You are on page 1of 12

RESUMEN GENERAL

VALORIZACION N 02 - NOVIEMBRE 2013

Obra

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"

Contratista : PROYCON

Cliente
Ubicacin

: MUNICIPALIDAD DE CERRO COLORADO


: AREQUIPA - AREQUIPA - CERRO COLORADO

SECCION
01

DESCRIPCION

MONTOS
CONTRATADO

ACUMULADO ACTUAL
DEL CONTRATO

ADICIONALES

ACUMULADO ANTERIOR
TOTAL

DEL CONTRATO

ADICIONALES

EN EL PERIODO
TOTAL

DEL CONTRATO

ADICIONALES

TOTAL

EJECUCION DE OBRAS

1,024,117.05

756,429.38

0.00

756,429.38

477,956.53

0.00

477,956.53

278,472.85

0.00

278,472.85

TOTAL A VALORIZAR

1,024,117.05

756,429.38

0.00

756,429.38

477,956.53

0.00

477,956.53

278,472.85

0.00

278,472.85

0.00

0.00

0.00

0.00

0.00

0.00

756,429.38

477,956.53

REINTEGROS
VALORIZACION BRUTA

0.00

0.00

477,956.53

278,472.85

0.00

278,472.85

MENOS:

AMORTIZACION POR ADELANTO DIRECTO

0.00

0.00

0.00

0.00

0.00

0.00

MENOS:

AMORTIZACION PARA MATERIALES

0.00

0.00

0.00

0.00

0.00

0.00

VALORIZACION NETA
MAS

I.G.V. 18.00%
MONTO TOTAL A CANCELAR

MUNICIPALIDAD DE CERRO COLORADO

1,024,117.05

756,429.38

0.00

1,024,117.05

756,429.38

0.00

756,429.38

477,956.53

0.00

477,956.53

278,472.85

0.00

278,472.85

184,341.07

136,157.29

0.00

136,157.29

86,032.18

0.00

86,032.18

50,125.11

0.00

50,125.11

1,208,458.12

892,586.67

0.00

892,586.67

563,988.71

0.00

563,988.71

328,597.96

0.00

328,597.96

CONTRATISTA

SUPERVISION

VALORIZACION N 03 (DICIEMBRE 2013)


Obra
Contratista
Cliente
Lugar

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

Item
01
01.01

Descripcin

CERCO PERIMETRICO PROVISIONAL


ALMACEN, OFICINA Y CASETA DE GUARDANIA

01.01.03

CARTEL DE OBRA DE 3.60X2.40M


AGUA POTABLE Y ENERGIA ELECTRICA PARA OFICINAS
LIMPIEZA DE TERRENO MANUAL

01.02.02

TRAZO Y REPLANTEO

01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS


EXCAVACION A MANO EN TERRENO NORMAL

01.03.02

CORTE DE MATERIAL SUELTO CON RETROEXCAVADORA 62 HP

01.03.03

RELLENO MANUAL CON MATERIAL PROPIO COMPACTADO

01.03.04

PERFILADO Y COMPACTADO DE SUB RASANTE EN PISOS Y VEREDAS

01.04
01.04.01
01.04.01.01
01.04.02

ELIMINACION DE MATERIAL EXCEDENTE DM=15 Km

CONCRETO CICLOPEO CIMIENTOS CORRIDOS 1:10+30% P.G.

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS


MURO DE CONTENCION Y GRADERIAS EN LOZA- CONCRETO F'C=140 KG/CM2

01.04.03.02

ENCOFRADO Y DESENC. MUROS DE CONTENCION Y GRADERIAS DE LOZA

01.05.01

SOLADO PARA POZO CISTERNA

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

m3

352.48

137.92

m3
m2

52.76
553.04

200.54
36.44

m3
m2

125.44
369.92

240.20
24.65

m2

20.16

18.83

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

m3
m2
kg

27.71
238.56
1,769.39

269.31
32.58
3.07

m3
m2
kg

8.39
55.01
588.91

288.98
31.75
4.26

m3
m2
kg
und

6.66
73.95
284.88
616.00

281.33
37.06
3.65
2.56

VIGAS

01.05.02.01

CONCRETO EN VIGAS F'C=210 KG/CM2

01.05.02.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

01.05.03

1.35
3.54
2.60
1.63
7.60

COLUMNAS
COLUMNAS CONCRETO F'C=210 KG/CM2

01.05.02.03

503.90
4,370.36
5,933.63
3,459.23
327.93

OBRAS DE CONCRETO ARMADO

01.05.01.02
01.05.02

m3
m3
m2
m2
m3

SOLADOS

01.05.01.01
01.05.01.03

0.27
0.69
237.29

MURO DE CONTENCION Y GRADERIA LOZA

01.04.03.01

01.05

7,314.40
7,314.40
2.00

SOBRECIMIENTOS
CONCRETO CICLOPEO SOBRECIMIENTOS 1:8+25% P.M.

01.04.04.01

m2
m2
glb

CIMIENTOS

01.04.02.02

01.04.04

12.35
38.35
537.25
1,356.25

OBRAS DE CONCRETO SIMPLE

01.04.02.01
01.04.03

475.58
18.00
1.00
4.00

MOVIMIENTO DE TIERRAS

01.03.01

01.03.05

m
m2
und
mes

TRABAJOS PRELIMINARES

01.02.01
01.02.03

Precio S/.

OBRAS PRELIMINARES

01.01.02

01.02

Metrado

ESTRUCTURAS

01.01.01

01.01.04

Und.

ACERO EN VIGAS FY= 4200 KG/CM2


LOSAS ALIGERADAS

01.05.03.01

LOSA ALIGERADA - CONCRETO 210 KG/CM2

01.05.03.02

ENCOFRADO Y DESENCOFRADO DE LOSAS ALIGERADAS

01.05.03.03

ACERO EN LOSAS ALIGERADAS FY=4200 KG/CM2

01.05.03.04

LADRILLO HUECO DE ARCILLA 15X30X30CM PARA TECHO ALIGERADO

Costo al: 22/05/2012


Parcial S/.
259,083.22
12,525.96
5,873.41
690.30
537.25
5,425.00
7,496.41
1,974.89
5,046.94
474.58
39,709.59
680.27
15,471.07
15,427.44
5,638.54
2,492.27
118,976.14
48,614.04
48,614.04
30,733.27
10,580.49
20,152.78
39,249.22
30,130.69
9,118.53
379.61
379.61
80,375.12
20,666.89
7,462.58
7,772.28
5,432.03
6,679.87
2,424.54
1,746.57
2,508.76
7,231.02
1,873.66
2,740.59
1,039.81
1,576.96

AVANCE ANTERIOR
Cantidad
Parcial S/.
221,253.64
9,813.46
475.58
5,873.41
18.00
690.30
1.00
537.25
2.00
2,712.50
7,259.12
7,314.40
1,974.89
7,314.40
5,046.94
1.00
237.29
39,573.53
403.12
544.21
4,370.36
15,471.07
5,933.63
15,427.44
3,459.23
5,638.54
327.93
2,492.27
95,256.22
38,890.68
281.98
38,890.68
24,586.94
42.21
8,464.79
442.43
16,122.15
31,398.99
100.35
24,104.07
295.94
7,294.92
379.61
20.16
379.61
69,351.31
20,666.89
27.71
7,462.58
238.56
7,772.28
1,769.39
5,432.03
6,679.87
8.39
2,424.54
55.01
1,746.57
588.91
2,508.76
7,231.02
6.66
1,873.66
73.95
2,740.59
284.88
1,039.81
616.00
1,576.96

AVANCE ACTUAL
Cantidad
Parcial S/.
36,236.06
1,356.25

1.00

100.78

70.50
10.55
110.61
25.09
73.98

1,356.25

136.05
136.05

23,719.92
9,723.36
9,723.36
6,146.33
2,115.70
4,030.63
7,850.23
6,026.62
1,823.61

11,023.84

AVANCE ACUMULADO
Cantidad
Parcial S/.
257,489.67
11,169.71
475.58
5,873.41
18.00
690.30
1.00
537.25
3.00
4,068.75
7,259.12
7,314.40
1,974.89
7,314.40
5,046.94
1.00
237.29
39,709.58
503.90
680.26
4,370.36
15,471.07
5,933.63
15,427.44
3,459.23
5,638.54
327.93
2,492.27
118,976.14
48,614.04
352.48
48,614.04
30,733.27
52.76
10,580.49
553.04
20,152.78
39,249.22
125.44
30,130.69
369.92
9,118.53
379.61
20.16
379.61
80,375.12
20,666.89
27.71
7,462.58
238.56
7,772.28
1,769.39
5,432.03
6,679.87
8.39
2,424.54
55.01
1,746.57
588.91
2,508.76
7,231.02
6.66
1,873.66
73.95
2,740.59
284.88
1,039.81
616.00
1,576.96

Cantidad

SALDO
Parcial S/.
1,593.55
1,356.25

100.00
100.00
100.00
75.00

1.00

1,356.25
237.29

100.00
100.00
50.00

1.00

237.29
0.01
0.01

100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

Pg 2 de 12

VALORIZACION N 03 (DICIEMBRE 2013)


Obra
Contratista
Cliente
Lugar

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

Item
01.05.04

Descripcin
CONCRETO EN ZAPATAS F'C= 210 KG/CM2

01.05.04.02

ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS


CONCRETO EN GRADERIAS F'C=210 KG/CM2

01.05.05.02

ENCOFRADO Y DESENCOFRADO PARA GRADERIAS

01.05.06

ACERO ESTRUCTURAL TRABAJADO PARA GRADERIAS


CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2

01.05.06.02

ENCOFRADO Y DESENC. MUROS DE CONTENCION

01.05.07

ACERO EN MUROS FY= 4200 KG/CM2


CONCRETO EN PISOS REFORZADOS F'C=210 KG/CM2

01.05.07.02

ACERO EN PISOS REFORZADOS FY= 4200 KG/CM2

02.01

MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM.


MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM.
TARRAJEO PRIMARIO RAYADO

02.02.02

TARRAJEO EN MUROS MEZCLA 1:5 E=1.5 cm

02.02.03

TARRAJEO DE COLUMNAS

02.02.04

TARRAJEO DE VIGAS

02.02.05

VESTIDURA DE DERRAMES

02.02.06

TARRAJEO CON IMPERMEABILIZANTE

02.03.01
02.04
02.04.01
02.05

319.93
28.71
3.27

m3
m2
kg

7.39
73.92
321.22

315.15
19.85
3.10

m3
kg

5.26
93.52

321.19
3.10

m2
m2

139.23
23.63

47.18
77.09

m2
m2
m2
m2
m
m2
m2

100.46
922.01
83.24
29.78
71.82
33.20
154.80

12.61
19.54
25.36
45.02
32.21
23.81
54.33

REVESTIMIENTO DE COLUMNA CON SILLAR


CIELOR RASO
CIELO RASO CON MEZCLA C:A 1:5

m2

67.58

22.31

REVESTIMIENTOS DE GRADAS Y ESCALERAS


TARRAJEO DE GRADAS, GRADERIAS Y ESCALERAS

m2

467.92

19.28

m2
m2
m2
m2
m2

1,830.41
46.98
46.98
109.56
118.25

1.62
17.86
307.87
33.24
54.25

m2
m2
m2

853.67
345.52
221.83

50.29
41.62
22.10

PISOS Y PAVIMENTOS

02.05.01

NIVELACION Y APISONADO MANUAL

02.05.02

FALSO PISO DE 4" DE CONCRETO 1:10

02.05.03

PISO DE CERAMICO 30CM X 30CM

02.05.04

PISO DE CEMENTO PULIDO BRUADO E=4" S/COLOREAR

02.05.05

PISO DE PIEDRA LAJA PORFIDO AMARRE AMERCANO

02.06

71.51
146.16
886.12

MUROS Y TABIQUES DE ALBAILERIA

02.02.01

02.03

m3
m2
kg

REVOQUES ENLUCIDOS

02.01.02

02.02.07

269.43
3.59

ARQUITECTURA

02.01.01
02.02

29.50
307.99

PISOS REFORZADOS

01.05.07.01
02

m3
kg

MUROS REFORZADOS

01.05.06.01
01.05.06.03

Precio S/.

GRADERIAS

01.05.05.01
01.05.05.03

Metrado

ZAPATAS

01.05.04.01
01.05.05

Und.

VEREDAS

02.06.01

VEREDAS ESTAMPADA DE CONCRETO DE E=4" F'C=140 KG/CM2

02.06.02

VEREDAS DE CONCRETO 140 KG/CM2 E=4" C/BRUAS COLOREADAS

02.06.03

ENCOFRADO Y DESENCOFRADO PARA VEREDAS

Costo al: 22/05/2012


Parcial S/.
9,053.87
7,948.19
1,105.68
29,972.05
22,878.19
4,196.25
2,897.61
4,792.05
2,328.96
1,467.31
995.78
1,979.37
1,689.46
289.91
519,435.62
8,390.51
6,568.87
1,821.64
34,248.64
1,266.80
18,016.08
2,110.97
1,340.70
2,313.32
790.49
8,410.28
1,507.71
1,507.71
9,021.50
9,021.50
28,324.88
2,965.26
839.06
14,463.73
3,641.77
6,415.06
62,214.04
42,931.06
14,380.54
4,902.44

AVANCE ANTERIOR
Cantidad
Parcial S/.
9,053.87
29.50
7,948.19
307.99
1,105.68
20,981.34
50.06
16,015.70
102.31
2,937.32
620.28
2,028.32
3,353.41
5.17
1,629.33
51.74
1,027.04
224.85
697.04
1,384.91
3.68
1,181.98
65.46
202.93
143,190.76
5,873.23
97.46
4,598.16
16.54
1,275.07
10,335.29
40.18
506.67
368.80
7,206.35
33.30
844.49
11.91
536.19
28.73
925.39
13.28
316.20

AVANCE ACTUAL
Cantidad
Parcial S/.

60.28
126.65

8,990.72
6,862.50
1,258.93
869.29
1,438.65
699.63
440.27
298.75
594.47
507.48
86.99
183,633.45
2,517.28
1,970.71
546.57
5,901.61
760.13
2,474.74

17.87
43.09
19.92

804.51
1,387.93
474.30

21.45
43.85
265.84
2.22
22.18
96.37
1.58
28.06

41.77
7.09

549.12
37.58
46.98
22.75

1,507.71
1,507.71
5,412.86
5,412.86
16,780.69
889.57
671.18
14,463.73
756.21

1,830.41
46.98
46.98
22.75

1,507.71
1,507.71
9,021.50
9,021.50
19,024.26
2,965.26
839.06
14,463.73
756.21

512.20
207.31
133.10

37,328.44
25,758.64
8,628.33
2,941.47

682.93
276.41
177.47

49,770.97
34,344.65
11,504.27
3,922.05

67.58
187.17
1,281.29
9.40

170.73
69.10
44.37

3,608.64
3,608.64
2,243.57
2,075.69
167.88

12,442.53
8,586.01
2,875.94
980.58

AVANCE ACUMULADO
Cantidad
Parcial S/.
9,053.87
29.50
7,948.19
307.99
1,105.68
29,972.05
71.51
22,878.19
146.16
4,196.25
886.12
2,897.61
4,792.05
7.39
2,328.96
73.92
1,467.31
321.22
995.78
1,979.37
5.26
1,689.46
93.52
289.91
326,824.20
8,390.51
139.23
6,568.87
23.63
1,821.64
16,236.89
100.46
1,266.80
495.45
9,681.09
33.30
844.49
29.78
1,340.70
71.82
2,313.32
33.20
790.49

280.75

67.58
467.92

Cantidad

SALDO
Parcial S/.

100.00
100.00
100.00
100.00
100.00

0.00

100.00
100.00
100.00
100.00
100.00
192,611.42
100.00
100.00
18,011.75
100.00
53.74
40.00
100.00
100.00
100.00

426.56
49.94

8,334.99
1,266.48

154.80

8,410.28

100.00
100.00
9,300.62
100.00
100.00
100.00
20.76

80.00
80.00
80.00

86.81
118.25
170.74
69.11
44.36

2,885.56
6,415.06
12,443.07
8,586.41
2,876.27
980.39

Pg 3 de 12

VALORIZACION N 03 (DICIEMBRE 2013)


Obra
Contratista
Cliente
Lugar

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

Item
02.07

Descripcin
CONCRETO F'C=175 KG/CM2 PARA LOSAS DEPORTIVAS FONDO-PISO

02.07.02

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS DEPORTIVAS

02.08.01
02.08.02
02.09
02.09.01
02.10

SARDINEL DE CONCRETO DE F'C=175 KG/CM2


ENCOFRADO Y DESENCOFRADO EN SARDINELES
ZOCALO DE CERAMICA 30X30 CM.

