1.- DATOS GENERALES


A.- POR PESO

MATERIALES
CEMENTO PORTLAND TIPO I
MADERA PARA ENCOFRADO
ACERO DE CONSTRUCCIN F'Y=4200 KG/CM2
ALAMBRE NEGRO RECOCIDO BWG N 16
CLAVOS PARA MADERA
OTROS

UNIDAD
BLS
P2
KG
KG
KG
GLOBAL

CANTIDAD
1,235.69
993.99
3,773.55
47.46
228.00
1.00

PESO
UNIT.
42.50
1.50
1.00
1.00
1.00
5,000.00

PESO TOTAL MATERIALES

PESO
TOTAL
52,516.83
1,490.99
3,773.55
47.46
228.00
5,000.00

63,056.820

B.- POR VOLUMEN


AGREGADO

DESCRIPCION
ARENA GRUESA
ARENA FINA
PIEDRA CHANCADA 1/2"
PIEDRA CHANCADA 3/4"
PIEDRA ZARANDEADA 1/2"
PIEDRA MEDIANA
PIEDRA GRANDE
VOLUMEN TOTAL (AGREGADOS)
VOLUMEN TOTAL (PIEDRA)
CAPACIDAD DEL CAMION ( M3 )
NUMERO DE VIAJES
REDONDEO NUMERO DE VIAJES

EN TUBERIA

UNIDAD
M3
M3
M3
M3
M3

AFECTOS
IGV
69.25
26.3
0
146.8

0.000
242.350
8.000
30.294
30.000

SIN
IGV
0.000 precio puesto en obra

45.120 CANTERA CERCANA


1.000
1.100
1.100
47.220
8.000
6.040
6.000

UNIDAD DE ( 2.20 m. * 3.00 m. ) DE CARROCERIA CON H = 1.50 m.

CAPACIDAD DEL CAMION EN TUBOS / VIAJE

ML

ml
tuberia

No
tubos

PESO POR TUBERIA


KG
No VIAJES

TUBERIA HDPE 160 MM

80

180.00

30

435.60

0.38

TUBERIA HDPE 110 MM CL7,5

150

80.00

13

133.60

0.09

TUBERIA CRIVADA 110 MM

150

80.00

13

233.60

0.09

NUMERO TOTAL DE VIAJES


REDONDEO
PESO TUBERIA POR UNIDAD

162021502.xlsx.ms_office

0.55
1.00
0

Pgina 1

2.- FLETE TERRESTRE


MATERIALES

UNIDAD DE TRANSPORTE
AGREGADOS
DE CANTERA LOCAL
UNIDAD QUE NO DA COMPROBANTE
8.00 CAPACIDAD DEL CAMION ( M3 )
8.00
2,300.00 COSTO POR VIAJE S/.
1000.00
11,000.00 CAPACIDAD DEL CAMION ( KG )
11,000.00
0.21 FLETE POR M3
125.00

UNIDAD QUE DA COMPROBANTE


CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION ( KG )
FLETE POR KG

AFECTO IGV
13,241.93

FLETE POR PESO - MATERIALES


FLETE POR VOLUMEN

AGREGADOS
TUBERIAS

COSTO TOTAL FLETE TERR.

2,300.00
15,541.93

SIN IGV

FLETE POR PESO =


Peso Total * Flete por Peso
FLETE POR VOLUMEN =
6,000.00 No Viajes * Costos por Viaje
6,000.00

3.- FLETE RURAL


MATERIALES Y AGREGADOS DESDE PUNTO DE DESCARGA / LARAOS - A OBRA
Costo de Transporte por Viaje
Acmila S/.
4.00
Pen S/.
4.00

Cantidad
Nmero Bolsas de Cemento
Peso Resto de Materiales
Agregados Total en KG.
Tuberia de HDPE 160mm

1,235.69
10,540.00
133,712.00
30.00

Unidades
de Carga

Costos de Transporte por Viaje / acmila de inmed.


