DATOS NECESARIOS PARA EL CALCULO DE FLETES

INSUMOS MATERIALES AGREGADOS TUBERIAS FLETE CON VEHICULO ORIGEN - DESTINO


HUARAZ- HUANCARPATA RAHUAPAMPA - HUANCARPATA LIMA - HUANCARPATA UND

Prec. U.
0.12 38 2000

FLETE CON ACEMILA Y P ORIGEN - DESTINO


A PIE DE OBRA A PIE DE OBRA A PIE DE OBRA

RELACION

DE

INSUMOS

BASE
Peso Longitud unitario de Tubo (kg) (m)

Cod.

IU

Tipo CAPATAZ

Insumo

Und HH

Precio U. 5.00

1001

1002
1003

1004
1005

1006
1007

1008
1009

1010
1011

1012
1013

1014
1015

1016
1017

1018
1019

1020
1021

1022
1023

1024
1025

1026
1027

1028
1029

1030
1031

1032
1033

1034
1035

1036

47 47 47 47 47 47 47 3 2 2 4 4 13 53 7 7 7 7 61 26 39 21 29 39 2 2 2 2 2 2 2 72 72 72 72 72

MO MO MO MO MO MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA

MO MAESTRO DE OBRA
OFICIAL OPERADOR DE EQUIPO LIVIANO OPERARIO PEON ACERO DE REFUERZO FY=4200 GRADO 60 ALAMBRE NEGRO RECOCIDO # 16 ALAMBRE NEGRO RECOCIDO # 8 ARENA FINA ARENA GRUESA

HH
HH HH HH HH

5
4.00 6.00 5.00 2.50

MO TOPOGRAFO

HH
KG KG KG M3 M3

6
3.85 4 4 50.00 35.00

1 1 1 1600 1600

ASFALTO RC-250
BREA CABLE TW # 10 AWG CABLE TW # 12 AWG - 4 MM2 CABLE TW # 14 AWG 2.5 MM2 CABLE TW #18

GLN
KG M M M M

12
1.35 2.17 1.48 0.78 0.47

CALAMINA CANDADO MEDIANO CARTEL DE OBRA


CEMENTO PORTLAND TIPO I (42.5KG) CINTA AISLANTE CINTA TEFLON

PZA UND UND


BOL ROLLO PZA KG UND KG KG KG KG KG UND UND UND UND UND

12 10 180
22.5 4.46 1.5

12 15 42.5 0.05 1 1 1 1 1 1

CLAVOS PARA CALAMINA


CLAVOS PARA CEMENTO C/C 3" CLAVOS PARA MADERA C/C 1 1/2 " CLAVOS PARA MADERA C/C 1" CLAVOS PARA MADERA C/C 2" CLAVOS PARA MADERA C/C 3" CLAVOS PARA MADERA D. PROM. CODO DE 90 PVC SAL DE 2" CODO DE 90 PVC SAL DE 4" CODO DE 90 CPVC P/AGUA CALIENTE DE 1/2" CODO DE 90C/R PVC SAP P/AGUA DE 3/4" CODO DE Fo. GALV. ISO-I DE 1/2" x 90

4
2.5 2.5 2.5 4 4 2.5 2.48 3.11 1.06 0.62 1.65

1037

1038
1039

1040
1041

1042
1043

1044
1045

1046
1047

1048
1049

1050
1051

1052
1053

1054
1055

1056
1057

1058
1059

1060
1061

1062
1063

1064
1065

1066
1067

1068
1069

1070
1071

1072
1073

1074
1075

1076
1077

1078
1079

1080
1081

1082
1083

1084
1085

72 72 72 72 38 30 53 17 17 17 43 43 43 43 43 43 24 24 30 30 5 5 5 54 54 37 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72

MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA

CODOS PVC SAL 2" X 45 CODOS PVC SAL 2" X 90 CODOS PVC SAL 4" X 45 CODOS PVC SAL 4" X 90 HORMIGON IMPRIMANTE

PZA PZA PZA PZA M3 GLN

2.2 1.86 5.62 3.42 30.00 16.35

1600
4

KEROSENE
LADRILLO K.K. DE ARCILLA 9X14X24 CM LADRILLO P/TECHO DE 15x30x30 CM 8 HCOS. LADRILLO PASTELERO 24X 24X3 CM

GLN
UND UND UND

4
0.47 1.44 0.75

3.8

MADERA DE EUCALIPTO MADERA DE EUCALIPTO 4" X 3m MADERA DE EUCALIPTO 4" X 5m


MADERA TORNILLO MADERA TORNILLO CEPILLADA MADERA TORNILLO INC.CORTE P/ENCOFRADO MAYOLICA BLANCA 1ra 15cm x 15cm MAYOLICA COLOR 1ra 15cm x 15cm PEGAMENTO P/TUBO CPBV 250 ML. PEGAMENTO PARA PVC 1/4 GLN PIEDRA CHANCADA DE 1/2" PIEDRA GRANDE DE 8" PIEDRA MEDIANA DE 6"

P2 UND UND
P2 P2 P2 M2 M2 PZA UND M3 M3 M3

1 15 5
2.81 5.12 2.81 22.81 24.11 15.09 35.71 35.00 25.00 25.00

6.606 30 40 6.606 6.606 6.606

1700 1700

PINTURA ESMALTE SINTETICO


PINTURA LATEX SUPERMATE REGLA DE MADERA SOMBRERO DE VENTILACION PVC SAL 2" TEE PVC SAP 3/4" C/R P/AGUA TEE PVC SAP DE 1/2" C/R PARA AGUA TEE SANITARIA SIMP C/REDUC PVC SAL 4"A2" TEE SANITARIA SIMPLE PVC SAL DE 4" TUB. PVC SAL P/DESAGUE DE 2" TUB. PVC SAL P/DESAGUE DE 4" TUB. PVC SAP P/INST. ELECT. DE 3/4" TUB. PVC SAP PRESION C-10 C/R. 3/4" x 5m TUB. PVC SAP PRESION P/AGUA C-10 R. 1/2" TUB. PVC SAP PRESION P/AGUA C-10 R. 3/4" TUB. PVC SEL P/INST. ELECT. DE 1" x 3m TUB. PVC SEL P/INST. ELECT. DE 5/8" TUB. PVC SEL P/INST. ELECT. DE 5/8" x 3m TUBO ABAS.CU.FLEX.TERM/M-H 1/2"x5/8"30cm TUBO CPVC AGUA CALIENTE 1/2" x 5M TUBO PROLONG.P/DES/BCE/CROM 1 1/4"X5"C/TUERCA

gln
GLN P2 PZA UND UND UND UND M M PZA UND M M UND PZA UND UND UND PZA

30
40.19 3.55 1.75 3.11 1.55 7.76 6.21 3.11 6.21 7.69 10.81 1.55 33.17 1.86 7.69 7.76 7.38 33.17 20.19

TUBO PVC S-25 U/F 200 MM CON ANILLO


TUBO PVC SAL 2" X 3M TUBO PVC SAL 4" X 3M TUBO PVC SAP (LUZ) (E/C) 1" X 3 M. TUBO PVC SAP (LUZ) (E/C) 3/4" X 3 M. TUBO PVC SEL (E/C) 3/4" X 3.00 M.

M
PZA PZA PZA PZA PZA

50
9.89 25.26 9.32 7.69 0.56

1086
1087

1088
1089

1090
1091

1092
1093

1094
1095

1096
1097

1098
1099

1100
1101

1102
1103

1104
1105

1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136

72 65 65 72 77 77 77 10 72 48 32 32 48 48 48 49 48 48 37 39 43 2 5 56 72 72 72 30 3 3 77 72 72 56 56 30 30 56 72 72 72 72 30 30 30 30 30 30 30 30 39

MA MA MA MA MA MA MA MA MA HE

UNION PVC SEL 3/4" UNION UNIVERSAL DE Fo. GALV. DE 1/2" UNION UNIVERSAL DE Fo. GALV. DE 3/4" UNION UNIVERSAL PVC SAP 3/4" VALVULA CHECK DE BRONCE DE 3/4" VALVULA COMPUERTA DE BRONCE DE 1/2" VALVULA COMPUERTA DE BRONCE DE 3/4" VALVULA FLOTADORA 3/4" C/BOLA DE COBRE YEE PVC SAL DE 4" X 4" CAMION VOLQUETE 4x2 140-210 HP 6 M3.

