SHEET NOTES 1. PIPE SHALL BE DEMOLISHED AS NOTED AND MODIFIED PER SHEET FU04.0003.

EXIST 2" COOLING RING PIPE EXIST 2" COOLING RING PIPE

2. SEE SHEET EL03.0002 FOR ELECTRICAL CONDUIT MODIFICATIONS.

4 5 "

EXISTING DBB-11 ORIENTATION

EXISTING DBB-12 ORIENTATION

EXISTING DBB-11 ORIENTATION TANK T-22 VALVE DBB-11

4 2 "

EXISTING DBB-12 ORIENTATION TANK T-22 VALVE DBB-12

DETAIL
1 0 1 2

5
FU03.0004 FU02.0008

DETAIL
1 0 1 2

6
FU03.0004 FU02.0008

SCALE IN FEET

SCALE IN FEET

EXIST 2" COOLING APPROX 5 FEET (FIELD DETERMINED) EXIST 2" COOLING RING PIPE DEMO EXIST 2" PIPE EXIST 2" COOLING RING PIPE RING PIPE

EXISTING DBB-13 ORIENTATION

4 0 . 7 5 "

EXISTING DBB-14 ORIENTATION

4 5 "

EXIST DBB-14 ORIENTATION

TANK T-22 VALVE DBB-13

EXISTING DBB-13 ORIENTATION

TANK T-22 VALVE DBB-14

DETAIL
1 0 1 2

7
FU03.0004 FU02.0008

DETAIL
1 0 1 2

8
FU03.0004 FU02.0008

SCALE IN FEET

SCALE IN FEET

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU02.0008
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FSTF TANK VALVE DEMO DETAILS SHEET 3 OF 3

1 of 1
SHEET NUMBER

FDH

31 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU02.0008.DGN

10-0"

6"

6"

8" 10" 6"

EXISTING JF LINES SHALL BE DECOMISSIONED AND FILLED WITH GROUT. CUT PIPE AT GRADE, REMOVE ABOVE GROUND PIPE TO POINTS INDICATED, FILL UNDERGROUND CARRIER PIPE WITH GROUT. BLIND FLANGE REMAINING ABOVE GROUND PIPE TO CLOSE SYSTEM AS SHOWN ON SHEET FU03.0008.

PUMP START/ STOP RACK


SUMP SEPARATOR NO. 26 2" WATER DRAWOFF

P-38 10" 10" 6" P-37

3/4" SAMPLING PIPES


2" FUEL RETURN REMOVE MOISTURE SWITCHES FROM THREE UNDERGROUND LINES. PULL WIRING BACK TO SOURCE. CAP EXISTING CONDUITS AS SPARE. RE-PROGRAM EXISTING PLC PER ELECTRICAL SPECIFICATIONS. F-2

10"

10"

G-16

G-17 PF-22 F/S-22

DETAIL 1 NOTES:
1. REMOVED 10 INCH VALVES SHALL BE REUSED WHERE POSSIBLE. CONTRACTOR SHALL DELIVER THE REMAINING VALVES TO THE AUTHORITY. SEE FUEL SETTLING TANK FARM VALVE ROTATION NOTE 3 ON FU00.0003

12" JF TRANSFER

2.

PLATFORM W/ HANDRAIL 12" JF

TRV & A/E DISCHARGE FILTER/ SEPARATOR F/S-22

1" WASTE FUEL DISCHARGE

DETAIL
0 2 4 8

1
FU02.0004 FU02.0009

SCALE IN FEET

NORTH

ENLARGED PLAN

ENLARGED PLAN

DETAIL
0 2 4 8

2
FU02.0004 FU02.0009

4
SCALE IN FEET

FU02.0009 FU05.0001

FILTER/SEPARATOR F/S-22
2

12"x10" RED. (TYP 2 PL) 43" TYP.


PF-22 F/S-22

1" TRV DISCHARGE 3/4" SAMPLING PIPES

12" TRANSFER 12" JF TRANSFER

43"

PS TOC

G-16

PS

F-2

G-17

PS TOC

43"

GRADE PS-3 PS-3

GRADE

NOTES:
1. PULL EXISTING PRE-FILTER DIFFERENTIAL PRESSURE TRANSMITTER WIRING BACK TO SOURCE. CAP EXISTING CONDUIT AS SPARE AT EDGE OF PAD. RE-PROGRAM EXISTING PLC PER ELECTRICAL SPECIFICATIONS. DEMOLISH PLATFORM AND STAIRS. REMOVE HYDRANT TANK FARM EXISTING PRE-FILTER, FILTER SEPARATOR, WATER SLUG VALVE, AND GATE VALVES G-16 AND G-17. PROVIDE AND INSTALL FLANGED PIPE SPOOL AS SHOWN ON SHEET FU03.0008.

2.

FILTER TRAIN AT EXISTING HYDRANT FUEL FARM

3.

SECTION
0 2 4 8

SCALE IN FEET

DATE

NORTH

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU02.0009
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

HTF ENLARGED DEMO PLANS AND SECTION

1 of 1
SHEET NUMBER

FDH

32 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU02.0009.DGN

1 1
FU02.0010 FU05.0001
1

FU02.0010 FU05.0001

ENLARGED PLAN

DETAIL
0 2 4 8

3
FU02.0004 FU02.0010

NORTH

DETAIL
0 2 4 8

4
FU02.0004 FU02.0010

SCALE IN FEET

SCALE IN FEET

NORTH

KEYED NOTES:
CUT PIPE AT GRADE, FILL UNDERGROUND CARRIER PIPE WITH GROUT, AND PLATE/CAP CARRIER AND CONTAINMENT PIPES. CAP OR BLIND FLANGE REMAINING ABOVE GROUND PIPE TO CLOSE SYSTEM.

