You are on page 1of 46

EXAMEN FINAL DE INGENIERIA ANTISISMICA

FACTOR DE ZONA
Z1 = 7.6 a mas
Z2 = 6.6 a 7.5
Z3 = 4 a 6.5

FACTOR DE SUELO
S1 = 7.6 a mas
S2 = 6.6 a 7.5
S3 = 4 a 6.5

1 +
2

FACTOR DE USO
A = 7.6 a mas
B = 6.6 a 7.5
C = 4 a 6.5

ALTURA DE EDIFICACION (m)


-

34.5

10
2

17
2

= 8.5

= 5.0

13
2

= 6.5

3.00

Por lo tanto utilizare Z1

3.00

3.00

3.00

Z = 0.15 (zona de la costa)

3.00

Por lo tanto utilizare S3

3.00

3.00

3.00

S3 = 1.4 (zona de la costa)

3.00

3.00

Por lo tanto utilizare C

4.50

C = 1.0 (zona de la costa)

5.00

5.00

4.50

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

METRADO D
Piso 1,2,3,4
Cargas Muertas - muros direccion X
Descripcion

ancho (a)

largo(l)

altura(h)

X1

3.30

0.25

2.40

X2

3.40

4.20

2.40

X3

3.40

3.40

2.40

X4

2.35

4.30

2.40

X5

3.35

3.40

2.40

X6

1.40

5.50

2.40

X7

3.35

3.60

2.40

X8

3.30

5.50

2.40

X9

3.40

2.20

2.40

X10

5.45

5.50

2.40

X11

4.60

3.60

2.40

largo(l)

altura(h)

Peso total de las cargas muertas


Cargas Vivas
Descripcion
ancho (a)
S/C Oficinas de 5.00mX5.90m
4.60

5.50

S/C Oficinas de 5.00mX4.00m


4.60

3.60

S/C Oficinas de 2.50mX5.90m


2.15

5.50

S/C Oficinas de 2.50mX2.95m


2.63
Peso total de las
cargas vivas

2.20

P. total de las cargas 1053334.80


muertas
Ptotal de cargas vivas 33612.75
P.parcial
1086947.55
P. s/c 5% (Peso del terreno)
54347.38

P . TOTAL

1141294.93

Piso 2,3,4,5,6,7,8,9,10
Cargas Muertas
Descripcion
ancho (a)

largo(l)

altura(h)

0.50

0.50

3.00

P.P. Viga Principal 4.00m


0.40

3.50

0.40

P.P. Viga Principal 5.00m


0.40

4.45

0.40

P.P. Viga Principal 5.90m


0.40

5.35

0.40

P.P. Viga Chata

7.70

0.25

P.P. Columna.

0.25

P.P. Acabados para Pisos


4.60de 5.00mx5.90m
5.50
P.P. Acabados para Pisos
4.60de 5.00mx4.00m
3.60
P.P. Acabados para Pisos
2.15de 2.50mX5.90m
5.50

ventana
alto

largo

1.20

1.35

P.P. Acabados para Pisos


2.63de 2.50mX2.95m
2.20
P.P. Acabados para cielo
4.60
raso de 5.00mX5.90m
5.50
P.P. Acabados para cielo
4.60
raso de 5.00mX4.00m
3.60
P.P. Acabados para cielo
2.15
raso de 2.50mX5.90m
5.50
P.P. Acabados para cielo
2.63
raso de 2.50mX2.95m
2.20
P.P. de losa 5.00mX5.90m
4.60

5.50

P.P. de losa 5.00mX4.00m


4.60

3.60

P.P. de losa 2.50mX5.90m


2.15

5.50

P.P. de losa 2.50mX2.95m


2.63
Peso total de las
cargas muertas

2.20

Cargas Vivas
Descripcion
ancho (a)

largo(l)

S/C Oficinas de 5.00mX5.90m


4.60

5.50

S/C Oficinas de 5.00mX4.00m


4.60

3.60

S/C Oficinas de 2.50mX5.90m


2.15

5.50

S/C Oficinas de 2.50mX2.95m


2.63
Peso total de las
cargas vivas

2.20

P. total de las cargas muertas


159858.90
Ptotal de cargas vivas 33612.75
P.parcial
193471.65
P. s/c 5% (Peso del terreno)
9673.58

P . TOTAL

203145.23

altura(h)

hvc

hvc

Hz

Hz

hvc

Hz

METRADO DE CARGAS

ventana
Area
1.62

Muro Efectivo (m3)


0.83

N veces

P.E

cantidad

peso(kg)