PZA UND UND PZA UND UND UND UND PZA HM

0.56 5.37 7.72 5.93 21.89 11.2 15.43 27.95 8.77 88.72

HE HE
HE HE

FLETE RURAL FLETE TERRESTRE


MEZCLADORA CONCRETO TAMBOR 18HP 11P3 MEZCLADORA DE CONCRETO 20-35HP 16P3

GBL GBL
HM HM

2320 4260
15.51 15.51

HE HE
HE

MIRA TOPOGRAFICA TEODOLITO


VIBRADOR DE CONCRETO 4 HP 2.40"

HM HM
HM

1.25 6
9.92

HE

WINCHA DE 30 m

UND
%MO %MT

30

%MO HERRAMIENTAS MANUALES %MA VARIOS (% MATERIALES)

MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA

ESTACA DE MADERA UND CLAVOS KG GRAVA O MATERIAL FILTRO M3 TAPA METALICA 0.60x0.60x1/8" UND CANASTILLA PVC 3 - 2" UND CODO PVC 2" x 90 UND TUB. PVC SAP C-5 DE 2"x5m ML PEGAMENTO PARA PVC GLN FIERRO CORRUGADO 3/8" KG FIERRO CORRUGADO 1/4" KG VALVULA COMPUERTA DE BRONCE 2" UND ADAPTADOR PVC SAP 2" UND TEE PVC SAP 2" UND TAPA METALICA 0.70x0.70x1/8" UND TAPA METALICA 0.25x0.25x1/8" UND COLLARIN PP TS 63mm - 3/4" UND VALVULA DE ACOPLE RAPIDO DE 3/4" PLASSON UND TAPA METALICA 0.40x0.40x1/8" UND TAPON PVC HEMBRA 11/2" UND ADAPTADOR PVC SAP 11/2" UND TUB. PVC SAP C-7.5 11/2" ML REDUCCION PVC C-7.5 2"-11/2" UND LLAVE BAYONETA 3/4" PLASSON UND REDUCCION MH 1"x3/4" UND CODO RH 32mm - 1" UND TEE RH 32mm - 1" UND UNION ROSCADO DE FG 3/4" UND TRIPODE METALICO CON ROSCA TUBO DE FG UND 3/4" ASPERSOR VYR 66 SECTORIZADO C/ROMPE UND CHORRO MANGUERA PEBD 32mm C - 4 ML CARTEL DE OBRA DE 2.40x1.20m UND

0.25 2.5 15 140 15 4.72 5.25 40 3.3 3.4 85 5.2 5.5 144 68 13.5 45 75 8 2.38 2.55 3 16 2.25 13.5 17.5 3 52 70 2 300

0.3 1 1700 15 0.2 0.2 1.464 3.85 0.56 0.248 2 0.2 0.2 18 8 0.4 0.5 12 0.2 0.2 1.224 0.2 0.25 0.2 0.2 0.2 0.6 7 0.95 0.6 25

1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 1184 1185 1186 1187 1188

43 43 39 72 72 72 72 43 2 48 54 3 72 72 72 77 39 72 72 3 72 71 72 39 39 39 39 39 39 39 39 39 39 72 72 43 2 72 77 72 77 72 72 72 39 39 39 39 28 27 27 27

MA MA MA MA MA MA MA MA MA HE MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA HE HE HE HE MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA MA

TRIPLAY DE 4'x8'x12mm UND 75 LISTONES DE MADERA TORNILLO 2"x3"x6' UND 10.5 SELLADOR DE MADERA GLN 25 CANASTILLA PVC 4"-3" UND 15.5 REDUCCION PVC 4"-3" UND 9.2 CODO PVC 3"x90 UND 10 TUB. PVC SAP C-5 DE 3"x5m ML 10 TRIPLAY DE 4'x8'x15mm UND 85 FIERRO CORRUGADO FY=4200Kg/cm2 GRADO KG 60 4 BOMBA MANUAL PARA PRUEBA DE TUBERIA HE 10 IMPERMEABILIZANTE P/MORTERO SIKA1 GLN 35 TAPA METALICA 0.50x0.50x1/8" UND 115 TEE PVC SAP 3" UND 12 UNION INIVERSAL PVC 3" UND 45 ADAPTADOR PVC SAP 3" UND 9.5 VALVULA COMPUERTA DE BRONCE 3" UND 235 LIJA UND 2.2 TUB. PVC SAP C-7.5 D=2"x5m M 6 REDUCCION PVC 3"-2" UND 6.5 TAPA METALICA 0.30x0.30x1/8" UND 65 CAJA PLASTICA RECTANGULAR DE 15"x21"x1'UND 80 ELEVADOR DE ALUMINIO DE 3/4"x1.00M UND 25 ENLACE RECTO FITTING 32mm UND 10.5 PRUEBA DE ROTURA DE PROBETAS UND 20 FLETE LIMA - HUAYOCHACA GLB 3000 FLETE HUARAZ - HUAYOCHACA GLB 5000 FLETE HUAYOCHACA A PIEDE OBRA GLB 4000 PROFESIONAL ESPECIALISTA DIA 500 REFRIGERIO DIA 50 EQUIPO MULTIMEDIA DIA 60 COMPUTADORA DIA 25 LOCAL DE EXPOSICION DIA 20 MATERIAL DIDACTICO GLB 100 TUB. PVC SAP C-5 D=4"x5m ML 13 TUB. PVC SAP C-10 D=2"x5m M 7 ATAGUIA DE MADERA TRATADA 1.0x0.25x1.5"UND 25 COMPUERTA METALICO CON VOLANTE 0.30x1.00x1/8" UND 155 CANASTILLA PVC 6" - 4" UND 20 SUMIDERO DE BRONCE CON ROSCA DE 3" UND 15 CODO PVC 4"x90 UND 13 VALVULA COMPUERTA DE BRONCE 4" UND 350 ADAPTADOR PVC SAP 4" UND 12 TEE PVC SAP 4" UND 16 REDUCCION PVC 4"-2" UND 9.5 FLETE LIMA - CAYAS GLB 4480.4 FLETE HUARAZ - CAYAS GLB 7000.53 FLETE RAHUAPAMPA - CAYAS GLB 3444.4 FLETE CAYAS A PIE DE OBRA GLB 8961.37 DINAMITA CART. 0.98 FULMINANTE UND 0.6 GUIA DE MECHA LENTA M 1 PENTACORD 5P M 0.527

40 5 4 1 1 1 1.8 45 1 4 30 0.6 1.2 0.6 2 0.001 1.5 0.8 15 5 3 0.4

2.56 1.6 2.5 30 1.2 1 0.8 3.5 0.8 1 1

5 5

0.2 0.01 0.01 0.02

1189 1190 1191 1192 1193 1194 1195 1196 1197 1198 1199 1200 1201 1202 1203 1204

38 27 2 48 48 48 48 27 2 3 72 39 39 39 39 39

MA MA MA HE HE HE HE MA MA MA MA MA MA MA MA MA

PIEDRA MEDIANA SELECCIONADA M3 RETARDADORES UND BARRENO 7/8"*1.70M PZA COMPACTADOR VIBRATORIO TIPO PLANCHAHM COMPRESORA 87 HP 250-330PCM HM MARTILLO NEUMATICO 25 KG HM PERFORADORA PIONJER HM ANFO SUPERFAM KG BARRENO 3/4" x 1.00m PZA TAPA METALICA 0.60x0.40x1/8" UND TUB. HDPE ISO 4427 SDR 17 DE D=3" ML UNION POR TERMOFUSION GLB FLETE LIMA - HUANCARPATA GLB FLETE HUARAZ - HUANCARPATA GLB FLETE RAHUAPAMPA - HUANCARPATA GLB FLETE HUANCARPATA - A PIE DE OBRA GLB

10.5 1.5 320 21.54 55 8.85 25 3 310 120 45 2.5 7086.8 5730.69 3918.18 7432.32

1 0.02 30

1 25 30 18

LETES
Prec. U.
0.025 1.0 0.05

FLETE CON ACEMILA Y PEON ORIGEN - DESTINO UND

E OBRA

E OBRA

E OBRA

0 BASE
Capacidad de camin en # Especfica Tubos por de Gastos Viaje Aporte Comunal

204

39 39 39 39 39 39 39 29 29 29 29 29 29 29 29 29 29 29 29 29 39 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29

29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29

29 29 29 29 29 29 29 29 29 39 39 39 39 39 39 39 39 30
30

320

380

29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29

270

320

210 320

29 29 29 29 29 29 29 29 29 39 29 29 29 29 29 29 29 29 29 29 29 29 29 39 29 29 29 39 30 39 39 39 39 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 26 26 26

29 26 29 29 29 29 29 29 29 29 29 29 29 29 29 29

MUNICIPALIDAD MAT. COMUNAL

0.0000 0.0000

Tipo

MAT. Cod.

