You are on page 1of 21

DATE

SIGN-IN TIME

23/09/2013 8.29
24/09/2013 8.4
25/09/2013 8.33
26/09/2013 8.35

8.29 - 10

11.45 - 12.45
1.30 - 6.00
8.45 - 9.30

TASKS
Discussion on the months time table filling
CATIA - housing model finished(Raghu)

filter element basis 4515054175, model and drawing modification


revision on Yesterday's work
corrections on filter basis (above)

27/09/2013 8.5
30/09/2013 8.45
1/10/2013

8.45

9.30 - 2.30
3.00 - 7.30
9.30 - 1.00

Practice and documentation of the same


Practice on the same.

2/10/2013
3/10/2013

Holiday
8.4

4/10/2013

8.3

7/10/2013

8.3

8/10/2013

8.3

9/10/2013

8.5

10/10/2013 8.41

11/10/2013 8.3

14/10/2013 Holiday
15/10/2013 8.2

16/10/2013 8.3

9.30 - 4.30
4.30 - 5.30
8.40 - 9.15

9.30-11.30
12.10-6.35
10-12.30
12.30-4.30
5.00-6.40
11.00 - 12.00
4.00 - 6.30
4.00 - 5.00
5.00 - 6.30
10.00 - 4.00
10.00 - 12.00
12.00 - 1.35
2.00 - 3.00
3.00 - 4.00
5.00 - 5.30
5.30 - 6.00

8.45 - 12.00
12.00 - 1.00
1.45 - 6.35
6.35 - 7.45
9.00 - 9.30
9.30 - 12.30

17/10/2013 8.31

2.00 - 6.30
8.45- 10.15

Excel task from Mahesh

KPI sheet updation(vivek)


Updation of Operational sheets from KPI (Mahesh and Prathiba)
Practice on Prathiba's training
Practice on Prathiba's training

KPI sheet (Providing CDB links)

Practice on today's training

Job ob EC - AA - 2013 - 0735


Job ob X type work flow, WDK 11 102/11 BOSCH
Parametric modelling
Modification ofbellow no. from 1083417S01 TO 1128923S01,
6650856220 TO1128923S01, 6650856290 TO 1128937S01,
1081998S01 TO 1129139S01, 6650656160 TO 1129139S01
Modification of EC-AA-2013-0353
Modification of EC-AA-2013-0353

18/10/2013 8.5

21/10/2013

12.00 - 5.15
6.00 - 7.40
9.00 - 10.00
10.00-12.45
5.30 - 6.18
8.4 9.00 - 9.25

9.35 - 2.25

22/10/13

23/10/13

24/10/13

25/10/13
28/10/13

2.40- 6.30
8.3 4.15-4.30
4.30-5.00
5.00-6.15
6.15-7.30
8.5 9.15-11.00

11.00-11.30
11.30-1.30
2.00-4.00
4.00 - 6.00
6.15 - 6.30
6.30 - 7.00
8.3 9.00-9.15
9.15-10-30
11.15-12.00
12.00-12.30
1.30-2.00
2.00-3.00
3.00-400
4.00-6.00
6.15-7.41
8.23 8.30-9.30
8.5 9.30-12.00
12.00-12.45
1.30-2.00
2.00- 3.00
3.00-4.00
4.00-5.30
5.30-6.10

Sample order - 1155533P01 to 1168873P01, 1168841P01


Modification of EC-AA-2013-0353
Modification of EC-AA-2013-0353
1092706S01 MODIFICATION
1092706S01 PRINTOUTS AND MODIFICATION
EP-GM1044-05-0000. 10 744 23 S01 C 35 160/1 Basis
- 10 886 94 S01 C 30 004 Basis
- 11 227 06 S01 C 22 018 Basis
(mridul)
- 11 319 90 S01 C 2567 Basis
- 11 328 30 S01 C 38 003 Basis
- 45 168 54 260 C 29 168 Basis
(Prisi)
check list of sample order sl.no 47
check list of sample order sl.no 48
documentation of the tasks did
Time sheet preparation

