FDN F1

FDN DETAILS

Lz =
Lx =
Depth Below FGL =
A=
Zx =
Zz =

LOAD CASE

7.6
7.9
3.0
60.04
79.05
76.05

m
m
m
sqm
m3
3
m

Wt of Soil + Fdn =

JOINT FORCE-X FORCE-Y FORCE-Z MOM-X

P
(Gross)

Mx

Mz

360.2 MT

P/A

ex/Lx ez/Lz

LINE 3 & 4
10
(DL+DUCT+WL)

15
(DL+LL+DUCT+WL)

2
3
11
12

2
3
11
12

-11.0
-10.0
-9.7
-15.3

-36.0
11.5
114.7
185.5

-20.2
-19.8
-20.2
-19.7

-46.0

275.7

-79.9

-10.1
-10.7
-8.9
-15.8

1.1
50.7
130.7
206.6

-20.2
-19.8
-20.3
-19.6

-45.5

389.0

-79.9

-11.2
-11.3
-10.3
-17.4

-23.7
16.5
137.0
188.0

-20.2
-19.2
-20.1
-19.1

-50.1

317.8

-78.5

-10.4
-12.1
-9.6
-18.0

16.5
56.1
158.6
209.7

-19.2
-19.2
-20.1
-19.0

-50.1

440.9

-77.4

Gross p(max)
(ref Teng's Chart)
K

pmax

-51.9
-50.6
-52.0
-50.6

-205.0 636.0 1438.1 493.2

10.6

0.29

0.10

4.1

43.4

12.5

0.22

0.09

3.1

38.7

11.3

0.27

0.08 3.75

42.3

13.3

0.21

0.07

37.4

-51.9
-50.4
-51.9
-50.4

-204.6 749.3 1323.8 511.2

LINE 7 & 8
10
(DL+DUCT+WL)

15
(DL+LL+DUCT+WL)

4
5
13
14

4
5
13
14

-51.1
-49.0
-51.0
-48.9

-199.9 678.0 1449.8 433.8


-49.0
-48.8
-51.0
-48.7

-197.5 801.2 1337.3 432.5

Actual Gross pmax =


Allowable Gross pmax = 38 x 1.25 + 3 x 1.8 =

43.4 T/sqm
52.9 T/sqm

Actual Net pmax = pgross - 3 x 1.8

38.0 T/sqm

2.8

DESIGN OF F1 RAFT

Thickness =
d =

Design pressure for cantilever =


Avg. Design press. for inner panel =

700 mm
640 mm
38.0 T/sqm
20 T/sqm

(Approx.)
2

Mmax (cantilever) = 37.2 x 0.75 /2


=
Mmax(inner panel)= 0.06 x 37 x 5.52 =

10.69 Tm/m
25.61 Tm/m

Provide : 12 dia @ 150 c/c at Bottom


20 dia @ 150 c/c at Top
Check For Shear :

(at d=640mm from face of beam)

DESIGN OF FB1 & FB2 RAFT beams

4.18 T/m
18.82 T/m

Depth =

1500 mm

d =
b =

1440 mm
600 mm

Mmax(inner panel) = (37.2x1.05x5.8 /10) + (25x2.75x5.8 /15)


Mmax (cantilever) = (37.2 x 1.05 x 1.052/2)
Provide : 8 nos 32 dia at Top
5 nos 20 dia at Bottom

pt
0.07
0.20

Ast
4.48 cm2/m AT BOTT.
12.8 cm2/m AT TOP

(pt provided = 0.33)

Vmax (cantilever) = 37.2 x 0.110 =


Vmax (inner panel) = 25 x (3.92 x 3.62)/2(3.92+3.62) =

Check For Shear :

Mu/bd
0.31
0.736

286 Tm
31 Tm

Mu/bd2
2.70
0.30

tc
Actual
Vu/bd allowable
0.077 0.24 N/mm2
0.346 0.41 N/mm2
HENCE OK

pt
Ast
0.727 62.81 cm2/m AT TOP
0.07 6.048 cm2/m AT BOTT.

(pt provided = 0.727)

(at d=1140mm from face of column)


Vmax = (37.2x1.05 + 25x2.75)x1.16 =
Vu =

125.06 T/m
150.07 T/m

Provide : 5L - 12 dia Stirrups @ 200 c/c


Shear capacity of section = 0.57x1440x600/9810 + 0.87x415x565x1440/200/9810 =

DESIGN OF PEDESTAL FOR F1


d =
b =

1200 mm
1200 mm

193.8 T/m
HENCE OK

Provide 20 nos 25 dia bars on 4 faces


with 8 dia links at 300 c/c

p =

Check For Compression case: (Node No. = 14, L/C =15)