MANO DE OBRA MANO DE OBRA Insumos

0.0000 0.0000

Und

HERR. Y EQUIPOS 0.0000 HERR. Y EQUIPOS 0.0000 Cantidad P.U. MUNICIPALIDAD

TOTAL
COMUNAL

0.00
Total

PRESUPUESTO GENERAL DEL PROYECTO


Proyecto CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Lugar Elab. Por FEBRERO DEL 2008 Fecha
PARTIDAS UND m2 M2 KM m2 GLB. GbL m3 m2 Kg m2 m3 m2 Gbl Gbl ml
METRADO

MUNICIPALIDAD C.U. PARCIAL

COMUNAL C.U.

01.00 TRABAJOS PRELIMINARES


01.01 01.02 01.03 01.04 01.05 02.01 02.02 02.03 02.04 02.05 02.06 02.07 02.08 02.09 02.10 02.11 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 OFICINAS, ALMACENES Y CASETA DE GUARDIAN LIMPIEZA Y DESBROCE TRAZO, NIVELACION Y REPLANTEO EN REDES TRAZO NIVELACION Y REPLANTEO EN ESTRUCTURAS CARTEL DE OBRA DEMOLICION DE CANAL PARA CAPTACION EXCAVACION EN MATERIAL CONGLOMERADO NIVELACION Y REFINE ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 ENCOFRADO Y DESENCOFRADO CONCRETO SIMPLE f'c=175 Kg/cm2 CONCRETO ARMADO f'c=175 Kg/cm2 TARRAJEO C/IMPERMEABILIZANTE MEZCLA 1:3 e=1" COLOCACION DE TAPAS METALICAS SUM. Y COLOC. DE ACCESORIOS CERCO PERIMETRICO 30.00 2294.04 10.14 265.24 1.00 1.00 2.22 2.55 14.39 14.13 0.83 0.12 5.00 1.00 1.00 1.00 204.12 13.33 284.28 84.24 173.84 6.85 10.50 212.20 272.32 19.00 45.30 11.34 1.25 1.08 1.00 1.00 85.00 4.79 3.30 10.75 11.48 1.60 22.99 1.00 1.00 2434.56 243.46 4057.60 10144.00 3263.04 693.19 4022.15 2433.97 10144.00 1.00 2434.56 71.77 68.04 272.88

02.00 CAPTACION ( 01 UND.)

03.00 RESERVORIO (V=180 M3)


EXCAVACION EN MATERIAL CONGLOMERADO M3 EXCAVACION EN ROCA SUELTA m3 ACARREO DE MATERIAL EXCEDENTE m3 NIVELACION Y REFINE CAJA RESERVORIO m2 RELLENO Y COMPACTADO CON MATERIAL PROPIO m2 FILTRO DE GRAVA m3 DREN DE AGUAS SUBTERRANEAS m3 EMPASTADO CON BARRO e = 5 cm m2 SUMINISTRO Y COLOCACION DE GEOMEMBRANA e=2mm m2 PROVISION E INSTALACION DE TUBERIA PVC SAP C-7.5 D=4" m PROVISION E INSTALACION DE TUBERIA PVC SAL 4" DRENAJE m ENCOFRADO Y DESENCOFRADO m2 CONCRETO SIMPLE f'c=175 kg/cm2 m3 CONCRETO SIMPLE f'c=140 kg/cm2 m3 U. GLB. ml

3.15 SUM. COLOC. DE TAPA METALICA 0.60*0.60m*3/16" 3.16 SUM. COLOC. DE ACCESORIOS EN RESERVORIO 3.17 CERCO PERIMETRICO

04.00 FILTRO DE ARENA (02 UND.)


04.01 04.02 04.03 04.04 04.05 04.06 04.07 04.08 05.01 05.02 05.03 05.04 05.05 05.06 05.07 05.08 05.09 05.10 05.11 EXCAVACION EN MATERIAL CONGLOMERADO M3 NIVELACION Y REFINE M2 ENCOFRADO Y DESENCOFRADO NORMAL m2 CONCRETO SIMPLE f'c=140 kg/cm2 m3 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg TARRAJEO CON MORTERO 1:3 e=1/2" m2 SUM. Y COLOC. DE TAPA METALICA 1.50*1.50M*3/16" GLB. SUMINISTRO Y COLOCACION DE ACCESORIOS CAM. FILTRO GLB. 4" EXCAVACION DE ZANJA EN MATERIAL CONGLOMERADO m3 EXCAVACION DE ZANJA EN ROCA SUELTA m3 NIVELACION Y REFINE DE FONDO DE ZANJA m2 CAMA DE APOYO PARA TUBERIA a=0.40m m PROVISION E INSTALACION TUBERIA PVC-SAP C-7.5 D=4" m PROVISION E INSTALACION TUBERIA PVC-SAP C-7.5 D=3" m PROVISION E INSTALACION TUBERIA PVC-SAP C-7.5 D=2" m PROVISION E INSTALACION TUBERIA PVC-SAP C-7.5 D=11/2" m PRUEBA HIDRAULICA m SUMINISTRO Y COLOCACION DE ACCESORIOS RED DIST. Gbl RELLENO Y APIZONADO C/MAT SELECCIONADO m3 M3 m2 M2

05.00 RED DE DISTRIBUCION ( 9706 ml.)

06.00 CAMARA ROMPE PRESION CRP-7 (36 UND)


06.01 EXCAVACION EN MATERIAL CONGLOMERADO 06.02 NIVELACION Y REFINE 06.03 ENCOFRADO Y DESENCOFRADO

PRESUPUESTO GENERAL DEL PROYECTO


Proyecto CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Lugar Elab. Por FEBRERO DEL 2008 Fecha
PARTIDAS ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 CONCRETO ARMADO f'c=175 kg/cm2 TARRAJEO MORTERO 1:3 e=1cm C/IMPERMEABILIZANTE SUM. Y COLOC. DE TAPA METALICA 0.60*0.60/3/16" SUM. Y COLOC. DE ACCESORIOS EN CRP-7 D =4" SUM. Y COLOC. DE ACCESORIOS EN CRP-7 D =3" SUM. Y COLOC. DE ACCESORIOS EN CRP-7 D =2" SUM. Y COLOC. DE ACCESORIOS EN CRP-7 D =1.5" UND kg m3 M2 Und Und Und Und Und
METRADO

MUNICIPALIDAD C.U. PARCIAL

COMUNAL C.U.

06.04 06.05 06.06 06.07 06.08 06.09 06.10 06.11 07.01 07.02 07.03 07.04 07.05 07.06

1149.89 20.03 215.28 36.00 12.00 3.00 15.00 13.00 12.78 163.52 8.18 89.00 57.00 146.00 0.55 11.00 14.00

07.00 HIDRANTES DE RIEGO ( 146 UND)


EXCAVACION EN MATERIAL CONGLOMERADO m3 ENCOFRADO Y DESENCOFRADO NORMAL m2 CONCRETO SIMPLE f'c=140 kg/cm2 m3 SUMINISTRO Y COLOCACION DE ACCESORIOS 2" HIDRANTE und SUMINISTRO Y COLOCACION DE ACCESORIOS 11/2" HIDRANTE und SUMINISTRO Y COLOCACION DE TAPA METALICA 0.30*0.30M*3/8" und

08.00 VALVULAS DE CONTROL (11 UND)


08.01 EXCAVACION EN MATERIAL CONGLOMERADO m3 08.02 SUM. Y COLOC. DE ACCESORIOS VALVULAS DE CONTROL und 2"

09.00 MODULO DE RIEGO (14 UND)


09.01 BRAZO PORTATIL DE RIEGO UND

10.00 TAPON DE PURGA (38 UND)


10.01 10.02 10.03 10.04 10.05 11.01 11.02 11.03 11.04 EXCAVACION EN MATERIAL CONGLOMERADO m3 1.82 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.36 CONCRETO SIMPLE f'c=140 kg/cm2 m3 2.28 SUMINISTRO Y COLOCACION DE ACCESORIOS TAPON DE und PURGA 11/2" 13.00 SUMINISTRO Y COLOCACION DE ACCESORIOS TAPON DE und PURGA 2" 25.00 PUERTA DE MADERA EN CERCO PRUEBA HIDRAULICA DEL SISTEMA CAPACITACION DE MANEJO Y MANTENIMIENTO IMPREVISTOS Gbl Gbl Gbl Gbl Gbl Gbl 1.00 1.00 1.00 1.00 1.00 1.00

11.00 VARIOS

12.00 FLETE
12.01 FLETE TERRESTRE 12.02 FLETE RURAL

COMUNAL PARCIAL

C.U.