1
1

FU02.0010 FU05.0001

DETAIL
0 2 4 8

5
FU02.0005 FU02.0010

SCALE IN FEET

DATE

NORTH

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU02.0010
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

1 of 1

HTF ENLARGED DEMO PLANS

SHEET NUMBER

FDH

33 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU02.0010.DGN

HPV2 4

B-134 TR-36
B6 3

TO F/S-22 FU03.0002

12"
FM

12" 1" G-23 DBB-23


FT FT0002 PT PT0002

IF

FROM PUMPS

2" LPD-55
HEAT TRACE

2" LPD-18 12"/16" DW TRANSFER LINE


1 "

1" CK-53 FROM PUMPS 12"x10" B-153


B1 5 4

HORIZONTAL SEGMENTS OF TRV DISCHARGE PIPE

1"

TR-83 HPV-84 1"

PLC

PLC

PDAH

FI

PI

TR-86

1" B-173
1 "

1"
B1 7 2

B-131

DPT 2101

PDI
PLC

S1

S2

PF-21

REUSE EXISTING

CK-17 B-171 CK-15

1"
HPV-28

TR-87

L PD6 0

10" 1"
EXISTING F/S-21 REMOVED ON DRAWING FU02.0001 AND RELOCATED
B1 7 4

B1 7 5

NOTES:
1. INSTALL SRC VALVES 23, 24, & 25 SO THEY ARE NOT UNDER THE PLATFORM. 2. INSTALL DP GAUGE AS PER GAMMON INSTRUCTION MANUAL. 3. ALL THERMAL RELIEF ISOLATION VALVES ARE TO BE BALL VALVES W/ STAINLESS STEEL HANDLES AND LOCKED IN THE OPEN POSITION.

TO TANK T-25

G-28 10"

VALVE

TR-88

TR-27 B-165 1"


B1 6 6

10"
B1 5 5

2"

G-33 2" 1" CK-54 1" B-156


B1 5 7

G-34

3/4" 1" B-170 B-161


B1 6 2

TO THIS LOCATION

TR-25 HPV-26
DPT 2102

2"

PDI
1 2 "

1"

PLC

TR-84
B1 3 2

PDAH F/S-21 CK-15


S7

HPV-85 PDAH

MS

4. MILLIPORE SAMPLE CONNECTIONS SHALL BE LOCATED ON THE INLET AND OUTLET ELBOWS OF EACH VESSEL.

TR-25 C.T.-21 10"


S- 3

S8

HPV-26

10"
G-39

10"
G-40

FY

5. SEE MECHANICAL GENERAL NOTES ON SHEET FU00.0003 FOR MODIFICATIONS TO F/S-21A WATER DETECTION SYSTEM.

2201

HPV-87 10"

B5 7

PLC

S- 4

DPT

PDI

PLC M

TR-29 10"

10"
B- 55

S1 5

S1 6

PF-22

G-12

HPV-21

B1 5 8

10" G-35 2"

10"
B1 3 3

F-1 MA

G-36

2"
B-184

FI CK-13
1 0"

B6 1

G-11

B-145

1" CK-14 1" B-159


B1 6 0

1" CK-14 B-159 TR-24 HPV-25 PDAH

CK-16 CK-55 1" 1" TR-85


B1 6 8

2"
HPV-86

HPV-88
PLC

TR-26
B1 6 4

B-167 HPV-27

1" 2"

3" G-29

B-163

FT

PRODUCT RETURN

LPD-64

PDI

003

FM

FROM TANK T-25

2"
DPT 2301

DPT

SEE NOTE 4 (TYP)

2202

PLC

DBB-24
IF

PDI
PLC

10" C.T.-22

LPD-63

PDAH

TR-28
F/S-22
MS
1 0"

DU
B6 0

S1 7

S1 8

S1 9

B- 56

10"
B8 3

10" G-38

10" 2" LPD-62 G-13

10" G-14

S2 0

PF-23

S- 5

S- 6

10"
B1 6 9

10" 2" G-42 LPD-56

2" LPD-61

G-37

2"

MS010 MS

MA
PLC

G-41

RECIRCULATION TO TANKS T-22, 23, & 24

TR-45

1"

SUMP SEPARATOR NO. 25 SRC-12 SRC-7 SRC-4 SRC-6 TR-48


B5 1 B5 2 B5 3 B5 4

1"
HS

TR-50 1"
B5 0

B4 7

B4 8

B4 9

SRC-5 2" B-76

B-59 B-58

CK-19 2" CK-18

P-32

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU03.0001
VOLUME NUMBER

MDP
ACCEPTED

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FSTF NEW WORK PIPING AND INSTRUMENTATION DIAGRAM

1 of 1
SHEET NUMBER

FDH

34 of 57
I:\MWAA1\62548\CAD\MECH\IL1102FU03.0001.DGN

12"

3/4"

CONNECTED TO EXISTING COLONIAL SAMPLING PIPES (TYP) TO IFS-3 DISCHARGE PIPE 3/4"
G1 5

2" LPD-19 12"/16" DW TRANSFER LINE


FU03.0001

HPV29

HPV74

2" LPD-20 12"/16" DW TRANSFER LINE

12" HPV-77 HPV-30 HPV-31 HPV-75 B-150 B-149 HPV-24 FLUSHING CONNECTION

12"
IF IF IF

12"

IF
FROM TRANSFER PUMPS P-22 THROUGH P-23

IF
MS

MS
MS009

MA
PLC

MA
PLC

MS 016

2" LPD-21 TO EXISTING HYDRANT TANKS 5 & 6


G1 8

015

2" LPD-25

B-73 10"

TO EXISTING HYDRANT TANKS 1, 2, 3 & 4 10"

PLC

PLC LOCATED AT EXISTING HYDRANT FUEL FARM 10" 1" LPD-51 FROM EXISTING COLONIAL FILL LINE

MA

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU03.0002
VOLUME NUMBER

MDP
ACCEPTED

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

HTF NEW WORK PIPING AND INSTRUMENTATION DIAGRAM

1 of 1
SHEET NUMBER

FDH

35 of 57

I:\MWAA1\62548\CAD\MECH\IL1102FU03.0002.DGN

NOTES: 1. DBB TANK VALVES SHALL BE ROTATED TO THE VERTICAL POSITION. A 1" DRAIN SHALL BE INSTALLED ON THE BOTTOM PLATE WITH AN ELBOW, BALL VALVE, AND THREADED PLUG. DRAIN ASSEMBLY SHALL BE INSULATED AND HEAT TRACED. ALL CONDUIT, COOLING RING PIPING, AND ELECTRICAL WIRING SHALL BE MODIFIED AS NECESSARY TO ACCOMMODATE THE NEW VALVE ORIENTATION.

