You are on page 1of 2

Windals Precision Pvt. Ltd.

Rudrapur
Pre-Dispatch Inspection Report
PART NO.: F 8921114 PART NAME: S/A PIVOT BKT CUSTOMER NAME: ASHOK LEYLAND
S.No. PAREMETER
BUSH MAJOR DIA MINOR DIA

Date:

SPEC.

METHOD

01 2 3 4 5 6 7 8 9 10 11 12

16.3.2 14.7.2 10.50.2 15+0.3 380.30 50.1 170.2 260.2 90 1 R- 9 1


50 10
FREE FROM BURR , SPATER ,COATING & WELDING DEFECTS ETC.

OK Gauge VC VC VC VC VC VC Right Angle RG


DFT METER TAPE TEST

OK
10.6 14.92 38.1 4.94 17.16 26.14 OK OK 54 OK

OK
10.64 14.94 38.16 4.92 17.14 26.14 OK OK 52 -

HOLE DIA THICKNESS


C.D DIMN. DIMN. DIMN. Angle Radius

10.62 14.96 38.12 4.96 17.12 26.16 OK OK 56 OK

COAT THICKNESS ADHETION

VISUAL

OK

OK

OK

13

VISUAL INSPECTION

STATUS : ACCEPTED / REJECTED / HOLD

INSPECTED BY:APPROVED BY:-

Remark :- Green Dim are added.(revised on 13.06.13)


QC 11

udrapur
INVOICE NO. : 2192 01.08.13 QTY. 100 Nos

port

Remark OK OK OK OK OK OK OK OK OK OK OK

OK
10.62 14.96 38.14 4.94 17.16 26.16 OK OK 58 -

OK
10.6 14.92 38.12 4.96 17.14 26.14 OK OK 54 -

OK

OK

OK

Surendra Rathor

You might also like