TOTAL PARCIAL

COMUNAL PARCIAL

C.U.

TOTAL PARCIAL

PLANILLA DE METRADO
Proyecto : Ubicacin: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH PARTIDA Und. m2 m3 1 1 1 36 Km m2 1 1 1 36 Gbl GbL m3 1 1 1.00 1.00 1.00 m2 1.00 1.00 1.00 Kg 12.00 12.00 -6.00 -6.00 1.20 1.20 0.60 0.60 0.56 0.56 0.56 0.56 8.06 8.06 -2.02 -2.02 0.90 1.20 1.20 0.70 1.20 0.40 0.63 1.44 0.48 14.39 0.90 1.20 1.20 0.70 1.20 0.40 0.70 1.10 0.40 3.00 11.00 2.20 2.00 2.50 10.00 1.70 2.00 7.50 110.00 3.74 144.00 1 1 0.44 1.58 0.19 2.55 1 1.00 2.22 1.00 3.00 11.00 2.20 2.00 10.14 2.50 10.00 1.70 2.00 1.00 0.20 7.50 110.00 3.74 144.00 2028.80 10.14 10.14 265.24 N V. 1.00 Fecha: FEBRERO DEL 2008

Largo(m) Ancho(m) Alto(m) Area(m2) Factor 6.00 5.00

PARCIAL 30.00

TOTAL 30.00 2294.04

01.00 TRABAJOS PRELIMINARES


01.01 01.02 OFICINAS, ALMACENES Y CASETA DE GUARDIAN LIMPIEZA Y DESBROCE Captacin Reservorio Camara de filtro Camara rompe presion tipo 7 Lnea de Distribucin 01.03 01.04 TRAZO, NIVELACION Y REPLANTEO EN REDES TRAZO NIVELACION Y REPLANTEO EN ESTRUCTURAS Captacin Reservorio Camara de filtro Camara rompe presion tipo CRP-7 01.05 02.01 02.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 X 1.20 m. DEMOLICION DE CANAL PARA CAPTACION EXCAVACION EN MATERIAL CONGLOMERADO Caja de vlvulas Caja de captacin Canal de conduccin NIVELACION Y REFINE Caja de vlvulas Caja de captacin Canal de conduccin ACERO CORRUGADO f'c=4200Kg/cm2 GRADO 60 Acero 3/8" longitudinal - Techo Acero 3/8" transversal - Techo Acero 3/8" Malla en tapa (longitudinal) Acero 3/8" Malla en tapa (transversal)

1 10144.00

02.00 CAPTACION ( 01 UND.)

02.03

02.04

PLANILLA DE METRADO
Proyecto : Ubicacin: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH PARTIDA Acero 3/8" longitudinal - Techo de canal de conduccin Acero 3/8" transversal - Techo de canal de conduccin ENCOFRADO Y DESENCOFRADO NORMAL Cara interior de caja de captacin Cara exterior de caja de captacin Techo de caja de captacin Cara interior de caseta de vlvulas muros Cara exterior de caseta de vlvulas muros Canal de conduccin Techo de canal de conduccin CONCRETO SIMPLE f'c=175 Kg/cm2 Caja de captacin losa Caja de captacin Muros Caja de vlvulas losa Caja de vlvulas Muros Canal de conduccion losa Canal de conduccin Muros CONCRETO ARMADO f'c=175 Kg/cm2 Techo de captacin Techo de canal de conduccin TARRAJEO C/IMPERMEABILIZANTE MEZCLA 1:3 e=1" Muros interior captacin Losa de fondo captacin SUM. Y COLOCACION DE TAPAS METALICAS EN CAPTACION SUM. Y COLOC. DE ACCESORIOS EN CAPTACION SUM. Y COLOC. DE REJILLA METALICA Und. Fecha: FEBRERO DEL 2008

N V. Largo(m) Ancho(m) Alto(m) Area(m2) Factor PARCIAL 5.00 0.50 0.56 1.40 4.00 0.40 0.56 0.90 1.00 1.00 1.00 1.00 1.00 2.00 1.00 4.00 4.80 1.20 2.40 2.50 1.20 1.20 1.20 4.40 0.90 2.80 1.20 1.20 1.00 1.10 1.20 0.40 0.50 0.40 0.20 1.20 0.10 0.70 0.10 0.40 0.10 0.10 1.00 0.10 0.40 0.10 0.20 0.10 0.10 1.00 1.00 0.95 4.00 5.28 1.44 0.96 1.25 0.96 0.24

TOTAL

02.05

m2

14.13

02.06

m3 1.00 1.00 1.00 1.00 1.00 1.00 m3 1.00 1.00 m2 1.00 1.00 1.00 1.00 1.00 4.00 1.00 4.00 1.00 1.00 1.00 1.00 0.50 0.40 0.10 0.02 0.14 0.44 0.06 0.11 0.05 0.02

0.83

02.07

0.12

02.08

5.00

02.09 02.10 02.11

Gbl Gbl Gbl M3

1.00 1.00 1.00 204.12

03.00 RESERVORIO (V=180 M3)


3.01 EXCAVACION EN MATERIAL CONGLOMERADO Caja Reservorio Caja de Vlvula Caja de Inspeccin 1 1 1 190.45 0.80 1.40 0.80 0.90 0.85 0.85 190.45 0.54 1.07

PLANILLA DE METRADO
Proyecto : Ubicacin: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH PARTIDA Canal de salida y limpia Canal de Desague Hoyos para cerco perimetrico Drenaje EXCAVACION EN ROCA SUELTA ACARREO DE MATERIAL EXCEDENTE NIVELACION Y REFINE CAJA RESERVORIO RELLENO Y COMPACTADO CON MATERIAL PROPIO FILTRO DE GRAVA DREN DE AGUAS SUBTERRANEAS EMPASTADO CON BARRO e = 5 cm SUMINISTRO Y COLOCACION DE GEOMEMBRANA e=2mm PROVISION E INSTALACION DE TUBERIA PVC SAP C-7.5 D=4" PROVISION E INSTALACION DE TUBERIA PVC SAL 4" DRENAJE ENCOFRADO Y DESENCOFRADO Cara Externa Caja Vlvulas Cara Interna Caja Vlvulas Cara Externa Caja Inspeccin Cara Interna Caja Inspeccin CONCRETO SIMPLE f'c=175 kg/cm2 Muro Caja Valvulas Muro Caja Inspeccin Muro Canal Desague Piso Caja Valvulas Piso Caja Inspeccin Piso Canal Desague CONCRETO SIMPLE f'c=140 kg/cm2 SUM. COLOC. DE TAPA METALICA 0.60*0.60m*3/16" SUM. COLOC. DE ACCESORIOS EN RESERVORIO CERCO PERIMETRICO EXCAVACION EN MATERIAL CONGLOMERADO NIVELACION Y REFINE ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Acerro 3/8"Longitudinal en techo Und. N V. 1 1 36 1 1 1 1 1 1 1 1 272 20 45 1 1 1 1 m3 1 1 1 1 1 1 1 1 1 1 1 1 6 0.85 0.85 0.35 0.10 0.10 0.10 0.30 0.42 1.00 0.42 0.84 1.65 1.08 0.26 0.36 0.35 0.04 0.08 0.17 1.08 1.00 1.00 85.00 4.79 3.30 0.56 5.38 Fecha: FEBRERO DEL 2008

3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12

m3 m3 m2 m2 m3 m3 m2 m2 m m m2

Largo(m) Ancho(m) Alto(m) Area(m2) Factor PARCIAL 6.00 0.60 1.00 3.60 6.00 0.50 0.40 1.20 0.15 0.15 0.50 0.41 42.80 0.40 0.40 6.85 190.45 0.07 13.33 190.45 1.15 284.28 84.24 84.24 173.84 173.84 42.80 0.40 0.40 6.85 16.40 0.64 10.50 212.20 212.20 272.32 19.00 45.30 3.40 2.60 4.60 3.80 0.85 0.65 0.85 0.75 2.89 1.69 3.91 2.85