10"/14" DW LOW SUCTION 16"/20" DW SUCTION 16"/20" DW SUCTION FROM TANK 23 16"/20" DW SUCTION FROM TANK 24 16"/20" DW SUCTION FROM TANK 22

16"/20" DW PIPE RISER AND 16" BLIND FLANGE. TOP OF BF EL=321-0" 3"/6" SUMPED FUEL 10"/14" DW RECIRC.

270 DEG

10" LOW SUCTION BLIND FLANGE. C EL=322-4" L

3" SUMPED FUEL C LEL=322-6"

UP

T-23

3
FU03.0003 FU02.0006, FU04.0001

3
FU03.0003 CV05.0003

180 DEG DBB-17

0 DEG

2
FU03.0003 FU02.0006, FU04.0001

10" TEE W/BLIND FLANGE AND HPV

16" SUCTION C EL.= 323-8" L DBB-16 PIPE CROSSOVER STAIRS B, C TANK T-23 (EXISITNG) DBB-15 1 DBB-18 4 90 DEG
FU03.0003 FU02.0006, FU04.0001

10" LOW SUCTION C LEL=322-4" 16" SUCTION FROM TANK T-23 C LEL=323-8" 16" SUCTION FROM TANK T-24 C LEL=323-8"

10" RECIRCULATION C LEL=323-6"

3" TEE W/BLIND FLANGE AND HPV

FU03.0003 ST03.0001

(TYP DBB-17, 18)

FU03.0003 FU02.0006, FU04.0001

24" TANK FILL C LEL=325-9"

10" LOW SUCTION C LEL=323-0" 24" TANK FILL C EL.= 324-0" L

16" SUCTION FROM TANK T-22 C LEL=323-8" 10" RECIRC C LEL=323-6" 3" SUMPED FUEL C LEL=322-6"

3" SUMPED FUEL C EL=322-6" L FOR CONTINUATION, SEE SHEET FU03.0004 24" TANK FILL C EL= L

FUEL SETTLING TANKS PIPING PLAN


0 30 60

NORT H

SCALE IN FEET

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU03.0003
VOLUME NUMBER

MDP
ACCEPTED

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANKS PIPING PARTIAL PLAN - T-23

1 of 1
SHEET NUMBER

FDH

36 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU03.0003.DGN

16" SUCTION 10" RECIRCULATION 24" TANK FILL 3" SUMPED FUEL 10" LOW SUCTION C LEL.=322-4" FOR CONTINUATION, SEE SHEET FU03.0003

10" LOW SUCTION

10" RECIRC W/ HPV C LEL=326-0"

16" SUCTION

NOTES: 1. DBB TANK VALVES SHALL BE ROTATED TO THE VERTICAL POSITION. A 1" DRAIN SHALL BE INSTALLED ON THE BOTTOM PLATE WITH AN ELBOW, BALL VALVE, AND THREADED PLUG. DRAIN ASSEMBLY SHALL BE INSULATED AND HEAT TRACED. ALL CONDUIT, COOLING RING PIPING, AND ELECTRICAL WIRING SHALL BE MODIFIED AS NECESSARY TO ACCOMMODATE THE NEW VALVE ORIENTATION.

10" RECIRCULATION 16" SUCTION 10" RECIRC 16" SUCTION 10" RECIRCULATION C LEL=323-6" 10" LOW SUCTION C EL=322-4" L

3
PIPE CROSSOVER STAIRS TYPE "D"

3" SUMPED FUEL

3" SUMPED FUEL

FU03.0004 FU02.0007, FU04.0002

2
FU03.0004 FU02.0007, FU04.0002

DBB-13 DBB-12 7
FU03.0004 FU02.0008, FU04.0003

10" LOW SUCTION C EL=323-0" L

DBB-20 DBB-21 DBB-19 3


TANK T-24

6 1
FU03.0004 FU02.0007, FU04.0002 FU03.0004 FU02.0008, FU04.0003

3" SUMPED FUEL C LEL=322-6"

FU03.0004 CV05.0003

5 DBB-11
FU03.0004 FU02.0008, FU04.0003

TANK T-22

3
FU03.0004 CV05.0003

24" TANK FILL C LEL=324-0" 180 DEG 0 DEG T-24 EXISTING 3" SUMPED FUEL C LEL=322-6" 180 DEG T-22 EXISTING 0 DEG

3" SUMPED FUEL

FUEL SAMPLING BUILDING

PIPE CROSSOVER STAIRS TYPE "F"

UP
DBB-22

4
FU03.0004 FU02.0007, FU04.0002

DBB-14
SUMP SEPARATOR SS-22

8 A, B
FU03.0004 FU02.0008, FU04.0003

24" TANK FILL FROM COLONIAL PIPELINE

24" TANK FILL C LEL=324-0"

FU03.0004 ST03.0001
(TYP DBB-13, 14, 21, 22)

T-22 AND T-23 FILL PIPE ISOLATION POINT.


