Field Check List Erection of Pretensioned Precast Concrete Girders ELH Master Copy

Lot Number: Date Opened : Lot location & Description

Approved Concrete Mix Code: ..... / .. / Delivery Date & Time:.. / / .. AM/PM Diameter:.mm

Identification Number:

Drawing References: . Item 1.0


1.1 1.2 1.3 1.4

Description Pre-start Activities


Induction Ground conditions Lifting chains Survey

Acceptance Criteria

HP

Conforms

Notes

(Initials & Date)


FM

All site personnel to be inducted into work method statement TL/MS/045 & the JSA for this activity. Ground conditions have been verified as being satisfactory. Chains are tagged Headstocks/abutments completed within tolerance. Bearings are satisfactory to use. Unique ID number and SAA number have been recorded. Pedestals completed to R.L within +/-2.5mm, grade across width of pedestal < 1 in 200 and deviation from flat surface is within +/-1.0mm (SURVEY) Temperature recorded Bearings placed to the correct level and alignment, as per the drawings. Headstocks/abutment clearly marked for each girder. Lifting method approved before commencement Temporary support in line vertically at the specified support points Girders lifted into correct location. Temporary restraints are located as per the drawings. Girders completed to within the specified tolerance (SURVEY HP). Approval given to remove temporary restraints. Approval given to traffic the girders.

FM FM ENG

2.0
2.1 2.2 2.3

Bearings
Material supply Numbers Pedestals
ENG FM ENG

2.4 2.5

Temperature Bearing placement

FM FM

3.0
3.1 3.2 3.3 3.4 3.5

Girder Erection
Girder setout Lifting method Location Girder placement Bracing
FM ENG FM ENG FM

4.0
4.1 4.2 4.3

Post Erection
Profile Remove temporary restraints Trafficking girders
ENG

ENG

ENG

Notes:

CHECKLIST CLOSED OUT BY:

SIGNATURE :

DATE :

Note: Title code in conforms column indicates lowest level at which item may be signed off LH: Leading Hand, PE: Project or Site Engineer, FM: Foreman Form ITP045-CL001Rev. 0 Page 1 of 1