629
617
299
2,695
633
307
649
N DE
HABITANTES
N DE
FAMILIAS
2014
2,780
573
2015
2,850
588
2016
2,921
602
2017
2,994
617
2,762
2018
3,069
633
315
2,831
2019
3,146
649
665
322
2,902
2020
3,224
665
681
330
2,974
2021
3,305
681
698
339
3,049
2022
3,388
698
716
347
3,125
2023
3,472
716
734
356
3,203
10
2024
3,559
734
3,155
651
651
Poblacin
5964
6108
6249
6386
6523
6658
6789
6922
7051
7180
7311
7442
7573
7704
7835
7964
AO
Promedio Anual 10
Aos
Und.
PLANTEAMIENTO TCNICO
PARTIDAS DESAGREGADAS
PARTIDAS DESAGREGADAS
m2
212.75
SARDINELES
72.07
PILETA
Und
m2
47.74
PILETA
REVESTIMIENTO CON PIEDRA LABRADA
MURO DE CONTENCION
17.81
MURO DE CONTENCION
INSTALACIONES SANITARIAS
pto
POSTE ORNAMENTAL
und
10
POSTE ORNAMENTAL
BANCAS ORNAMENTALES
und
10
BANCAS ORNAMENTALES
BOTADEROS DE BASURA
und
AREAS VERDES
m2
4
86.82
Und.
SIN
PROYECTO
PARTIDAS DESAGREGADAS
PISO DE PIEDRA LAJA (EN GRADAS)
m2
60.00
SARDINELES
104.00
AREAS VERDES
m2
25
INSTALACIONES SANITARIAS
BOTADEROS DE BASURA
AREAS VERDES
Und.
SIN PROYECTO
m2
DETERIORADO
212.75
72.07
DETERIORADO
Und
NO TIENE
m2
NO TIENE
47.74
17.81
NO TIENE
pto
NO TIENE
und
NO TIENE
10
und
NO TIENE
10
und
NO TIENE
m2
ESCASO
86.82
Actividad
PARTIDAS GENERALES
MANTENIMIENTO DE AREAS VERDES
Unid.
Costos
Cant.
M2
Unitario
1.00
Parcial
2,000.00
2,000.00
A PRECIO.S.
Actividad
Unid.
Costos
Cant.
Unitario
Parcial
1.02
PARTIDAS GENERALES
PISO DE PIEDRA LAJA
M2
4.26
114.83
488.60
1.05
mes
12
160.00
1,920.00
1.07
MANTENIMIENTO DE PILETA
GlB.
300.00
300.00
1.08
M2
86.82
13.62
1,182.49
1.09
OTROS IMPREVISTOS
GlB.
250.00
250.00
Costo Directo
Gastos Generales 10%
Sub Total
IGV 18 %
Total
Actividad
PARTIDAS GENERALES
PISO DE PIEDRA LAJA
REVESTIMIENTO CON PIEDRA LABRADA
MANTENIMIENTO DE MOBILIARIOS
LUMINARIA ORNAMENTAL C. LAMPARA
MANTENIMIENTO DE PILETA
TRATAMIENTO DE AREAS VERDES
OTROS IMPREVISTOS
Unid.
M2
M2
Glb.
Glb.
Glb.
M2
Glb.
Costo Directo
Gastos Generales 10%
Sub Total
Costos
Cant.
Unitario
10.64
1.43
1
1
1
86.82
1
114.83
75.14
500.00
350.00
500.00
15.00
300.00
Parcial
1,221.50
107.62
500.00
350.00
500.00
1,302.30
300.00
IGV 18 %
Total
Actividad
Unid.
Costos
Cant.
Unitario
Parcial
1.02
PARTIDAS GENERALES
PISO DE CERAMICO 30 X 30
M2
31.91
81.20
1.03
M2
7.16
67.50
483.37
1.05
mes
12
160.00
1,920.00
1.07
MANTENIMIENTO DE PILETA
GlB.
250.00
250.00
1.08
M2
86.82
13.62
1,182.49
1.09
OTROS IMPREVISTOS
300.00
300.00
GlB.
Costo Directo
2,591.30
Actividad
Unid.
Costos
Cant.
Unitario
Parcial
PARTIDAS GENERALES
1.02
PISO DE CERAMICO 30 X 30
M2
42.55
1.03
M2
1.04
MANTENIMIENTO DE MOBILIARIOS
GlB.