Hormigon
3.00
Piedras de la zona
3.00

Capacidad de
Carga
1
1
1
2

1.00
50.00
50.00
1.00

Nmero de
Flete no
Viajes
Afecto a IGV
1,236.00
4,944.00
211.00
844.00
2,674.00
8,022.00
30.00
240.00

EL TRASLADO DE MATERIALES Y AGREGADOS ES DESDE LARAOS A OBRA


COSTO TOTAL DEL FLETE EN ACEMILA S/.

14,050.00

RESUMEN FLETE TOTAL

FLETE
FLETE TERRESTRE

AFECTO
IGV
15,541.93

FLETE EN ACEMILA ( RURAL )


FLETES TOTALES S/.

15,541.93

162021502.xlsx.ms_office

SIN
IGV
6,000.00

TOTAL DE
FLETE
21,541.93

14,050.00

14,050.00

20,050.00

35,591.93

Pgina 2

CALCULO DEL FLETE


OBRA

Elaboracin
Fecha

CREACION DE REHABILITACION DEL RESERVORIO DE RIEGO COMUNAL


COSANCHE
ING. DAMACINO ANTIPORTA SANCHEZ
JUL.-2013

1.- DATOS GENERALES


A.- POR PESO

MATERIALES
CEMENTO PORTLAND TIPO I
MADERA PARA ENCOFRADO
ACERO DE CONSTRUCCIN F'Y=4200 KG/CM2
ALAMBRE NEGRO RECOCIDO BWG N 16
CLAVOS PARA MADERA
TRIPLAY
OTROS

UNIDAD

CANTIDAD

BLS
P2
KG
KG
KG
PLANCHA
GLOBAL

1,609.79
2,000.75
7,750.82
1,189.99
101.87
88.07
1.00

PESO TOTAL MATERIALES


EN TUBERIA

PESO
UNIT.
42.50
1.50
1.00
1.00
1.00
30.00
2,360.00

PESO
TOTAL
68,416.08
3,001.12
7,750.82
1,189.99
101.87
2,642.10
2,360.00

17,045.91

85,461.984

UNIDAD DE ( 2.20 m. * 3.00 m. ) DE CARROCERIA CON H = 1.50 m.

CAPACIDAD DEL CAMION EN TUBOS / VIAJE

ML

ml
tuberia

No
tubos

PESO POR TUBERIA


KG
No VIAJES

TUBERIA DE PVC UF 200 MM

80

55.00

133.10

0.11

TUBERIA DE PVC UF 110 MM CL7,5


TUBERIA DE PVC UF 110 MM CL 5,0

150
150

168.00
0.00

6
6

28
0

280.56
0.00

0.19
0.00

TUBERIA CRIBADA 110 MM

100

80.00

13

233.60

0.13

NUMERO TOTAL DE VIAJES


REDONDEO
PESO TUBERIA POR UNIDAD

0.43
0.00
SS

3.- FLETE RURAL


MATERIALES Y AGREGADOS DESDE PUNTO DE DESCARGA / A OBRA
Costo de Transporte por Viaje
Acmila S/.
0.70
Pen S/.
0.70

Cantidad
Nmero Bolsas de Cemento
Peso Resto de Materiales
Agregados (1) en KG.
Agregados (c.entorno) en KG.
Tuberia de PVC 160mm

1,609.79
17,045.91
198,324.00
36,177.00
50.50

Unidades
de Carga

Costos de Transporte por Viaje / acmila de inmed.


Agregados
0.70
Piedras de la zona
0.70

Capacidad de
Carga
1
1
1
1
2

1.00
50.00
50.00
50.00
1.00

Nmero de
Flete no
Viajes
Afecto a IGV
1,610.00
1,127.00
341.00
238.70
3,966.00
2,776.20
724.00
506.80
51.00
71.40

(1)Traslado de materiales y agregados desde pie de carrtera a la obra; (2) A 100m de obra
COSTO TOTAL DEL FLETE EN ACEMILA S/.

