Professional Documents
Culture Documents
Obra
Descripcin
01.00
01.01
01.01.01
01.01.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.04.03
ESTRUCTURAS
OBRAS PROVISIONALES
Und
Und.
Viaje
8/31/2008
Distrito
Metrado
Precio
Parcial
Total
1.00
2.00
1,685.42
339.40
1,685.42
678.80
2,364.22
528.61
528.61
4.53
23.21
528.61
15.00
1.03
1.66
15.55
10.41
11.72
15.61
544.47
877.49
70.44
241.62
6,195.31
234.15
8,163.48
57.65
57.65
15.61
17.40
899.92
1,003.11
1,903.03
4.00
29.80
4.00
38.48
22.00
41.90
153.92
655.60
167.60
977.12
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
m2
m2
m2
m2
Und.
MOVIMIENTO DE TIERRAS
ACARREO INTERNO MAT. PROCEDENTE DE PICADO
m3
m3
m2
m2
m2
Costo directo
GASTOS GENERALES
10.00%
13,407.85
1,340.79
UTILIDAD
5.00%
SUBTOTAL
IMPUESTO (IGV)
19.00%
TOTAL PRESUPUESTO
SON :
670.39
--------15,419.03
2,929.62
=========
18,348.65
HUANCHACO
PRESUPUESTO
Obra
Descripcin
02.00
02.01
ARQUITECTURA
MUROS Y TABIQUES
02.01.01
02.01.02
02.01.03
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.04
02.04.01
02.05
02.05.01
02.05.02
02.06
02.06.01
02.07
Und
Metrado
m2
m2
Distrito
Precio
Parcial
Total
84.01
192.90
76.32
66.73
78.82
23,714.91
5,605.99
15,204.38
44,525.28
386.63
386.63
57.1
15.23
22,076.57
5,888.37
27,964.94
17.05
41.63
42.99
44.53
8,678.96
1,283.87
640.55
20,751.43
31,354.81
TABIQUE DE DRY WALL COMBINADO INTERIOR Y EXTERIOR, (PLACA DE YESO ST 12.5mm - , PLACA
FIBROCEMENTO
310.73
8mm, PERFIL 89
m2
TABIQUE DE DRY WALL INTERIOR Y EXTERIOR, (PLACA DE YESO ST1/2", 12.5mm.PERFIL 89)
8/31/2008
CIELORRASOS
FALSO CIELO RASO PLACA FIBROCEMENTO, e=4mm.
m2
m2
PISOS Y PAVIMENTOS
CONTRAPISO DE 40 MM.
m2
m2
m2
m2
509.03
30.84
14.90
466.01
316.60
16.97
5,372.70
5,372.70
CONTRAZOCALOS
CONTRAZOCALO DE CERAMICA DE COLOR CLARO 15 X 30 cm.
ZOCALOS
ZOCALO DE MAYOLICA DE COLOR DE 30x30
m2
m2
121.66
86.22
58.72
58.72
7,143.88
5,062.84
12,206.72
m2
30.34
72.73
2,206.63
2,206.63
REVESTIMIENTOS
REVESTIMIENTO CON MAYOLICA DE COLOR EN MESA TRABAJO DE LABORATORIO
CUBIERTAS
02.07.01
02.07.02
02.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.10
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
02.10.06
02.11
02.11.01
02.11.02
02.11.03
02.11.04
02.11.05
02.12
02.12.01
02.12.02
02.12.03
02.12.04
02.12.05
02.13
m2
m2
144.90
433.00
103.62
140.45
15,014.54
60,814.85
75,829.39
4.56
8.40
18.66
96.00
75.30
238.18
303.6
268.04
265.46
191.2
1,086.10
2,550.24
5,001.63
25,484.16
14,397.36
48,519.49
39.75
48.00
28.80
38.08
204.95
172.57
425.34
264
8,146.76
8,283.36
12,249.79
10,053.12
38,733.03
48.00
32.00
8.00
4.00
4.00
24.00
8.14
35.57
83.8
66.3
27.29
46.66
390.72
1,138.24
670.40
265.20
109.16
1,119.84
3,693.56
687.65
217.14
23.98
434.37
386.63
6.29
8.45
9.33
12.11
8.22
4,325.32
1,834.83
223.73
5,260.22
3,178.10
14,822.20
37.8
6.98
14.4
9.6
29.68
150.33
152.78
1108.01
1057.15
558.64
5,682.47
1,066.40
15,955.34
10,148.64
16,580.44
49,433.29
CARPINTERIA DE MADERA
PUERTAS P2 DE MELAMINE
m2
m2
m2
m2
CARPINTERIA METALICA
COLUMNA METALICA
Und.
m2
m2
CERRAJERIA
BISAGRA ALUMINIZADA CAPUCHINA DE 4" X4"
Und.
