DISEO ESTRUCTURA PAVIMENTO FLEXIBLE. METODO AASHTO 1. TPDC = (1875,0125) C = 50% F.C. = 3.113 r = 0.

0491 n = 30

W18 = 7.1*107 EJES EQ. 8,2 TON 2. MODULO RESILIENTE CBR = 4.1 MR = 1500 * CBR MR = 1500 * (4.1) MR = 6150 Lb/Pulg
2

3. MODULO RESILIENTE BASE Y SUB BASE BASE GRANULAR a2 = 0.13 CBR = 80%
2

CON LA GRAFICA PAG. 5

E O Mr = 29000 Lb/Pulg SUB BASE GRANULAR a3 = 0.1 CBR = 25%

CON LA GRAFICA PAG. 8


2

E O Mr = 16500 Lb/Pulg

4. VOLUMEN ESTRUCTURAL DEL PAVIMENTO SN Nivel Confiabilidad 90%

Desviacin Estndar ndice Inicial de Servicio

d = 0.45 Po = 4.3 Pt = 2.0

ndice de Serviciabilidad Final PSI = Po Pt PSI = 4.3 2.0 PSI = 2.3 DE LA GRAFICA PAG. 11

SN = 5.95

5. VALOR ESTRUCTURAL PARA LA CAPA ASFALTICA Ec = 350000 PSI GRAFICA PAG. 4 (25000 Kg/Cm ) a1 = 0.38
2

6. VOLUMEN ESTRUCTURAL DEL CONCRETO ASFALTICO Mr BASE = 29000 Lb/Pulg SN1 = a1*D1 SN1 = 3.8 D1 = Espesor Concreto Asfaltico (Pulg) a1 = Coeficiente Estructural Capa Asfltica SN1 = Volumen Estructural Concreto Asfaltico a1 = 0.38 SN1 = 3.8 D1 = D1 = 3.8/0.38 D1 = 10 Pulg. = 25.4 Cm
2

ESPESOR BASE GRANULAR Sin calculado SN2 SN1 SNc = 4.3 3.8 SNc = 0.5 a2 = 0.13 D2 = D2 = m2 = 1.15

= 3.34 Pulg 4 Pulg

SN2 = D2 * a2 * m2 SN2 = 4.0 * 0.13 * 1.15 SN2 = 0.598 SUB BASE GRANULAR SN = SN1 + SN2 +SN3 SN3 = a3 * D3 * m3 5.95 = 3.8 + 0.598 * (0.1 * D3 * 1.15) 5.95 = 4.398 + (0.115 D3) 5.95 4.398 = 0.115 D3 D3 = 1.552 / 0.115 D3 = 13.49 14 Pulg. SN3 = 14 * 0.1 * 1.15 SN3 = 1.61