4,720.10

162021502.xlsx.ms_office

Pgina 3

CALCULO DEL FLETE


OBRA
Elaboracin
Fecha

CREACION DE REHABILITACION DEL RESERVORIO DE RIEGO COMUNAL


COSANCHE

ING. DAMACINO ANTIPORTA SANCHEZ


JUL.-2013

B.- POR VOLUMEN


AGREGADO

DESCRIPCION

UNIDAD

ARENA GRUESA
ARENA FINA
PIEDRA CHANCADA 1/2"
PIEDRA CHANCADA 3/4"
PIEDRA ZARANDEADA 1/2"
PIEDRA GRANDE SELECCIONADA
PIEDRA MEDIANA CANTO RODADO
PIEDRA MEDIANA
PIEDRA GRANDE
VOLUMEN TOTAL (AGREGADOS)
VOLUMEN TOTAL (PIEDRA)
CAPACIDAD DEL CAMION ( M3 )
NUMERO DE VIAJES
REDONDEO NUMERO DE VIAJES

0.00
0.00
0.00

M3
M3
M3
M3
M3
M3
M3
M3
M3

AFECTOS
IGV
53.9312
8.8408
69.444

0.820
23.298 CERCANA

132.216
0.000
10.000
13.22
13.22

SIN
IGV

0.000 A OBRA
24.118
0.000
8.000
3.01
3.01

2.- FLETE TERRESTRE


MATERIALES
UNIDAD QUE DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION ( KG )
FLETE POR KG

FLETE POR PESO - MATERIALES


FLETE POR VOLUMEN
COSTO TOTAL FLETE TERR.

UNIDAD DE TRANSPORTE
AGREGADOS
DE CANTERA LOCAL
UNIDAD QUE NO DA COMPROBANTE
10.00 CAPACIDAD DEL CAMION ( M3 )
8.00
2,200.00 COSTO POR VIAJE S/.
800.00
16,000.00 CAPACIDAD DEL CAMION ( KG )
12,800.00
0.14 FLETE POR M3
100.00

AFECTO IGV
11,964.86
AGREGADOS
TUBERIAS

0.00
11,964.86

SIN IGV

FLETE POR PESO =


Peso Total * Flete por Peso
FLETE POR VOLUMEN =
12,989.08 No Viajes * Costos por Viaje
12,989.08

O DE DESCARGA / A OBRA

por Viaje / acmila de inmed.


RESUMEN FLETE TOTAL

FLETE
FLETE TERRESTRE

AFECTO
IGV
11,964.86

FLETE EN ACEMILA ( RURAL )


FLETES TOTALES S/.

11,964.86

162021502.xlsx.ms_office

SIN
IGV
12,989.08

TOTAL DE
FLETE
24,953.94

4,720.10

4,720.10

17,709.18

29,674.04

Pgina 4

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra
Subpresupuesto
Fecha
Lugar

1401001
001
19/07/2013

CREACION DE REHABILITACION DEL RESERVORIO DE RIEGO COMUNAL COSANCHE


CREACION DE REHABILITACION DEL RESERVORIO DE RIEGO COMUNAL COSANCHE, SAN ANDRES DE TUPICOCHA, HUAROCHIR

150715

LIMA - HUAROCHIRI - SAN ANDRES DE TUPICOCHA

Cdigo

Recurso

0101010003
0101010004
0101010005
0101030000
0102020014

OPERARIO
OFICIAL
PEON
TOPOGRAFO
ALMACENERO

Unidad

Cantidad

Precio S/.

Parcial S/.