BISAGRA DE VAIVEN
Und.
Und.
Und.
Und.
TIRADORES CROMADOS
Und.
PINTURA
PINTURA EN MUROS INTERIORES CON LATEX, 2 MANOS
m2
m2
m2
m2
m2
m2
VENTANA ALTA C/VIDRIO CRUDO REFLEJ. SIST. DTO., CON PERFILES DE ALUMINIO
m2
m2
m2
m2
VARIOS
02.13.01
02.13.02
02.13.03
02.13.04
02.13.05
m2
m2
m2
m2
26.39
1.30
509.03
4.20
45.18
104.85
169.74
0.56
45.11
65.59
Costo directo
GASTOS GENERALES
UTILIDAD
10.00%
5.00%
SUBTOTAL
IMPUESTO (IGV)
19.00%
TOTAL PRESUPUESTO
SON :
2,766.99
220.66
285.06
189.46
2,963.36
6,425.53
361,087.57
36,108.76
18,054.38
--------415,250.71
78,897.63
=========
494,148.34
TRUJILLO
PRESUPUESTO
Obra
Descripcin
03,00
INSTALACIONES ELECTRICAS
03.01
03.01.01
03.01.01.01
03.01.01.02
03.01.01.03
03.01.01.04
03.01.01.05
03.01.01.06
03.01.02
03.01.02.01
03.01.03
03.01.03.01
03.01.03.02
03.01.03.03
03.01.03.04
03.01.03.05
03.01.03.06
03.01.03.07
03.01.04
03.01.04.01
03.01.04.02
03.01.04.03
03.01.04.04
03.01.04.05
03.01.05
03.01.05.01
03.01.05.02
03.01.05.03
03.01.06
03.01.06.01
03.01.06.02
03.01.06.03
03.01.06.04
03.01.06.05
03.01.06.06
Und
8/31/2008
Distrito
Metrado
Precio
Parcial
Total
2,203.98
1,287.98
1,684.98
1,644.98
1,725.98
845.99
2,203.98
1,287.98
1,684.98
1,644.98
1,725.98
5,921.93
14,469.83
BAJA TENSION
TABLEROS DE DISTRIBUCION
TABLERO DE DISTRIBUCION TG-2
Und.
Und.
Und.
Und.
Und.
Und.
1.00
1.00
1.00
1.00
1.00
7.00
Und.
2.00
630.73
1,261.46
1,261.46
1.00
20.00
2.00
2.00
24.00
8.00
1.00
11.72
0.72
40.01
45.01
5.85
5.03
1,289.73
11.72
14.40
80.02
90.02
140.40
40.24
1,289.73
1,666.53
80.00
5.00
72.00
1.00
10.00
73.15
66.58
75.77
62.98
534.97
5,852.00
332.90
5,455.44
62.98
5,349.70
17,053.02
8.00
2.00
1.00
131.79
101.84
105.06
1,054.32
203.68
105.06
1,363.06
15.00
26.00
12.00
10.00
22.00
5.00
235.23
98.23
80.70
181.73
285.70
89.14
3,528.45
2,553.98
968.40
1,817.30
6,285.40
445.70
15,599.23
POZO DE TIERRA
POZO DE CONEXION A TIERRA
ALIMENTADORES Y SUB ALIMENTADORES
EXCAVAC. ZANJA DE 0.60x0.65m, PARA CABLES DIRECTAMENTE ENTERRADOS
ACOMETIDA ELECTRICA
Und.
SALIDAS
SALIDA DE TECHO C/CABLE AWG THW 2.5MM(12)
Pto.
Pto.
Und.
Pto.
Pto.
Pto.
Pto.
SALIDA DE UPS
Pto.
Und.