24"/28" DW JF PIPE FROM COLONIAL PIPELINE

FUEL SETTLING TANKS PIPING PLAN


0 30 60

SCALE IN FEET

DATE

U P

DESIGNED

CHECKED

NORT H

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED

TWD
DRAWN

FU03.0004
VOLUME NUMBER

MDP
ACCEPTED

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANKS PIPING PARTIAL PLAN - T-22 & T-24

1 of 1
SHEET NUMBER

FDH

37 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU03.0004.DGN

12" TRANSFER LINE C LEL=322-0" 10" JF C L EL=320-10" 12" JF C L EL=327-0" 12" 12" JF C EL=323-8" L PS-13 PF-21 PS-13 PS-13 12" 12" 12" JF C L EL=327-3" PS-10 12" 10" JF C L EL=323-1" 2" PF-22 8" 8" 1" 2"
1 1 1 1 1 1 1

SEE NOTE 3 (TYP OF 3) RELOCATED SEE SHEET FU02.0003 CLAY TREATER (TYPICAL OF 2)

12"/16" DW JF TRANSFER PIPE TO EXISTING HYDRANT FUEL FARM 12"

OIL/WATER SEPARATOR CONTROL PANEL

CT-21

F/S-21

12"

T-25 15,000 GAL. PRODUCT RECLAIM TANK

1" TRV DISCHARGE (AT TOC EL)

8" JF C LEL=322-0"

2" 10" 1" 10" T-26 10,000 GALLON WASTE WATER TANK F/S-22 2" PF-23 2" 2" 1"
1

8" JF C L EL=323-6" PS-10A

TRUCK LOAD PUMPS


2

1" TRV DISCHARGE C EL=327-0" L P-23 12" JF C L EL=323-6" P-24 P-22

1" TRV DISCHARGE (AT TOC EL)

PS-13 PS-13 CT-22

P-26 8" JF C L EL.=322-0"

P-25

12"

TRANSFER PUMPS

B
FU03.0005 FU04.0004
P-32 10" RECIRC. C EL=322-0" L 3" PRODUCT RETURN C EL = 322-0" L IF

16" JF C L EL=323-6"
1 1

12"

12"

P-33 F/S-23 1" WATER DRAIN IF P-34 2" PS

SIGN 8" 8" 3-8" PS-11 PS-11 ELECTRICAL RACK

P-35

3 0 "

IF
1
8 " / 1 2 "DW

16" 8"/12" DW

10" LOW SUCTION 10"/14" DW

16"
1

16"
1 1

16"

2" WASTE WATER TRANSFER C EL=331-6" L

FROM FUTURE TANK 21

16"/20" DW

EQUIPMENT PAD FROM TANK 23 16"/20" DW 8"/12" DW JF TO TRUCK LOADING ISLAND 3"/6" DW SUMPED FUEL
1

FROM TANK 24

16"/20" DW

FROM TANK 22

16"/20" DW TRUCK LOADING STATION NO. 1

3"/6" DW WASTEWATER DISCHARGE

RECIRC TO STORAGE

10"/14" DW

4" JF C L EL=322-6"

3" SUMP TRUCK OFFLOADING STATION

1" TRV DISCHARGE

NOTES:
IF 1. REPLACE ALL BOLTS AND NUTS ON EXISTING VESSEL F/S-21 AND 22 BODY FLANGES. MATCH EXISTING SIZES AND MATERIALS. MODIFY ALL EXISTING VESSEL RELIEF PIPING AND INSTALL A STAINLESS STEEL BALL VALVE AND CAPPED TEE ON THE INLET AND OUTLET SIDES OF THE RELIEF VALVES. LOCATE ALL PRE-FILTER INLET VALVES SO THEY ARE OPERABLE FROM THE PLATFORM. STEM EXTENSIONS SHALL BE INSTALLED TO RAISE VALVE HANDWHEEL 3 INCHES ABOVE HANDRAIL. PIPE SUPPORT QUANTITIES: PS-10A ---1 PS-10 ---1 PS-13 ---5 CONTRACTOR SHALL VERIFY QUANTITY OF ALL RELIEF VALVES TO BE MODIFIED IN THE FSTF PUMP PAD AREA. ANY VALVES NOT SHOWN ON THE DRAWING SHALL BE MODIFIED PER KEYED NOTE 1 OR 2, AS APPLICABLE. 4"
M

2.

3.

4.

PUMP EQUIPMENT PAD LAYOUT


0 5 10

NORTH

5.

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

FROM SUMP SEPARATORS

3"/6" DW

3/4"x1" TRV

TRUCK UNLOADING PUMP P-39


1

4" TRANSPORT TRUCK UNLOADING STATION TRUCK LOADING/ UNLOADING ISLAND

TRUCK LOADING STATION NO. 2

KEYED NOTES:
REPLACE PIPE, VALVES, AND FITTINGS ON TRV INLETS AND OUTLETS TO MATCH DETAIL 4 ON SHEET FU05.0001. (TOTAL QUANTITY: 28 EXCLUDING RELIEF VALVES CONNECTED TO NEW PIPING). REPLACE PIPE, VALVES, AND FITTINGS ON 4" TRV INLETS AND 6" TRV OUTLETS TO MATCH THE SETUP SHOWN IN DETAIL 4 ON SHEET FU05.001. KEEP EXISTING PIPE SIZES. (TOTAL QUANTITY :2).

SCALE IN FEET

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU03.0005
VOLUME NUMBER

JHB
ACCEPTED

MDP

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FSTF NEW WORK PLAN EQUIPMENT PAD

1 of 1
SHEET NUMBER

FDH

38 of 57

I:\MWAA1\62548\CAD\MECH\IL1102FU03.0005.DGN

3
FU03.0006 FU03.0009

1
FU03.0006 FU03.0008

ROUTE NEW PIPE ABOVE EXISTING 24" PIPE. INSTALL HIGH POINT VENT.

3/4"

10"

FU03.0006 FU03.0008

PS-10B (TYP OF 8)

EXISTING 24" FLUSHING LINE

INSTALL LOW POINT DRAIN

12" JF TRANSFER

1" WASTE FUEL DISCHARGE 12" JF

NORTH

ENLARGED PLAN
0 10 SCALE IN FEET 20

4
FU03.0006 FU03.0009
NOTES:
1. REPLACE ALL BOLTS AND NUTS ON EXISTING F/S-22, CT-2, AND HFS-3 COVER FLANGES. MATCH EXISTING SIZES AND MATERIALS. 2. MODIFY ALL EXISTING F/S-22 VESSEL RELIEF PIPING AND INSTALL BALL VALVE WITH STAINLESS STEEL HANDLES AND CAPPED TEES ON THE INLET AND OUTLET SIDES OF THE RELIEF VALVES. 3. REPLACE EXISTING FLOW CONTROL VALVE F-2, WITH A FLANGED PIPE SPOOL AS SHOWN ON DRAWING FU3.0008. 4. REPLACE EXISTING PF-22 WITH A FLANGED PIPE SPOOL AS SHOWN ON DRAWING FU03.0008.