TOTAL

13.33 284.28 84.24 173.84 6.85 10.50 212.20 272.32 19.00 45.30 11.34

3.13

1.25

3.14 3.15 3.16 3.17 04.01 04.02 04.03

m3 U. GLB. ml M3 M2 kg

85.00 2.20 2.20 1.60 1.50 1.50 1.45

1.08 1.00 1.00 85.00 4.79 3.30 10.75

04.00 FILTRO DE ARENA (01 UND.)

PLANILLA DE METRADO
Proyecto : Ubicacin: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH PARTIDA Acero 3/8" transversal en techo ENCOFRADO Y DESENCOFRADO NORMAL Muro Longitudinal caja Muro transversal caja Techo CONCRETO SIMPLE f'c=140 kg/cm2 Muro Longitudinal caja Muro transversal caja Techo Piso de la caja TARRAJEO CON MORTERO 1:3 e=1/2" Cara interna del muro Cara externa del muro piso (enlucido) Techo enclucido SUM. Y COLOC. DE TAPA METALICA 1.50*1.50M*3/16" SUM. Y COLOC. DE ACCESORIOS FILTROS DE ARENA 4" EXCAVACION DE ZANJA EN MATERIAL CONGLOMERADO EXCAVACION DE ZANJA EN ROCA SUELTA NIVELACION Y REFINE DE FONDO DE ZANJA CAMA DE APOYO PARA TUBERIA a=0.40m PROVISION E INSTALACION TUBERIA PVC-SAP C-7.5 D=4" PROVISION E INSTALACION TUBERIA PVC-SAP C-7.5 D=3" PROVISION E INSTALACION TUBERIA PVC-SAP C-7.5 D=2" PROVISION E INSTALACION TUBERIA PVC-SAP C-7.5 D=1.5" PRUEBA HIDRAULICA SUM. Y COLOC. DE ACCESORIOS RED DE DISTRIBUCION RELLENO Y COMPACTADO MANUAL DE ZANJA EXCAVACION EN MATERIAL CONGLOMERADO Camara caseta Und. m2 2 2 1 m3 2 2 1 1 m2 1 1 1 1 1 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00 7.80 2.00 1.50 1.30 1.30 1.50 0.50 9.10 10.14 3.00 0.75 1.00 1.00 2434.56 243.46 4057.60 10144.00 3263.04 693.19 4022.15 2433.97 10144.00 1.00 2434.56 2.20 1.50 1.50 2.00 0.10 0.10 0.50 1.50 1.45 1.45 0.10 0.15 0.64 0.44 0.08 0.45 22.99 2.20 1.50 1.50 1.45 1.45 0.50 6.38 4.35 0.75 1.60 Fecha: FEBRERO DEL 2008

N V. Largo(m) Ancho(m) Alto(m) Area(m2) Factor PARCIAL 16 0.60 0.56 5.38

TOTAL 11.48

04.04

04.05

04.06

04.07 04.08 05.01 05.02 05.03 05.04 05.05 05.06 05.07 05.08 05.09 05.10 05.11 06.01

Und Und m3 m3 m2 m m m m m m Gbl m3 m3

1.00 1.00 2434.56 243.46 4057.60 10144.00 3263.04 693.19 4022.15 2433.97 10144.00 1.00 2434.56 71.77

05.00 RED DE DISTRIBUCION ( 10144 ml.)


10144.00 10144.00 10144.00 10144.00 3168.00 673.00 3905.00 2398.00 10144.00 10144.00 0.40 0.40 0.40 0.60 0.60 0.10

1.03 1.03 1.03 1.02

0.40

0.60

06.00 CAMARA ROMPE PRESION CRP-7 (36 UND)


36.00 36.00 1.50 0.60 1.10 0.40 1.15 0.40 68.31 3.46

PLANILLA DE METRADO
Proyecto : Ubicacin: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH PARTIDA NIVELACION Y REFINE Caja Camara Rompe Presin Caja Vlvula de Control ENCOFRADO Y DESENCOFRADO NORMAL Muro Exterior Muro Interior Techo ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Acero 3/8" longitudinal - Techo Acero 3/8" transversal - Techo Acero 3/8" Malla en tapa Acero 3/8" Longitudinal Rejilla - Piso Acero 3/8" transversal Rejilla - Piso Acero 3/8" Muro Vertical. Acero 1/4" Muro Horizontal CONCRETO ARMADO f'c=175 kg/cm2 Muros long. Muros transversal techo Piso TARRAJEO C/IMPERMEABILIZANTE MEZCLA 1:3 e=1" Muro Exterior Muro Interior Techo Piso SUM. Y COLOC. DE TAPA METALICA 0.60*0.60m*3/16" SUM. Y COLOC. DE ACCESORIOS EN CRP-7 D =4" SUM. Y COLOC. DE ACCESORIOS EN CRP-7 D =3" SUM. Y COLOC. DE ACCESORIOS EN CRP-7 D =2" SUM. Y COLOC. DE ACCESORIOS EN CRP-7 D =1.5" Und. m2 N V. 36.00 36.00 m2 36.00 36.00 36.00 kg 324.00 468.00 -432.00 40.00 70.00 540.00 360.00 m3 36.00 36.00 36.00 36.00 m2 36.00 36.00 36.00 36.00 36.00 12.00 3.00 15.00 13.00 4.40 3.20 0.60 1.00 0.50 0.90 0.50 0.60 79.20 103.68 10.80 21.60 36.00 12.00 3.00 15.00 13.00 1.30 0.60 0.60 1.50 0.15 0.15 0.40 1.10 1.00 1.00 0.10 0.15 7.02 3.24 0.86 8.91 215.28 1.30 0.90 0.60 1.40 1.10 1.30 4.00 0.56 0.56 0.56 0.56 0.56 0.56 0.25 235.45 235.45 -144.89 31.30 43.04 392.42 357.12 20.03 4.40 3.20 0.60 1.00 0.90 0.50 158.40 103.68 10.80 1149.89 Fecha: FEBRERO DEL 2008

Largo(m) Ancho(m) Alto(m) Area(m2) Factor 1.50 0.60 1.10 0.40

PARCIAL 59.40 8.64

06.02

TOTAL 68.04

06.03

272.88

06.04

06.05

06.06

06.07 06.08 06.09 06.10 06.11

Und Und Und Und Und

36.00 12.00 3.00 15.00 13.00

PLANILLA DE METRADO
Proyecto : Ubicacin: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH PARTIDA Und. m3 m2 N V. 146.00 146.00 146.00 m3 292.00 292.00 89.00 57.00 146.00 11.00 11.00 14.00 38.00 152.00 152.00 m3 38.00 38.00 Und Und Gbl Gbl Gbl 13.00 25.00 1.00 1.00 1.00 0.40 0.20 0.40 0.20 0.30 0.30 1.82 0.46 13 25 1.00 1.00 1.00 13.00 25.00 1.00 1.00 1.00 0.40 0.40 0.20 0.40 0.30 0.30 0.30 0.50 0.30 0.10 0.10 0.35 0.35 5.11 3.07 89.00 57.00 146.00 0.55 11.00 14.00 1.82 18.24 9.12 2.28 Fecha: FEBRERO DEL 2008

Largo(m) Ancho(m) Alto(m) Area(m2) Factor 0.50 2.00 1.20 0.50 0.35 0.35 0.35

PARCIAL 12.78 102.20 61.32

TOTAL 12.78 163.52

07.00 HIDRANTES DE RIEGO ( 146 UND)


07.01 07.02 EXCAVACION EN MATERIAL CONGLOMERADO ENCOFRADO Y DESENCOFRADO NORMAL Cara exterior Muro Cara interior Muro CONCRETO SIMPLE f'c=140 kg/cm2 Muro Long. Muro trans. SUMINISTRO Y COLOCACION DE ACCESORIOS 2" HIDRANTE SUMINISTRO Y COLOCACION DE ACCESORIOS 11/2" HIDRANTE SUMINISTRO Y COLOCACION DE TAPA METALICA 0.30*0.30M*3/8" EXCAVACION EN MATERIAL CONGLOMERADO SUM. Y COLOC. DE ACCESORIOS VALVULAS DE CONTROL 2" BRAZO PORTATIL DE RIEGO EXCAVACION EN MATERIAL CONGLOMERADO ENCOFRADO Y DESENCOFRADO NORMAL Base de Dado Parte Baja Base de Dado Parte Superior 10.03 CONCRETO SIMPLE f'c=140 kg/cm2 Base de Dado Parte Baja Base de Dado Parte Superior 10.04 10.05 11.01 11.02 11.03 SUMINISTRO Y COLOCACION DE ACCESORIOS TAPON DE PURGA 11/2" SUMINISTRO Y COLOCACION DE ACCESORIOS TAPON DE PURGA 2" PUERTA DE MADERA EN CERCO PRUEBA HIDRAULICA DEL SISTEMA CAPACITACION DE MANEJO Y MANTENIMIENTO