Und.
Und.
Und.
Und.
Und.
Costo directo
GASTOS GENERALES
UTILIDAD
10.00%
5.00%
SUBTOTAL
IMPUESTO (IGV)
19.00%
TOTAL PRESUPUESTO
SON :
51,413.13
5,141.31
2,570.66
--------59,125.10
11,233.77
=========
70,358.87
HUANCHACO
PRESUPUESTO
Obra
Descripcin
SISTEMA DE DESAGUE
Und
8/31/2008
Distrito
Metrado
Precio
Parcial
Total
24.00
24.00
24.00
24.00
24.00
22.25
20.00
15.00
4.00
47.00
43.75
8.00
23.00
5.00
10.00
5.00
14.00
6.00
4.00
2.00
1.00
5.00
1.00
8.00
3.00
1.00
7.00
1.00
5.00
1.00
3.00
9.00
9.00
7.00
8.00
0.93
15.61
1.36
4.92
9.98
33.63
66.60
78.88
54.98
12.20
15.35
9.92
10.22
11.62
11.88
9.42
12.67
13.59
14.37
11.77
14.59
19.52
30.21
29.34
11.28
170.92
201.84
290.96
354.03
235.88
82.87
27.87
28.40
27.47
348.66
22.32
374.64
32.64
118.08
239.52
748.27
1,332.00
1,183.20
219.92
573.40
671.56
79.36
235.06
58.10
118.80
47.10
177.38
81.54
57.48
23.54
14.59
97.60
30.21
234.72
33.84
170.92
1,412.88
290.96
1,770.15
235.88
248.61
250.83
255.60
192.29
2,789.28
14,422.27
124.70
4.50
10.80
13.30
3.50
4.50
10.80
13.30
2.50
1.00
4.00
1.00
0.93
6.01
5.14
4.26
4.04
2.53
2.29
2.29
2.29
6.50
4.69
5.68
115.97
27.05
55.51
56.66
14.14
11.39
24.73
30.46
5.73
6.50
18.76
5.68
SISTEMA DE DESAGUE
TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO
m.
m.
m.
m.
m.
m.
Pto.
Pto.
Pto.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
pza.
Und.
pza.
pza.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
pza.
Und.
Und.
Und.
04.02.13
04.02.14
04.02.15
04.02.16
04.02.17
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
Und.
Und.
Und.
Und.
Und.
1.00
3.00
2.00
1.00
3.00
4.60
4.03
8.30
7.68
6.28
4.60
12.09
16.60
7.68
18.84
432.39
33.00
35.00
58.80
8.00
2.00
9.00
3.00
6.00
49.00
13.00
1.00
1.00
41.41
10.07
10.08
39.48
46.88
4.03
3.73
3.43
3.18
17.97
757.93
807.18
1,366.53
352.45
592.70
315.84
93.76
36.27
11.19
20.58
155.82
233.61
757.93
807.18
4,743.86
AGUA INTERIORES
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
Pto.
pza.
pza.
Und.
Und.
Und.
Und.
Und.
Und.
pza.
Costo directo
GASTOS GENERALES
UTILIDAD
10.00%
5.00%
SUBTOTAL
IMPUESTO (IGV)
19.00%
TOTAL PRESUPUESTO
SON :
19,598.52
1,959.85
979.93
--------22,538.30
4,282.28
=========
26,820.58
HUANCHACO
UBICACIN
PROPIET.
FORMULA
: 01
PLAZO
: 75 DIAS NATURALES
FECHA
: AGOSTO - 2,008
COSTO OFER.
: S/. 18,348.65
ESTRUCTURAS
30d.n.
PART.
DESCRIPCION
60d.n.
75d.n.
