Stages of a Project

? Enthusiasm
? Disillusionment
? Panic
? Search for the guilty party
? Punishment of the innocent party
? Fame and honor for the non-
participants
Omni, 1980

1
What is Design?
? ABET:
“The process of devising a system, component,
or process to meet desired needs. It is a
decision-making process (often iterative), in
which the basic sciences, mathematics, and
engineering sciences are applied to convert
resources optimally to meet a stated objective.”

Thermal-Fluids Design
? Design associated with principles of
thermodynamics, heat transfer, and fluid
mechanics
? Hardware: fans, pumps, compressors,
engines, heat exchangers, turbines,
reactors, pipes
? Systems: power generation, refrigeration,
air conditioning, electronics cooling, fluids
transport, and food, chemical, and
process industries

2
Basic Course Topics
? Analysis, selection, and modeling of
thermal/fluid equipment
? System simulation
? System optimization
? Basics of economics
? Optimization using exergy

Some ME 200 applications


? Fluids: design and modeling of
piping networks
? Thermodynamics: modeling and
optimization of a refrigeration
system
? Heat Transfer:
design/modeling/optimization of an
electronic module cooling system

3
Aircraft Development Cycle

Engineering Design
Flow Diagram

4
Need/Opportunity
? Make sure that this statement
describes the need, not a possible
solution.
? For example:
? City officials want to enlarge a reservoir
to store larger quantities of water
vs.
? City officials need more water during
certain times of the year

Probability of Success
? Need to choose success criteria
? For example, a 10% rate of ROI for a 5-year plant life

5
Market Analysis
? Higher volume means lower price because cost
is lower (usually) in a large plant

Technical Design
? This is what we’re focusing on in this
class!

6
Feasibility
? Is the project even possible?
Infeasibility can be caused by
? Lack of investment capital
? Lack of land or labor

? Unfavorable zoning regulations

? Safety codes or other laws

?A project may be feasible but


uneconomical.

Research and Development


? This may occur in many phases of
design.
? It could be the source of the idea.
? It may be involved in the first technical
design iteration or in later iterations as
new designs are chosen or the original
one is improved

7
Other important factors
? Relevant codes, standards, laws
? Interference with other systems
? Liability – written documentation of
everything is important!
? Environmental concerns
? Safety and reliability
? Disposal/recycling

What constitutes a workable system?


?A workable system
? Meets system requirements, such as
maintaining a refrigeration room at the
required temperature
? Has acceptable life an maintenance
costs
? Abides by constraints such as size,
noise, pollution, effects on other
systems

8
Workable vs. Optimum System Example
? Pump and piping must be selected to convey 3
kg/s of water over distance of 250 m and an
elevation rise of 8 m.
? To design a workable system

? P ?elevation rise ?=?gZ= ?1000 kg/m 3 ??9.81 m/s 2 ??8 m ? ? 78.5 kPa

Estimate a 100 kPa pressure drop due to pipe friction.


Pick a pump that meets this 179 kPa pressure drop while
delivering 3 kg/s.
Choose a pipe size that results in 100 kPa pressure drop or
less over a 250 m length. A 2-in pipe meets this
specification.

? But will this be the optimum system? Probably


not.

Optimum System
? Optimize life-cycle cost.
? Assume that installation and
maintenance costs are the same for
all cases and thus can be ignored.
? Three main costs
? Pump first cost (increases with ? P)
? Piping first cost (decreases with ? P)

? Operating cost (increases with ? P)