1.05
GlB.
1.07
MANTENIMIENTO DE PILETA
GlB.
1.08
M2
1.09
OTROS IMPREVISTOS
GlB.
81.2
3,455.06
9.55
67.5
644.49
500.00
500.00
350
350.00
300.00
300.00
86.82
15
1,302.30
500.00
500.00
Costo Directo
Gastos Generales 10%
Sub Total
IGV 18 %
Total
N DE LA AVENIDA
DE CACHICADAN,
TO
Costo Total
2,000.00
1,500.00
N DE LA AVENIDA
DE CACHICADAN,
OYECTO
Costo Total
4,141.09
4,141.09
414.11
4,555.20
819.94
5,375.13
4,031.35
ROYECTO
Costo Total
4,281.42
4,281.42
428.14
4,709.56
847.72
5,557.28
4,167.96
N DE LA AVENIDA
DE CACHICADAN,
OYECTO
Costo Total
6,727.15
6,727.15
672.72
7,399.87
1,331.98
8,731.84
6,548.88
ROYECTO
Costo Total
7,051.85
7,051.85
705.19
7,757.04
1,396.27
9,153.30
6,864.98
0.8696
0.6
MANO DE OBRA
0.20
Materiales y Herramientas
0.8404
MAT. Y HERRM.
0.80
Costos Operacionales
0.8928
Expediente Tcnico
0.9091
Costo Directo
144,533.96
Supervisin
0.9091
Mano de Obra
29,145.40
Mat. y Herrm.
115,388.56
A PRECIOS PRIVADOS
PARTIDAS
MANO DE OBRA CALIFICADA
SOCIAL
TOTAL
19,637.39
TOTAL
0.8696
17,076.67
9,508.01
0.6
5,704.81
MATERIALES Y HERRAMIENTAS
115,388.56
0.8404
96,972.55
14,453.40
0.8928
12,903.99
MITIGACIN 2%
2,890.68
0.9091
2,627.92
EXPEDIENTE TCNICO
6,000.00
0.9091
5,454.60
SUPERVISIN DE OBRA 6%
8,672.04
0.9091
7,883.75
176,550.07
148,624.28
0.8696
0.6
MANO DE OBRA
0.18
Materiales y Herramientas
0.8404
MAT. Y HERRM.
0.82
Costos Operacionales
0.8928
Expediente Tcnico
0.9091
Costo Directo
135,579.98
Supervisin
0.9091
Mano de Obra
24,517.68
Mat. y Herrm.
111,062.30
A PRECIOS PRIVADOS
PARTIDAS
MANO DE OBRA CALIFICADA
SOCIAL
TOTAL
15,658.87
TOTAL
0.8696
13,616.95
8,858.81
0.6
5,315.29
MATERIALES Y HERRAMIENTAS
111,062.30
0.8404
93,336.76
13,558.00
0.8928
12,104.58
MITIGACIN 2%
2,711.60
0.9091
2,465.12
EXPEDIENTE TCNICO
6,000.00
0.9091
5,454.60
SUPERVISIN DE OBRA 6%
8,134.80
0.9091
7,395.35
165,984.38
139,688.64
PERIODO EN AOS
0
176,550.07
5,375.13
5,375.13
5,375.13
5,375.13
176,550.07
5,375.13
5,375.13
5,375.13
5,375.13
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
174,550.07
3,375.13
3,375.13
3,375.13
3,375.13
ETAPA PREOPERATIVA
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA
19,637.39
9,508.01
MATERIALES Y HERRAMIENTAS
115,388.56
14,453.40
MITIGACIN 2%
2,890.68
EXPEDIENTE TCNICO
6,000.00
SUPERVISIN DE OBRA 6%
8,672.04
ETAPA OPERATIVA
B) COSTOS DE OPERACIN Y MANTENIMIENTO
C) COSTOS CON PROYECTO (A+B)
D) COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
E) TOTAL COSTOS INCREMENTALES (C-D)
TASA DE DESCUENTO
VACT
=
=
10%
200,882.02
PERIODO EN AOS
0
165,984.38
8,731.84
8,731.84
8,731.84
8,731.84
165,984.38
8,731.84
8,731.84
8,731.84
8,731.84
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
6,731.84
6,731.84
6,731.84
6,731.84
ETAPA PREOPERATIVA
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA
