You are on page 1of 1

EHC Project

Organization Chart for QA/QC Staff for 9 months till tanks erection finish
QA/QC MANAGER
Document Controllers

TANKS
6/2012 to 3/2013
Low alloy & C.S Work shop

Work Shop
SS Work shop

Site

HAS QC Engineers

QC Engineers QC Engineer

HAS Subcontractor

1Data Collector Fit up check 1Data Collectors

Material
Traceability
fit up check

QC Engineer

1Data Collector
Data collecting

&visual inspection

QC Engineers

Data Entry

Data Collector

Material Traceability

Data collecting

Fit up check
Data collecting

PWHT&NDT

Scope

Fit up check

Visual Inspection

Visual Inspection

Material Traceability Consumables control

Consumables control

NDT Scope

Check NDT for painting release

Consumables control Visual Inspection

Isometrics check with the main contractor and the owner

Data collecting

NDT Scope

NDT Scope

Consumables control

PWHT

HAS QA/QC Manager