You are on page 1of 2

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra

0503001

Subpresupuesto

001

Fecha

22/03/2013

Lugar

110208

CONSTRUCCION DEL CAMINO VECINAL ENTRE LAS LOCALIDADES


SIHUAY-COPACABANA-SAN JUAN DE YANAC, DISTRITO DE SAN JUAN DE YANAC,
PROVINCIA DE CHINCHA - ICA
INFRAESTRUCTURA VIAL
ICA - CHINCHA - SAN JUAN DE YANAC

Cdigo

Recurso

Unidad

0147000032
0147010001
0147010002
0147010003
0147010004
0147010064
0147010066

TOPOGRAFO
CAPATAZ
OPERARIO
OFICIAL
PEON
CONTROLADOR OFICIAL
OFICIAL PERFORADOR

hh
hh
hh
hh
hh
hh
hh

Cantidad

Precio S/.

470.2400
19.0287
1,693.1566
1,305.8013
8,514.1577
1,342.5849
743.0825

16.18
17.80
16.18
13.88
12.52
13.14
13.14

Parcial S/. Presupuestado S/.

MANO DE OBRA
7,608.48
338.71
27,395.27
18,124.52
106,597.25
17,641.57
9,764.10

7,608.48
338.74
27,100.62
18,115.92
106,637.97
17,498.16
9,763.03

187,469.90

187,062.92

MATERIALES
0202000007
0202000008
0202000020
0202000021
0202010005
0202010079
0202970002
0205000003
0205010004
0205020051
0205370001
0210000032
0221000000
0227010001
0227010007
0228010001
0229030002
0232010001
0239900099
0243010003
0249060016
0249910002
0249910004
0253030001
0254110090
0286010001
0299020001

ALAMBRE NEGRO RECOCIDO # 16


ALAMBRE NEGRO RECOCIDO # 8
NIVELACION CON TRACTOR D7
LETRINA C/TECHO DE CALAMINA
CLAVOS PARA MADERA C/C 3"
CLAVOS C/C DE 4"
ACERO DE REFUERZO FY=4200 GRADO 60
PIEDRA CHANCADA DE 1/2"
ARENA GRUESA
PIEDRA GRANDE
AGUA
MORTERO C:A 1:3
CEMENTO PORTLAND TIPO I (42.5KG)
GUIA
FULMINANTE COMUN N 635mm
DINAMITA
YESO EN BOLSAS DE 25 KG.
TRANSPORTE DE COMBUTIBLES Y
MATERIALES
CARTEL DE OBRA DE 2.40x3.60m
INC.INSTALACION Y TRANSP
MADERA TORNILLO
BARRENO DE 5" X 1/8"
ENSAYO DE RESISTENCIA A COMPRESION
DEL CONCRETO
ENSAYO DE DENSIDAD DE CAMPO
THINER
PINTURA ESMALTE
MOVILIZACIN Y DESMOVILIZACION DE
MAQUINARIAS Y EQUIPOS
CONSTRUCCION DEL CAMPAMENTO

kg
kg
GLB
und
kg
kg
kg
m3
m3
m3
m3
m3
BOL
m
und
kg
BOL
GLB

141.0620
77.8600
1.0000
4.0000
77.8600
506.9340
2,962.3020
44.1600
27.6000
19.2200
2,127.5052
6.4387
463.6800
5,894.7900
9,452.7200
2,363.1800
802.6455
1.0000

3.20
3.20
2,500.00
252.24
3.34
3.34
4.55
50.00
35.00
60.00
10.00
349.70
14.60
5.50
5.50
15.25
16.00
65,450.67

451.40
249.15
2,500.00
1,008.96
260.05
1,693.16
13,478.47
2,208.00
966.00
1,153.20
21,275.05
2,251.61
6,769.73
32,421.35
51,989.96
36,038.49
12,842.33
65,450.67

451.40
249.15
2,500.00
1,008.96
260.83
1,692.59
13,485.53
2,208.00
966.00
1,153.20
21,275.05
2,251.62
6,769.73
32,421.35
51,989.96
36,014.87
12,842.32
65,450.67

GLB

8.6400

92.60

800.06

800.06

p2
und
und

1,401.4800
68.1900
24.0000

5.70
305.50
5.04

7,988.44
20,832.04
120.96

7,988.44
20,809.65
120.96

und
gln
gln
GLB

10.0000
24.6876
24.0998
1.0000

176.47
18.00
35.00
36,507.04

1,764.70
444.38
843.49
36,507.04

1,764.70
444.38
843.49
36,507.04

GLB

100.0000

500.00

50,000.00

50,000.00

372,308.69

372,269.95

EQUIPOS
0337010001
0348010011
0348040034
0349020011
0349020015
0349030030
0349030035
0349060016
0349070004
0349090002
0349190001
0349880007

HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO DE 9 -11P3
CAMION CISTERNA 4x2 (AGUA) 2,000 GLN.
(inc. combustible)
COMPRESORA NEUMATICA 196 HP 600-690
PCM
TRACTOR SOBRE ORUGAS D7G-200HP
COMPACTADOR VIBR. TIPO PLANCHA 7 HP
RODILLO LISO VIBR. AUTOP. 70-100 HP 7-9 T.
(inc. combustible)
MARTILLO NEUMATICO DE 25 KG
VIBRADOR DE CONCRETO 4 HP 2.40"
MOTONIVELADORA DE 125 HP (inc.
combustible)
TEODOLITO
NIVEL

%MO
hm
hm

55.2000
62.9348

15.00
166.75

8,089.47
828.00
10,494.38

8,089.47
828.00
10,489.14

hm

299.6828

172.50

51,695.28

51,688.28

hm
hm
hm

1,456.4385
3.2284
619.1951

338.40
27.00
162.64

492,858.79
87.17
100,705.89

493,199.97
87.12
100,140.88

hm
hm
hm

743.0825
55.2000
619.1951

16.95
15.00
195.50

12,595.25
828.00
121,052.64

12,569.17
828.00
121,464.60

hm
HE

470.2400
470.2400

10.00
10.00

4,702.40
4,702.40

4,702.40
4,702.40

808,639.67

808,789.43

1,368,418.26

1,368,122.30

Total

S/.
Fecha :

15/04/2013 02:26:25p.m.

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra

0503001

Subpresupuesto

001

Fecha

22/03/2013

Lugar

110208

Cdigo

Recurso

CONSTRUCCION DEL CAMINO VECINAL ENTRE LAS LOCALIDADES


SIHUAY-COPACABANA-SAN JUAN DE YANAC, DISTRITO DE SAN JUAN DE YANAC,
PROVINCIA DE CHINCHA - ICA
INFRAESTRUCTURA VIAL
ICA - CHINCHA - SAN JUAN DE YANAC
Unidad

Cantidad

Precio S/.

Parcial S/. Presupuestado S/.

S/.

1,368,122.30

La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando

Fecha :

15/04/2013 02:26:25p.m.