Mary's TCM TCR


P-type work flow - shridhar
TCM/TCR (EC-AA-MFVP-2013-0073) prathiba
KPI Sheet cancelled - Deepak
Std spin on check list Check list(Std - 1051177S01)
Personal time sheet updation
Check list(Std - 1051177S01)
Mridual task sl.no 54
kpi sheet
kpi sheet
Mridual task sl.no 54
kpi
Mridual task sl.no 54
kpi
TCM/TCR (EC-AA-MFVP-2013-0073) sl 64
EP-MHE1140-0009 - 0018 (Mahesh / lohl)
Time sheet

time sheet kpi


SAMPLE ORDER PRATHIBA 2-2

6.10-6.25

29/10/13

8.4 9.08-9.30
9.30-10.15
10.30-2.45
2.45-4.45
5.15-6.20

30/10/13
31/10/2013
1/10/2013

EP-GM1044-05-0000. 10 744 23 S01 C 35 160/1 Basis


- 10 886 94 S01 C 30 004 Basis
- 11 227 06 S01 C 22 018 Basis
(mridul)
- 11 319 90 S01 C 2567 Basis
- 11 328 30 S01 C 38 003 Basis
- 45 168 54 260 C 29 168 Basis

EC-AA-MFVP-2013-0073
kpi
EP-MHE1140-0009
(MAHESH, LOHL)
ORDER NO. 150000142
EC-AA-2013-035313070062235 (PRATHIBA) correction
KPI Mahesh (oil only)

8.45
8.45

holiday

5/11/2013
6/11/2013
7/11/2013
8/11/2013

8.2
8.3
8.4
8.5

11/11/2013
12/11/2013
13/11/2013
14/11/2013
15/11/2013

8:42 AM
8:25 AM
8:42 AM
8:47 AM
8:30 AM

18/11/2013
19/11/2013
20/11/2013
21/11/2013
22/11/2013

8:38 AM
8:45 AM
8:45 AM
9:00 AM
8:30 AM

25/11/2013

8:50 AM
9:00 AM
8:45 AM

TRAINING

MEETING

SIGN-OUT

Extra hours

6.4

50 mins

50 mins

7
5.3

10 mins
0

Training on below tasks

6.11
CDB introduction (prathiba)

7.3

1hr 15 mins

CDB (prathiba)

6.15

CDB introduction (prathiba)


Virtual engg. Training

7.2

1hr 10 mins

X-type and P - type workflow training

6.45

45 mins

Std model (Prathiba)

6.45

45 mins

6.3

0 mins

7.05

I hr

Ranjith's tumkur presentation


Ranjith's tumkur presentation
CDB parametric modelling
TCM TCR (Prathiba)
CDB parametric modelling

6.15
TTK meeting
SC meeting(ajay)
Ayuda pooja

7.5

2 hr

7.3

1 hr 30min

7.5

1hr 50 mins

Town hall meeting


CREATION OF TIME SHEET

6.3

7.15

7.4
town hall by CEO

7
task training on check list preparation
of Spin-on (Std - 1051177S01)

darshan on spin on

7.3 1hr

Team meeting
Lohl web-ex, sl 79

6.15 15mins

6.2 5mins
5.15

holiday
3.3
7.3
7.3
7
7:55 PM 2 hr
7:12 PM
6:15 PM
6:15 PM
5:20 PM

0
0.3
0.2

0
0
0

7:30 PM
7:45 PM
7:55 PM
8:10 PM
6:10 PM

1.22
1.3
1.4
1.4
0.1

7:45 PM
8:25 PM

1.25
2.35

Week
Mon
Tue
Wed
Thu
Fri
Mon
tue

thur
Fri
mon
tue

wed
thur

fri

mon
tue

wed

thurs

ACTUALLY
WORKED

mon

tue

wed

thur

fri
mon

tues

wed
thurs

MON
TUES
WED
THURS
FRI

11:13
10:47
09:33
09:28
08:50

MON
TUES
WED
THURS
FRI

10:52
11:00
11:10
11:10
09:40
10:55
11:25

DATE

TRAINING

20/09/2013 1167170P01
25/09/2013 45 150 54 175
1167169P01
15/10/2013 EC - AA - 2013 - 0735
WDK 11 102/11 BOSCH

16/10/2013 EC-AA-2013-0353

17/10/2013 EC-AA-2013-0353
1155533P01
18/10/2013 EC-AA-2013-0353

21/10/13

EP-GM1044-05-0000.