1,812.4374
1,337.3601
17,547.4440
27.6019
3.0000

10.00
7.50
4.00
20.00
750.00

18,124.37
10,030.20
70,189.78
552.04
2,250.00

MANO DE OBRA
hh
hh
hh
hh
mes

101,146.39
MATERIALES
0201040001
0203020002
0203020003
02040100010001
02040100010002
02040100020001
0204010009
0204030001
02041200010004
0204120004
02050700020024
02050700020025
02050700020026
02050700020028
02051000010008
0205100004
02051100010001
02052300010045
02060100010020
02061100010027
02061500010004
02070100010002
0207010011
0207010012
02070200010001
02070200010002
0207070001
0210040005
0210060002
0212030003
0213010001
0213020004
02150200010004
02150200010005
0219150003
02221600010024
02221700010044
0231010002
0231010003
0231010004
0231040002
02310500010007
0231130001
0237010002
02370600070005
02401500010007
02460200020002
0251020002
0253180001
0253180002
0253180011

PETROLEO D-2
FLETE TERRESTRE
FLETE EN ZONA RURAL
ALAMBRE NEGRO RECOCIDO N 8
ALAMBRE NEGRO RECOCIDO N 16
ALAMBRE NEGRO N 16
ALAMBRE DE PUAS GALVANIZADO #16
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
CLAVOS PARA MADERA CON CABEZA DE 2 1/2"
CLAVO PARA MADERA 4"
TUBERIA PVC SAP DE 1"
TUBERIA PVC SAP DE 3/4"
TUBERIA PVC SAP DE 3"
TUBERIA PVC 110 mm para drenaje
CODO PVC SAP S/P 3" X 45
CODO PVC 45 D=200mm
TEE PVC-SAP S/P 1/2"
REDUCCION PVC SAP 1" A 3/4"
TUBERIA PVC-SAP 1/2"
YEE PVC-SAL DE 3"
TRAMPA PVC SAL DE 3"
PIEDRA CHANCADA 1/2"
PIEDRA MEDIANA CANTO RODADO
GRAVA REDONDA DE RIO D=1/2"
ARENA FINA
ARENA GRUESA
AGUA PUESTA EN OBRA
TECNOPOR
WATER STOP PVC 8"
CODO TIPO RACORD D=6'' P/ ALIVIADERO
CEMENTO PORTLAND TIPO I (42.5 kg)
CALAMINA GALVANIZADA 1.83*0.83*0.3mm
CODO x 45 D=110mm
CODO x 30 D=110mm
CAJA DE CONCRETO 25X30
SELLADOR ELASTOMERICO POLIURETANO
ADITIVO IMPERMEABILIZANTE
MADERA TORNILLO PARA ENCOFRADOS INCLUYE CORTE
MADERA PARA ENCOFRADO
MADERA TORNILLO 1 1/2"X3"X10"
ESTACAS DE MADERA TORNILLO TRATADA 30cmx2"
TRIPLAY 18 mm PARA ENCOFRADO
MADERA CACHIMBO
CANDADO FORTE 40mm
BISAGRA DE SEGURIDAD 3 1/2"
IMPRIMANTE PARA ELASTOMERICO
SUMIDERO DE BRONCE DE 3"
ARMELLA PARA MADERA
VALVULA COMPUERTA DE 1/2"
VALVULA COMPUERTA DE 3/4"
VALVULA COMPUERTA CON BRIDA CON ACCESORIOS MAZZA 6"

02620900030002 DISEO DE MEZCLA

gal
glb
glb
kg
kg
kg
m
kg
kg
kg
m
m
m
m
und
und
und
und
mll
und
und
m3
m3
m3
m3
m3
m3
m2
m
und
bol
pln
und
und
und
gal
gal
p2
p2
pza
und
pln
p2
und
und
gal
und
pza
und
und
und