P = 209.72 + 1.2x1.2x3x2.5
=
Mux = 1.2x(48.7+19x2.95)
=
Muz = 1.2x(18x2.95)
=

0.68

220.52 T
125.7 Tm
63.7 Tm

p/fck = 0.027

Pu/fckbd

= 0.072

Tu/fckbd

= -0.008

For
p/fck = 0.0272
&
Pu/fckbd =
0.072
(Refer Chart 47)
Mux1 = Muz1 =
0.07 x 25x1200x1200x1200 =
308.26 Tm
Mux/Mux1 + Muz/Muz1 =

0.6

Check For Tension case: (Node No. = 4, L/C =10)


P = -23.74
Mx = 1.2x(51+20.2x2.95)
Mz = 1.2x(11.3x2.95)

HENCE OK

=
=
=

-23.74 T
132.7 Tm
40.0 Tm

For
p/fck = 0.0272
&
Tu/fckbd =
-0.008
(Refer Chart 82)
Mux1 = Muz1 =
0.05 x 25x1200x1200x1200 =
220.18 Tm
Mux/Mux1 + Muz/Muz1 =

0.78

HENCE OK

FDN F2
FDN DETAILS

Lz =
Lx =
Depth Below FGL =
A=
Zx =
Zz =

LOAD CASE

2.5
5.5
1.5
13.75
12.60
5.73

JOINT FORCE-X FORCE-Y FORCE-Z

m
m
m
sqm
m3
m3

Wt of Soil + Fdn =

41.5 MT
4 of 7

MOM-X

P
(Gross)

Mx

Mz

P/A

Mx/Zx Mz/Zz

LINE 1
10
(DL+LL)

1
10

15
(DL+LL+DUCT+WL)

1
10

0.0
0.0

15.0
15.0

3.00
3.00

0.0
0.0

0.0

30.0

6.0

0.0

0.0
0.0

15.0
15.0

3.00
3.00

0.0
0.0

0.0

30.0

6.0

0.0

Actual Gross pmax =


Allowable Gross pmax = 10 + 1.5 x 1.8 =
Actual Net pmax = pgross(max) - 3 x 1.8=
Actual Net pmin = pgross(min) - 3 x 1.8=

Gross p
(MAX)

(MIN)

71.5

10.8

0.0

5.2

0.86

0.00

6.1

4.3

71.5

10.8

0.0

5.2

0.86

0.00

6.1

4.3

6.1 T/sqm
12.7 T/sqm
3.40 T/sqm
1.60 T/sqm

DESIGN OF F2 RAFT

Thickness =
d =

Design pressure for cantilever =


Mmax = 9.7 x 0.72/2

3.4 T/sqm
0.83 Tm/m

Provide : 16 dia @ 200 c/c at Bottom


17 dia @ 200 c/c at Bottom
Check For Shear :

400 mm
340 mm

Mu/bd2
0.11

pt
0.07

Ast
2.38

(pt provided = 0.17)

(at d=340mm from face of beam)

Vmax (cantilever) = 9.7 x 0.360 =

tc
allowable
0.3 N/mm2

Actual
Vu/bd
0.042366

1.2 T/m

HENCE OK

DESIGN OF PEDESTAL FOR F2

(NODE =1 L/C =10)


d =

Check For Compression case:

5 of 7
cm2/m AT BOTT.

1200 mm

b =

1200 mm

P = 1 + 1.2x1.2x3.25x2.5
Mux = 1.2x(13.7+4.5x3.15)
(Refer Chart 47)

=
=

12.7 T
33.5 Tm

Pu/fckbd
Mu/fckbd2

= 0.004
= 0.008

p/fck = negligible Provide 20 nos 16 dia bars on 4 faces


with 8 dia links at 250 c/c
6 of 7

BEAM FB3 FOR F2 (

400 X

1800 )
15.07

14.8X2= 15.15
T/m
5.4X2=

10.9
2.7X2 =
10.86 T/m

7.55
T/m

vv

0.1

5.5

0.1
13.44

17.7

PRESSURE DISTRIBUTION
DIAGRAM

-20.7
0.0
BENDING MOMENT DIAGRAM
0.0
-13.4
0.756

0.335
SHEAR FORCE DIAGRAM
15.9
1.29

16.9

2.58
Mmax (support)
Mu
bd2

Mmax (span)
Mu
2

bd

V max ( at d =
Vus

Vus

0.0

Tm
pt reqd =

0.00 N/mm2

0.07
(

mm dia bars at bottom)

-20.7 Tm
pt reqd =

0.20 N/mm2

0.28

Ast =

0.69 m from support) =


Vu -

Ast = 4.872 cm2


provide 4 number of
20

tcbd =

15.93

19.49 cm2
provide 4 number of
28

tc = 0.55 ( for pt =

-192 KN

-1.10
Provide

4 L, 10 dia. Bars @

Face rebar = 5No of T10 on each face

mm dia bars at top)

200 mm c/c

0.35 )