PUERTA DE REJA METALICA

02.10.03

REJA METALICA

02.10.04

VENTANA DE FIERRO C/PERFIL DE 1"X1/8"FIJA+REF. "T" DE 1"

02.10.05

CERCO DE MALLA METALICA (h=1.80m)

02.10.06

MALLA PARED DE FRONTON

02.10.07

TAPA METALICA DE ACERO ESTRELLADO

02.10.08

COBERTURA DE DE MALLA RASCHEL DE H=7.5M

02.10.09

CERCO DE MALLA METALICA (h=0.90m)

02.12

COBERTURA DE DE MALLA RASCHEL EN GRADERIAS


VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS FIERRO
PINTURA LATEX EN CIELORASO 2 MANOS
PINTURA EN MUROS LATEX

02.12.03

PINTURA LATEX EN SARDINELES

02.12.04

PINTURA ANTICOR. Y ESMALTE 2 MANOS C/ANDAMIO EN FAROLAS

02.12.05

PINTURA BARNIZ

02.12.06

PINTURA ESMALTE EN MUROS


PINTURA DEMARCACION DE LOSA DEPORTIVA
JUEGO INFANTIL SUBE Y BAJA INC. COLOCACION

02.13.02

JUEGO INFANTIL PASAMANOS CURVO INC. COLOCACION

02.13.03

JUEGO INFANTIL COLUMBIO INC. COLOCACION

02.14

38.96
223.54

251.83
23.78

m2

100.46

61.10

und
m2
m2
m2
m
m2
und
GLB
m
m2

13.00
19.68
43.80
7.76
420.02
19.00
2.00
1.00
80.00
67.50

132.46
176.40
174.97
198.39
146.70
105.39
241.83
18,697.48
113.09
65.12

p2

102.94

6.33

m2
m2
m
m2
m2
m2
m

67.58
147.76
223.54
405.03
91.47
1,360.16
512.57

7.01
7.24
3.73
6.27
10.33
5.22
17.60

und
und
und
und

2.00
2.00
2.00
1.00

1,200.00
1,200.00
1,200.00
13,000.00

JUEGOS INFANTILES

02.13.01

02.13.04

m3
m2

PINTURA

02.12.02

02.13

202.62
28.95

VIDRIOS, CRISTALES Y SIMILARES

02.12.01

02.12.07

79.20
98.56

CARPINTERIA METALICA Y MADERA

02.10.02

02.11.01

m3
m2

ZOCALOS

BASURERO BASCULANTE (INC. DADOS DE CONCRETO)

02.11

Precio S/.

SARDINELES

02.10.01

02.10.10

Metrado

LOSA DEPORTIVA

02.07.01
02.08

Und.

JUEGO INFANTIL TOBOGAN MULTIPLE INC. COLOCACION


JARDINERIA

02.14.01

AREAS VERDES

02.14.01.01

EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA PARA AREAS VERDAS

02.14.01.02

SEMBRADO DE GRASS EN AREAS VERDES

02.14.01.03

SEMBRADO DE PLANTONES

02.14.02

AREAS VERDES EN CAMPO DEPORTIVO

02.14.02.01

NIVELACION Y COMPACTACION MANUAL PARA SEMBRADO DE GRAS

02.14.02.02

INSTALACION DE GRASS SINTETICO A TODO COSTO

m2
m2
und

3,082.30
3,082.30
70.00

4.70
7.83
21.87

m2
m2

1,288.00
1,288.00

30.17
64.11

Costo al: 22/05/2012


Parcial S/.
18,900.81
16,047.50
2,853.31
15,127.08
9,811.30
5,315.78
6,138.11
6,138.11
110,640.01
1,721.98
3,471.55
7,663.69
1,539.51
61,616.93
2,002.41
483.66
18,697.48
9,047.20
4,395.60
651.61
651.61
21,983.02
473.74
1,069.78
833.80
2,539.54
944.89
7,100.04
9,021.23
20,200.00
2,400.00
2,400.00
2,400.00
13,000.00
161,584.76
40,152.12
14,486.81
24,134.41
1,530.90
121,432.64
38,858.96
82,573.68

AVANCE ANTERIOR
Cantidad
Parcial S/.
18,900.81
79.20
16,047.50
98.56
2,853.31
4,538.58
11.69
2,943.89
67.06
1,594.69

AVANCE ACTUAL
Cantidad
Parcial S/.

10.40

2,219.68
1,448.02
771.66
6,138.11
6,138.11
42,380.61
1,377.58

6.21
126.02
5.20

1,231.61
18,487.13
548.03

0.80
20.00
54.00

14,957.98
2,261.80
3,516.48

5.75
32.45
100.46

41,997.84
10.00
22.00

1,764.00
3,849.34

210.00
10.00

30,807.00
1,053.90

40.00

4,523.60

AVANCE ACUMULADO
Cantidad
Parcial S/.
18,900.81
79.20
16,047.50
98.56
2,853.31
6,758.26
17.44
4,391.91
99.51
2,366.35
6,138.11
100.46
6,138.11
84,378.45
10.40
1,377.58
10.00
1,764.00
22.00
3,849.34
6.21
1,231.61
336.02
49,294.13
15.20
1,601.93
0.80
60.00
54.00

14,957.98
6,785.40
3,516.48

Cantidad

100.00
100.00
44.76
44.52

21.52
124.03

202.52

1,269.77

80.00
50.81
50.23
80.00
80.00
80.00
80.00
75.00
80.00

2.60
9.68
21.80
1.55
84.00
3.80
2.00
0.20
20.00
13.50

1,269.77

202.52

1,269.77

50.00

67.58
147.76
223.54
202.52
91.47
1,360.16
512.57
2.00
2.00
2.00
1.00

38,858.96
1,541.15

1,288.00

38,858.96
38,858.96

56,787.62
7,243.41
7,243.41

1,541.15

95,646.58
7,243.41
7,243.41

50.00

1,288.00
772.80

88,403.17
38,858.96
49,544.21

100.00
60.00

49,544.21
772.80

49,544.21

8,368.82
5,419.39
2,949.43

100.00

102.94
1,269.77

SALDO
Parcial S/.

1,541.15
3,082.30
70.00

515.20

26,261.56
344.40
1,707.55
3,814.35
307.90
12,322.80
400.48
483.66
3,739.50
2,261.80
879.12
651.61
651.61
20,713.25
473.74
1,069.78
833.80
1,269.77
944.89
7,100.04
9,021.23
20,200.00
2,400.00
2,400.00
2,400.00
13,000.00
65,938.18
32,908.71
7,243.40
24,134.41
1,530.90
33,029.47
33,029.47

Pg 4 de 12

VALORIZACION N 03 (DICIEMBRE 2013)


Obra
Contratista
Cliente
Lugar

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

Item
02.15

Descripcin
JUNTAS ASFALTICAS

02.15.02

JUNTA SISMICA DE TECKNOPORT DE 1"

02.15.03

BANCAS ORNAMENTALES (METAL-MADERA)

02.15.04

PERGOLA (METAL-MADERA) CON COBERTURA DE POLIPROPENO

02.15.05

PERFILADO DE TALUDES

02.15.06

LIMPIEZA DE OBRA

02.15.07

CONSTRUCCION DE SILO PERCOLADOR D=1.5 H=3m

03.01

EXCAVACION ZANJAS P/RED ELECTRICA H=1.00 M


RELLENO CON MATERIAL PROPIO
CABLE ELECTRICO NYY 2 X 6 MM2.

03.02.02

CABLE ELECTRICO NYY 2 X 10 MM2.

03.02.03

ACOMETIDA

03.02.04

MEDIDOR DE LUZ

03.02.05

EMPALME UNIPOLAR P/CABLE NYY 6-35 mm2

03.02.06

POSTE DE C.A.C DE 9/200

03.02.07

PASTORAL DE 2 BRAZOS DE 70W C/U

03.02.08

BASE PORTAFUSIBLES BIPOLAR 15


POSTE METALICO DE H=7.00 X4"e=4mm METALICO INC/REFLECTOR
SALIDA DE TECHO (CENTRO DE LUZ) 2.5MM2 TW

03.03.02

SALIDA PARA TOMACORRIENTE SIMPLE

03.04

INTERRUPTOR SIMPLE
TUBERIA PVC - SAP 25 MM

03.04.02

TUBERIA PVC - SEL 20 MM

03.05.01
03.06

4.72
14.58

m
m
m
und
und
und
und
und
und

114.70
547.60
59.00
1.00
3.00
10.00
20.00
10.00
12.00

11.94
1.26
1.58
204.82
31.64
250.00
232.63
4.50
936.60

pto
pto
pto

6.00
6.00
8.00

65.42
109.60
13.44

m
m

4.00
54.79

115.17
112.23

CABLE TW DE 2.5 MM2

54.79

0.95

ARTEFACTOS
PORTALAMPARA BAKELITA ROSCA TICINO P/LAMPARA INCAND. O AHORR.

03.06.02

PLAMPARA AHORRADORA ESPIRAL DE 42 W

03.06.03

INTERRUPTOR SIMPLE

03.06.04

TOMACORRIENTE SIMPLE UNIPOLAR

04.01

120.31
120.31

CONDUCTORES Y CABLES

03.06.01

04

m3
m3

CANALIZACION Y/O TUBERIAS

03.04.01
03.05

7.10
6.46
510.00
63.10
1.62
222.11
1,068.40

SALIDA PARA ELECTRICIDAD Y FUERZA

03.03.01
03.03.03

738.66
112.10
12.00
98.17
162.29
4.00
1.00

ACOMETIDA Y ALUMBRADO PUBLICO

03.02.01

03.03

m
m
und
m2
m2
mes
und

MOVIMIENTO DE TIERRAS

03.01.02

03.02.09

Precio S/.

