Preface 8
Acknowledgements 10
Section 1: Introduction
1.1  About MEPCO……………………………………………………………………………...………………………. 12 
1.2  History of MEPCO………………………………………………………………………………………………... 13
1.3  Vision of MEPCO………………………………………………………………………………………………….. 14
1.4  Mission Statement………………………………………………………………………………………………. 14
1.5  Technical Overview……………………………………………………………………………………………… 15
1.6  Jurisdiction Map………………………………………………………………………………………………….. 17

Section 2: MEPCO’s MIS


2.1  Organogram…………………………………………………………………………………………………………. 19
2.2  Major Subsystems of MEPCO………………………………………………………………………………. 20
2.3  Inputs and Outputs of MEPCO……………………………………………………………………………… 21
2.4  MEPCO’s MIS……………………………………………………………………………………………………….. 23
2.5  Organogram of MIS Dept…………………………………………………………………………………….. 25
2.6  Working of MIS Dept…………………………………………………………………………………………… 27
2.7  MEPCO Online MIS Web Site………………………………………………………………………………. 27
2.8  MIS Web Site Main Menu……………………………………………………………………………………. 29

Section 3: Getting New Connection


3.1  Applying for New Connection………………………………….………………………………………….. 32
3.2  Processing of User Application…………………………………………………………………………….. 33
3.3  Making Feasibility Report……………………………………………………………………………...……. 34
3.4  Paying the Demand Notice……………………………………………………………………………...….. 35
3.5  DFD for Getting a New Connection……………………………………………………………………… 36

Section 4: Billing System


4.1  Consuming Units……………………………………………………………………………....................... 37
4.2  Meter Reading……………………………………………………………………………...……….……………. 38
4.3  Generating & Distributing Bills……………………………………………………………….……………. 39
4.4  Paying Bills and Receiving Revenues………………………………………………………….………... 40
4.5  DFD of Billing System……………………………………………………………………………...………..... 41
 
Billing System of Multan Electric Power Company  6 

Section 5: Problems in Current System 44


Section 6: Proposed Solutions 46
Section 7: References 48
 
Billing System of Multan Electric Power Company  7 

Preface
Some Words
About the Report
 
Billing System of Multan Electric Power Company  8 

Preface
“Genius  makes  its  observations  in  short‐hand;  talent  writes  them  out  at 
length.” 
                  ‐‐‐ Christian Nevell Bovee 
“Nothing has such power to broaden the mind as the ability to investigate 
systematically and truly all that comes under thy OBSERVATION in life.” 
                  ‐‐‐Marcus Aurelius 
As mentioned by the above quotations observing and on‐site viewing are a 
very firm base for learning. We learn a lot more by seeing the theories, we read in 
books, applied practically by the pros and by seeing how they actually put them to 
work. 
  Team building and teams are an important part of the business as we see it 
today  and  a  large  emphasis  is  given  to  them  in  the  modern  business  world. 
Organizations make systems to accomplish tasks and to increase efficiency in their 
work.  When  it  came  to  choosing  the  organization  of  the  Billing  System  MEPCO 
became the first thing to the mind of the team members. 
  We  were  extremely  pleased  to  do  the  case  study  of  MEPCO  because  we 
saw the book written theories in real action. The effective system at MEPCO was a 
piece of art and to see it in working process was a treat itself. The billing system at 
MEPCO  is  designed  to  calculate  and  disseminate  bills  and  to  store  these  bills  in 
the  data  base  and  to  use  them  for  further  use.  MEPCO  has  fine  organizational 
structure  and  a  well  defined  fully  working  effective  system  that  helps  and  aids 
managers to do their job at best. Our knowledge was further enlighten when we 
had some of the lectures from the seniors managers of MEPCO, they knew quite a 
lot about the organization and the subject and they left no stone unturned to let 
us know about that it was a four week study of the billing system and we had the 
most enjoyable case study of our life. 
  It is hoped that the conducted study and the compiled report will provide a 
source of comprehensive information and a complete survey report on the topic 
as well as on the organization. 
 
Billing System of Multan Electric Power Company  9 

Acknowledgements
A Short Thanks
Giving
 
Billing System of Multan Electric Power Company  10 

Acknowledgements
  This project report is a result of joint hard work of the whole team and was 
accomplished by the blessing and grace of Allah Almighty. 
  We want to give a special thanks to Prof. Dr. Muhammad Aftab who gave 
us their full support and guided us throughout this report and she should be given 
credit on top of all for this collection of knowledge. 
  We  like  to  express  our  gratitude  to  Raja  Ishtiaq  (Head  of  Law  Dept. 
MEPCO), Ahsan Kareem (Manager Revenue Branch) and the whole MEPCO Team 
that  helped  us  by  providing  all  the  needed  information  we  needed  to  complete 
this report. 
  At the end we would also like to thanks our parents who motivated us and 
that  motivation  led  to  the  successful  completion  of  the  report  and  also  all  our 
mates who took time out of their busy lives to help us complete this report. 
 