90.9430
1.0000
1.0000
18.8160
45.4715
453.7068
672.0000
7,750.8244
87.4715
14.4000
30.0000
20.0000
30.0000
82.0000
8.0000
1.0000
3.0000
1.0000
6.0000
3.0000
1.0000
69.4440
86.1215
0.8200
8.8408
143.1024
92.7234
3.0176
197.7600
3.0000
1609.79
12.0000
4.0000
5.0000
1.0000
26.6108
47.6984
19.2000
2,000.7460
5.0000
51.6890
88.0658
144.0000
3.0000
2.0000
4.3692
3.0000
2.0000
3.0000
1.0000
1.0000

14.00
24,148.03
4,621.40
2.63
5.00
5.00
4.00
4.00
5.00
2.75
2.40
2.40
6.00
4.00
3.00
250.00
2.00
1.00
2.40
2.00
3.50
100.00
50.00
25.00
100.00
100.00
1.00
4.55
11.75
90.00
17.80
22.50
4.00
4.00
25.00
133.25
45.00
4.50
4.20
5.00
1.00
150.00
2.00
7.50
7.00
198.31
2.50
2.00
7.00
10.00
1,800.00

1,273.20
24,148.03
4,621.40
49.49
227.36
2,268.53
2,688.00
31,003.30
437.36
39.60
72.00
48.00
180.00
328.00
24.00
250.00
6.00
1.00
14.40
6.00
3.50
6,944.40
4,306.08
20.50
884.08
14,310.24
92.72
13.73
2,323.68
270.00
28,654.32
270.00
16.00
20.00
25.00
3,545.89
2,146.43
86.40
8,403.13
25.00
51.69
13,209.87
288.00
22.50
14.00
866.46
7.50
4.00
21.00
10.00
1,800.00

und

1.0000

550.00

550.00

0262100002
0262140002
02630100010003
02650100010009
02670100010009
0267060021
0267070007
0267070008
0267100012
0270110324
0290150030
02901700010018
02901700010019
02901700010020
0290200006
0290220011
02902300040003

ENSAYO DE RESISTENCIA DE CONCRETO


PLACA RECORDATORIA ACRILICA 0.40X0.60
POSTE DE EUCALIPTO D=4"- L=2.8m
TUBO DE FIERRO NEGRO DE 6" X 6'
CASCO AMARILLO
POLOS DE TRABAJO
BOTADERO DE DESMONTE
BOTAS DE JEBE
COLLARIN D=110mmX2"
REJILLA METALICA 0.20 X 0.20
GIGANTOGRAFIA P/CARTEL DE OBRA (3.60X2.40M)
LETRINAS SANITARIAS MOVILES
SERVICIO DE CAPACITACION EN RIEGO - INFRAESTRUCTURA
SERVICIO DE CAPACITACION EN RIEGO - GESTION
GRAPAS PARA PUAS
SUMINISTRO TUBERIA PVC 200mm
ESPUMA DE POLYOLEFINA D=1 1/4" (RODON)

und
und
und
und
und
und
glb
par
und
und
und
und
Mod
Mod
kg
m
m

10.0000
1.0000
32.0000
1.0000
20.0000
20.0000
1.0000
20.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
32.0000
55.0000
298.2000

50.00
21,756.87
5.00
450.00
20.00
25.00
358.00
30.00
22.40
48.00
300.00
320.00
1,500.00
1,500.00
10.00
6.00
1.50

500.00
21,756.87
160.00
450.00
400.00
500.00
358.00
600.00
22.40
48.00
300.00
320.00
1,500.00
1,500.00
320.00
330.00
447.30
186,404.36

