You are on page 1of 1

TITLE: PROJECT: LOCATION:

HYDRAULIC CALCULATIONS Combined Sewer Outflow and Force Main with Lift Station Bahay Toro, Quezon City
STATIC HEAD No. of Pump Units Duty Standby 2 1 Main Pipe Unit flow (cms) Total flow (cms) Total Head HT (m.) Pump Dia. (mm) Dia. mm. Length m. hf (m.) HP computed Pipe Velocity M/S Pump Velocity M/S

PEAK FLOW (m3/hr)

PEAK FLOW (CMS)

DNSTRM (M)

UPSTRM (M) ???

524.00

0.146

???

0.073

0.146

#VALUE!

192.57

272.34

???

######

#VALUE!

2.50

2.50

You might also like