 

 
 
Billing System of Multan Electric Power Company  11 

Section 1
Introduction
 

Sr.  Title
1  About MEPCO
2  History of MEPCO
3  Vision of MEPCO
4  Mission Statement
5  Technical Overview
6  Jurisdiction Map
 

 
 
Billing System of Multan Electric Power Company  12 

1.1 About MEPCO


Multan  Electric  Power  Company  is  one  of  the  biggest  Distribution  Company  of 
WAPDA,  its  area  of  operation  is  from  Sahiwal  to  Sadiqabad,  Bahawalnager  to 
Bahawalpur  and  Tounsa  Sharif  to  Rajanpur  and  bordering  with  Sind,  Balochistan  and 
NWFP Map. 
The Charter of MEPCO is to provide the reliability, quality and safety of electric 
power supply to the consumers in its Jurisdiction. 
MEPCO is envisaged for the creation of the resources and engineering plans for 
additions, renovation and augmentation of the distribution system in order to achieve 
charter. 
MEPCO is putting efforts to make it a viable and progressive utility to take care of 
consumer's power demand. 
Following  MEPCO  Officers  will  sit  at  MEPCO  Regional  Complaint  Centre, 
Khanewal Road Multan between 1000 to 1200 hrs on the weekdays mentioned against 
each  to  receive  the  complaints  regarding  electricity.  They  will  issue  orders  at  the  spot 
where possible for immediate disposal of complaints:‐ 
 

Sr.No.  Officers Day 


a.  Chief Engineer / Tech:  Monday 
Director 
b.  Chief Engineer / CS Director Tuesday 
c.  Chief Engineer / Op. Director Wednesday 
d.  Manager (Commercial) Thursday 
e.  Manager (O&M) Distribution Friday 
 
 In case of non availability of any of the officer, next junior to him will sit in his place. 
 
 
 
 
Billing System of Multan Electric Power Company  13 

1.2 History of MEPCO


WAPDA 
The  electricity  supply  service  in  Pakistan,  initially,  was  undertaken  by  different 
agencies,  both  in  public  and  private  sectors,  in  different  areas.  In  order  to provide  for 
the unified and coordinated development of the water and power resources, Water and 
Power  Development  Authority  (WAPDA)  was  created  in  1958  through  WAPDA  Act, 
1958.  

Area Electricity Board Multan 
The  local  areas  electricity  distribution  service  was  being  performed  by  various 
Regions of WAPDA. Then the Area Electricity Board (AEB) Multan, on the eight AEBs in 
Pakistan, was established under the scheme of Area Electricity Boards in 1982, in order 
to  provide  more  autonomy  and  representation  to  provincial  government,  elected 
representatives,  industrialists, agriculturalists  and  other  interest  groups in  functions  of 
the AEBs.  

MEPCO 
The environment and structure of the power industry throughout the world are 
undergoing  dramatic  change.  The  power  sector  is  moving  from  monopoly  to 
privatization and from integration to disintegration. To keep pace with this change, the 
Government of Pakistan approved a S0trategic Plan in 1994 as a consequence of which 
the  power  wing  of  WAPDA  has  been  unbundled  into  12  Companies  for  generation, 
transmission and distribution of electricity. 

Multan Area Electricity Board was reorganized into one such corporatized entity 
under  the  name  of  Multan  Electric  Power  Company  (MEPCO)  with  effect  from 
14.05.1998, with the aim of commercialization and eventually privatization. 

 
 
 
 
Billing System of Multan Electric Power Company  14 

1.3 Vision of MEPCO


To ensure convenient availability of high quality power in area of responsibility, in 
order to alleviate the poverty, improve quality of life and make the Industrial and 
Agriculture Sector competitive in the World Market. 

1.4 Mission Statement


Ensure convenient availability of high quality electric power to the people at 
affordable price, retaining financial viability of the Company. 