07.03

8.18

07.04 07.05 07.06 08.01 08.02 09.01 10.01 10.02

und und und m3 Und Und m3 m2

89.00 57.00 146.00 0.55 11.00 14.00 1.82 27.36

08.00 VALVULAS DE CONTROL (11 UND)


0.52 0.32 0.30

09.00 MODULO DE RIEGO (14 UND) 10.00 TAPON DE PURGA (38 UND)

11.00 VARIOS

PLANILLA DE METRADO
Proyecto : Ubicacin: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH PARTIDA 11.04 12.01 12.02 IMPREVISTOS FLETE TERRESTRE FLETE RURAL Und. Gbl Gbl Gbl Fecha: FEBRERO DEL 2008

N V. Largo(m) Ancho(m) Alto(m) Area(m2) Factor 1.00 1.00 1.00

PARCIAL 1.00 1.00 1.00

TOTAL 1.00 1.00 1.00

12.00 FLETE

DETALLE DE GASTOS GENERALES


PROYECTO: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE Fecha: CHALHUA FEBRERO DEL 2008 DURACION: 4 Meses
ITEM ESP. DESCRIPCION UNIDAD CANTIDAD Costo Directo de Obra: P.UNIT. P.PARCIAL

#REF!
% del C.D.

1 2 3 4 5 6 7

27 27 27 30 39 39 39

Honorarios del Ingeniero Residente Honorarios del Ingeniero Supervisor Honorarios del Maestro de obra Materiales fotogrficos y de escritorio Fotocopias, anillados y otros servicios Gastos en Elaboracion de Exp. Tecnico Gastos en Elaboracion de Exp. Liquidacin

mes mes mes mes Gbl Gbl Gbl

4 4 4 4 1 1 1

3800.00 3500.00 1500.00 15.00 80.00 7000.00 2500.00

15200.00 14000.00 6000.00 60.00 80.00 7000.00 2500.00

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

TOTAL

44840.00

#REF!

DETALLE DE GASTOS DE SUPERVISION


PROYECTO: CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE Fecha: CHALHUA FEBRERO DEL 2008 DURACION: 4 Meses
ITEM ESP. DESCRIPCION UNIDAD CANTIDAD Costo Directo de Obra: P.UNIT. P.PARCIAL

#REF!
% del C.D.

20

Combustibles y lubricantes

Mes

300.00

900.00

#REF!

TOTAL

900.00

#REF!

RELACION DE INSUMOS DEL PROYECTO


Proyecto CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA Lugar LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Elab. Por Fecha FEBRERO DEL 2008 Cdigo
MANO
1003 1005 1006 1007 1009 1019 1136 1030 1106 1048 1049 1060

Descripcin
DE OBRA
OFICIAL OPERARIO PEON TOPOGRAFO ALAMBRE NEGRO RECOCIDO # 16 CALAMINA CARTEL DE OBRA DE 2.40x1.20m CLAVOS PARA MADERA C/C 3" ESTACA DE MADERA MADERA DE EUCALIPTO 4" X 3m MADERA DE EUCALIPTO 4" X 5m PINTURA ESMALTE SINTETICO

Unidad
HH HH HH HH KG PZA UND KG UND UND UND gln %MO HM HM

P.U.
4.00 5.00 2.50 6.00 4.00 12.00 300.00 4.00 0.25 15.00 5.00 30.00 96.38 1.25 6.00

Cantidad
28.00 90.43 793.53 110.78 30.00 360.00 1.00 31.00 7 187.20 242.00 174.20 89.84 1.00 110.78 110.78

Parcial
3 212.65
112.00 452.15 1 983.82 664.68

MATERIALES

13 857.02
120.00 4 320.00 300.00 124.00 1 796.80 3 630.00 871.02 2 695.20

HERRAMIENTAS

EQUIPOS

899.53
96.38 138.47 664.68

1104 HERRAMIENTAS MANUALES 1100 MIRA TOPOGRAFICA 1101 TEODOLITO

TOTAL APORTE Cdigo COMUNAL Descripcin

17 969.20

Unidad

P.U.

Cantidad TOTAL

Parcial 0.00

Proyecto Lugar Elab.Por Fecha

CALCULO DEL FLETE : CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA : LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH : : FEBRERO DEL 2008

1,- DATOS GENERALES DE CARGA a.- POR PESO DESCRIPCION ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 ADAPTADORES PVC SAP ALAMBRE DE PUAS # 16 ALAMBRE NEGRO RECOCIDO # 16 ALAMBRE NEGRO RECOCIDO # 8 ALDABA ASPERSOR SECTORIZADO C/ROMPE CHORO q=0.42LIT/SEG CAJA PLASTICA RECTANGULAR 21"*15"*1" CALAMINA 1.80*0.83m*0.20" CANASTILLAS PVC SAP CANDADO MEDIANO CEMENTO PORTLAND TIPO I (42.5 kg) CILINDRO PARA FILTRO DE ARENA D=1.00M INCL. ACC. DE 4" CLAVOS PARA MADERA CON CABEZA DE 2" CLAVOS PARA MADERA CON CABEZA DE 3" CLAVOS PARA MADERA CON CABEZA DE 4" CODOS PVC SAP CODO RH 32MM*1" COLLARIN PP TS 32MM*3/4" COLLARIN PP TS 63MM*3/4" CONOS DE REBOSE PVC SAP DE 2" A 1 1/2" ENLACE RECOTO FIFTINGG 32MM ESTERA DE 2.00 X 3.00 m GEOMEMBRANA HDPE e=2MM GRAPAS PARA ALAMBRE PUA IMPERMEABILIZANTE SIKA 1 LETRERO DE CARTEL DE OBRA 2.40*1.20M LIJA # 40 (PLIEGO) LLAVE BAYONETA 3/4"*1" RM PLASSON MADERA EUCALIPTO ROLLIZO 4" X 2.30 m MADERA EUCALIPTO ROLLIZO 4" X 4 m MADERA TORNILLO 2" X 3" X 10' MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO MANGUERA PEBD 32MM C-4 MANOMETRO INCLUIDO ACCESORIOS NIPLES DE F G PEGAMENTO PARA PVC PINTURA ESMALTE PINTURA ESMALTE ANTICORROSIVO REDUCCION MH 1"*3/4" REDUCCIONES PVC SAP REGILLA METALICA DE 0.60*0.40M SOLVENTE PCV THF TAPA METALICA 0.30*0.30M*3/16" TAPA METALICA 0.40*0.60M*3/16" TAPA METALICA 0.60*0.60M*3/16" TAPA METALICA 0.70*0.70M*3/16" TAPA METALICA 1.50*1.50M*5/16" TAPON MACHO DE FG DE 1.5" TEES PVC SAP TEE RH 32MM*1" TRIPLAY DE 4' X 8' X 8 mm UND kg u m kg kg u u u u u u bls u kg kg kg u u u u u u u m2 kg gal u u u u u u p2 m u u gal gal gal u u u gal u u u u u u u u pl CANTIDAD PESO U.(kg) 1,233.7800 1.00 176.0000 0.30 680.8500 0.13 58.7500 1.00 145.2500 1.00 3.0000 0.20 42.0000 0.25 53.0000 6.00 19.8000 8.00 45.0000 0.40 1.0000 2.00 389.1900 42.50 1.0000 500.00 72.6200 1.00 158.5900 1.00 1.0000 1.00 124.0000 0.30 28.0000 0.10 57.0000 0.30 89.0000 0.30 44.0000 0.50 14.0000 0.10 10.2000 4.50 299.5520 5.00 3.4000 1.00 4.8500 4.50 1.0000 8.00 9.4100 0.10 14.0000 0.10 34.0000 15.00 2.0000 20.00 8.0600 15.00 2,352.8000 3.60 700.0000 0.40 2.0000 1.00 43.0000 0.60 11.9300 4.50 8.9925 4.50 4.8700 4.50 42.0000 0.10 24.0000 0.20 1.0000 12.00 8.1696 4.50 146.0000 15.00 1.0000 20.00 37.0000 30.00 1.0000 35.00 1.0000 80.00 15.0000 0.50 22.0000 0.20 28.0000 0.10 1.0000 10.00

