Chapter 12

Total Runout Measurement

TOTAL RUNOUT MEASUREMENT

Interpret the total runout tolerance requirement


TOTAL RUNOUT MEASUREMENT 2

Sketch the Inspection set up required


TOTAL RUNOUT MEASUREMENT 3

Inspection Set up for TRM


TOTAL RUNOUT MEASUREMENT 4

Sketch the Inspection set up required


TOTAL RUNOUT MEASUREMENT 5

Inspection Set up for TRM from one end to another


TOTAL RUNOUT MEASUREMENT 6

Interpret tolerance requirement


TOTAL RUNOUT MEASUREMENT 7

& Sketch the Inspection set up required


TOTAL RUNOUT MEASUREMENT 8

Datum C

Matched V-Blocks for A & B


Inspection Set up for TRM on end face of shaft Indicator moved in a straight line outward while part rotated 3600 (How to ensure square movement of dial gauge?)
9

Thank You
TOTAL RUNOUT MEASUREMENT 10