 
 
Billing System of Multan Electric Power Company  15 

1.5 Technical Overview


Area of Operation 
MEPCO's area of responsibility covers Civil Districts of Multan, Khanewal, Sahiwal, 
Pakpattan,  Bahawalnager,  Lodhran,  Bahawalpur,  R.Y.  Khan,  Vehari,  Muzaffargarh,  D.G. 
Khan, Layyah, and Rajanpur.  (Map) 

Organizational Structure Of Mepco 
MEPCO comprises of the following eight (08) distributions Operation Circles, one 
(1) Construction and two (2) GSO Circle, as detailed below:‐ 

Operation Circles 
Circle Name  Divisions/Sub Divisions 
1. Multan Circle  6 Divisions / 33 Sub Divisions 
2. D.G. Khan Circle  3 Divisions /12 Sub Divisions 
3. Vehari Circle  3 Divisions /13 Sub Divisions 
4. Bahawalpur Circle  3 Divisions / 17 Sub Divisions 
5. Sahiwal Circle  4 Divisions /18 Sub Divisions 
6. R.Y. Khan Circle  3 Divisions /15 Sub Divisions 
7. Muzaffargarh  3 Divisions /16 Sub Divisions 
8. Bahawanager Circle  3 Divisions / 13 Sub Divisions 
G.S.O. Circles           6 Divisions 

1. Multan Circle 
2. Sahiwal Circle 
Project Construction Circle       8 Divisions 

Grid Stations 
1. 132/11KV   74 Nos.
2. 66/11KV   30 Nos.
Total  104Nos.
 
 
Billing System of Multan Electric Power Company  16 

Distribution Transformers             109,381 Nos. 

Capacity of Distribution Transformers                      5639.770 (MVA) 

Detail Of Information Given Below:‐ 
Sr.  Information  Figure Unit

1.  Total Length of 132/66KV, T/Lines 4282 KM
2.  132KV Transmission Line.   2832 KM
3.  66KV Transmission Line.  1450 KM
4.   Total No. of Power Transformers  197 Nos.
5.  Peak Demand of 2006‐07  1852 MW
6.  Peak Demand of 2007‐08  2218 MW
7.  New G/S added in 2006‐07,2007‐08 01 No.
8.  Conversion for 66KV & 132KV 2006‐07 02  Nos.
9.  Augmentation during 2006‐07,2007‐08 22 Nos.
10.  Extension 2006‐07, 2007‐08 15  Nos.
 

 
 
HT / LT LINES 
Sr. #  Information  Figure
1.  11 KV Feeders                     867 Nos.  
2.  Length of 11 KV Line           61,818.224 KM  
3.  Length of LT Line                41,615.914 KM
 
Billing System of Multan Electric Power Company  17 

1.6 Jurisdiction Map of MEPCO

 
 

 
 
Billing System of Multan Electric Power Company  18 

Section 2
MEPCO’s MIS 
 

Sr.  Title
1  Organogram
2  Major Subsystems of MEPCO
3  Inputs and Outputs of MEPCO
4  MEPCO’s MIS
5  Organogram of MIS Dept. 
6  Working of MIS Dept. 
7  MEPCO Online MIS Web Site
8  MIS Web Site Main Menu 
 

 
 
Billing System of Multan Electric Power Company  19 

2.1 Organogram
 

 
 

 
 
Billing System of Multan Electric Power Company  20 

2.2 Major Subsystems of MEPCO


Finance

Audit HRM

Comercial Legal

Operational MIS

Technical

 
 

 
 
Billing System of Multan Electric Power Company  21 

2.3 Inputs and Outputs of MEPCO


MEPCO  Multan  Electric  Power  Company  is  an  electricity  distributing  company 
that disrtibutes electricity. Multan Electric Power Company buys electricity from either 
WAPDA the Pakistan Water and Power Development Authority and NEPRA or produce 
their own electricity by using thermal power station and distributes it to the consumers 
through grids and power stations.  

Inputs 

  The inputs of MEPCO includes the raw form of electricity coming from the power 
stations and WAPDA and the purchased electricity from NEPRA. The then distribute this 
electricity through out the multan division. 

Outputs 

  The output of MEPCO is the processed form of electricity that is in the state of 
distribution and is distributed through grid stations and transformer. They distribute this 
electricity through out multan division to various sub divisions. 
 
Billing System of Multan Electric Power Company  22 

Vendors

G
s

ov
er

er
ld

nm
Ho

en
k
oc

t
St

Fees Backs

Management

Consumer
Control
WAPDA

Processing Distribution of
Inputs
Electricty Electricity

Di
m ns

s
e o
al

t
Th tati

ri but
r

or
s

Indicators
Economic

 
 

 
 
Billing System of Multan Electric Power Company  23 

2.4 MEPCO’ MIS


The  MIS  of  MEPCO  Multan  Electric  Power  Company  is  specialy  designed  to  solve  the 
management related issues the MIS of MEPCO take the inputs coming from all the dept. 
and banks that are present in their enviornment MIS then process all the data coming 
from  these  sources  then  make  reports  that  helps  in  management  decision  making. 
These reports help a lot in managing the firm effectively and efficiently. 