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU03.0006
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

HTF NEW WORK PARTIAL PLAN SHEET 1 OF 2

1 of 1
SHEET NUMBER

FDH

39 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU03.0006.DGN

M ATCHL I NE -FOR CONTI NUATI ON SEE DRAW I NG FU0 3 . 0 0 0 7

M ATCHL I NE -FOR CONTI NUATI ON SEE DRAW I NG FU0 3 . 0 0 0 6

5
FU03.0007 FU03.0009

ENLARGED PLAN
0 10 SCALE IN FEET 20

DATE

NORTH

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU03.0007
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

HTF NEW WORK PARTIAL PLAN SHEET 2 OF 2

1 of 1
SHEET NUMBER

FDH

40 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU03.0007.DGN

10-0" 2 3/4"

10" 3 2

1 12"

A
FU03.0008 FU04.0004
NORTH
ENLARGED PLAN
12" JF TRANSFER 12" JF 10"

DETAIL
0 2 4 8

1
FU03.0006 FU03.0008

SCALE IN FEET

ENLARGED PLAN

DETAIL
0 2 4 8

2
FU03.0006 FU03.0008

SCALE IN FEET

NOTES:
1. REPLACE ALL BOLTS AND NUTS ON EXISTING VESSEL COVER FLANGES. MATCH EXISTING SIZES AND MATERIALS. MODIFY ALL EXISTING VESSEL RELIEF PIPING AND INSTALL BALL VALVE WITH STAINLESS STEEL HANDLES AND CAPPED TEES ON THE INLET AND OUTLET SIDES OF THE RELIEF VALVES.

2.

KEYED NOTES:
REPLACE PF-22, F/S-22, F2, G-16, AND G-17 WITH FLANGED PIPE SPOOL AS SHOWN.

INSTALL CAP OR BLIND FLANGE TO CLOSE SYSTEM.

RECONNECT SAMPLE LINES TO NEW ABOVE GROUND PIPE.

DATE

NORTH

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU03.0008
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

HTF ENLARGED NEW WORK PLANS SHEET 1 OF 2

1 of 1
SHEET NUMBER

FDH

41 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU03.0008.DGN

1
1

FU03.0009 FU05.0001

CT-2

10" 10"

1
FU03.0009 FU05.0001
HTF-3

1
FU03.0009 FU05.0001

1 3 10" 10"

6"

PS-10B EXTENDED TO MEET CORRECT PIPE ELEVATION

DETAIL
0 2 4 8

3
FU03.0006 FU03.0009

NORTH

ENLARGED PLAN

SCALE IN FEET

DETAIL
0 2 4 8

4
FU03.0006 FU03.0009

SCALE IN FEET

NORTH

NOTES:
1. REPLACE ALL BOLTS AND NUTS ON EXISTING VESSEL COVER FLANGES. MATCH EXISTING SIZES AND MATERIALS. 2. MODIFY ALL EXISTING VESSEL RELIEF PIPING TO INSTALL BALL VALVES WITH STAINLESS STEEL HANDLES AND CAPPED TEES ON THE INLET AND OUTLET SIDES OF THE RELIEF VALVES. ALL THESE THERMAL RELIEF ISOLATION VALVES SHALL BE LOCKED IN THE OPEN POSITION. 3. HYDRANT TANK FARM VESSELS SHALL BE PREPARED FOR USE. REFER TO THE MECHANICAL GENERAL NOTES FOR MORE DETAILS

1
FU02.0010 FU05.0001

1 10"

KEYED NOTES:
CAP OR BLIND FLANGE REMAINING ABOVE GROUND PIPE TO CLOSE SYSTEM.

TIE NEW ABOVE GROUND PIPE INTO EXISTING UNDERGROUND DOUBLE WALL PIPE. EXISTING PIPE TO THE WEST OF TIE IN POINT SHALL BE DETACHED FROM THE SYSTEM ABANDONED, FILLED WITH GROUT, AND PLATED/CAPPED. IF MOISTURE SWITCH HAS BEEN REMOVED FROM THE SYSTEM AS PART OF THIS MODIFICATION, RELOCATE AND REINSTALL SWITCH IN THIS SECTION OF UNDERGROUND DOUBLE WALL PIPE. RELOCATE EXISTING LEAK DETECTION SENSOR AND WIRING FOR NEW IFS-3 PIPING.

DETAIL
0 2 4 8

5
FU03.0007 FU03.0009

NORTH

SCALE IN FEET

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU03.0009
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

HTF ENLARGED NEW WORK PLANS SHEET 2 OF 2

1 of 1
SHEET NUMBER

FDH

42 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU03.0009.DGN

SHEET NOTES 1. LENGTH OF PIPE BETWEEN SUPPORTS SHALL NOT EXCEED 15 FEET (TYP ALL SPRAY RING PIPING).

EXIST 2" COOLING RING PIPE

EXIST 2" COOLING RING PIPE

2. ALL VALVES TO BE MODIFIED, INSPECTED, AND TESTED BY THE MANUFACTURER. VALVE BASE PLATES TO HAVE A 1 DRAIN INSTALLED, BACKWELDED, WITH A SPRING LOADED DRAIN VALVE AS PART OF THE FACTORY MODIFICATIONS. NEW DRAIN SETUP SHALL MATCH DBB-22 ON T-24.
3. SEE THE MECHANICAL GENERAL NOTES SHEET FU00.003 FOR MORE REQUIREMENTS.