INSTALACIONES ELECTRICAS

03.01.01
03.02

Metrado

VARIOS

02.15.01

03

Und.

und
und
pza
pto

6.00
6.00
6.00
8.00

35.00
15.00
13.44
110.85

INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACESORIOS SANITARIOS

04.01.01

INODORO TANQUE BAJO BLANCO

04.01.02

LAVATORIO DE PARED DE COLOR 1 LLAVE

04.01.03

DUCHAS CROMADAS DE CABEZA GIRATORIA Y LLAVE MEZCLADORA


URINARIOS DE LOZA DE PICO BLANCO

pza
pza
pza
pza

4.00
8.00
4.00
5.00

206.63
145.00
137.90
165.00

Costo al: 22/05/2012


Parcial S/.
20,502.94
5,244.49
724.17
6,120.00
6,194.53
262.91
888.44
1,068.40
32,298.13
2,321.98
567.86
1,754.12
20,889.26
1,369.52
689.98
93.22
204.82
94.92
2,500.00
4,652.60
45.00
11,239.20
1,157.64
392.52
657.60
107.52
6,609.76
460.68
6,149.08
52.05
52.05
1,267.44
210.00
90.00
80.64
886.80
19,681.69
3,363.12
826.52
1,160.00
551.60
825.00

AVANCE ANTERIOR
Cantidad
Parcial S/.
4,391.31

6.00

AVANCE ACTUAL
Cantidad
Parcial S/.
5,389.07
126.90
900.99
112.10
724.17

3,060.00

162.29

262.91

1.00

1,068.40
3,305.44

49.09

3,097.58

3.00

666.33
9,891.00

AVANCE ACUMULADO
Cantidad
Parcial S/.
9,780.38
126.90
900.99
112.10
724.17
6.00
3,060.00
49.09
3,097.58
162.29
262.91
3.00
666.33
1.00
1,068.40
13,196.44

%
17.18
100.00
50.00
50.01
100.00
75.00
100.00

SALDO
Parcial S/.
10,722.56
611.76
4,343.50

Cantidad

6.00
49.08

3,060.00
3,096.95

1.00

222.11

120.31
120.31
7,492.80

8.00
6.00
6.00
6.00
2.00
27.40

7,492.80
1,130.76
392.52
657.60
80.64

3,305.44
230.34
3,075.10

7,492.80

8.00
6.00
6.00
6.00
2.00
27.40

7,492.80
1,130.76
392.52
657.60
80.64
3,305.44
230.34
3,075.10

66.67

114.70
547.60
59.00
1.00
3.00
10.00
20.00
10.00
4.00

100.00
100.00
75.00

2.00

50.00
50.01

2.00
27.39
54.79

6.00
6.00
6.00
8.00
5,068.29
4.00
8.00
4.00
5.00

1,267.44
210.00
90.00
80.64
886.80
5,940.98
3,363.12
826.52
1,160.00
551.60
825.00

6.00
6.00
6.00
8.00

4.00
8.00
4.00
5.00

1,267.44
210.00
90.00
80.64
886.80
11,009.27
3,363.12
826.52
1,160.00
551.60
825.00

19,101.69
2,321.98
567.86
1,754.12
13,396.46
1,369.52
689.98
93.22
204.82
94.92
2,500.00
4,652.60
45.00
3,746.40
26.88

26.88
3,304.32
230.34
3,073.98
52.05
52.05

100.00
100.00
100.00
100.00
8,672.42
100.00
100.00
100.00
100.00

Pg 5 de 12

VALORIZACION N 03 (DICIEMBRE 2013)


Obra
Contratista
Cliente
Lugar

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

Item
04.02
04.02.01

Descripcin

SALIDAS DE PVC SAL PARA DESAGUE DE 4"


SALIDAS DE PVC SAL PARA DESAGUE DE 2"

04.02.01.03

SALIDAS DE PVC SAL PARA VENTILACION DE 2"


BAJADA PARA LLUVIA PVC SAL 2"
TUBERIA DE PVC SAL 4"

04.02.02.02

TUBERIA DE PVC SAL 2"


YEE PVC SAL 4"X2"

04.02.03.02

REDUCCION DE PVC SAL SP DE 4"-2"

04.02.03.03

YEE PVC SAL 2"

04.02.03.04

CODO PVC SAL 2"X90

04.02.04

TEE PVC-SAL SANITARIA 4"


SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION

04.02.04.02

REGISTRO ROSCADOS CROMADO DE 4"

04.02.05
04.02.05.01
04.03

SOMBRERO VENTILACION PVC DE 2"


CAJA DE REGISTRO DE DESAGUE 12" X 24"

04.03.02

REDES DE DISTRIBUCION

04.03.02.01

TUBERIA PVC CLASE 10 SP 1/2"

04.03.02.02

TUBERIA PVC CLASE 10 SP 3/4"


VALVULA DE COMPUERTA DE BRONCE 1/2"

04.03.03.02

VALVULA DE COMPUERTA DE BRONCE 3/4"

04.04

14.00
6.00
4.00
14.00
8.00

14.80
3.00
3.53
16.30
16.60

und
und
pza

12.00
2.00
4.00

36.48
31.27
10.32

pza

8.00

188.35

pto

20.00

75.97

m
m

37.84
66.30

9.38
9.86

und
und

4.00
1.00

50.25
36.11

CAJA PREFABRICADA

pza

5.00

48.50

SISTEMA DE RIEGO
EXCAVACION ZANJAS P/RED ELECTRICA H=1.00 M

04.04.02

RELLENO CON MATERIAL PROPIO

04.04.03

SALIDA DE AGUA FRIA 3/4"

04.04.04

REDES DE DISTRIBUCION

04.04.05

TUBERIA DE PVC A-10 SP DE 2"

04.04.06

LLAVES Y VALVULAS

04.04.06.01

VALVULA DE COMPUERTA DE BRONCE 3/4"

04.04.06.02

VALVULA DE COMPUERTA 2"

04.04.07.01

pza
und
pza
pza
und

CAJAS METALICAS

04.04.01

04.04.07

18.25
17.44

LLAVES Y VALVULAS

04.03.03.01

04.03.04.01

16.20
39.34

SISTEMA DE AGUA FRIA


SALIDA DE AGUA FRIA 3/4"

04.03.04

m
m

CAMARAS DE INSPECCION

04.03.01

04.03.03

61.49
55.89
53.57
14.21

ADITAMIENTOS VARIOS

04.02.04.01
04.02.04.03

4.00
13.00
4.00
4.00

ACCESORIOS DE REDES

04.02.03.01

04.02.03.05

pto
pto
pto
pto

REDES DE DISTRIBUCION

04.02.02.01
04.02.03

Precio S/.

SALIDAS DE DESAGUE

04.02.01.02

04.02.02

Metrado

INSTALACIONES SANITARIAS

04.02.01.01

04.02.01.04

Und.

m3
m3
pto

78.75
78.75
12.00

4.72
14.58
75.97

315.00

8.71

und
und

12.00
1.00

36.11
47.35

pza

12.00

48.50

CAJAS METALICAS
CAJA PREFABRICADA

Costo al: 22/05/2012


Parcial S/.
4,874.09
1,243.65
245.96
726.57
214.28
56.84
981.74
295.65
686.09
600.32
207.20
18.00
14.12
228.20
132.80
541.58
437.76
62.54
41.28
1,506.80
1,506.80
3,007.67
1,519.40
1,008.66
354.94
653.72
237.11
201.00
36.11
242.50
242.50
8,436.81
371.70
1,148.18
911.64
2,743.65
2,743.65
480.67
433.32
47.35
582.00
582.00

AVANCE ANTERIOR
Cantidad
Parcial S/.
1,843.97
1,243.65
4.00
245.96
13.00
726.57
4.00
214.28
4.00
56.84

AVANCE ACTUAL
Cantidad
Parcial S/.
1,523.32

16.20
39.34
14.00
6.00
4.00
14.00
8.00

981.74
295.65
686.09

600.32
207.20
18.00
14.12
228.20
132.80
12.00
2.00
4.00

541.58
437.76
62.54
41.28

AVANCE ACUMULADO
Cantidad
Parcial S/.
3,367.29
1,243.65
4.00
245.96
13.00
726.57
4.00
214.28
4.00
56.84
981.74
16.20
295.65
39.34
686.09
600.32
14.00
207.20
6.00
18.00
4.00
14.12
14.00
228.20
8.00
132.80
541.58
12.00
437.76
2.00
62.54
4.00
41.28