Upper Management Level
Strategic 
Planning Information

Middle Level Management Management Control


Information

Lower Level Managent Operational Information


 
 
Billing System of Multan Electric Power Company  24 

MIS

 
 

MEPCO’s MIS
 
Billing System of Multan Electric Power Company  25 

2.5 Organogram of MIS Dept.

 
 

 
 
Billing System of Multan Electric Power Company  26 

2.6 Working of MIS Dept.


Revenue
Office

MIS Department

Liasion
Section

Control
Section

Punch/Entry
Section

Machine
Room

 
 

 
 
Billing System of Multan Electric Power Company  27 

2.7 MEPCO Online MIS Web Site


Purpose of website 

On  the  directives  of  CEO  MEPCO,  Online  MIS  website  (www.mepco‐it.com.pk)  is 
developed to provide all required reports and information to concerned field officers on their 
desk  through  internet  promptly.  This  helps  for  prompt  action  to  control  line  losses,  improve 
recovery  and  overall  performance  of  company  through  daily  monitoring.  This  website  is 
password protected. 

How to access website 
After connecting internet, Run Internet Explorer and type www.mepco‐it.com.pk in address bar 
of Internet Explorer. Press Enter or click on “Go” Button. 

User Name & Password 

A  login  screen  as  above  will  appear.  Please  give  the  user  name  and  password  as  already 
provided to you and click on login.  
 
Billing System of Multan Electric Power Company  28 

Menu 

After successful login home page of website will be appeared. You can go to different reports by 
using menus. 

Username  and  passwords  along  with  user  manual  has  been  circulated  vide  this  office  No. 
MCM/WS‐208/1591‐1796 dated 07.06.2005. 

 
 
Billing System of Multan Electric Power Company  29 

2.8 MIS Web Site Main Menu


Home 

{ Site Home   (Use this option to go to home page) 
{ Logout        (Use this option to logout your account) 
Daily Reports 

o Cash collection (Date wise) Company level to Sub Division level 
o Batch‐wise assessment (Batch wise) Company level to Sub Division level 
¾ Billing Statistics Report 
o Billing Status  (Status of Batch & Cash received from Divisions and status of 
Cash Posting and Batch billing at Computer Center) 
Defaulters 

o Running Defaulters 
™ Company to Sub Division Level 
™ From 1000 to 500000  (Select any) 
™ To 1000 to > 500000   (Select any) 
™ Batch No. 01 to 21,27 or all 
™ Private or Govt. 
™ Running or Disconnected 
™ Sorted by: Ref No., Amount, Age  
 
o Outstanding TDO’s/ERO’s (CP‐114) 
™ Company to Sub Division Level 
 

o Outstanding TDO’s/ERO’s (CP‐114 Tentative) 
™ Company to Sub Division Level 
™ Available on 25th of each month 
Line Losses 
o Monthly     (Company to Sub Division/Feeder level) 
o Progressive (Company to Sub Division/Feeder level) 
o Feeder Analysis (%Age Losses Slab wise List) 
Revenue 
o Monthly Billing  
™ Monthly Billing v/s Collection & %Age 
™ Company to Sub Division level 
™ Private, Govt. & Total 
™ Tariff/Slab Wise (Analysis of Billing/Collection) 
o Computed Assessment 
™ Computed Assessment v/s Collection & %Age 
™ Company to Sub Division level 
 
Billing System of Multan Electric Power Company  30 

™ Private, Govt. & Total 
o  Receivables 
™ Receivables, Arrears & Spill Over 
™ Company to Sub Division level 
™ Private, Govt. & Total 
o Govt. Departments 
ƒ Company to Sub Division level 
ƒ Federal & Provincial Govt.  
ƒ Department wise 
ƒ No. of consumer, O. Bal., Assessment, Payment, C. Bal 
Others 
o Defective Meters (CP‐90) 
™ Company to Sub Division level 
o Billing Program 
™ Meter Reading and Billing Schedule 
o Court Cases 
™ Company to Sub Division level 
™  
™ Use Back Button to go back 
™ Use MIS Home Button to come on main home page 
™ All Reports can be printed. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Billing System of Multan Electric Power Company  31 

Section 3
Getting New
Connection 
 

Sr.  Title
1  Applying for New Connection
2  Processing of User Application
3  Making Feasibility Report 
4  Paying the Demand Notice
5  DFD for Getting a New Connection
 

 
 
Billing System of Multan Electric Power Company  32 

3.1 Applying for New Connection


Use Case 

 
 
 
 
  To apply for new connection the user needs to send the application 
to the SDO which then process it further. 
 
