Professional Documents
Culture Documents
SIGN-IN TIME
23/09/2013 8.29
24/09/2013 8.4
25/09/2013 8.33
26/09/2013 8.35
8.29 - 10
11.45 - 12.45
1.30 - 6.00
8.45 - 9.30
TASKS
Discussion on the months time table filling
CATIA - housing model finished(Raghu)
27/09/2013 8.5
30/09/2013 8.45
1/10/2013
8.45
9.30 - 2.30
3.00 - 7.30
9.30 - 1.00
2/10/2013
3/10/2013
Holiday
8.4
4/10/2013
8.3
7/10/2013
8.3
8/10/2013
8.3
9/10/2013
8.5
10/10/2013 8.41
11/10/2013 8.3
14/10/2013 Holiday
15/10/2013 8.2
16/10/2013 8.3
9.30 - 4.30
4.30 - 5.30
8.40 - 9.15
9.30-11.30
12.10-6.35
10-12.30
12.30-4.30
5.00-6.40
11.00 - 12.00
4.00 - 6.30
4.00 - 5.00
5.00 - 6.30
10.00 - 4.00
10.00 - 12.00
12.00 - 1.35
2.00 - 3.00
3.00 - 4.00
5.00 - 5.30
5.30 - 6.00
8.45 - 12.00
12.00 - 1.00
1.45 - 6.35
6.35 - 7.45
9.00 - 9.30
9.30 - 12.30
17/10/2013 8.31
2.00 - 6.30
8.45- 10.15
18/10/2013 8.5
21/10/2013
12.00 - 5.15
6.00 - 7.40
9.00 - 10.00
10.00-12.45
5.30 - 6.18
8.4 9.00 - 9.25
9.35 - 2.25
22/10/13
23/10/13
24/10/13
25/10/13
28/10/13
2.40- 6.30
8.3 4.15-4.30
4.30-5.00
5.00-6.15
6.15-7.30
8.5 9.15-11.00
11.00-11.30
11.30-1.30
2.00-4.00
4.00 - 6.00
6.15 - 6.30
6.30 - 7.00
8.3 9.00-9.15
9.15-10-30
11.15-12.00
12.00-12.30
1.30-2.00
2.00-3.00
3.00-400
4.00-6.00
6.15-7.41
8.23 8.30-9.30
8.5 9.30-12.00
12.00-12.45
1.30-2.00
2.00- 3.00
3.00-4.00
4.00-5.30
5.30-6.10
6.10-6.25
29/10/13
8.4 9.08-9.30
9.30-10.15
10.30-2.45
2.45-4.45
5.15-6.20
30/10/13
31/10/2013
1/10/2013
EC-AA-MFVP-2013-0073
kpi
EP-MHE1140-0009
(MAHESH, LOHL)
ORDER NO. 150000142
EC-AA-2013-035313070062235 (PRATHIBA) correction
KPI Mahesh (oil only)
8.45
8.45
holiday
5/11/2013
6/11/2013
7/11/2013
8/11/2013
8.2
8.3
8.4
8.5
11/11/2013
12/11/2013
13/11/2013
14/11/2013
15/11/2013
8:42 AM
8:25 AM
8:42 AM
8:47 AM
8:30 AM
18/11/2013
19/11/2013
20/11/2013
21/11/2013
22/11/2013
8:38 AM
8:45 AM
8:45 AM
9:00 AM
8:30 AM
25/11/2013
8:50 AM
9:00 AM
8:45 AM
TRAINING
MEETING
SIGN-OUT
Extra hours
6.4
50 mins
50 mins
7
5.3
10 mins
0
6.11
CDB introduction (prathiba)
7.3
1hr 15 mins
CDB (prathiba)
6.15
7.2
1hr 10 mins
6.45
45 mins
6.45
45 mins
6.3
0 mins
7.05
I hr
6.15
TTK meeting
SC meeting(ajay)
Ayuda pooja
7.5
2 hr
7.3
1 hr 30min
7.5
1hr 50 mins
6.3
7.15
7.4
town hall by CEO
7
task training on check list preparation
of Spin-on (Std - 1051177S01)
darshan on spin on
7.3 1hr
Team meeting
Lohl web-ex, sl 79
6.15 15mins
6.2 5mins
5.15
holiday
3.3
7.3
7.3
7
7:55 PM 2 hr
7:12 PM
6:15 PM
6:15 PM
5:20 PM
0
0.3
0.2
0
0
0
7:30 PM
7:45 PM
7:55 PM
8:10 PM
6:10 PM
1.22
1.3
1.4
1.4
0.1
7:45 PM
8:25 PM
1.25
2.35
Week
Mon
Tue
Wed
Thu
Fri
Mon
tue
thur
Fri
mon
tue
wed
thur
fri
mon
tue
wed
thurs
ACTUALLY
WORKED
mon
tue
wed
thur
fri
mon
tues
wed
thurs
MON
TUES
WED
THURS
FRI
11:13
10:47
09:33
09:28
08:50
MON
TUES
WED
THURS
FRI
10:52
11:00
11:10
11:10
09:40
10:55
11:25
DATE
TRAINING
20/09/2013 1167170P01
25/09/2013 45 150 54 175
1167169P01
15/10/2013 EC - AA - 2013 - 0735
WDK 11 102/11 BOSCH
16/10/2013 EC-AA-2013-0353
17/10/2013 EC-AA-2013-0353
1155533P01
18/10/2013 EC-AA-2013-0353
21/10/13
EP-GM1044-05-0000.
