Construction Cost Estimate

SN 1 2 3 4 5 6 7 8 9

Material Bricks Sand Crush Steel Cement Mud Shuttering for Roof Tiles for Front Grills

Requirement Bricks 20 / sq ft Sand 1 Truck/ 167 Sq. ft Crush 0.6 Cubic feet / sq ft Steel 1.35 kg / sq ft Cement 1 Bag / 3.07 sq ft

10 Marla (2000 Sqft) Quantity 5000/ per Thousand 40,000 5000 /Truck (350 cub ft) 12 10000 6 3 ton @ 60000 2,700 340/ Bag 651

Rate / Unit (in Rs.)

10 Glass 11 Lamination

12 ChipBoard

13 Ply

14 Wood

65.03 Sqm for 10 Marla Grills 160 sq ft for 5 Marla; 160 Sq ft for 7 Marla and 280 sq ft for 10 Marla Glass 140 sq ft for 5 Marla; 140 sq ft for 7 Marla and 250 sq ft for 10 Marla Lamination 12 sheets for 5 Marla House; 16 Sheets for 7 Marla and 18 for 10 Marla Chip Board 66 sheets for 5 Marla House; 74 Sheets for 7 Marla and 74 sheets for 10 Marla Ply 12 sheets for 5 Marla House; 17 Sheets for 7 Marla and 19 sheets for 10 Marla House Wood 242 Sq ft for 5 Marla; 296 Sq ft for 7 Marla and 296 Sq ft for 10 Marla House For the whole covered area for 4 bathrooms

425/ Sq m 150/ Sq ft 30/ Sq ft 1025/ Sheet

700/ Sheet

210/ Sheet

15/ Sq Ft

15 16 17 18 19 20 21 22 23 24

Gate Flooring Bathrooms flooring Doors (16) Civil Work Elecrification Sanitation Paint Carpenter Glass Work

150 /Sq ft 35/ Sq ft 450/ Sq m 80/ Sq ft

Total Cost 10 Marla 721,498 400,000 2,100,000

Material Labour @ 200 per sqft Land

Miscellaneous Total Per Sqr Feet Cost (Labour+Material) -

200,000 3,421,498 561

10 Marla (2000 Sqft) Cost 200,000 60,000 60,000 180,000 221,498

721,498