10"

4 71 / 2 "

3 3 "

& CONDUIT
SUPPORT

EXISTING DBB-15 ORIENTATION NEW DBB-15 ORIENTATION

EXISTING DBB-16 ORIENTATION

NOTE: ACTUATOR SHALL BE ROTATED 180 DEGREES AROUND THE VERTICAL VALVE STEM, THEN ROTATED 180 DEGREES AROUND THE HORIZONTAL GEAR BOX AXIS.

NEW DBB-16 ORIENTATION

TANK T-23 VALVE DBB-15

TANK T-23 VALVE DBB-16

DETAIL
1 0 1 2

1
FU03.0003 FU04.0001

DETAIL
1 0 1 2

2
FU03.0003 FU04.0001

SCALE IN FEET

SCALE IN FEET

EXIST 2" COOLING RING PIPE

EXIST 2" COOLING RING PIPE


EXIST 2" COOLING RING PIPE 1 2 6 . 8 6 " EXIST 2" COOLING RING PIPE

9 2 . 6 "

4 0 . 7 5 "

PROVDE AND INSTALL 37.5" VALVE STEM EXTENSION

3 5 "

EXIST PIPE

NEW 2" COOLING RING PIPE


3 3 "

4 13 / 4 "

4. COOLING RING PIPING SHALL BE SUPPORTED OFF THE TANK CHIME. CONTRACTOR SHALL INSTALL ANY INSULATOR SLEEVES, FIBERGLASS SUPPORTS, ETC. TO NOT HARM THE TANK INTEGRITY AND MAINTAIN ANY CORROSION CONTROL SYSTEMS AND CATHODIC PROTECTION. ALL PIPING SUPPORTS SHALL COMPLY WITH NFPA SPACING REQUIREMENTS.

PROVDE AND INSTALL 59.5" VALVE STEM EXTENSION

NEW 2" COOLING RING PIPE

NEW 2" COOLING RING PIPE

NEW 2" COOLING RING PIPE

EXISTING DBB-17 ORIENTATION

EXTEND TO TANK BASE. CONTRACTOR SHALL DESIGN SUPPORT ON TANK BASE OR WALKWAY TO SUPPORT SPRAY RING PIPE (TYP OF 2) INSTALL DRAIN WITH 3/4" PLUGGED BALL VALVE AT LOW POINT
NEW DBB-17 ORIENTATION TANK T-23 VALVE DBB-17

EXISTING DBB-18 ORIENTATION

DRAIN

EXTEND TO TANK BASE. CONTRACTOR SHALL DESIGN SUPPORT ON TANK BASE OR WALKWAY TO SUPPORT SPRAY RING PIPE (TYP OF 2) INSTALL DRAIN WITH 3/4" PLUGGED BALL VALVE AT LOW POINT
TANK T-23 VALVE DBB-18

DRAIN
NEW DBB-18 ORIENTATION

DETAIL
1 0 1 2

3
FU03.0003 FU04.0001

DETAIL
1 0 1 2

4
FU03.0003 FU04.0001

SCALE IN FEET

SCALE IN FEET

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU04.0001
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

FSTF TANK VALVE


OFFICE OF ENGINEERING DESIGN DEPARTMENT
METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

1 of 1
SHEET NUMBER

DRH
5/2/12
APPROVED

NEW WORK DETAILS SHEET 1 OF 3

FDH

43 of 57

I:\MWAA1\62548\CAD\MECH\IL1102FU04.0001.DGN

SHEET NOTES 1. LENGTH OF PIPE BETWEEN SUPPORTS SHALL NOT EXCEED 15 FEET (TYP ALL SPRAY RING PIPING). NOTE: NO PIPE MODIFICATION IS REQUIRED 1" CONDUIT EXIST 2" COOLING RING PIPE

2. ALL VALVES TO BE MODIFIED, INSPECTED, AND TESTED BY THE MANUFACTURER. VALVE BASE PLATES TO HAVE A 1 DRAIN INSTALLED, BACKWELDED, WITH A SPRING LOADED DRAIN VALVE AS PART OF THE FACTORY MODIFICATIONS. NEW DRAIN SETUP SHALL MATCH DBB-22 ON T-24.
3. SEE THE MECHANICAL GENERAL NOTES SHEET FU00.0003 FOR MORE REQUIREMENTS.

10"

4 71 / 2 "

PIPE & CONDUIT SUPPORT

3 3 "

EXISTING DBB-19 ORIENTATION

NOTE: ACTUATOR SHALL BE ROTATED 180 DEGREES AROUND THE VERTICAL VALVE STEM, THEN ROTATED 180 DEGREES AROUND THE HORIZONTAL GEAR BOX AXIS. EXISTING DBB-20 ORIENTATION NEW DBB-20 ORIENTATION

NEW DBB-19 ORIENTATION TANK T-24 VALVE DBB-19 TANK T-24 VALVE DBB-20

DETAIL
1 0 1

1
2FU03.0004

DETAIL
1 0 1 2

2
FU03.0004 FU04.0002

FU04.0002

SCALE IN FEET

SCALE IN FEET

EXIST 2" COOLING RING PIPE

EXIST 2" COOLING RING PIPE

4 13 / 4 "

4. COOLING RING PIPING SHALL BE SUPPORTED OFF THE TANK CHIME. CONTRACTOR SHALL INSTALL ANY INSULATOR SLEEVES, FIBERGLASS SUPPORTS, ETC. TO NOT HARM THE TANK INTEGRITY AND MAINTAIN ANY CORROSION CONTROL SYSTEMS AND CATHODIC PROTECTION. ALL PIPING SUPPORTS SHALL COMPLY WITH NFPA SPACING REQUIREMENTS.