Modifications in drawing
Modification in GUD labelling
Oct-13
Creating our CCN no. and changing
designation from MC 18 001 to C 18 008
Modification of BOSCH labelling from M+H
bassis
Modification of EC-AA-2013-0353 - bellow no.
from 1083417S01 TO 1128923S01,
6650856220 TO1128923S01, 6650856290 TO
1128937S01, 1081998S01 TO 1129139S01,
6650656160 TO 1129139S01
Modification of EC-AA-2013-0353; CCN 42913
Sample order - 1155533P01 to 1168873P01,
1168841P01
Modification of EC-AA-2013-0354; CCN 46913
10 744 23 S01 C 35 160/1 Basis
10 886 94 S01 C 30 004 Basis
11 227 06 S01 C 22 018 Basis
11 319 90 S01 C 2567 Basis
11 328 30 S01 C 38 003 Basis
45 168 54 260 C 29 168 Basis

GUIDED BY TIME SPENT

1150051P01
EC-AA-MFVP-2013-0073
EP-MHE1140-0009 - 0018

P-type work flow


Changing yellow/green folding box to neutral
Changing of different EC no's

OUTCOME

LINKS

Order no.

SHRIDHAR
Prathiba
Prathiba

4
5.5
5

CDB LINK
Editing dimensions
in 3D
modelling and drafting, alignment of te
CDB
LINKS
detail sheet modification,
instantiate, text orientation
CDB Link

Prathiba

3.25

Searching for EC no.,


CDBcreating
LINK CCN from the ECR.

Prathiba

printing the order plan from the work flow, BOSCH labelling as p

Prathiba

generating the CCN


no.,LINK
and modification of drawing
CDB

Prathiba

6.3

generating the CCN


no.,LINK
and modification of drawing
CDB

Prathiba

9.15

Prathiba

2.4

generating the CCN


no.,LINK
and modification of drawing
CDB

Mridul

6.45

No generation of index
for the part no. if there is no need of mod
CDB LINK

Mary's TCM TCR

23/10/13

28/10/13

TASK

CDB LINK

2.3
shridhar

Prathiba
Mahesh

4.3
0.45

170014777
130004514

November monthly time sheet

30/10/13

EC-AA-MFVP-2013-0073

Changing yellow/green folding box to neutral

Prathiba

0.3
CDB LINK

31/10/13

EP-MHE1140-0009 - 0018

changing the element part number and


replacing it with new basis. Task package, EP- mahesh
MHE1140-0013,0012,0015.

VarioPleat-MA'S

Drawings were copied to the new part number

6/11/2013

1155533P01

8/11/2013

C 52/1 - Zeichnung mit


Nanofasermedium

Sample order - 1155533P01 to 1168873P01,


1168841P01
change media number to 1702146999, store it
in project EP-DCT1143, Reference is filter
4500258050

21.45
150000142

shridhar

0.3

140001144

Prathiba

4.3

100000389

shridhar

calculation drawings for the 3 elements,


1170552P01 - STD
1170552P02 - Low
1170552P03 - High
reference element 1117437P01

deepak

11/11/2013 C 14 130/1 VW

Transfer of LOGO from V4 to V5 and


modification of drawing and BOM

deepak

12/11/2013 13_3619_X_00/

X work flow

VOL1125 RFI

130004514

4.3

150 000 119

8.3

170019831

10

130004512

prathiba

4.35

170016713

prathiba

14/11/2013

Sample Order
Replacement of reinforcement in the ZB,
updation of drawings

shridhar

7.45

15/11/2013 EC-AA-2013-0819

change of PCT LOGO

prathiba

2.3

130004512

16/11/2013 EC-AA-2013-0807

Modifing the dimensions

prathiba

130004514

21/11/2013 200032315

change in inscription and generating new


number

prathiba

3.15

900010783

Shridhar

15.15(27/11)

200032185

25/11/2013

14002094

From

task type project no.

status

flow, BOSCH labelling as per the BOSCH std.s

KPI
documentat
updation
ion

Y
Y

y
Y

MONTHLY
SHEET

part no.

Product
type

fuel

released,
13/11/2013
sample
order
Thomas Lohl
time sheet

Roock, Sigrid

tcm/tcr

Thomas Lohl

drawings

Nadine

MHV1284

Andraschko, Regina

drawings
sample
order

Daniel

drawings

EP-DCT1143

Adriano

drawings

released,
EP-VOL1125-01 12/11/2013

LOHL

(others)

C 14 130/1 VW

Gottwald-Grill
Gottwald-Grill

X work flow 13_3619_X_00/


sample
order
EP-MHE1181

Daniel

drawings

Renate Gottwald-Grill
ROOCK

6630159920
,1169950s0
1

Fuel

Air

Air

Oil

Air

Air

Air

Air

VE-IPD1010

tcm/tcr

EC-AA-2012

drawings

EC-AA-2013

released,
12/11/2013

Andraschko, Regina

Sample
order

no proj no.