Cantidad

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
8.00

20.00
37.84
10.00
4.00

1,054.54
400.00
453.54
354.94
98.60
201.00
201.00

20.00
37.84
10.00
4.00

1,054.54
400.00
453.54
354.94
98.60
201.00
201.00

100.00
100.00
15.08

315.00
12.00
1.00

2,743.65
2,743.65
480.67
433.32
47.35

555.12
36.11

1.00

78.75
78.75
12.00

36.11
242.50
242.50
5,212.49
371.70
1,148.18
911.64

12.00

582.00
582.00

100.00

3,224.32

315.00
12.00
1.00

2,743.65
2,743.65
480.67
433.32
47.35

1,506.80
1,506.80
1,953.13
1,119.40
555.12

56.30

5.00
3,224.32

SALDO
Parcial S/.
1,506.80

100.00
100.00
100.00

Pg 6 de 12

VALORIZACION N 03 (DICIEMBRE 2013)


Obra
Contratista
Cliente
Lugar

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

Item
04.04.08
04.04.08.01
04.04.08.02
05
05.01
05.01.01
05.02

Descripcin
MEDIDOR DE PISO
PRUEBA HIDRAULICA SISTEMA DE RIEGO

EXCAVACION PARA CIMIENTOS HASTA 1.20 MT TERRENO NORMAL

ENCOFRADO Y DESENC. NORMAL PARA DADOS

m3

21.06

7.97

m3
m3
m2

21.06
6.50
52.00

137.92
197.63
28.01

TARRAJEO DE DADOS DE CONCRETO

m2

52.00

30.60

CARPINTERIA METALICA
COLUMNA METALICA TIPO RECTANGULAR PLANCHA 3/16'' - 1/8''

05.04.02

VIGA METALICA TIPO CUADRADA V-1, 4'' x 4'' x 2.5 mm

05.05

211.32
6.31

REVOQUES ENLUCIDOS Y MOLDURAS

05.04.01
05.04.03

1.00
315.00

OBRAS DE CONCRETO SIMPLE


DADOS DE CONCRETO F'C=140 KG/CM2

05.04

und
m3

MOVIMIENTO DE TIERRAS

CIMIENTOS CORRIDOS C:H 1:10 + 30% PG

05.03.01

Precio S/.

COBERTURA SOLAR

05.02.02
05.03

Metrado

VARIOS

05.02.01
05.02.03

Und.

CABLES 5/16" SOSTENEDORES DE MALLA

m
m
m

247.00
130.00
720.00

169.75
122.51
9.98

m2
glb

1,500.00
1.00

4.25
1,007.69

VARIOS

05.05.01

COBERTURA DE DE MALLA RASCHEL AL 90% (INC. INSTALACION)

05.05.02

ACCESORIOS DE MALLA RASHEL

COSTO DIRECTO

Costo al: 22/05/2012


Parcial S/.
2,198.97
211.32
1,987.65
79,827.61
167.85
167.85
5,645.72
2,904.60
1,284.60
1,456.52
1,591.20
1,591.20
65,040.15
41,928.25
15,926.30
7,185.60
7,382.69
6,375.00
1,007.69

AVANCE ANTERIOR
Cantidad
Parcial S/.

AVANCE ACTUAL
Cantidad
Parcial S/.

52,032.12
16.85
16.85
5.20
41.60
41.60
197.60
104.00
576.00

11,829.97
134.28
134.28
4,516.58
2,323.68
1,027.68
1,165.22
1,272.96
1,272.96

52,032.12
33,542.60
12,741.04
5,748.48

AVANCE ACUMULADO
Cantidad
Parcial S/.

16.85
16.85
5.20
41.60
41.60
197.60
104.00
576.00

1,200.00
0.80

5,906.15
5,100.00
806.15

1,200.00
0.80

63,862.09
134.28
134.28
4,516.58
2,323.68
1,027.68
1,165.22
1,272.96
1,272.96
52,032.12
33,542.60
12,741.04
5,748.48
5,906.15
5,100.00
806.15

80.00
80.00

SALDO
Parcial S/.
2,198.97
1.00
211.32
315.00
1,987.65
15,965.52
33.57
4.21
33.57
1,129.14
4.21
580.92
1.30
256.92
10.40
291.30
318.24
10.40
318.24
13,008.03
49.40
8,385.65
26.00
3,185.26
144.00
1,437.12
1,476.54
300.00
1,275.00
0.20
201.54

80.00
80.00
80.00
80.00
80.00
80.00
80.00
80.00

Cantidad

910,326.27

424,850.25

247,531.46

672,381.67

73.86

237,944.60

GASTOS GENERALES

5.00%

45,516.31

21,242.51

12,376.57

33,619.08

73.86

11,897.23

UTILIDAD

7.50%

68,274.47

31,863.77

18,564.86

50,428.63

73.86

17,845.85

1,024,117.05

477,956.53

278,472.89

756,429.38

73.86

267,687.68

SUB TOTAL
IGV
TOTAL PRESUPUESTO (S/.)

18.00%

184,341.07

86,032.18

50,125.12

136,157.29

73.86

48,183.78

1,208,458.12

563,988.71

328,598.01

892,586.67

73.86

315,871.46

Pg 7 de 12

HOJA DE SUSTENTO DE METRADOS


Obra
Contratista
Cliente
Ubicacin

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

FECHA:

DIMENSIONES
ITEM

DESCRIPCION

UND

METRADO
PRESUP.

N
LARGO
VECES

ANCHO

ALTURA

AREA

PERIM.

