You are on page 1of 2

Norms for scaffolding crainage and fabrication manpow Errection

Height Bands Base supported scaffold (built externally) Base supported scaffold (built in confined space-internal scaffold)) Suspended and catelever scaffold 0m to 10 m 0.76 0.91 1.37

Dismantling
Height Bands Base supported scaffold (built externally) Base supported scaffold (built in confined space-internal scaffold)) Suspended and catelever scaffold 0m to 10 m 0.37 0.45 0.68

Manpower cost (AED per day)


Scaffolders (per hour) Welders (per day) Fabricator Crane operator (company's) Riggers Vehicle (to guide and carry stuff with crane) Forklift driver

Turn around job 75 600 600 900 720 900 810

External crane charges

Price in 1000AED
Column1 Mob/demob daily rent Mob/demob daily rent 50 ton 10 6.5 12 7.8

e and fabrication manpower Manhours/m3


10m to 20 m220m to 30 m330m to40 m4 40m to 50 m550m to 60 m660m to 70 m7 0.87 1 1.2 1.44 1.8 2.43 1.04 1.2 1.44 1.73 2.16 2.92 1.58 1.82 2.18 2.62 3.27 4.41

Manhours/m3
10m to 20 m220m to 30 m330m to40 m4 40m to 50 m550m to 60 m660m to 70 m7 0.43 0.49 0.59 0.71 0.89 1.2 0.51 0.59 0.71 0.85 1.07 1.44 0.68 0.89 1.07 1.29 1.61 2.17

Others 25 200 200 300 240 300 270


Work together

Work together

ges

Price in 1000AED
100 ton 20 12 24 14.5 150 ton 35 15 42 18

Before March 2013

After March 2013