2400

15.00

21600.00

0.00

2400

4.00

329011.20

0.00

2400

4.00

266342.40

0.00

2400

6.00

349228.80

0.00

2400

1.00

65606.40

0.00

100

2.00

1540.00

0.00

100

4.00

4824.00

0.00

100

1.00

1815.00

0.00

100

1.00

748.00

0.00

100

2.00

5995.00

0.00

100

4.00

6624.00
1053334.80

P.E

cantidad

peso(kg)

250.00

2.00

12650.00

250.00

4.00

16560.00

250.00

1.00

2956.25

250.00

1.00

1446.50
33612.75

PESO TOTAL:

1141294.93

P.E

cantidad

peso(kg)

2400

15.00

54000.00

2400

6.00

8064.00

2400

10.00

17088.00

2400

6.00

12326.40

2400

1.00

1155.00

100

2.00

5060.00

100

4.00

6624.00

100

1.00

1182.50

100

1.00

578.60

100

2.00

5060.00

100

4.00

6624.00

100

1.00

1182.50

100

1.00

578.60

300

2.00

15180.00

300

4.00

19872.00

300

1.00

3547.50

300

1.00

1735.80
159858.90

P.E

cantidad

peso(kg)

250.00

2.00

12650.00

250.00

4.00

16560.00

250.00

1.00

2956.25

250.00

1.00

1446.50
33612.75

PESO TOTAL:

203145.23

Hz

Hz

2
A
bvc

2
A
bvc

Hz

2
A
bvc

CORTANTE BASAL
PESO DE PISOS
NIVEL
1 PISO
2 PISO
3 PISO
4 PISO
5 PISO
6 PISO
7 PISO
8 PISO
9 PISO
10 PISO
PESO TOTAL

PESOS (Toneladas)
Peso CM
Peso CV P. Total = CM + 25%CV
1053.33
33.61
1061.74
159.86
33.61
168.26
159.86
33.61
168.26
159.86
33.61
168.26
159.86
33.61
168.26
159.86
33.61
168.26
159.86
33.61
168.26
159.86
33.61
168.26
159.86
33.61
168.26
159.86
33.61
168.26
2492.06
336.13
2576.10
CALCULO DE LA CORTANTE BASAL
FACTORES

ZONA = Z
USO = Categoria C = U
SUELO III = S
FACTOR DE AMPLIFICACION SISMICA = C
COEFICIENTE DE REDUCCION = R
Tp
Periodo fundamental
Ct

VALOR
0.15
1.00
1.40
2.28
8.00
0.90
0.98571
35.00

Fuerza Sismica (Ton)

=
Fuerza Sismica (Ton)

*P

0.401.001.402.28
*1763.62
8

154.36

DISTRIBUCION DE LA FUERZA SISMICA EN ALTURA


NIVEL

Wi

1 PISO
2 PISO
3 PISO
4 PISO
5 PISO
6 PISO
7 PISO
8 PISO
9 PISO
10 PISO
PESO TOTAL

1061.74
168.26
168.26
168.26
168.26
168.26
168.26
168.26
168.26
168.26

Fi =

hi

Wi*hi
7.50
10.50
13.50
16.50
19.50
22.50
25.50
28.50
31.50
34.50

7963.03
1766.75
2271.54
2776.32
3281.11
3785.90
4290.68
4795.47
5300.26
5805.04
42036.11



0.18943
0.04203
0.05404
0.06605
0.07805
0.09006
0.10207
0.11408
0.12609
0.13810
1.00

Fi (ton)
27.22
6.04
7.77
9.49
11.22
12.94
14.67
16.39
18.12
19.85
143.71

Qi(ton)
27.22
33.26
41.03
50.52
61.74
74.68
89.35
105.74
123.86
143.71

*(V-Fa)

Fa =

0.07

10.65

Fa =

0.15

23.15

El cual tomaremos el menos valor = 7.29

5.12
4.84
6.22
7.6
8.98
10.36
11.74
13.13
14.51
15.89

os el menos valor = 7.29

5.12
9.95
16.17
23.77
32.75

43.11
54.86
67.98
82.49
98.38

NUMERO

NUMERO

LONG.