Schmid, Daniel

drawings

MHE1140

Air
Ref1169071S01
,261007407
0
4502954160
1166861p01ref,
1171624p01
,1171626p0
1

Air
Air

oil

Air

Time

Date

30/10/2013

Oct-13
CDB LINK

Nov-13
31/10/2013

CDB LINK

5/11/2013

CDB LINK

8.00
sign-in 8.45
8.30

break

9.00

sign-in 8.45

break

8.2
break

break

time sheet

mahesh task
package

break
Daily kpi

Sridharsample order
9.30

10.00
mahesh task
package

Depart. Kpi
10.30
jobless
11.00

CDB LINK
11.30
Mahesh kpi

Sridhar-other
task 2nd in
mail

12.00

mahesh task
package

12.30

Prathiba
check sheet
preparation

lunch

Prathiba TCM
TCR - EC-AAMFVP-20130073

1.00

lunch
lunch

lunch

1.30

Mahesh kpi

2.00
2.30

WEB-EX
LOHL

Sridhar-other
task 2nd in
mail

task 2nd in
mail

3.00

Mahesh kpi
time sheet
daily
Prathiba TCM
TCR - EC-AAMFVP-20130073

3.30

4.00

Quiz
SC updates
Prathiba TCM
TCR - EC-AA- CDB LINK

4.30

5.00
5.30

6.00

6.30
7.00
7.30
8
8.3

ETHNIC DAY
CELEBRATI
ON

Nov-13
6/11/2013

CDB LINK

7/11/2013

8.3

CDB LINK

8/11/2013

8.4

CDB LINK

11/11/2013

8.5

break

break

break

time sheet

timesheet

timesheet

8.42
break, time
sheet

deepak
monthly
modification
in KPI sheet

mahesh task
package

mahesh task
package

Sridhar-other
task 2nd in
mail

MRIDUAL

Deepak task

deepak
monthly
modification
in KPI sheet

LUNCH
lunch
lunch

Deepak task

1155533P01
(PRATHIBA)

deepak
monthly
modification
in KPI sheet

Sridhar-other
task 2nd in
mail

CDB LINK

1155533P01
(PRATHIBA)

deepak
monthly
modification
in KPI sheet

Sridhar-other
task 2nd in
mail

Deepak task

Deepak task

Deepak task

Deepak task

12/11/2013

CDB LINK

13/11/2013

8.25

CDB LINK

14/11/2013

8.42

CDB LINK

15/11/2013

8.47

break

time sheet

time sheet

timesheet

deepak task

Hard copy
documentatio
n

Deepak task

Prathiba

break

8.3

break

time sheet
Hard copy
documentati
on

break

shridhar ask

Deepak task
deepak task

Prathiba

1155533P01

(Prathiba)

lunch
lunch
Prathiba

lunch

lunch
lunch
Presentation
on x
workflow

lunch

lunch
jobless

shridhar ask

CDB LINK

shridhar
teaching the
task

meeting
vishwas
prathiba

Prathiba
sample order

shridhar
task
documentati
on

deepak task

18/11/2013

CDB LINK

19/11/2013

8:38

CDB LINK

20/11/2013

CDB LINK

21/11/2013

CDB LINK

8.45

break

break

timesheet

timesheet

Training
Need excel
draft
preparation

prathiba
task

8.45

Mahesh
task

Mahesh
task

KPI
modification

Hard copy
documentatio
n sridhar task

break mogena
jadhe

Hard copy
documentatio
n sridhar task
kpi

Doc of mary helping

weekly
meeting

prathiba
task
prathiba birth
day party

lunch

lunch

lunch

kpi

Prathiba wit
anshul
sample
order
kpi task wise
prathiba

LUNCH

prathiba
task

deepak kpi

Mahesh
task

kpi

kpi

Prathiba wit
anshul
sample
order

documentatio
n of all
prathiba
kpi
mahesh
product wise
kpi

Mahesh
task
prathiba

Mahesh
task

kpi

22/11/2013

CDB LINK

25/11/2013

CDB LINK

26/11/2013

CDB LINK

27/11/2013

8.3
BREAK,
TIME SHEET

Prathiba's
task

8.5

8.45

break, time
sheet

Sridhar task

break, time
sheet

kpi

Sridhar task

lunch

kpi

Mahesh
task

lunch
lunch

lunch

lunch

lunch

Sridhar task

lunch

Prathiba

break

Check list

Sridhar task

You might also like