15,658.87
8,858.81
MATERIALES Y HERRAMIENTAS
111,062.30
13,558.00
MITIGACIN 2%
2,711.60
EXPEDIENTE TCNICO
6,000.00
SUPERVISIN DE OBRA 6%
8,134.80
ETAPA OPERATIVA
B) COSTOS DE OPERACIN Y MANTENIMIENTO
C) COSTOS CON PROYECTO (A+B)
D) COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
E) TOTAL COSTOS INCREMENTALES (C-D)
TASA DE DESCUENTO
VACT
163,984.38
=
=
10%
214,561.10
PERIODO EN AOS
0
148,624.28
ETAPA PREOPERATIVA
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA
17,076.67
5,704.81
96,972.55
12,903.99
MITIGACIN 2%
2,627.92
EXPEDIENTE TCNICO
5,454.60
SUPERVISIN DE OBRA 6%
7,883.75
ETAPA OPERATIVA
B) COSTOS DE OPERACIN Y MANTENIMIENTO
C) COSTOS CON PROYECTO (A+B)
D) COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
E) TOTAL COSTOS INCREMENTALES (C-D)
TASA DE DESCUENTO
VACT
4,031.35
4,031.35
4,031.35
4,031.35
148,624.28
4,031.35
4,031.35
4,031.35
4,031.35
1,500.00
1,500.00
1,500.00
1,500.00
1,500.00
2,531.35
2,531.35
2,531.35
2,531.35
147,124.28
=
=
10%
166,873.25
PERIODO EN AOS
0
139,688.64
6,548.88
6,548.88
6,548.88
6,548.88
139,688.64
6,548.88
6,548.88
6,548.88
6,548.88
1,500.00
1,500.00
1,500.00
1,500.00
1,500.00
138,188.64
5,048.88
5,048.88
5,048.88
5,048.88
ETAPA PREOPERATIVA
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA
13,616.95
5,315.29
93,336.76
12,104.58
MITIGACIN 2%
2,465.12
EXPEDIENTE TCNICO
5,454.60
SUPERVISIN DE OBRA 6%
7,395.35
ETAPA OPERATIVA
B) COSTOS DE OPERACIN Y MANTENIMIENTO
C) COSTOS CON PROYECTO (A+B)
D) COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
E) TOTAL COSTOS INCREMENTALES (C-D)
TASA DE DESCUENTO
VACT
=
=
10%
176,121.18
10
10,932.42
5,375.13
5,375.13
5,375.13
5,375.13
10,932.42
10,932.42
5,375.13
5,375.13
5,375.13
5,375.13
10,932.42
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
8,932.42
3,375.13
3,375.13
3,375.13
3,375.13
8,932.42
10
ES ALTERNATIVA N 02
MERCADO )
PERIODO EN AOS
5
0
17,885.14
8,731.84
8,731.84
8,731.84
8,731.84
17,885.14
17,885.14
8,731.84
8,731.84
8,731.84
8,731.84
17,885.14
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
15,885.14
6,731.84
6,731.84
6,731.84
6,731.84
15,885.14
10
8,199.31
4,031.35
4,031.35
4,031.35
4,031.35
8,199.31
8,199.31
4,031.35
4,031.35
4,031.35
4,031.35
8,199.31
1,500.00
1,500.00
1,500.00
1,500.00
1,500.00
1,500.00
6,699.31
2,531.35
2,531.35
2,531.35
2,531.35
6,699.31
10
ES ALTERNATIVA N 02
SOCIAL )
PERIODO EN AOS
5
0
13,413.86
6,548.88
6,548.88
6,548.88
6,548.88
13,413.86
13,413.86
6,548.88
6,548.88
6,548.88
6,548.88
13,413.86
1,500.00
1,500.00
1,500.00
1,500.00
1,500.00
1,500.00
11,913.86
5,048.88
5,048.88
5,048.88
5,048.88
11,913.86
PRIVADO
Evaluacin:
Evaluacin:
INDICADORES DE
ALTERNATIVA
ALTERNATIVA
INDICADORES DE
EVALUACIN
N 01
N 02
EVALUACIN
VACT
200,882.02
214,561.10
VACT