30/12/2013

METRADO EJECUTADO
VOLUM. FACTOR

TOTAL
METRADO

ACUMULADO ACTUAL
EJECUTADO VALORIZADO

ACUMULADO PRESENTE
MES
ANTERIOR

01

ESTRUCTURAS

01.01

OBRAS PRELIMINARES

01.01.01

CERCO PERIMETRICO PROVISIONAL

475.58

0.00

0.00

0.00

0.00

475.58

0.00

01.01.02

ALMACEN, OFICINA Y CASETA DE GUARDANIA

m2

18.00

0.00

0.00

0.00

0.00

18.00

0.00

01.01.03

CARTEL DE OBRA DE 3.60X2.40M

und

1.00

0.00

0.00

0.00

0.00

1.00

0.00

01.01.04

AGUA POTABLE Y ENERGIA ELECTRICA PARA OFICINAS

mes

4.00

1.00

1.00

1.00

25.00

2.00

1.00

01.02

TRABAJOS PRELIMINARES

01.02.01

LIMPIEZA DE TERRENO MANUAL

m2

7,314.40

0.00

0.00

0.00

0.00

7,314.40

0.00

01.02.02

TRAZO Y REPLANTEO

m2

7,314.40

0.00

0.00

0.00

0.00

7,314.40

0.00

01.02.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

glb

2.00

0.00

0.00

0.00

0.00

1.00

0.00

01.03

MOVIMIENTO DE TIERRAS

01.03.01

EXCAVACION A MANO EN TERRENO NORMAL

m3

503.90

100.78

100.78

100.78

20.00

403.12

100.78

01.03.02

CORTE DE MATERIALSUELTO CON RETROEXCAVADORA 62 HP

m3

4,370.36

0.00

0.00

0.00

0.00

4,370.36

0.00

01.03.03

RELLENO MANUAL CON MATERIAL PROPIO COMPACTADO

m2

5,933.63

0.00

0.00

0.00

0.00

5,933.63

0.00

01.03.04

PERFILADO Y COMPACTADO DE SUB RASANTE EN PISOS Y VEREDAS

m2

3,459.23

0.00

0.00

0.00

0.00

3,459.23

0.00

01.03.05

ELIMINACION DE MATERIAL EXCEDENTE DM=15 Km

m3

327.93

0.00

0.00

0.00

0.00

327.93

0.00

01.04

OBRAS DE CONCRETO SIMPLE

01.04.01

CIMIENTOS
m3

352.48

70.50

70.50

70.50

20.00

281.98

70.50

01.04.01.01 CONCRETO CICLOPEO CIMIENTOS CORRIDOS 1:10+30% P.G.


01.04.02

100.78

70.50

SOBRECIMIENTOS

01.04.02.01 CONCRETO CICLOPEO SOBRECIMIENTOS 1:8+25% P.M.

m3

52.76

10.55

10.55

10.55

10.55

20.00

42.21

10.55

01.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS

m2

553.04

110.61

110.61

110.61

110.61

20.00

442.43

110.61

01.04.03.01 MURO DE CONTENCION Y GRADERIAS EN LOZA-CONCRETO F'C=140 KG/CM2

m3

125.44

31.36

2.00

25.09

25.09

25.09

20.00

100.35

25.09

01.04.03.02 ENCOFRADO Y DESENC. MUROS DE CONTENCION Y GRADERIAS DE LOZA

m2

369.92

36.99

2.00

73.98

73.98

73.98

20.00

295.94

73.98

m2

20.16

0.00

0.00

0.00

0.00

20.16

0.00

01.04.03

01.04.04

MURO DE CONTENCION Y GRADERIA LOZA


0.40

SOLADOS

01.04.04.01 SOLADO PARA POZO CISTERNA


01.05

OBRAS DE CONCRETO ARMADO

01.05.01

COLUMNAS

0.00

0.00

01.05.01.01 COLUMNAS CONCRETO F'C=210 KG/CM2

m3

27.71

0.00

0.00

0.00

0.00

27.71

0.00

01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

m2

238.56

0.00

0.00

0.00

0.00

238.56

0.00

01.05.01.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

kg

1,769.39

0.00

0.00

0.00

0.00

1,769.39

0.00

01.05.02

VIGAS

01.05.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2

m3

8.39

0.00

0.00

0.00

0.00

8.39

0.00

01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

55.01

0.00

0.00

0.00

0.00

55.01

0.00

01.05.02.03 ACERO EN VIGAS FY= 4200 KG/CM2

kg

588.91

0.00

0.00

0.00

0.00

588.91

0.00

01.05.03

LOSAS ALIGERADAS

01.05.03.01 LOSA ALIGERADA - CONCRETO 210 KG/CM2

m3

6.66

0.00

0.00

0.00

0.00

6.66

0.00

01.05.03.02 ENCOFRADO Y DESENCOFRADO DE LOSAS ALIGERADAS

m2

73.95

0.00

0.00

0.00

0.00

73.95

0.00

01.05.03.03 ACERO EN LOSAS ALIGERADAS FY=4200 KG/CM2

kg

284.88

0.00

0.00

0.00

0.00

284.88

0.00

und

616.00

0.00

0.00

0.00

0.00

616.00

0.00

01.05.03.04 LADRILLO HUECO DE ARCILLA 15X30X30CM PARA TECHO ALIGERADO


01.05.04

ZAPATAS

01.05.04.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2

m3

29.50

0.00

0.00

0.00

0.00

29.50

0.00

01.05.04.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS

kg

307.99

0.00

0.00

0.00

0.00

307.99

0.00

1.30

21.45

21.45

21.45

30.00

50.06

21.45

43.85

43.85

43.85

43.85

30.00

102.31

43.85

265.84

265.84

265.84

30.00

620.28

265.84

01.05.05

GRADERIAS

01.05.05.01 CONCRETO EN GRADERIAS F'C=210 KG/CM2

m3

71.51

01.05.05.02 ENCOFRADO Y DESENCOFRADO PARA GRADERIAS

m2

146.16

01.05.05.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIAS

kg

886.12

16.50

265.84

HOJA DE SUSTENTO DE METRADOS


Obra
Contratista
Cliente
Ubicacin

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

FECHA:

DIMENSIONES
ITEM

01.05.06

DESCRIPCION

UND

METRADO
PRESUP.

N
LARGO
VECES

ALTURA

AREA

PERIM.

VOLUM. FACTOR

TOTAL
METRADO

ACUMULADO ACTUAL
EJECUTADO VALORIZADO

ACUMULADO PRESENTE
MES
ANTERIOR

MUROS REFORZADOS

01.05.06.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2

m3

7.39

01.05.06.02 ENCOFRADO Y DESENC. MUROS DE CONTENCION

m2

73.92

01.05.06.03 ACERO EN MUROS FY= 4200 KG/CM2

kg

321.22

01.05.07.01 CONCRETO EN PISOS REFORZADOS F'C=210 KG/CM2

m3

5.26

01.05.07.02 ACERO EN PISOS REFORZADOS FY= 4200 KG/CM2

kg

93.52

01.05.07

ANCHO

30/12/2013

METRADO EJECUTADO

2.22

2.22

2.22

2.22

30.04

5.17

2.22

22.18

22.18

22.18

30.01

51.74

22.18

96.37

96.37

96.37

30.00

224.85

96.37

1.58

1.58

1.58

30.04

3.68

1.58

28.06

28.06

28.06

30.00

65.46

28.06

41.77

41.77

41.77

41.77

30.00

97.46

41.77

7.09

7.09

7.09

7.09

30.00

16.54

7.09

22.18
96.37

PISOS REFORZADOS

02

ARQUITECTURA

02.01

REVOQUES ENLUCIDOS

02.01.01

MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM.

m2

139.23

02.01.02

MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM.

m2

23.63

02.02

MUROS Y TABIQUES DE ALBAILERIA

02.02.01

TARRAJEO PRIMARIO RAYADO

m2

100.46

02.02.02

TARRAJEO EN MUROS MEZCLA 1:5 E=1.5 cm

m2

922.01

02.02.03

TARRAJEO DE COLUMNAS

m2

83.24

02.02.04

TARRAJEO DE VIGAS

m2

29.78

02.02.05

VESTIDURA DE DERRAMES

71.82

02.02.06

TARRAJEO CON IMPERMEABILIZANTE

m2

33.20

02.02.07

REVESTIMIENTO DE COLUMNA CON SILLAR

m2

154.80

02.03

CIELO RASO

02.03.01

CIELO RASO CON MEZCLA C:A 1:5

m2

67.58

02.04

REVESTIMIENTOS DE GRADAS Y ESCALERAS

02.04.01

TARRAJEO DE GRADAS, GRADERIAS Y ESCALERAS

m2

467.92

02.05

PISOS Y PAVIMENTOS

02.05.01

NIVELACION Y APISONADO MANUAL

m2

1,830.41

02.05.02

FALSO PISO DE 4" DE CONCRETO 1:10

m2

02.05.03

PISO DE CERAMICO 30CM X 30CM

02.05.04

PISO DE CEMENTO PULIDO BRUADO E=4" S/COLOREAR

02.05.05

PISO DE PIEDRA LAJA PORFIDO AMARRE AMERCANO

02.06

VEREDAS

02.06.01
02.06.02
02.06.03
02.07

LOSA DEPORTIVA

02.07.01
02.07.02
02.08

SARDINELES

02.08.01

1.58
28.06

60.28

60.28

60.28

60.28

60.00

40.18

60.28

126.65

126.65

126.65

126.65

13.74

368.80

126.65

0.00

0.00

0.00

0.00

33.30

0.00

17.87

17.87

17.87

60.01

11.91

17.87

43.09

43.09

43.09

60.00

28.73

43.09

19.92

19.92

19.92

60.00

13.28

19.92

0.00

0.00

0.00

0.00

0.00

67.58

67.58

67.58

67.58

100.00

67.58

280.75

280.75

280.75

280.75

60.00

187.17

280.75

549.12

549.12

549.12

549.12

30.00

1,281.29

549.12

46.98

37.58

37.58

37.58

37.58

79.99

9.40

37.58

m2

46.98

46.98

46.98

46.98

46.98

100.00

46.98

m2

109.56

22.75

22.75

22.75

22.75

20.76

22.75

m2

118.25

0.00

0.00

0.00

0.00

0.00

VEREDAS ESTAMPADA DE CONCRETO DE E=4" F'C=140 KG/CM2

m2

853.67

512.20

512.20

512.20

60.00

170.73

512.20

VEREDAS DE CONCRETO 140 KG/CM2 E=4" C/BRUAS COLOREADAS

m2

345.52

207.31

207.31

207.31

60.00

69.10

207.31

ENCOFRADO Y DESENCOFRADO PARA VEREDAS

m2

221.83

133.10

133.10

133.10

60.00

44.37

133.10

CONCRETO F'C=175 KG/CM2 PARA LOSAS DEPORTIVAS FONDO-PISO

m3

79.20

0.00

0.00

0.00

0.00

79.20

0.00

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS DEPORTIVAS

m2

98.56

0.00

0.00

0.00

0.00

98.56

0.00

SARDINEL DE CONCRETO DE F'C=175 KG/CM2

m3

38.96

5.75

5.75

5.75

14.76

11.69

5.75

02.08.02

ENCOFRADO Y DESENCOFRADO EN SARDINELES

m2

223.54

32.45

32.45

32.45

32.45

14.52

67.06

32.45

02.09

ZOCALOS

02.09.01

ZOCALO DE CERAMICA 30X30 CM.

m2

100.46

100.46

100.46

100.46

100.46

100.00

02.10

CARPINTERIA METALICA Y MADERA

02.10.01

BASURERO BASCULANTE (INC. DADOS DE CONCRETO)

und

13.00

10.40

10.40

10.40

80.00

02.10.02

PUERTA DE REJA METALICA

m2

19.68

0.00

0.00

0.00

10.00

02.10.03

REJA METALICA

m2

43.80

0.00

0.00

0.00

22.00

0.00

02.10.04

VENTANA DE FIERRO C/PERFIL DE 1"X1/8"FIJA+REF. "T" DE 1"

m2

7.76

6.21

6.21

6.21

80.00

02.10.05

CERCO DE MALLA METALICA (h=1.80m)