3 5 "

EXIST 2" COOLING RING PIPE

NEW 2" COOLING RING PIPE

EXISTING DBB-21 ORIENTATION

EXTEND TO TANK BASE. CONTRACTOR SHALL DESIGN SUPPORT ON TANK BASE OR WALKWAY TO SUPPORT SPRAY RING PIPE (TYP OF 2) INSTALL DRAIN WITH 3/4" PLUGGED BALL VALVE AT LOW POINT

4 0 . 5 "

PROVDE AND INSTALL 37.5" VALVE STEM EXTENSION

5 1 . 8 6 "+ TBD

4 8 . 6 "+ TBD

NEW 2" COOLING RING PIPE

PROVDE AND INSTALL 50.5" VALVE STEM EXTENSION

EXISTING DBB-22 ORIENTATION

DRAIN
NEW DBB-21 ORIENTATION DETAIL

TANK T-24 VALVE DBB-22

4
FU03.0004 FU04.0002

DETAIL
1 0 1 2

3
1 0 1 2

FU03.0004 FU04.0002
SCALE IN FEET

SCALE IN FEET
DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU04.0002
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

FSTF TANK VALVE


OFFICE OF ENGINEERING DESIGN DEPARTMENT
METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

1 of 1
SHEET NUMBER

DRH
5/2/12
APPROVED

NEW WORK DETAILS SHEET 2 OF 3

FDH

44 of 57

I:\MWAA1\62548\CAD\MECH\IL1102FU04.0002.DGN

SHEET NOTES 1. LENGTH OF PIPE BETWEEN SUPPORTS SHALL NOT EXCEED 15 FEET (TYP ALL SPRAY RING PIPING).

EXIST 2" COOLING RING PIPE


EXIST 2" COOLING RING PIPE

2. ALL VALVES TO BE MODIFIED, INSPECTED, AND TESTED BY THE MANUFACTURER. VALVE BASE PLATES TO HAVE A 1 DRAIN INSTALLED, BACKWELDED, WITH A SPRING LOADED DRAIN VALVE AS PART OF THE FACTORY MODIFICATIONS. NEW DRAIN SETUP SHALL MATCH DBB-22 ON T-24.
3. SEE THE MECHANICAL GENERAL NOTES SHEET FU00.0003 FOR MORE REQUIREMENTS.

4 2 "

4. COOLING RING PIPING SHALL BE SUPPORTED OFF THE TANK CHIME. CONTRACTOR SHALL INSTALL ANY INSULATOR SLEEVES, FIBERGLASS SUPPORTS, ETC. TO NOT HARM THE TANK INTEGRITY AND MAINTAIN ANY CORROSION CONTROL SYSTEMS AND CATHODIC PROTECTION. ALL PIPING SUPPORTS SHALL COMPLY WITH NFPA SPACING REQUIREMENTS.
3 5 " NEW DBB-12 ORIENTATION

EXISTING DBB-11 ORIENTATION

3 3 "

4 5 "

EXISTING DBB-12 ORIENTATION

NEW DBB-11 ORIENTATION TANK T-22 VALVE DBB-11 TANK T-22 VALVE DBB-12

DETAIL
1 0 1 2

5
FU03.0004 FU04.0003

DETAIL
1 0 1 2

6
FU03.0004 FU04.0003

SCALE IN FEET

SCALE IN FEET

PIPE SHALL BE CUT AND CAPPED AT A POINT THAT DOES NOT INTERFERE WITH OPERATION OF THE VALVE ACTUATOR

EXIST 2" COOLING RING PIPE

EXIST 2" COOLING RING PIPE

EXIST 2" COOLING RING PIPE


9 5 . 8 6 "

NEW 2" COOLING RING PIPE EXTEND TO TANK BASE. CONTRACTOR SHALL DESIGN SUPPORT ON TANK BASE OR WALKWAY TO SUPPORT SPRAY RING PIPE (TYP OF 2) INSTALL DRAIN WITH 3/4" PLUGGED BALL VALVE AT LOW POINT

EXISTING DBB-13 ORIENTATION

4 0 . 7 5 "

PROVDE AND INSTALL 38" VALVE STEM EXTENSION

PROVDE AND INSTALL 58" VALVE STEM EXTENSION

9 2 . 6 "

NEW 2" COOLING RING PIPE

EXISTING DBB-14 ORIENTATION

4 5 "

NEW DBB-14 ORIENTATION

DRAIN
TANK T-22 VALVE DBB-13 NEW DBB-13 ORIENTATION DETAIL DETAIL
1 0 1 2

TANK T-22 VALVE DBB-14

8
FU03.0004 FU04.0003

7
1 0 1 2

FU03.0004 FU04.0003
SCALE IN FEET

SCALE IN FEET
DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU04.0003
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

FSTF TANK VALVE


OFFICE OF ENGINEERING DESIGN DEPARTMENT
METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

1 of 1
SHEET NUMBER

DRH
5/2/12
APPROVED

NEW WORK DETAILS SHEET 3 OF 3

FDH

45 of 57

I:\MWAA1\62548\CAD\MECH\IL1102FU04.0003.DGN

NOTES:
1. REPLACE ALL BOLTS AND NUTS ON EXISTING VESSEL COVER FLANGES. MATCH EXISTING SIZES AND MATERIALS. MODIFY ALL EXISTING VESSEL RELIEF PIPING AND INSTALL BALL VALVE WITH STAINLESS STEEL HANDLES AND CAPPED NIPPLES ON THE INLET AND OUTLET SIDES OF THE RELIEF VALVES.

2.

1" TRV DISCHARGE 3/4" SAMPLING PIPES

12" TRANSFER

12" JF TRANSFER

4 3 "

PS-3

PS-3

TOC GRADE

4 3 "

TOC GRADE

FILTER TRAIN AT EXISTING HYDRANT FUEL FARM

SECTION
0 1 2 4

A FU03.0008 FU04.0004

SCALE IN FEET

DETAIL B NOTE: 1. CONTRACTOR SHALL COORDINATE PIPE CENTERLINE ELEVATIONS, FILTER VESSEL DIMENSIONS & PLATFORM HEIGHTS SUCH THAT VESSELS HEAD FLANGE GASKET IS 43 INCHES OR LESS ABOVE TOP OF PLATFORM GRATING. CLA-VAL CONTROL VALVE SHALL BE MODIFIED TO BE CONTROLLED BY A SOLENOID VALVE WHICH IS CONTROLLED BY THE PLC WHEN THE WATER SENSORS IN THE FILTER SEPARATORS DETECT WATER.

2.