 
 
Billing System of Multan Electric Power Company  33 

3.2 Processing of User Application


Processing of the User's Application

* * Recive User's
Application

SDO

Check Connection
Recuest

<<include>> <<include>>

Conncection Conncection
Request < 40 Request >= 40

Ast. *
Manager <<extend>>
C.S.
*

<<extend>>
Ex.
Engg.
*
*
* Make a Fesibility
Report

<<include>>

* * Make Demand
Actor Notice

 
The sent application is then sent by the SDO to either ex. Engg. Or to 
the  Ast.  Manager  C.S.  depending  on  the  requested  connection.  Who  then 
direct it to the lineman to get a feasibility report which is sent to the dist. 
 
Billing System of Multan Electric Power Company  34 

3.3 Making Feasibility Report


Making Feasibility Report

Process
Ex. Application
* *
Engg.

<<include>>

Make Feasibility
Requirements

Recieve Feasibility
Line Requirements
* *
Suprt.

<<include>>

On Site Feasibility
Study

<<include>>

Process Demand
Notice

<<include>>

Send Demand * *
Notice

SDO

 
  To make the feasibility report the lineman gives a direct visit to the site where 
the connection is to be installed. Then estimate the expenses then  send it back to SDO. 
 
Billing System of Multan Electric Power Company  35 

3.4 Paying the Demand Notice

Paying the Demand Notice

Recieve the *
Demand Notice *

<<include>> Actor

Pays Demand
Notice in a Bank

<<include>>

Send Receipt

* Recieve Receipt
*

Actor

 
  Once the demand notice is made it is then sent to the user so that he/she may 
pay it to the banks. 
 
Billing System of Multan Electric Power Company  36 

3.5 DFD for Getting a New Connection

 
 
Billing System of Multan Electric Power Company  37 

Section 4
Billing System 
 

Sr.  Title
1  Consuming Units
2  Meter Reading
3  Generating & Distributing Bills
4  Paying Bills and Receiving 
Revenues 
5  DFD of Billing System 
 

 
 
Billing System of Multan Electric Power Company  38 

4.1 Consuming Units

 
 

 
 
Billing System of Multan Electric Power Company  39 

4.2 Meter Reading

 
 
Billing System of Multan Electric Power Company  40 

4.3 Generating & Distributing Bills

 
 
Billing System of Multan Electric Power Company  41 

4.4 Paying Bills and Receiving Revenues

 
 
 
Billing System of Multan Electric Power Company  42 

4.5 DFD of Billing System

 
 
 
Billing System of Multan Electric Power Company  43 

Section 5
Problem in the
Current System 
 

 
 
Billing System of Multan Electric Power Company  44 

5.1 Problems in Current System


  Nothing  in  the  world  is  perfect  except  Allah  every  existing  thing  has  got  its 
limitation and has always had a room for improvement. The billing system of MEPCO is 
no different. They have got their own errors and limitation which will only go with time. 
Some of the major draw back of MEPCO’s system are as follow:‐ 

1. No online application System 

2. Billing process is slow and has to go through a lot of useless stages. 

3. Recovery reports are sent about a month late. 

4. The  mainframe  is  located  in  the  head  quarters  which  slow  down  the  report 
receiving process. 

5. The schedule generating process is not automated. 

6. More automation is needed in the organization. 

 
 
Billing System of Multan Electric Power Company  45 

Section 6
Proposed
Solutions
 

 
 
Billing System of Multan Electric Power Company  46 

6.1 Proposed Solutions


The Proposed solutions are:‐ 

1. Need online application System 

2. Need to speed up the Billing process and has to go cut the useless stages. 

3. Recovery report generation must be speed up so that action should be taken 
early. 

4. Must increase database capability. 

5. The schedule generating process must be automated. 

6. More automation is needed in the organization. 

 
 
Billing System of Multan Electric Power Company  47 

Section 7
References
 

 
 
Billing System of Multan Electric Power Company  48 

7.1 Proposed Solutions


1. www.scribd.com 

2. www.docstoc.com 

3. www.wikipedia.com 

4. www.britanica.com 

5. SAD by Awad 

6. SAD by Kendell n Kendell 

7. MIS by Louden n Louden 

8. IS by Steven Alter 

You might also like