PRIMER
SEGUNDO
TERCER
MES
MES
MES
TOTAL
( S/. )
01.00
ESTRUCTURAS
01.01
OBRAS PROVISIONALES
01.01.01
01.01.02
01.02
TRABAJOS PRELIMINARES
01.02.01
544.47
01.02.02
877.49
01.02.03
70.44
01.02.04
241.62
01.02.05
6,195.31
01.02.06
234.15
01.03
MOVIMIENTO DE TIERRAS
01.03.01
899.92
01.03.02
1,003.11
01.04
01.04.01
153.92
01.04.02
655.60
01.04.03
167.60
SUB - TOTAL I
13,407.85
0.00
0.00
13,407.85
2,011.18
0.00
0.00
2,011.18
15,419.03
0.00
0.00
15,419.03
2,929.62
0.00
0.00
2,929.62
18,348.65
0.00
0.00
18,348.65
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
19.00 %
TOTAL GENERAL
AVANCE PARCIAL ( % )
AVANCE ACUMULADO ( % )
1,685.42
678.80
1,685.42
678.80
544.47
877.49
70.44
241.62
6,195.31
234.15
899.92
1,003.11
153.92
655.60
167.60
#REF!
13,407.85
2,011.18
15,419.03
2,929.62
18,348.65
15,419.03
UBICACIN
PROPIET.
FORMULA
: 02
PLAZO
: 75 DIAS NATURALES
FECHA
: AGOSTO - 2,008
COSTO OFER.
: S/. 494,148.34
ARQUITECTURA
30d.n.
PART.
DESCRIPCION
02.00
ARQUITECTURA
02.01
MUROS Y TABIQUES
60d.n.
75d.n.
PRIMER
SEGUNDO
TERCER
MES
MES
MES
02.01.01
23,714.91
23,714.91
5,605.99
5,605.99
15,204.38
15,204.38
02.01.02
12.5mm.PERFIL 89)
TOTAL
( S/. )
02.01.03
02.02
CIELORRASOS
02.02.01
02.02.02
02.03
PISOS Y PAVIMENTOS
02.03.01
CONTRAPISO DE 40 MM.
02.03.02
02.03.03
02.03.04
22,076.57
22,076.57
5,888.37
5,888.37
8,678.96
8,678.96
1,283.87
1,283.87
640.55
640.55
20,751.43
20,751.43
02.04
CONTRAZOCALOS
02.04.01
02.05
ZOCALOS
02.05.01
7,143.88
7,143.88
02.05.02
5,062.84
5,062.84
2,206.63
2,206.63
15,014.54
15,014.54
60,814.85
60,814.85
1,086.10
1,086.10
2,550.24
2,550.24
02.06
5,372.70
5,372.70
REVESTIMIENTOS
REVESTIMIENTO CON MAYOLICA DE COLOR EN MESA TRABAJO DE
02.06.01
LABORATORIO
02.07
CUBIERTAS
02.07.01
02.07.02
GALVANIZADO
02.08
CARPINTERIA DE MADERA
02.08.01
PUERTAS P2 DE MELAMINE
PUERTAS P-1 CONTRAPLACADA 45 MM. C/TRIPLAY 6MM.+ MARCO CEDRO 1
02.08.02
3/8"X4"
PUERTAS P-2,P-4,M-2 CONTRAPLACADA 35 MM. C/TRIPLAY 6MM.+ MARCO
02.08.03
CEDRO 1 3/8"X4"
02.08.04
02.08.05
02.09
CARPINTERIA METALICA
02.09.01
COLUMNA METALICA
02.09.02
02.09.03
02.09.04
02.10
CERRAJERIA
02.10.01
5,001.63
5,001.63
25,484.16
25,484.16
14,397.36
14,397.36
8,283.36
8,283.36
12,249.79
12,249.79
10,053.12
10,053.12
8,146.76
8,146.76
390.72
390.72
UBICACIN
PROPIET.
FORMULA
: 02
PLAZO
: 75 DIAS NATURALES
FECHA
: AGOSTO - 2,008
COSTO OFER.
: S/. 494,148.34
ARQUITECTURA
30d.n.
PART.
DESCRIPCION
60d.n.
75d.n.