Proyecto Lugar Elab.Por Fecha

CALCULO DEL FLETE : CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA : LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH : : FEBRERO DEL 2008
u u u u u u u u bls 42.0000 3.0000 185.0000 8.0000 56.0000 146.0000 3.0000 43.0000 41.2250 8.00 0.50 0.60 0.60 0.60 0.30 0.20 2.00 25.00

TRIPODE METALICO CON TUBO FG ROSCADO DE 3/4" UNION PVC SAP 3" UNIONES ROSCADO DE FG UNIONES UNIVERSAL PVC SAP 3" VALVULAS COMPUERTAS DE BRONCE VALVULA DE ACOPLE RAPIDO DE 3/4" PLASSON VALVULA ESFERICA PVC SAP DE 4" VALVULAS FLOTADORAS YESO EN BOLSAS DE 25 kg

TOTAL
DESCRIPCION ARENA FINA HORMIGON UND m3 m3 CANTIDAD PESO(kg) 7.4200 11872.00 60.3600 96576.00

TOTAL
CAMIN : Descripcin TUBERIA PVC SAL PARA DESAGUE DE 4" TUBERIA PVC SAP PRESION C-7.5 1 1/2" X 5m TUBERIA PVC SAP PRESION C-7.5 2" X 5m TUBERIA PVC SAP PRESION C-7.5 3" X 5m TUBERIA PVC SAP PRESION C-7.5 4" X 5m

67.78 108 448.00

Unidad Cantidad Peso U.(kg) Peso T.(kg) Cap(U/Viaje) m 47.5650 1 47.57 4029 u 511.1337 1.88 960.93 4030 u 844.6515 2.87 2 424.15 2303 u 145.5699 6.16 896.71 992 u 688.8674 10.17 7 005.78 552 2,237.7875 TOTAL 11 335.14 RUTA MATERIALES: HUARAZ - CHALLHUA RUTA TUBOS : LIMA - CHALHUA RUTA AGREGADOS : CANTERA - CHALLHUA

Descripcin
Materiales Hormigon Tubos

Unidad
kg M3 Viaje

Cantidad
35 772.66 67.7800 1.90

P.U.
0.14 20 5000

Total(S/.)

RUTA MATERIALES ALMACEN - PIE DE OBRA RUTA AGREGADOS ALAMCEN - PIE DE OBRA

Descripcin
Cemento Materiales sin cemento Agregados Tubos (*) Se utiliza como factor de conversin 1 m3 = 55 latas

Unidad
Bls kg Lata(*) kg

Cantidad
389.19 19 232.08 3727.9 11 335.14

P.U.
0.50 0.02 0.50 0.02

Total(S/.)

Descripcin
Flete Rural Flete Terrestre

Monto(S/.)
2 573.73 15 864.23

TOTAL

18 437.96

P. PARCIAL(kg) 1 233.78 52.80 85.11 58.75 145.25 0.60 10.50 318.00 158.40 18.00 2.00 16 540.58 500.00 72.62 158.59 1.00 37.20 2.80 17.10 26.70 22.00 1.40 45.90 1 497.76 3.40 21.83 8.00 0.94 1.40 510.00 40.00 120.90 8 470.08 280.00 2.00 25.80 53.69 40.47 21.92 4.20 4.80 12.00 36.76 2 190.00 20.00 1 110.00 35.00 80.00 7.50 4.40 2.80 10.00

336.00 1.50 111.00 4.80 33.60 43.80 0.60 86.00 1 030.63

35 772.66

N Viajes 0.01 0.13 0.37 0.15 1.25

1.90

Parcial
5 008.17 1 355.60 9 500.46

15 864.23

Parcial
194.60 288.48 1 863.95 226.70

2 573.73

PRESUPUESTO ANALITICO
Proyecto CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA Lugar LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Elab. Por Fecha FEBRERO DEL 2008
PARTIDA DESCRIPCION PARCIAL S/. 158518.56 MONTO S/.

A .02.00 22 23 26 29 30

COSTO DIRECTO
BIENES Vestuario-Botas de Jebe,Guantes de cuero,etc Combustible-Petrleo Protec. Madera encofrado Materiales Explosivos (*1) Materiales de Construccin Bienes de Consumo-Herramientas

231506.23

43.84 155986.08 2488.64 72987.67 72987.67

03.00 SERVICIOS 39 Otros servicios terceros

B .27 27 39 30 39 39 39

GASTOS GENERALES
Honorarios del Ingeniero Residente Honorarios del Ingeniero Supervisor Honorarios del Maestro de obra Materiales fotogrficos y de escritorio Fotocopias, anillados y otros servicios Gastos en Elaboracion de Exp. Tecnico Gastos en Elaboracion de Exp. Liquidacin 15200.00 14000.00 6000.00 60.00 80.00 7000.00 2500.00

44840.00

PRESUPUESTO TOTAL (A+B+C)

S/.

276346.23

(*1) Incluye dinamina, fulminante, gua de agua, nitrato y barrenos

CRONOGRAMA DE EJECUCION FISICO Y FINANCIERO


CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LUGAR: LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Fecha FEBRERO DEL 2008 Costo Directo S/. #REF!
PROYECTO: PARTIDAS UND METRAD PRESUPU # DE CUAO ESTO DRILLAS Duracin (Das)

MES N 01 2 3

MES N 02 2 3

MES N 03 2 3

MES N 04 2 3

MES N 05 2

01.00 TRABAJOS PRELIMINARES


01.02 LIMPIEZA Y DESBROCE M2 2294 0 1 #DIV/0! S/. 0.00 P x E S/. #REF! P xxxxxx E S/. #REF! P x E

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF! xxxxxx

#REF!

#REF!

###

#REF!

#REF!

#REF!

0
#REF! #REF! ### #REF! #REF! 1 #REF! S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E #REF! #REF! xxx xxxx #REF! x #REF! #REF! #REF! x xxxxxx x #REF! x #REF! x #REF! #REF! xxxx xxx #REF! x #REF! x

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

0
#REF! #REF! ### #REF! #REF! 1 #REF! S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E #REF! #REF! x x #REF! xx #REF! x #REF! x #REF! x #REF! #REF! xxx x

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

CRONOGRAMA DE EJECUCION FISICO Y FINANCIERO


CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LUGAR: LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Fecha FEBRERO DEL 2008 Costo Directo S/. #REF!
PROYECTO: PARTIDAS UND METRAD PRESUPU # DE CUAO ESTO DRILLAS Duracin (Das)

1 S/. P E S/. P E

MES N 01 2 3

#REF!

#REF!

###

#REF!

#REF!

#REF!

1 #REF! xx #REF! x

MES N 02 2 3

MES N 03 2 3

MES N 04 2 3

MES N 05 2

#REF!

#REF!

###

#REF!

#REF!

#REF!

#
#REF! #REF! ### #REF! #REF! 1 #REF! S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E #REF! #REF! #REF! x xxxxxx xxxxxx #REF! #REF! xxxx x #REF! xx #REF! xx #REF! #REF! x x #REF! x #REF! x #REF! xx #REF! #REF! x xxxxxx #REF! x

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#
01.05 CARTEL DE OBRA GLB. 1 0 S/. P E S/. 3 #REF! P E S/. 2 #REF! P E S/. 2 #REF! P E S/. 1 #DIV/0! P E S/. 1 #DIV/0! P E 6 #DIV/0! 0.00 0.00 0.00 xxxxxx xxxxxx x #REF! #REF! #REF! #REF! x xxxxxx xxxxxx x #REF! #REF! #REF! #REF! xxx xxxxxx xxxxxx xxxx #REF! #REF! #REF! xxxxxx xxxxxx x 0.00 x 0.00 0.00 x xxxxx

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

02.02

EXCAVACION EN MATERIAL CONGLOMERADO

m3

2.217

CRONOGRAMA DE EJECUCION FISICO Y FINANCIERO


CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LUGAR: LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Fecha FEBRERO DEL 2008 Costo Directo S/. #REF!
PROYECTO: PARTIDAS UND METRAD PRESUPU # DE CUAO ESTO DRILLAS Duracin (Das)

1 S/. P E S/. P E

MES N 01 2 3

MES N 02 2 3

MES N 03 2 3

#REF!