EQUIPOS
03010000020002 NIVEL TOPOGRAFICO CON TRIPODE
0301000020
MIRAS Y JALONES
0301010006
HERRAMIENTAS MANUALES

hm
hm
%mo

03010400010004
0301100007
0301100008
0301100009
0301100010
0301170002
0301220001
03012200040005
0301290001
03012900010003
03012900030002
03013400030005

hm
hm
pza
pza
pza
hm
km
hm
hm
hm
hm
pza

BOMBA PARA PRUEBA DE AGUA


COMPACTADORA VIBRATORIA TIPO PLANCHA 4 HP
COMPUERTA METALICA DE IZAJE (0.20X0.50, H=0.80m)
COMPUERTA METALICA DE IZAJE (0.20X0.30, H=0.80m)
COMPUERTA METALICA DE TIPO IZAJE (0.40X0.50, H=0.90m)
RETROEXCAVADORA
CAMION PLATAFORMA
CAMION VOLQUETE 4X2 140 - 210 HP 6m3
VIBRADOR PARA CONCRETO
VIBRADOR A GASOLINA
MEZCLADORA DE TROMPO 9 P3 (8 HP)
ESCALERA TIPO GATO D=5/8 LISO

27.6019
27.6019

12.00
4.00

331.22
110.41
3,408.69

528.0000
1,140.8482
1.0000
1.0000
2.0000
36.1820
0.0000
1.6000
29.1390
112.3639
212.9502
1.0000

1.20
21.00
350.00
350.00
300.00
150.00
50.00
80.00
15.00
15.00
90.00
66.00

633.60
23,957.81
350.00
350.00
600.00
5,427.30
0.00
128.00
437.09
1,685.46
19,165.52
66.00
56,651.10

SUBCONTRATOS
0420030009

SC SERVICIO DE VOLADURA

pto

0.3400

70.00

23.80
23.80

Total

S/.

344,225.65

Fecha :

28/07/2013 02:34:02 PM

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra
Subpresupuesto
Fecha
Lugar

1401001
001
19/07/2013

CREACION DE REHABILITACION DEL RESERVORIO DE RIEGO COMUNAL COSANCHE


CREACION DE REHABILITACION DEL RESERVORIO DE RIEGO COMUNAL COSANCHE, SAN ANDRES DE TUPICOCHA, HUAROCHIR

150715

LIMA - HUAROCHIRI - SAN ANDRES DE TUPICOCHA

Cdigo

Recurso

0101010003
0101010004
0101010005
0101030000
0102020014

OPERARIO
OFICIAL
PEON
TOPOGRAFO
ALMACENERO

Unidad

Cantidad

Precio S/.

Parcial S/.

1,756.7464
1,309.6657
17,296.9824
27.6019
3.0000

10.00
7.50
4.00
20.00
750.00

17,567.46
9,822.49
69,187.93
552.04
2,250.00

MANO DE OBRA
hh
hh
hh
hh
mes

99,379.92
MATERIALES
0201040001
0203020002
0203020003
02040100010001
02040100010002
02040100020001
0204010009
0204030001
02041200010004
0204120004
02050700020024
02050700020025
02050700020026
02050700020028
02051000010008
0205100004
02051100010001
02052300010045
02060100010020
02061100010027
02061500010004
02070100010002
0207010011
0207010012
02070200010001
02070200010002
0207070001
0210040005
0210060002
0212030003
0213010001
0213020004
02150200010004
02150200010005
02190100010024
0219150003
02221600010024
02221700010044
0231010002
0231010003
0231010004
0231040002
02310500010007
0231130001
0237010002
02370600070005
02401500010007
02460200020002
0251020002
0253180001
0253180002
0253180011

