CDIGO

1
2
3
4
5
6
7
8
10
12
13
14

RUBRO
LIMPIEZA MANUAL DEL TERRENO
REPLANTEO MANUAL
EXCAVACION A MANO ESTRUCTURAS MENORES
DESALOJO VOLQUETA TIERRA-ESCOMBROS
RELLENO COMPACTACIN TIERRA PLANCHA COMP
REPLANTILLO HS fc=14MPa
ENCOFRADO-DESENCOFRADO MURO TABLERO CONTRACHAPADO
HORMIGN CICLOPEO 40% PIEDRA
SUB-BASE CLASE 3 LASTRE
BORDILLO h=50cm, b=15cm.
DRENES PVC 110mm
LIMPIEZA FINAL OBRA

CANTIDAD

m2
m2
m3
m3
m3
m3
m2
m3
m3
m
m
m2

102.00
102.00
68.00
189.00
189.00
10.79
306
178.5
189.00
17
6
102.00
TOTAL:

PRECIO
TOTAL
UNITARIO
0.99
100.98
1.32
134.64
7.24
492.32
8.43 1593.27
3.94
744.66
87.3
941.79
6.77 2071.62
94.81 16923.59
25.07 4738.23
14.44
245.48
6.62
39.72
1.79
182.58
TOTAL: 28208.88

CDIGO

RUBRO
1
2
3
4
5
6
7
8
10
12
13
14

LIMPIEZA MANUAL DEL TERRENO


REPLANTEO MANUAL
EXCAVACION A MANO ESTRUCTURAS MENORES
DESALOJO VOLQUETA TIERRA-ESCOMBROS
RELLENO COMPACTACIN TIERRA PLANCHA COMP
REPLANTILLO HS fc=14MPa
ENCOFRADO-DESENCOFRADO MURO TABLERO CONTRACHAPADO
ACERO DE REFUERZO fy=4200kg/cm2
HORMIGN SIMPLE f'c=210kg/cm2
SUB-BASE CLASE 3 LASTRE
BORDILLO h=50cm, b=15cm.
DRENES PVC 110mm
LIMPIEZA FINAL OBRA

U
m2
m2
m3
m3
m3
m3
m2
kg
m3
m3
m
m
m2

CANTIDAD
102.00
102.00
51.00
123.84
542.16
5.57
267.75
1148.64
52.02
542.16
17
6
102.00

PRECIO
UNITARIO
0.99
1.32
7.24
8.43
3.94
115.6
17.83
1.83
94.81
25.07
14.44
6.62
1.79

TOTAL
100.98
134.64
369.24
1043.97
2136.11
643.66
4773.98
2102.01
4932.02
13591.95
245.48
39.72
182.58
30296.34