Modifications in drawing
Modification in GUD labelling
Oct-13
Creating our CCN no. and changing
designation from MC 18 001 to C 18 008
Modification of BOSCH labelling from M+H
bassis
Modification of EC-AA-2013-0353 - bellow no.
from 1083417S01 TO 1128923S01,
6650856220 TO1128923S01, 6650856290 TO
1128937S01, 1081998S01 TO 1129139S01,
6650656160 TO 1129139S01
Modification of EC-AA-2013-0353; CCN 42913
Sample order - 1155533P01 to 1168873P01,
1168841P01
Modification of EC-AA-2013-0354; CCN 46913
10 744 23 S01 C 35 160/1 Basis
10 886 94 S01 C 30 004 Basis
11 227 06 S01 C 22 018 Basis
11 319 90 S01 C 2567 Basis
11 328 30 S01 C 38 003 Basis
45 168 54 260 C 29 168 Basis
1150051P01
EC-AA-MFVP-2013-0073
EP-MHE1140-0009 - 0018
OUTCOME
LINKS
Order no.
SHRIDHAR
Prathiba
Prathiba
4
5.5
5
CDB LINK
Editing dimensions
in 3D
modelling and drafting, alignment of te
CDB
LINKS
detail sheet modification,
instantiate, text orientation
CDB Link
Prathiba
3.25
Prathiba
printing the order plan from the work flow, BOSCH labelling as p
Prathiba
Prathiba
6.3
Prathiba
9.15
Prathiba
2.4
Mridul
6.45
No generation of index
for the part no. if there is no need of mod
CDB LINK
23/10/13
28/10/13
TASK
CDB LINK
2.3
shridhar
Prathiba
Mahesh
4.3
0.45
170014777
130004514
30/10/13
EC-AA-MFVP-2013-0073
Prathiba
0.3
CDB LINK
31/10/13
EP-MHE1140-0009 - 0018
VarioPleat-MA'S
6/11/2013
1155533P01
8/11/2013
21.45
150000142
shridhar
0.3
140001144
Prathiba
4.3
100000389
shridhar
deepak
11/11/2013 C 14 130/1 VW
deepak
12/11/2013 13_3619_X_00/
X work flow
VOL1125 RFI
130004514
4.3
8.3
170019831
10
130004512
prathiba
4.35
170016713
prathiba
14/11/2013
Sample Order
Replacement of reinforcement in the ZB,
updation of drawings
shridhar
7.45
15/11/2013 EC-AA-2013-0819
prathiba
2.3
130004512
16/11/2013 EC-AA-2013-0807
prathiba
130004514
21/11/2013 200032315
prathiba
3.15
900010783
Shridhar
15.15(27/11)
200032185
25/11/2013
14002094
From
status
KPI
documentat
updation
ion
Y
Y
y
Y
MONTHLY
SHEET
part no.
Product
type
fuel
released,
13/11/2013
sample
order
Thomas Lohl
time sheet
Roock, Sigrid
tcm/tcr
Thomas Lohl
drawings
Nadine
MHV1284
Andraschko, Regina
drawings
sample
order
Daniel
drawings
EP-DCT1143
Adriano
drawings
released,
EP-VOL1125-01 12/11/2013
LOHL
(others)
C 14 130/1 VW
Gottwald-Grill
Gottwald-Grill
Daniel
drawings
Renate Gottwald-Grill
ROOCK
6630159920
,1169950s0
1
Fuel
Air
Air
Oil
Air
Air
Air
Air
VE-IPD1010
tcm/tcr
EC-AA-2012
drawings
EC-AA-2013
released,
12/11/2013
Andraschko, Regina
Sample
order
no proj no.