420.02

126.02

126.02

126.02

30.00

210.00

126.02

02.10.06

MALLA PARED DE FRONTON

m2

19.00

5.20

5.20

5.20

27.37

10.00

5.20

02.10.07

TAPA METALICA DE ACERO ESTRELLADO

und

2.00

02.10.08

COBERTURA DE DE MALLA RASCHEL DE H=7.5M

GLB

1.00

02.10.09

CERCO DE MALLA METALICA (h=0.90m)

80.00

40.00

20.00

17.87
43.09
19.92

5.75

40.00

0.00

0.00

0.00

0.80

0.80

0.80

80.00

20.00

20.00

20.00

25.00

100.46
10.40
0.00
6.21

0.00
0.80

HOJA DE SUSTENTO DE METRADOS


Obra
Contratista
Cliente
Ubicacin

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

FECHA:

DIMENSIONES
ITEM

DESCRIPCION

02.10.10

COBERTURA DE DE MALLA RASCHEL EN GRADERIAS

02.11

VIDRIOS, CRISTALES Y SIMILARES

02.11.01

VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS FIERRO

02.12

PINTURA

02.12.01

PINTURA LATEX EN CIELORASO 2 MANOS

02.12.02

PINTURA EN MUROS LATEX

02.12.03

PINTURA LATEX EN SARDINELES

02.12.04

UND

METRADO
PRESUP.

N
LARGO
VECES

ANCHO

ALTURA

AREA

PERIM.

30/12/2013

METRADO EJECUTADO
VOLUM. FACTOR

TOTAL
METRADO

ACUMULADO ACTUAL
EJECUTADO VALORIZADO

ACUMULADO PRESENTE
MES
ANTERIOR

m2

67.50

54.00

54.00

54.00

80.00

54.00

p2

102.94

0.00

0.00

0.00

0.00

0.00

m2

67.58

0.00

0.00

0.00

0.00

0.00

m2

147.76

0.00

0.00

0.00

0.00

0.00

223.54

0.00

0.00

0.00

0.00

0.00

PINTURA ANTICOR. Y ESMALTE 2 MANOS C/ANDAMIO EN FAROLAS

m2

405.03

202.52

202.52

202.52

50.00

202.52

02.12.05

PINTURA BARNIZ

m2

91.47

0.00

0.00

0.00

0.00

0.00

02.12.06

PINTURA ESMALTE EN MUROS

m2

1,360.16

0.00

0.00

0.00

0.00

0.00

02.12.07

PINTURA DEMARCACION DE LOSA DEPORTIVA

512.57

0.00

0.00

0.00

0.00

0.00

02.13

JUEGOS INFANTILES

02.13.01

JUEGO INFANTIL SUBE Y BAJA INC. COLOCACION

und

2.00

0.00

0.00

0.00

0.00

0.00

02.13.02

JUEGO INFANTIL PASAMANOS CURVO INC. COLOCACION

und

2.00

0.00

0.00

0.00

0.00

0.00

02.13.03

JUEGO INFANTIL COLUMBIO INC. COLOCACION

und

2.00

0.00

0.00

0.00

0.00

0.00

02.13.04

JUEGO INFANTIL TOBOGAN MULTIPLE INC. COLOCACION

und

1.00

0.00

0.00

0.00

0.00

0.00

02.14

JARDINERIA

02.14.01

AREAS VERDES

02.14.01.01 EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA PARA AREAS VERDAS

m2

3,082.30

1,541.15

1,541.15

1,541.15

50.00

1,541.15

02.14.01.02 SEMBRADO DE GRASS EN AREAS VERDES

m2

3,082.30

0.00

0.00

0.00

0.00

0.00

02.14.01.03 SEMBRADO DE PLANTONES

und

70.00

0.00

0.00

0.00

0.00

0.00

02.14.02.01 NIVELACION Y COMPACTACION MANUAL PARA SEMBRADO DE GRAS

m2

1,288.00

0.00

0.00

0.00

0.00

02.14.02.02 INSTALACION DE GRASS SINTETICO A TODO COSTO

m2

1,288.00

772.80

772.80

772.80

60.00

02.14.02

1,541.15

AREAS VERDES EN CAMPO DEPORTIVO


1,288.00

0.00
772.80

02.15

VARIOS

02.15.01

JUNTAS ASFALTICAS

738.66

126.90

126.90

126.90

126.90

17.18

02.15.02

JUNTA SISMICA DE TECKNOPORT DE 1"

112.10

112.10

112.10

112.10

112.10

100.00

02.15.03

BANCAS ORNAMENTALES (METAL-MADERA)

und

12.00

0.00

0.00

0.00

0.00

02.15.04

PERGOLA (METAL-MADERA) CON COBERTURA DE POLIPROPENO

m2

98.17

49.09

49.09

49.09

50.01

02.15.05

PERFILADO DE TALUDES

m2

162.29

0.00

0.00

0.00

0.00

02.15.06

LIMPIEZA DE OBRA

mes

4.00

3.00

3.00

3.00

75.00

02.15.07

CONSTRUCCION DE SILO PERCOLADOR D=1.5 H=3m

und

1.00

0.00

0.00

0.00

0.00

03

INSTALACIONES ELECTRICAS

03.01

MOVIMIENTO DE TIERRAS

03.01.01

EXCAVACION ZANJAS P/RED ELECTRICA H=1.00 M

m3

120.31

0.00

0.00

0.00

0.00

0.00

03.01.02

RELLENO CON MATERIAL PROPIO

m3

120.31

0.00

0.00

0.00

0.00

0.00

03.02

ACOMETIDA Y ALUMBRADO PUBLICO

03.02.01

CABLE ELECTRICO NYY 2 X 6 MM2.

114.70

0.00

0.00

0.00

0.00

0.00

03.02.02

CABLE ELECTRICO NYY 2 X 10 MM2.

547.60

0.00

0.00

0.00

0.00

0.00

03.02.03

ACOMETIDA

59.00

0.00

0.00

0.00

0.00

0.00

03.02.04

MEDIDOR DE LUZ

und

1.00

0.00

0.00

0.00

0.00

0.00

03.02.05

EMPALME UNIPOLAR P/CABLE NYY 6-35 mm2

und

3.00

0.00

0.00

0.00

0.00

0.00

03.02.06

POSTE DE C.A.C DE 9/200

und

10.00

0.00

0.00

0.00

0.00

0.00

03.02.07

PASTORAL DE 2 BRAZOS DE 70W C/U

und

20.00

0.00

0.00

0.00

0.00

0.00

03.02.08

BASE PORTAFUSIBLES BIPOLAR 15

und

10.00

0.00

0.00

0.00

0.00

0.00

03.02.09

POSTE METALICO DE H=7.00 X4"e=4mm METALICO INC/REFLECTOR

und

12.00

8.00

8.00

8.00

66.67

8.00

03.03

SALIDA PARA ELECTRICIDAD Y FUERZA

03.03.01

SALIDA DE TECHO (CENTRO DE LUZ) 2.5MM2 TW

pto

6.00

6.00

6.00

6.00

100.00

6.00

03.03.02

SALIDA PARA TOMACORRIENTE SIMPLE

pto

6.00

6.00

6.00

6.00

100.00

6.00

03.03.03

INTERRUPTOR SIMPLE

pto

8.00

6.00

6.00

6.00

75.00

6.00

03.04

CANALIZACION Y/O TUBERIAS

3.00

126.90
112.10
6.00

0.00
49.09

162.29

0.00
3.00

1.00

0.00

HOJA DE SUSTENTO DE METRADOS


Obra
Contratista
Cliente
Ubicacin

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

FECHA:

DIMENSIONES
ITEM

DESCRIPCION

UND

METRADO
PRESUP.

N
LARGO
VECES

ANCHO

ALTURA

AREA

PERIM.