ELEMENTOS

PIEZAS POR

POR PZA

IGUALES

ELEMENTO

(M)

3/8"

39

1.56

3/8"

39

1.16

3/8"

10

34

1.56

3/8"

10

34

1.16

3/8"

29

1.56

3/8"

29

1.16

0.25

3/8"

39

0.96

0.25

METRADO DE FIERRO

3/8"

23

0.96

DISEO

0.40

ELEMENTO

VIGAS 5.90m

0.40

0.40

0.40

VIGAS 5.00m

0.40

0.40

0.40

VIGAS 4.00m

0.40

0.40

0.19

VIGAS CHATA 5.50m


0.25

0.19

VIGAS CHATA 2.20m


0.25

SUBTOTAL(ML)
TOTAL (MTS)
PESO (KG/MT) POR DIAMETRO VARILLA
TOTAL KGS

1154.23 KG

LONGITUD (METROS LINEALES DE VARILLAS)


3/8"
1/4"
M

365.04

271.44

530.40

394.40

271.44

201.84

37.44

22.08

2034.56

59.52

0.56

0.25

1139.35

14.88

CALCULO DE CEMENTO DE LOSA ALIGERADA


Area Vigueta =

1 + A2 = 0.04m2
0.40

A1(m2) =
A2(m2) =
A. total(m2) =

0.02
0.25

0.02
0.04

0.10

Para Area 5.00m*5.90m


# Viguetas =

5.50
0.40

vol. concreto = #

= 13.75

Veces
luz
ancho vigueta
#viguetas
largo
Volumen de concreto(m3)
Volumen de concreto total (m3)
Bolsas de cemento por m3
numero de bolsas
ladrillos por m2
area de losa
ladrillos total

numero de bolsas =

5.50

0.40

ladrillos por m2 =

13.75
4.60
2.53

2
5.06

ladrillos por m2 =

1.00
0.30

ladrillos total =

12.70
64.26


0 30

65

6.67
25.30
337.50

2
338

Para Area 5.00m*4.00m (sentido "X")


# Viguetas =

4.60
0.40

vol. concreto = #

= 11.5

Veces
luz
ancho vigueta
#viguetas
largo
Volumen de concreto(m3)
Volumen de concreto total (m3)
Bolsas de cemento por m3
numero de bolsas
ladrillos por m2

numero de bolsas =

4.60

0.40

ladrillos por m2 =

11.50
3.60
1.66

2
3.31

ladrillos por m2 =

12.70
42.06

6.67


0 30

43

ladrillos total =

1.00
0.30

area de losa
ladrillos total

# Viguetas =

16.56
220.91

3.60
0.40

2
221

vol. concreto = #

=9

Veces
luz
ancho vigueta
#viguetas
largo
Volumen de concreto(m3)
Volumen de concreto total (m3)
Bolsas de cemento por m3
numero de bolsas
ladrillos por m2
area de losa
ladrillos total

numero de bolsas =

3.60

0.40

ladrillos por m2 =

9.00
4.60
1.66

2
3.31

ladrillos por m2 =

12.70
42.06


0 30

43

ladrillos total =

1.00
0.30

6.67
16.56
220.91

2
221

Para Area 5.50m*2.15m


# Viguetas =

5.50
0.40

vol. concreto = #

= 13.75

Veces
luz
ancho vigueta
#viguetas
largo
Volumen de concreto(m3)
Volumen de concreto total (m3)
Bolsas de cemento por m3
numero de bolsas
ladrillos por m2
area de losa
ladrillos total

numero de bolsas =

5.50

0.40

ladrillos por m2 =

13.75
2.15
1.18

2
2.37

ladrillos por m2 =

12.70
30.04


0 30

31

ladrillos total =

1.00
0.30

6.67
11.83
157.75

2
158

Para Area 2.20m*2.63m


# Viguetas =

2.20
0.40

= 5.50

vol. concreto = #

Veces
luz
ancho vigueta
#viguetas
largo
Volumen de concreto(m3)
Volumen de concreto total (m3)
Bolsas de cemento por m3
numero de bolsas
ladrillos por m2
area de losa
ladrillos total

numero de bolsas =

2.20

ladrillos por m2 =

5.50
2.63
0.58

ladrillos por m2 =

12.70
14.70

15

ladrillos total =

6.67
5.79
77.19


0 30

2
1.16

2
78

10 pisos
TOTAL DE CEMENTO (bls) x piso
TOTAL DE LADRILLOS (und) x piso

0.40

197
1016

total material
10
1970
10
10160

1.00
0.30

0.20

0.05

0.40

0.10

0.30
0.30
1.00
0.30

= 6.67 ladrillos/m2

2 veces

0.30
0.30
1.00
0.30

= 6.67 ladrillos/m2

0.30
0.30
1.00
0.30

= 6.67 ladrillos/m2

0.30
0.30
1.00
0.30

= 6.67 ladrillos/m2

0.30
0.30
1.00
0.30

= 6.67 ladrillos/m2

total de cemento a utilizar en el edificio 10 pisos (losas) = 1900 bolsas


total de ladrillos a utilizar en el edificio 10 pisos (losas) = 10160 unidades

You might also like