BENEFICIARIOS (PA)
3,155
3,155
BENEFICIARIOS (PA)
CE
63.67
68.00
CE
SOCIAL
aluacin:
INDICADORES DE
ALTERNATIVA
ALTERNATIVA
EVALUACIN
N 01
N 02
VACT
166,873.25
176,121.18
BENEFICIARIOS (PA)
3,155
3,155
CE
52.89
55.82
Anlisis de Sensibilidad:
SOCIAL
PRIVADO
VARIACION DE
COSTOS DE
INVERSION
CE
VARIACION DE
COSTOS DE
INVERSION
VACT
CE
VACT
-20%
5025432.52
337.52
5761447.73
VACT
386.95
-20%
133,498.60
-15%
5339522.05
358.61
6121538.22
411.13
-15%
141,842.26
-10%
5653611.58
-5%
5967701.12
379.71
6481628.7
435.32
-10%
150,185.92
400.8
6841719.18
459.5
-5%
0%
158,529.58
6281790.65
421.9
7201809.67
483.69
0%
166,873.25
5%
6595880.18
442.99
7561900.15
507.87
5%
175,216.91
10%
6909969.71
464.09
7921990.63
532.05
10%
183,560.57
15%
7224059.25
485.18
8282081.12
556.24
15%
191,904.23
20%
7538148.78
506.28
8642171.6
580.42
20%
200,247.90
Alternativa N 01
Alternativa N 02
Alternativa N 01
SOCIAL
Alternativa N 01
Alternativa N 02
CE
VACT
CE
42.31
140,896.95
44.65
44.95
149,703.01
47.45
47.60
158,509.07
50.24
50.24
167,315.12
53.03
52.89
176,121.18
55.82
55.53
184,927.24
58.61
58.18
193,733.30
61.40
60.82
202,539.36
64.19
63.46
211,345.42
66.98
Evaluacin:
INDICADORES DE
ALTERNATIVA
EVALUACIN
N 01
ICE - SNIP
VACT
166,873.25
ALTER. N 01
BENEFICIARIOS (PA)
3,155
52.89
CE
52.89
ALTERNATIVA N 01
Precios
Costos
Privados
176,550.07
Proyecto incluido Estudios
Operacin y Mantenimiento
Rutinario
5,375.13
Periodico
5,557.28
Precios
Sociales
148,624.28
4,031.35
4,167.96
CRONOGRAMA ALTERNATIVA N 01
Obra
Formula
PARTIDAS GENERALES
Cliente
Localidad
CACHICADAN
Item
Descripcin
MESES
1
TOTAL
METAS FISICAS
1
GRADERIA
SARDINELES
PISO DE PIEDRA
PILETA
BALCON
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
MOBILIARIO URBANO
AREAS VERDES
ESTUDIOS Y OTROS
MITIGACIN
COSTOS OPERACIONALES
EXPEDIENTE TCNICO
SUPERVISIN DE OBRA
70.00
80.00
50.00
30.00
70.00
60.00
Descripcin
20.00
30.00
30.00
20.00
100.00
80.00
35.00
34.00
33.00
33.00
32.00
33.00
33.30
38.09
33.30
29.47
33.40
29.04
100.00
Item
30.00
20.00
30.00
70.00
40.00
30.00
40.00
3.40
MESES
1
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
TOTAL
METAS FINANCIERAS
1
GRADERIA
SARDINELES
PISO DE PIEDRA
PILETA
BALCON
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
MOBILIARIO URBANO
AREAS VERDES
ESTUDIOS Y OTROS
MITIGACIN
COSTOS OPERACIONALES
EXPEDIENTE TCNICO
SUPERVISIN DE OBRA
19,246.17
12,061.87
13,318.98
12,680.84
688.02
437.17
8,248.36
3,015.47
7,991.39
6,040.93
16,907.79
294.86
291.45
5,327.59
2,588.97
12,680.84
633.00
19,548.28
2,531.98
1,011.74
4,914.15
953.92
4,769.62
925.02
4,769.62
2,887.79
67,246.73
2,887.79
52,034.58
2,896.46
51,268.77
6,000.00
6,000.00
27,494.53
15,077.34
26,637.95
8,629.90
42,269.48
982.88
728.62
19,548.28
3,164.98
2,890.68
14,453.40
6,000.00
8,672.04
176,550.07