PETROLEO D-2
FLETE TERRESTRE
FLETE EN ZONA RURAL
ALAMBRE NEGRO RECOCIDO N 8
ALAMBRE NEGRO RECOCIDO N 16
ALAMBRE NEGRO N 16
ALAMBRE DE PUAS GALVANIZADO #16
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
CLAVOS PARA MADERA CON CABEZA DE 2 1/2"
CLAVO PARA MADERA 4"
TUBERIA PVC SAP DE 1"
TUBERIA PVC SAP DE 3/4"
TUBERIA PVC SAP DE 3"
TUBERIA PVC 110 mm para drenaje
CODO PVC SAP S/P 3" X 45
CODO PVC 45 D=200mm
TEE PVC-SAP S/P 1/2"
REDUCCION PVC SAP 1" A 3/4"
TUBERIA PVC-SAP 1/2"
YEE PVC-SAL DE 3"
TRAMPA PVC SAL DE 3"
PIEDRA CHANCADA 1/2"
PIEDRA MEDIANA CANTO RODADO
GRAVA REDONDA DE RIO D=1/2"
ARENA FINA
ARENA GRUESA
AGUA PUESTA EN OBRA
TECNOPOR
WATER STOP PVC 8"
CODO TIPO RACORD D=6'' P/ ALIVIADERO
CEMENTO PORTLAND TIPO I (42.5 kg)
CALAMINA GALVANIZADA 1.83*0.83*0.3mm
CODO x 45 D=110mm
CODO x 30 D=110mm
CONCRETO F'C=175 kg/cm2
CAJA DE CONCRETO 25X30
SELLADOR ELASTOMERICO POLIURETANO
ADITIVO IMPERMEABILIZANTE
MADERA TORNILLO PARA ENCOFRADOS INCLUYE CORTE
MADERA PARA ENCOFRADO
MADERA TORNILLO 1 1/2"X3"X10"
ESTACAS DE MADERA TORNILLO TRATADA 30cmx2"
TRIPLAY 18 mm PARA ENCOFRADO
MADERA CACHIMBO
CANDADO FORTE 40mm
BISAGRA DE SEGURIDAD 3 1/2"
IMPRIMANTE PARA ELASTOMERICO
SUMIDERO DE BRONCE DE 3"
ARMELLA PARA MADERA
VALVULA COMPUERTA DE 1/2"
VALVULA COMPUERTA DE 3/4"
VALVULA COMPUERTA CON BRIDA CON ACCESORIOS MAZZA 6"

gal
glb
glb
kg
kg
kg
m
kg
kg
kg
m
m
m
m
und
und
und
und
mll
und
und
m3
m3
m3
m3
m3
m3
m2
m
und
bol
pln
und
und
m3
und
gal
gal
p2
p2
pza
und
pln
p2
und
und
gal
und
pza
und
und
und

90.9430
1.0000
1.0000
18.8160
45.4715
453.7068
672.0000
7,750.8244
87.4715
14.4000
30.0000
20.0000
30.0000
82.0000
8.0000
1.0000
3.0000
1.0000
6.0000
3.0000
1.0000
69.4440
23.2980
0.8200
8.8408
53.9312
92.7234
3.0176
197.7600
3.0000
1,440.2181
12.0000
4.0000
5.0000
11.3050
1.0000
26.6108
47.5957
19.2000
2,000.7460
5.0000
51.6890
136.4145
144.0000
3.0000
2.0000
4.3692
3.0000
2.0000
3.0000
1.0000
1.0000

14.00
8,669.98
18,413.33
2.63
5.00
5.00
4.00
4.00
5.00
2.75
2.40
2.40
6.00
4.00
3.00
250.00
2.00
1.00
2.40
2.00
3.50
100.00
50.00
25.00
100.00
100.00
1.00
4.55
11.75
90.00
17.80
22.50
4.00
4.00
319.00
25.00
133.25
45.00
4.50
4.20
5.00
1.00
150.00
2.00
7.50
7.00
198.31
2.50
2.00
7.00
10.00
1,800.00

1,273.20
8,669.98
18,413.33
49.49
227.36
2,268.53
2,688.00
31,003.30
437.36
39.60
72.00
48.00
180.00
328.00
24.00
250.00
6.00
1.00
14.40
6.00
3.50
6,944.40
1,164.90
20.50
884.08
5,393.12
92.72
13.73
2,323.68
270.00
25,635.88
270.00
16.00
20.00
3,606.30
25.00
3,545.89
2,141.81
86.40
8,403.13
25.00
51.69
20,462.18
288.00
22.50
14.00
866.46
7.50
4.00
21.00
10.00
1,800.00