PRIMER
SEGUNDO
TERCER
MES
MES
MES
TOTAL
( S/. )
02.10.02
BISAGRA DE VAIVEN
1,138.24
1,138.24
02.10.03
670.40
670.40
02.10.04
265.20
265.20
02.10.05
109.16
02.10.06
TIRADORES CROMADOS
109.16
1,119.84
1,119.84
02.11
PINTURA
02.11.01
4,325.32
4,325.32
02.11.02
1,834.83
1,834.83
02.11.03
02.11.04
5,260.22
5,260.22
02.11.05
3,178.10
3,178.10
02.12
5,682.47
5,682.47
223.73
223.73
02.12.01
ALUMINIO
VENTANA ALTA C/VIDRIO CRUDO REFLEJ. SIST. DTO., CON PERFILES DE
02.12.02
ALUMINIO
1,066.40
1,066.40
02.12.03
15,955.34
15,955.34
02.12.04
10,148.64
10,148.64
02.12.05
16,580.44
16,580.44
02.13
VARIOS
02.13.01
02.13.02
02.13.03
02.13.04
02.13.05
SUB - TOTAL I
2,766.99
2,766.99
220.66
220.66
285.06
2,963.36
2,963.36
77,694.99 160,855.33 122,537.25
361,087.57
11,654.25
18,380.59
54,163.14
SUB - TOTAL II
415,250.71
I.G.V.
16,976.36
19.00 %
TOTAL GENERAL
AVANCE PARCIAL ( % )
AVANCE ACUMULADO ( % )
24,128.30
285.06
189.46
189.46
26,774.39
78,897.63
494,148.34
21.52%
21.52%
35,146.89
44.55%
66.06%
33.94%
100.00%
361,087.57
54,163.14
415,250.71
78,897.64
494,148.35
415,250.71
UBICACIN
PROPIET.
FORMULA
: 03
PLAZO
: 75 DIAS NATURALES
FECHA
: AGOSTO - 2,008
COSTO OFER.
: S/. 68,593.87
INSTALACIONES ELECTRICAS
30d.n.
PART.
DESCRIPCION
03,00
INSTALACIONES ELECTRICAS
03.01
BAJA TENSION
03.01.01
TABLEROS DE DISTRIBUCION
03.01.01.01
03.01.01.02
03.01.01.03
03.01.01.04
03.01.01.05
03.01.01.06
03.01.02
POZO DE TIERRA
03.01.02.01
03.01.03
60d.n.
75d.n.
PRIMER
SEGUNDO
TERCER
MES
MES
MES
TOTAL
( S/. )
2,203.98
1,287.98
1,684.98
1,644.98
1,725.98
5,921.93
2,203.98
1,287.98
1,684.98
1,644.98
1,725.98
5,921.93
1,261.46
1,261.46
ENTERRADOS
03.01.03.02
03.01.03.03
03.01.03.04
03.01.03.05
03.01.03.06
03.01.03.07
ACOMETIDA ELECTRICA
03.01.04
SALIDAS
03.01.04.01
03.01.04.02
03.01.04.03
03.01.04.04
03.01.04.05
03.01.05
03.01.05.01
03.01.05.02
03.01.05.03
SALIDA DE UPS
03.01.06
11.72
14.40
80.02
90.02
140.40
40.24
1,289.73
11.72
14.40
80.02
90.02
140.40
40.24
5,852.00
332.90
5,455.44
62.98
5,349.70
5,852.00
332.90
5,455.44
62.98
5,349.70
1,054.32
203.68
105.06
1,054.32
203.68
105.06
PRISMATICOOARA ADOSAR
03.01.06.02
03.01.06.03
INCL.LAMP.
3,528.45
2,553.98
968.40
968.40
1,817.30
1,817.30
6,285.40
6,285.40
ADOSAR, INCL.LAMPA.
ARTEFACTO FLUORESCENTE RECTO CON REJILLA 3 x36 W, PARA
03.01.06.05
EMPOTRAR
BRAQUETE BETA VISERA HORIZONTAL CON FOCO AHORRADOR DE
03.01.06.06
25W
3,528.45
2,553.98
445.70
445.70
UBICACIN
PROPIET.
FORMULA
: 03
PLAZO
: 75 DIAS NATURALES
FECHA
: AGOSTO - 2,008
COSTO OFER.
: S/. 68,593.87
INSTALACIONES ELECTRICAS
30d.n.
PART.
DESCRIPCION
SUB - TOTAL I
GASTOS GENERALES Y UTILIDAD ( 15.00%)
SUB - TOTAL II
I.G.V.
19.00 %
TOTAL GENERAL
AVANCE PARCIAL ( % )
AVANCE ACUMULADO ( % )
60d.n.
75d.n.