30/12/2013

METRADO EJECUTADO
VOLUM. FACTOR

TOTAL
METRADO

ACUMULADO ACTUAL
EJECUTADO VALORIZADO

ACUMULADO PRESENTE
MES
ANTERIOR

03.04.01

TUBERIA PVC - SAP 25 MM

4.00

0.00

0.00

0.00

0.00

2.00

0.00

03.04.02

TUBERIA PVC - SEL 20 MM

54.79

0.00

0.00

0.00

0.00

27.40

0.00

03.05

CONDUCTORES Y CABLES

03.05.01

CABLE TW DE 2.5 MM2

54.79

0.00

0.00

0.00

0.00

0.00

03.06

ARTEFACTOS

03.06.01

PORTALAMPARA BAKELITA ROSCA TICINO P/LAMPARA INCAND. O AHORR.

und

6.00

6.00

6.00

6.00

100.00

6.00

03.06.02

PLAMPARA AHORRADORA ESPIRAL DE 42 W

und

6.00

6.00

6.00

6.00

100.00

6.00

03.06.03

INTERRUPTOR SIMPLE

pza

6.00

6.00

6.00

6.00

100.00

6.00

03.06.04

TOMACORRIENTE SIMPLE UNIPOLAR

pto

8.00

8.00

8.00

8.00

100.00

8.00

04

INSTALACIONES SANITARIAS

04.01

APARATOS SANITARIOS Y ACESORIOS SANITARIOS

04.01.01

INODORO TANQUE BAJO BLANCO

pza

4.00

4.00

4.00

4.00

100.00

4.00

04.01.02

LAVATORIO DE PARED DE COLOR 1 LLAVE

pza

8.00

8.00

8.00

8.00

100.00

8.00

04.01.03

DUCHAS CROMADAS DE CABEZA GIRATORIA Y LLAVE MEZCLADORA

pza

4.00

4.00

4.00

4.00

100.00

4.00

URINARIOS DE LOZA DE PICO BLANCO

pza

5.00

5.00

5.00

5.00

100.00

5.00

04.02

INSTALACIONES SANITARIAS

04.02.01

SALIDAS DE DESAGUE

04.02.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 4"

pto

4.00

0.00

0.00

0.00

0.00

4.00

0.00

04.02.01.02 SALIDAS DE PVC SAL PARA DESAGUE DE 2"

pto

13.00

0.00

0.00

0.00

0.00

13.00

0.00

04.02.01.03 SALIDAS DE PVC SAL PARA VENTILACION DE 2"

pto

4.00

0.00

0.00

0.00

0.00

4.00

0.00

04.02.01.04 BAJADA PARA LLUVIA PVC SAL 2"

pto

4.00

0.00

0.00

0.00

0.00

4.00

0.00

04.02.02.01 TUBERIA DE PVC SAL 4"

16.20

16.20

16.20

16.20

16.20

100.00

16.20

04.02.02.02 TUBERIA DE PVC SAL 2"

39.34

39.34

39.34

39.34

39.34

100.00

39.34

04.02.03.01 YEE PVC SAL 4"X2"

pza

14.00

0.00

0.00

0.00

0.00

14.00

0.00

04.02.03.02 REDUCCION DE PVC SAL SP DE 4"-2"

und

6.00

0.00

0.00

0.00

0.00

6.00

0.00

04.02.03.03 YEE PVC SAL 2"

pza

4.00

0.00

0.00

0.00

0.00

4.00

0.00

04.02.03.04 CODO PVC SAL 2"X90

pza

14.00

0.00

0.00

0.00

0.00

14.00

0.00

04.02.03.05 TEE PVC-SAL SANITARIA 4"

und

8.00

0.00

0.00

0.00

0.00

8.00

0.00

04.02.04.01 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION

und

12.00

12

12.00

12.00

12.00

100.00

12.00

04.02.04.02 REGISTRO ROSCADOS CROMADO DE 4"

und

2.00

2.00

2.00

2.00

100.00

2.00

04.02.04.03 SOMBRERO VENTILACION PVC DE 2"

pza

4.00

4.00

4.00

4.00

100.00

4.00

0.00

0.00

0.00

0.00

0.00

20

20.00

20.00

20.00

100.00

20.00

04.02.02

04.02.03

04.02.04

04.02.05

REDES DE DISTRIBUCION

ACCESORIOS DE REDES

ADITAMIENTOS VARIOS

CAMARAS DE INSPECCION

04.02.05.01 CAJA DE REGISTRO DE DESAGUE 12" X 24"

pza

8.00

pto

20.00

04.03.02.01 TUBERIA PVC CLASE 10 SP 1/2"

37.84

37.84

37.84

37.84

37.84

100.00

37.84

04.03.02.02 TUBERIA PVC CLASE 10 SP 3/4"

66.30

10.00

10.00

10.00

10.00

15.08

10.00

04.03.03.01 VALVULA DE COMPUERTA DE BRONCE 1/2"

und

4.00

4.00

4.00

4.00

4.00

100.00

4.00

04.03.03.02 VALVULA DE COMPUERTA DE BRONCE 3/4"

und

1.00

0.00

0.00

0.00

0.00

0.00

pza

5.00

0.00

0.00

0.00

0.00

0.00

04.03

SISTEMA DE AGUA FRIA

04.03.01

SALIDA DE AGUA FRIA 3/4"

04.03.02

REDES DE DISTRIBUCION

04.03.03

04.03.04

LLAVES Y VALVULAS

CAJAS METALICAS

04.03.04.01 CAJA PREFABRICADA


04.04

SISTEMA DE RIEGO

04.04.01

EXCAVACION ZANJAS P/RED ELECTRICA H=1.00 M

m3

78.75

0.00

0.00

0.00

0.00

0.00

04.04.02

RELLENO CON MATERIAL PROPIO

m3

78.75

0.00

0.00

0.00

0.00

0.00

04.04.03

SALIDA DE AGUA FRIA 3/4"

pto

12.00

0.00

0.00

0.00

0.00

0.00

04.04.04

REDES DE DISTRIBUCION

HOJA DE SUSTENTO DE METRADOS


Obra
Contratista
Cliente
Ubicacin

: "CONSTRUCCION DEL COMPLEJO DEPORTIVO EN EL SECTOR V EN LA ASOC. JOSE L. BUSTAMANTE Y RIVERO DEL CONO NORTE"
: PROYCON
: MUNICIPALIDAD DE CERRO COLORADO
: AREQUIPA - AREQUIPA - CERRO COLORADO

FECHA:

DIMENSIONES
ITEM

DESCRIPCION

04.04.05

TUBERIA DE PVC A-10 SP DE 2"

04.04.06

LLAVES Y VALVULAS

UND

METRADO
PRESUP.

N
LARGO
VECES

ANCHO

ALTURA

AREA

PERIM.

30/12/2013

METRADO EJECUTADO
VOLUM. FACTOR

TOTAL
METRADO

ACUMULADO ACTUAL
EJECUTADO VALORIZADO

ACUMULADO PRESENTE
MES
ANTERIOR

315.00

0.00

0.00

0.00

0.00

315.00

0.00

04.04.06.01 VALVULA DE COMPUERTA DE BRONCE 3/4"

und

12.00

0.00

0.00

0.00

0.00

12.00

0.00

04.04.06.02 VALVULA DE COMPUERTA 2"

und

1.00

0.00

0.00

0.00

0.00

1.00

0.00

pza

12.00

0.00

0.00

0.00

0.00

0.00

04.04.07

CAJAS METALICAS

04.04.07.01 CAJA PREFABRICADA


04.04.08

VARIOS

04.04.08.01 MEDIDOR DE PISO

und

1.00

0.00

0.00

0.00

0.00

0.00

04.04.08.02 PRUEBA HIDRAULICA SISTEMA DE RIEGO

m3

315.00

0.00

0.00

0.00

0.00

0.00

m3

21.06

16.85

16.85

16.85

80.00

16.85

21.06

16.85

16.85

16.85

05

COBERTURA SOLAR

05.01

MOVIMIENTO DE TIERRAS

05.01.01

EXCAVACION PARA CIMIENTOS HASTA 1.20 MT TERRENO NORMAL

05.02

OBRAS DE CONCRETO SIMPLE

05.02.01

CIMIENTOS CORRIDOS C:H 1:10 + 30% PG

m3

16.85

80.00

05.02.02

DADOS DE CONCRETO F'C=140 KG/CM2

m3

6.50

5.20

5.20

5.20

80.00

5.20

05.02.03

ENCOFRADO Y DESENC. NORMAL PARA DADOS

m2

52.00

41.60

41.60

41.60

80.00

41.60

05.03

REVOQUES ENLUCIDOS Y MOLDURAS

05.03.01

TARRAJEO DE DADOS DE CONCRETO

m2

52.00

41.60

41.60

41.60

80.00

05.04

CARPINTERIA METALICA

05.04.01

COLUMNA METALICA TIPO RECTANGULAR PLANCHA 3/16'' - 1/8''

247.00

0.00

0.00

0.00

0.00

197.60

0.00

05.04.02

VIGA METALICA TIPO CUADRADA V-1, 4'' x 4'' x 2.5 mm

130.00

0.00

0.00

0.00

0.00

104.00

0.00

05.04.03

CABLES 5/16" SOSTENEDORES DE MALLA

720.00

0.00

0.00

0.00

0.00

576.00

05.05

VARIOS

05.05.01

COBERTURA DE DE MALLA RASCHEL AL 90% (INC. INSTALACION)

m2

1,500.00

1,200.00

1,200.00

1,200.00

80.00

1,200.00

05.05.02

ACCESORIOS DE MALLA RASHEL

glb

1.00

0.80

0.80

0.80

80.00

0.80

41.60

0.00