Schmid, Daniel
drawings
MHE1140
Air
Ref1169071S01
,261007407
0
4502954160
1166861p01ref,
1171624p01
,1171626p0
1
Air
Air
oil
Air
Time
Date
30/10/2013
Oct-13
CDB LINK
Nov-13
31/10/2013
CDB LINK
5/11/2013
CDB LINK
8.00
sign-in 8.45
8.30
break
9.00
sign-in 8.45
break
8.2
break
break
time sheet
mahesh task
package
break
Daily kpi
Sridharsample order
9.30
10.00
mahesh task
package
Depart. Kpi
10.30
jobless
11.00
CDB LINK
11.30
Mahesh kpi
Sridhar-other
task 2nd in
mail
12.00
mahesh task
package
12.30
Prathiba
check sheet
preparation
lunch
Prathiba TCM
TCR - EC-AAMFVP-20130073
1.00
lunch
lunch
lunch
1.30
Mahesh kpi
2.00
2.30
WEB-EX
LOHL
Sridhar-other
task 2nd in
mail
task 2nd in
mail
3.00
Mahesh kpi
time sheet
daily
Prathiba TCM
TCR - EC-AAMFVP-20130073
3.30
4.00
Quiz
SC updates
Prathiba TCM
TCR - EC-AA- CDB LINK
4.30
5.00
5.30
6.00
6.30
7.00
7.30
8
8.3
ETHNIC DAY
CELEBRATI
ON
Nov-13
6/11/2013
CDB LINK
7/11/2013
8.3
CDB LINK
8/11/2013
8.4
CDB LINK
11/11/2013
8.5
break
break
break
time sheet
timesheet
timesheet
8.42
break, time
sheet
deepak
monthly
modification
in KPI sheet
mahesh task
package
mahesh task
package
Sridhar-other
task 2nd in
mail
MRIDUAL
Deepak task
deepak
monthly
modification
in KPI sheet
LUNCH
lunch
lunch
Deepak task
1155533P01
(PRATHIBA)
deepak
monthly
modification
in KPI sheet
Sridhar-other
task 2nd in
mail
CDB LINK
1155533P01
(PRATHIBA)
deepak
monthly
modification
in KPI sheet
Sridhar-other
task 2nd in
mail
Deepak task
Deepak task
Deepak task
Deepak task
12/11/2013
CDB LINK
13/11/2013
8.25
CDB LINK
14/11/2013
8.42
CDB LINK
15/11/2013
8.47
break
time sheet
time sheet
timesheet
deepak task
Hard copy
documentatio
n
Deepak task
Prathiba
break
8.3
break
time sheet
Hard copy
documentati
on
break
shridhar ask
Deepak task
deepak task
Prathiba
1155533P01
(Prathiba)
lunch
lunch
Prathiba
lunch
lunch
lunch
Presentation
on x
workflow
lunch
lunch
jobless
shridhar ask
CDB LINK
shridhar
teaching the
task
meeting
vishwas
prathiba
Prathiba
sample order
shridhar
task
documentati
on
deepak task
18/11/2013
CDB LINK
19/11/2013
8:38
CDB LINK
20/11/2013
CDB LINK
21/11/2013
CDB LINK
8.45
break
break
timesheet
timesheet
Training
Need excel
draft
preparation
prathiba
task
8.45
Mahesh
task
Mahesh
task
KPI
modification
Hard copy
documentatio
n sridhar task
break mogena
jadhe
Hard copy
documentatio
n sridhar task
kpi
weekly
meeting
prathiba
task
prathiba birth
day party
lunch
lunch
lunch
kpi
Prathiba wit
anshul
sample
order
kpi task wise
prathiba
LUNCH
prathiba
task
deepak kpi
Mahesh
task
kpi
kpi
Prathiba wit
anshul
sample
order
documentatio
n of all
prathiba
kpi
mahesh
product wise
kpi
Mahesh
task
prathiba
Mahesh
task
kpi
22/11/2013
CDB LINK
25/11/2013
CDB LINK
26/11/2013
CDB LINK
27/11/2013
8.3
BREAK,
TIME SHEET
Prathiba's
task
8.5
8.45
break, time
sheet
Sridhar task
break, time
sheet
kpi
Sridhar task
lunch
kpi
Mahesh
task
lunch
lunch
lunch
lunch
lunch
Sridhar task
lunch
Prathiba
break
Check list
Sridhar task