Professional Documents
Culture Documents
dgn
6/5/2012
X
3" 2-4" MAX
OPENINGS.
ONE EACH END AND ONE OVER OPENING. E. MAKE HORIZONTAL CUT AT BOTTOM OF 4. OPENING WIDTH "W" - 8" OPENING AND REMOVE MASONRY.
8"
UP TO 6-0" MAXIMUM.
5 4
1
6. SUGGESTED ERECTION
SEQUENCE:
3 1
GROUT SOLID FOR 8" HOLE THRU MASONRY AT ALL 4 CORNERS PRIOR TO CUTTING TO ABOVE AND 4" BELOW BOLT LOCATION.
SECTION
AVOID OVERCUTTING.
NEW OPENING IN EXISTING NON-BEARING WALL OR BEARING MASONRY WALL WITH LINE OF BEARING AT LEAST A DISTANCE "W" ABOVE OPENING
' CH2M HILL NOTE TO DESIGNER:
0420-039
DETAIL REF DATE TDC TDR LCT XTR DESC SIZE
STRUCTURAL