DESIGN OF R.C.C.SLAB EL -2.

07
fck Ec fy Es Cover xumax/d Mu_lim= Qlim= fy/fck Unit weight of soil Ec= For shear fy= Min spacing of bar UNIT 2 N/mm 2 N/mm 2 N/mm N/mm2 mm kN-m t/cum M Pa Mpa mm 35 29580 500 210000 50 0.462
2 4.72 bd 11.86 2.00 29590 415 200

no support

Depth provided=D= Width=B= Span M.I Self weight of the slab LL Dust load Spillage load Miscel Total Load Total with 1.5 Torsion Shear due to torsion
Shearasperstaad Momentasperstaad

mm mm m

700 1000 7.12 0.02858 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0.00
602.855 758.39

say

t/m t/m t/m t/m t/m t/m t kN kN


kN kN

Shear Moment Mt=Moment due to torsion Total Shear Mue+Mtr Mu_lim Mu/bd Pt= Pmax= Pt adopted= Ast= Ast_max

kN kN-m kN-m kN kN-m kN-m % 0.17 % % mm2 2 mm

602.86 0.00 0.00 602.86 758.39 1993.66 1.55 0.53 0.53 3450 10493

1.61 % Ptmin=

Ast_min Ast adopted Dia of bar Area No. Provide Extra Rods Spacing Area provided= d= d_min Check for Shear: Shear force Shear force at d/2= Shear stress Grade of concrete Check for Shear at support: Depth Width Span Shear stress Atx100/bd Permissible shear= Balance shear stress= Balance Shear force= Maximum shear c_max Stirrups: Dia Area Spacing= No. of legs Asv= Minimum steel Spacing= Deflection Permissible deflection=

mm 2 mm mm 2 mm No No No mm 2 mm mm mm kN kN N/mm2

1105 3450 25 491 7.03 8 9 17 55 8345 650 675 603 484 0.7451 M35 @d 700 1000 7.12 0.75 1.391 0.76 0.00 0

SELECT FOR d

m m m

N/mm2 % N/mm2 N/mm2 N N/mm2 mm sq.cm mm mm mm2 mm2 mm mm mm

8 0.50 200 2 101


STP NIL

200 4.546 20.000

LOADDIAGRAM

B.M.DIAGRAM

Beam

L/C Dist m Fx kN 1 2 COMBIN 0 1.78 3.56 5.34 7.12

0 0 0 0 0

Fy kN Fz kN -602.855 -292.468 -55.505 108.032 198.145

0 0 0 0 0

Mx MTon My MTon-m Mz MTon-m 0 0 -75.839 0 0 4.306 0 0 34.775 0 0 28.898 0 0 0