PRIMER
SEGUNDO
TERCER
MES
MES
MES
TOTAL
( S/. )
20,082.61
15,731.29
15,599.23
50,123.40
3,012.39
2,359.69
2,339.88
7,518.51
23,095.00
18,090.98
17,939.11
57,641.91
4,388.04
3,437.29
3,408.43
10,951.96
27,483.04
21,528.27
21,347.54
68,593.87
40.07%
40.07%
31.39%
71.45%
31.12%
102.57%
51,413.13
7,711.96
59,125.09
11,233.76
70,358.85
22,538.30
UBICACIN
PROPIET.
FORMULA
: 04
PLAZO
: 75 DIAS NATURALES
FECHA
: AGOSTO - 2,008
COSTO OFER.
: S/. 26,820.58
INSTALACIONES SANITARIAS
30d.n.
PART.
DESCRIPCION
04.01
SISTEMA DE DESAGUE
04.01
SISTEMA DE DESAGUE
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
PROPIO
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.01.11
04.01.12
04.01.13
04.01.14
04.01.15
04.01.16
04.01.17
04.01.18
04.01.19
04.01.20
04.01.21
04.01.22
04.01.23
04.01.24
04.01.25
04.01.26
04.01.27
SIMILAR)
04.01.28
04.01.29
MANUAL
04.01.30
04.01.31
04.01.32
04.01.33
BLANCO
04.01.34
04.01.35
04.02
04.02.01
04.02.02
04.02.03
60d.n.
75d.n.
PRIMER
SEGUNDO
TERCER
MES
MES
MES
22.32
374.64
32.64
118.08
22.32
374.64
32.64
118.08
239.52
748.27
1,332.00
1,183.20
219.92
573.40
671.56
79.36
235.06
58.10
118.80
47.10
177.38
81.54
57.48
23.54
14.59
97.60
30.21
234.72
33.84
170.92
239.52
748.27
1,332.00
1,183.20
219.92
573.40
671.56
79.36
235.06
58.10
118.80
47.10
177.38
81.54
57.48
23.54
14.59
97.60
30.21
234.72
33.84
170.92
115.97
27.05
55.51
TOTAL
( S/. )
1,412.88
290.96
1,412.88
290.96
1,770.15
235.88
248.61
250.83
1,770.15
235.88
248.61
250.83
255.60
192.29
2,789.28
255.60
192.29
2,789.28
115.97
27.05
55.51
UBICACIN
PROPIET.
FORMULA
: 04
PLAZO
: 75 DIAS NATURALES
FECHA
: AGOSTO - 2,008
COSTO OFER.
: S/. 26,820.58
INSTALACIONES SANITARIAS
30d.n.
PART.
DESCRIPCION
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.02.09
04.02.10
04.02.11
04.02.12
04.02.13
04.02.14
04.02.15
04.02.16
04.02.17
04.03
AGUA INTERIORES
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
SUB - TOTAL I
GASTOS GENERALES Y UTILIDAD ( 15.00%)
SUB - TOTAL II
I.G.V.
19.00 %
TOTAL GENERAL
AVANCE PARCIAL ( % )
AVANCE ACUMULADO ( % )
60d.n.
75d.n.
PRIMER
SEGUNDO
TERCER
MES
MES
MES
TOTAL
( S/. )
56.66
14.14
11.39
24.73
30.46
5.73
6.50
18.76
5.68
4.60
12.09
16.60
7.68
18.84
56.66
14.14
11.39
24.73
30.46
5.73
6.50
18.76
5.68
4.60
12.09
16.60
7.68
18.84
1,366.53
352.45
592.70
315.84
93.76
36.27
11.19
20.58
155.82
233.61
757.93
807.18
1,366.53
352.45
592.70
315.84
93.76
36.27
11.19
20.58
155.82
233.61
757.93
807.18
10,586.93
9,011.59
0.00
19,598.52
1,588.04
1,351.74
0.00
2,939.78
12,174.97
10,363.33
0.00
22,538.30
2,313.23
1,969.03
0.00
4,282.28
14,488.20
12,332.36
0.00
26,820.58
54.02%
54.02%
45.98%
100.00%
0.00%
100.00%
19,598.52
2,939.78
22,538.30
4,282.26
26,820.56
22,538.30
UBICACIN
: LA LIBERTAD
PROPIET.