#REF!

###

#REF!

#REF!

#REF!

MES N 04 4 1 2 3 4 #REF! #REF! #REF! #REF! #REF! xxx xxxxxx xxxxxx xxxxxx xxxx #REF! x

MES N 05 2

#REF!

#REF!

###

#REF!

#REF!

#REF!

#
#REF! #REF! ### #REF! #REF! 7 #REF! S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E #REF! #REF! #REF! #REF! #REF! #REF! #REF! xxxxxx xxxxxx xxxxxx xxxxxx xxxxxx xxxxxx xxxxx #REF! #REF! xxxx xxx #REF! #REF! #REF! #REF! xxx xxxxxx xxxxxx xxx #REF! xxx #REF! xxxxx #REF! #REF! #REF! #REF! x xxxxxx xxxxxx xx #REF! xxxx #REF! xx #REF! xxx #REF! xxxxx #REF! xx #REF! xxx #REF! xxx #REF! xx x #REF! xx #REF! #REF! #REF! #REF! #REF! #REF! xxxxxx xxxxxx xxxxxx xxxxxx xxxxxx xxxx

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! xx xxxxxx xxxxxx xxxxxx xxxxxx xxxxxx xxxxxxx xxxxx xxxxxx xxxx #REF! x

#REF!

#REF!

###

#REF!

#REF!

#REF!

#
#REF! #REF! ### #REF! #REF! 1 #REF! S/. P E S/. P E S/. P E S/. P E S/. P E S/. P E #REF! xx #REF! #REF! x xxx #REF! x #REF! x #REF! xxx #REF! xx

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

CRONOGRAMA DE EJECUCION FISICO Y FINANCIERO


CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LUGAR: LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Fecha FEBRERO DEL 2008 Costo Directo S/. #REF!
PROYECTO: PARTIDAS UND METRAD PRESUPU # DE CUAO ESTO DRILLAS Duracin (Das)

MES N 01 2 3

MES N 02 2 3

MES N 03 2 3

MES N 04 2 3

MES N 05 2

#
#REF! #REF! ### #REF! #REF! 1 #REF! S/. P E S/. P E S/. P E S/. P E #REF! xxxxx #REF! #REF! xxxxxx x #REF! x #REF! #REF! xxxx xxxxxx

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

10

#REF!

#
#REF! #REF! ### #REF! #REF! 1 #REF! S/. P E S/. P E S/. P E #REF! x #REF! #REF! xxx xxxx #REF! x

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#
#REF! #REF! ### #REF! #REF! 3 #REF! S/. P E #REF! xx

0
#REF! #REF! ### #REF! #REF! 1 S/. P E #REF! x

#
#REF! #REF! ### #REF! #REF! 1 #REF! S/. P E S/. P E #REF! x #REF! x

#REF!

#REF!

###

#REF!

#REF!

#
#REF! #REF! ### #REF! #REF! 1 #REF! S/. P E #REF! #REF! #REF! #REF! #REF! x

EndAVANCE MENSUAL(%) AVANCE ACUMULADO(%)

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

0.00 #REF!

S N 05 3

MES N 06 2 3

MES N 07 2 3

MES N 08 2 3

S N 05 3

MES N 06 2 3

MES N 07 2 3

MES N 08 2 3

S N 05 3

MES N 06 2 3

MES N 07 2 3

MES N 08 2 3

S N 05 3

MES N 06 2 3

MES N 07 2 3

MES N 08 2 3

#REF! #REF!

0.00 #REF!

#REF! #REF!

0.00 #REF!

#REF! #REF!

0.00 #REF!

#REF! #REF!

CRONOGRAMA VALORIZADA DE ADQUISICION DE INSUMOS


Proyecto CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA Lugar LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH Elab. Por Fecha FEBRERO DEL 2008 Cdigo Descripcin Unidad P.U.

DETERMINACION DE LA FORMULA POLINOMICA Proyecto Lugar Elab. Por Fecha


N 1 2 IU 02 03 04 21 30 37 38 39 43 47 48 49 54 56 71 72 77 SIMB. A C CONSTRUCCION DE RIEGO TECNIFICADO EN LA LOCALIDAD DE CHALHUA LOC.: CHALHUA, DIST.: YANAMA, PROV.: YUNGAY, REG.: ANCASH FEBRERO DEL 2008 ELEMENTO Acero de construccin liso Acero de construccin corrugado Agregado fino Cemento Portlan tipo I Dlar mas inflacin mercado USA Herramienta manual Hormign Indice General de precios al consumidor Madera nacional para encofrado y carpintera Mano de obra (incluido leyes sociales) Maquinaria y equipo nacional Maquinaria y equipo importado Pintura Ltex Plancha de acero LAC Tubera de fierro fundido Tubera de PVC para agua Vlvula de bronce nacional TOTAL PARCIAL 14951.54 6035 485.73 16999.17 20955.49 2490.01 2730.63 73062.96 8719.35 67992.19 6171.7 536.4 424.15 840 1950 47971.91 4030 276346.23 Coefi 0.054 0.022 0.002 0.062 0.076 0.009 0.010 0.264 0.032 0.246 0.022 0.002 0.002 0.003 0.007 0.174 0.015 1.002 En (3) (48) 0.062 (48) (38) 0.019 0.264 (48) 0.246 0.136 (48) (48) (3) (3) 0.174 (3) 1.002 Coeff 0.101

3 4 5 6

H I M M

N 1 2 3 4 5 6 7

IU 03 21 38 39 47 48 72

SIMB. A C H I MO M T

ELEMENTO Acero de construccin corrugado Cemento Portlan tipo I Hormign Indice General de precios al consumidor Mano de obra (incluido leyes sociales) Maquinaria y equipo nacional Tubera de PVC para agua

COEFICIENTE 0.101 0.062 0.019 0.264 0.246 0.136 0.174

Luego, la frmula polinmica resultante es: Ar Cr Hr K= 0.101 ---------- + 0.062 ---------- + 0.019 ---------- + Ao Co Ho Ir MOr Mr Tr 0.264 ---------- + 0.246 ---------- + 0.136 ---------- + 0.174 ---------Io MOo Mo To

VALORIZACIO
CONVENIO OBRA MES RESIDENTE SUPERVISOR PRESUPUESTO BASE

P A R T I D A S

UND.

METR.

C.U.

PARCIAL

VALORIZACION DEL AVANCE FISICO DE LA OBRA


MONTO FINANCIADO FECHA DE INICIO DE OBRA PLAZO DE EJECUCION FECHA DE TERMINO PROGR. FECHA DE TERMINO REAL

VALORIZACION
C. U. REAL
ANTERIOR METR. VALOR. ACTUAL METR. VALOR. METR. ACUMULADA VALOR. SALDOS % METR.

MONTO FINANCIADO

FECHA DE INICIO DE OBRA

PLAZO DE EJECUCION

FECHA DE TERMINO PROGR.

FECHA DE TERMINO REAL

SALDOS VALOR.

INSUMOS ADQUIRIDOS PARA LA OBRA


TIPO MO MA HE

TOTAL OBRA TOTAL C.D. MANO DE OBRA MATERIALES Y OTROS HERRAMIENTAS Y EQUIPO

GG GS DATOS DE COMPROBANTES DE PAGO


REND. NOrd TIPO ESP CANT. UND DESCRIPCION V. VENTA

GASTOS GENERALES GASTOS SUPERVISION

IGV

TOTAL OBRA 0.00 TOTAL C.D. 0.00 MANO DE OBRA 0.00 MATERIALES Y OTROS 0.00 HERRAMIENTAS Y EQUIPOS 0.00 0.00 0.00 0.00 GASTOS GENERALES 0.00 GASTOS SUPERVISION 0.00 CAMBIO DE UNIDAD Y CANTIDAD
IMPORTE P.U. INSUMOS UND FACTOR CANTIDAD

TOTAL OBRA TIPO MO MA HE TOTAL C.D. MANO DE OBRA MATERIALES Y OTROS HERRAMIENTAS Y EQUIPOS

GG GS

GASTOS GENERALES GASTOS SUPERVISION

RELACION DE INSUMOS UTILIZADOS EN LA OBRA


TIPO DESCRIPCION UND P.U.Prom. CANT. PARCIAL

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTAS Y EQUIPOS

INC.(%)

ESP