02620900030002
0262100002
0262140002
02630100010003
02650100010009
02670100010009
0267060021
0267070007
0267070008
0267100012
0270110324
0290150030
02901700010018
02901700010019
02901700010020
0290200006
0290220011
02902300040003

DISEO DE MEZCLA
ENSAYO DE RESISTENCIA DE CONCRETO
PLACA RECORDATORIA ACRILICA 0.40X0.60
POSTE DE EUCALIPTO D=4"- L=2.8m
TUBO DE FIERRO NEGRO DE 6" X 6'
CASCO AMARILLO
POLOS DE TRABAJO
BOTADERO DE DESMONTE
BOTAS DE JEBE
COLLARIN D=110mmX2"
REJILLA METALICA 0.20 X 0.20
GIGANTOGRAFIA P/CARTEL DE OBRA (3.60X2.40M)
LETRINAS SANITARIAS MOVILES
SERVICIO DE CAPACITACION EN RIEGO - INFRAESTRUCTURA
SERVICIO DE CAPACITACION EN RIEGO - GESTION
GRAPAS PARA PUAS
SUMINISTRO TUBERIA PVC 200mm
ESPUMA DE POLYOLEFINA D=1 1/4" (RODON)

und
und
und
und
und
und
und
glb
par
und
und
und
und
Mod
Mod
kg
m
m

1.0000
10.0000
1.0000
32.0000
1.0000
20.0000
20.0000
1.0000
20.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
32.0000
55.0000
298.2000

550.00
50.00
360.00
5.00
450.00
20.00
25.00
358.00
30.00
22.40
48.00
300.00
320.00
1,500.00
1,500.00
10.00
6.00
1.50

550.00
500.00
360.00
160.00
450.00
400.00
500.00
358.00
600.00
22.40
48.00
300.00
320.00
1,500.00
1,500.00
320.00
330.00
447.30
159,098.62

EQUIPOS
03010000020002 NIVEL TOPOGRAFICO CON TRIPODE
0301000020
MIRAS Y JALONES
0301010006
HERRAMIENTAS MANUALES

hm
hm
%mo

03010400010004
0301100007
0301100008
0301100009
0301100010
0301170002
0301220001
03012200040005
0301290001
03012900010003
03012900030002
03013400030005

hm
hm
pza
pza
pza
hm
km
hm
hm
hm
hm
pza

BOMBA PARA PRUEBA DE AGUA


COMPACTADORA VIBRATORIA TIPO PLANCHA 4 HP
COMPUERTA METALICA DE IZAJE (0.20X0.50, H=0.80m)
COMPUERTA METALICA DE IZAJE (0.20X0.30, H=0.80m)
COMPUERTA METALICA DE TIPO IZAJE (0.40X0.50, H=0.90m)
RETROEXCAVADORA
CAMION PLATAFORMA
CAMION VOLQUETE 4X2 140 - 210 HP 6m3
VIBRADOR PARA CONCRETO
VIBRADOR A GASOLINA
MEZCLADORA DE TROMPO 9 P3 (8 HP)
ESCALERA TIPO GATO D=5/8 LISO

27.6019
27.6019

12.00
4.00

331.22
110.41
3,320.35

528.0000
1,140.8482
1.0000
1.0000
2.0000
36.1820
0.0000
1.6000
29.1390
112.1306
212.7169
1.0000

1.20
21.00
350.00
350.00
300.00
150.00
50.00
80.00
15.00
15.00
90.00
66.00

633.60
23,957.81
350.00
350.00
600.00
5,427.30
0.00
128.00
437.09
1,681.96
19,144.52
66.00
56,538.26

SUBCONTRATOS
0420030009

SC SERVICIO DE VOLADURA

pto

0.3400

70.00

23.80
23.80

Total

S/.

315,040.60