PLAZO
: 75 DIAS NATURALES
FECHA
: AGOSTO - 2,008
COSTO OFER.
: S/. 609,676.44
30d.n.
PART.
DESCRIPCION
60d.n.
75d.n.
PRIMER
SEGUNDO
TERCER
MES
MES
MES
TOTAL
( S/. )
Frmula 01:
ESTRUCTURAS
13,407.85
0.00
0.00
13,407.85
Frmula 02:
ARQUITECTURA
77,694.99
160,855.33
122,537.25
361,087.57
Frmula 03:
INSTALACIONES ELECTRICAS
20,082.61
15,731.29
15,599.23
51,413.13
Frmula 04:
INSTALACIONES SANITARIAS
10,586.93
9,011.59
0.00
19,598.52
SUB - TOTAL I
19.00 %
TOTAL GENERAL
AVANCE PARCIAL ( % )
AVANCE ACUMULADO ( % )
445,507.07
12,177.24
18,559.82
13,813.65
44,550.71
6,088.62
9,279.91
6,906.83
22,275.36
512,333.14
26,607.27
30,182.82
97,343.30
609,676.44
27.33%
27.33%
40,553.21
41.66%
68.99%
31.01%
100.00%
COSTO DIRECTO
S/.
445,507.07
VALOR REFERENCIAL
S/.
609,676.44
a)
b)
c)
DESCRIPCION
MES
ADMINISTRACION Y DIRECCION TECNICA
Oficina Central :
Secretaria
2.50
Obra :
Ing. Residente
2.50
Administrador
2.50
Contador
2.50
Planillero
2.50
Almacenero
2.50
Chofer
2.50
Otros :
Oficina (Incl. telef, agua, luz, etc.) 2.50
Camioneta
2.50
8.8242%
UNIT.
1,450.00
PARCIAL
3,625.00
UNID.
0.50
SUB-TOTAL
1.00
0.50
0.50
1.00
1.00
1.00
10,000.00
4,500.00
3,500.00
5,000.00
3,750.00
4,250.00
900.00
1,700.00
1.00
1.00
2,250.00
4,250.00
2,250.00
4,250.00
TOTAL
1,812.50
4,000.00 10,000.00
3,600.00 9,000.00
2,800.00 7,000.00
2,000.00 5,000.00
1,500.00 3,750.00
1,700.00 4,250.00
INCID.
39,312.50
1.2825%
CANT.
Utiles de escritorio
Estimado
1.00
Caseta de Guardiana
Estimado
1.00
Gastos de Adjudicacin (Notaria) Estimado
1.00
Fianza de Fiel Cumplimiento 10% x 609676.44 x 2.25%x3
C.UNIT.
INCID.
PARCIAL
700.00
639.16
258.99
1.00
1.00
1.00
1.00
700.00
639.16
258.99
4,115.32
TOTAL
5,713.47
45,025.97
RESUMEN:
Gastos Generales relacionados con el tiempo de ejecucin de la Obra:
Gastos Generales no relacionados con el tiempo de ejecucin de la Obra:
TOTAL GASTOS GENERALES:
UTILIDAD:
8.8242%
1.2825%
10.1067%
5.0000%
22,275.35
DEPARTAMENTO
PROVINCIA
LUGAR
PLAZO DE EJECUCIN
FECHA
: LA LIBERTAD
: TRUJILLO
: HUANCHACO
: 75 DIAS NATURALES
: AGOSTO -2008
VALOR REFERENCIAL :
S/.
DESCRIPCIN
609,676.44
COSTO
DIRECTO
GASTOS
UTILIDAD
GENERALES
(S/)
SUB TOTAL
(S/)
I.G.V.
(S/)
TOTAL
(S/)
ESTRUCTURAS
13,407.85
1340.79
670.39
15,419.03
2,929.62
18,348.65
ARQUITECTURA
361,087.57
36108.76
18,054.38
415,250.71
78,897.63
494,148.34
INSTALACIONES ELECTRICAS
51,413.13
5141.31
2,570.66
59,125.10
11,233.77
70,358.87
INSTALACIONES SANITARIAS
19,598.52
1959.85
979.93
22,538.30
4,282.28
26,820.58
44,550.71
22,275.36
512,333.14
97,343.30
609,676.44
TOTAL
445,507.07