APPROX EL 9-2"

VESSEL HEAD FLANGE GASKET

P/F-21, 22, 23 C EL=327-0" L

CT-1, 2

F/S-21, 22

31.5" TYP (43" MAX) TOP OF GRATING (70.75" ABOVE TOC)


VALVE INSTALLED WITH STEM ANGLED 60 DEGREES FROM THE HORIZONTAL (TYP OF 2)

12" C LEL=322-6"
3 2 "

PS

12" JF C EL=322-2" L

PS

PS

TOC EL=319-6" 10" JF C LEL=320-10" 10"x8" RED (TYP 2 PL) EQUIPMENT PAD FILTER TRAIN

SECTION
0 1 2 4

B FU03.0005 FU04.0004

SCALE IN FEET
DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU04.0004
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FSTF EQUIPMENT PAD SECTION & DETAIL

1 of 1
SHEET NUMBER

FDH

46 of 57

I:\MWAA1\62548\CAD\MECH\IL1102FU04.0004.DGN

NOTES:
1. ALL VENTS, DRAINS, LOW POINT DRAINS, PRESSURE GAUGES, AND THERMAL RELIEFS SHALL BE INSTALLED AS SHOWN ON THIS DRAWING, UNLESS INDICATED OTHERWISE.

CLOSE SYSTEM WITH WELDNECK AND BLIND FLANGE COMBINATION

E D A R EG V O B A E D A R G W O L E B

E D A R EG V O B A E D A R G W O L E B

PRESSURE GAUGE 3/4" BALL VALVE 3/4" PIPE PLUG 1/2"-3000# THREADOLET

3/4" PIPE

3/4" THREADOLET

1/2" X 1/2"-3000# NEEDLE VALVE W/ BLEED FEATURE

PIPE CL
FILL UNDERGROUND CARRIER PIPE WITH GROUT AND CAP / PLATE BOTH CARRIER AND CONTAINMENT PIPE AT GRADE

PIPE CL 2" PIPE 2" THREADOLET

DEMOLITION ISOMETRIC

NEW WORK ISOMETRIC

2" BALL VALVE

2" DRY BREAK COUPLING

NOTE:
CONTRACTOR TO PROVIDE QUANTITY AS NEEDED & LOCATE AS REQUIRED TO VENT & DRAIN ALL PIPING
CONCEPT ISOMETRIC TYPICAL VENT / DRAIN TYPICAL PRESSURE GAUGE

DETAIL
NOT TO SCALE

1
FU02.0010, FU03.0009 FU05.0001

DETAIL
NOT TO SCALE

DETAIL
NOT TO SCALE

1" BALL VALVE W/ STAINLESS STEEL HANDLES (LOCKED OPEN,) 1"x1"x1" THREADED TEE W/ CAP 3/4"x1" THERMAL RELIEF VALVE 3/4" PIPE 1" UNION 1" PIPE 3/4" PIPE 3/4"x3/4"x3/4" THREADED TEE W/ CAP 3/4" BALL VALVE W/ STAINLESS STEEL HANDLES (LOCKED OPEN,) THREADOLET SRC BALL VALVE PIPE CL BACKWELDED

VALVE BOTTOM PLATE

BALL VALVE

SIGHT FLOW INDICATOR

NOTE: CONNECT TO PIPING AS INDICATED ON PLANS


THREADED PLUG

TYPICAL THERMAL RELIEF VALVE

TYPICAL DBB VALVE DRAIN

DETAIL
NOT TO SCALE

DETAIL
NOT TO SCALE

DATE

MAY 4, 2012
SCALE

PROJECT IDENTIFIER

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, D.C.

IL1102
SHEET NAME

AS NOTED
DESIGNED

TWD
CHECKED DRAWN

FU05.0001
VOLUME NUMBER

JHB
ACCEPTED

MDP

9400 WARD PARKWAY KANSAS CITY, MISSOURI 64114 62548


NO. REVISION DATE

OMK
SUBMITTED

DRH
5/2/12
APPROVED

OFFICE OF ENGINEERING DESIGN DEPARTMENT


METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

1 of 1

TYPICAL DETAILS AND SCHEDULE

SHEET NUMBER

FDH

47 of 57 I:\MWAA1\62548\CAD\MECH\IL1102FU05.0001.DGN

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL00.0001

I:\MWAA1\62548\CAD\ASHE\IL1102EL000001.DWG

5' SCALE IN FEET

10'

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL03.0001

I:\MWAA1\62548\CAD\ASHE\IL1102EL030001.DWG

60' SCALE IN FEET

120'

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL03.0002

I:\MWAA1\62548\CAD\ASHE\IL1102EL030002.DWG

10'

20'

40'

SCALE IN FEET

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL03.0003

I:\MWAA1\62548\CAD\ASHE\IL1102EL030003.DWG

60' SCALE IN FEET

120'

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL03.0004

I:\MWAA1\62548\CAD\ASHE\IL1102EL030004.DWG

5' SCALE IN FEET

10'

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL04.0001

I:\MWAA1\62548\CAD\ASHE\IL1102EL040001.DWG

60' SCALE IN FEET

120'

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL04.0002

I:\MWAA1\62548\CAD\ASHE\IL1102EL040002.DWG

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL07.0001

I:\MWAA1\62548\CAD\ASHE\IL1102EL070001.DWG

CHEMELEX DIVISION

CAD FILE NAME:

JBS-100-A

DWG. NO.

REV.

64

1993, Raychem Corporation

Industrial Division of CAD FILE NAME:

Corporation DWG. NO. REV.

VALVE-2

34

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL07.0002

I:\MWAA1\62548\CAD\ASHE\IL1102EL070002.DWG

FUEL SETTLING TANK FARM INBOUND PARTICLE SEPARATOR


950 Herndon Parkway, Suite 320 Herndon, Virginia 20170-5500 T 703 230 2500 F 703 871 6812 www.asheconsultants.com

IL1102

EL09.0001

I:\MWAA1\62548\CAD\ASHE\IL1102EL090001.DWG

You might also like