You are on page 1of 143

USER NAME: PASSWORD: PRIMAVERA SDK:

admin admin
Primavera P6 SDK

Global \ Proj... Select Projec...


Bldg Office Building Addition

Global Only

Read-Only

Select Projec...
Bldg Office Building Addition

Admin Categories:

Version 6v7 Updated: 04/28/10

RESOURCES
Internal ID (Read-Only)

Resource Name

1709 1710 1711 1712 1713 1714 1715 1716 1717 1722 1723 1724 1725 1726 1727 1728 1729 1730 1731

Project Costs Site L Design Structure L

Project Cost Breakdown Sitework Labor Costs Design Costs

Structural Labor Costs Exterior Finishes Labor Ext. Finishes L Cost Interior Finish Labor Int.Finishes L Costs Heating, Air Conditioning Mech L & Plumbing Labor Costs Elev L Elec L Site NL Site M Structure NL Structure M Ext. Finishes NL Elevator Labor Costs Electrical Labor Costs Site Non Labor Site Material Structure NL Structure Material Exterior Finishes Nonlabor

Ext Finishes M Exterior Finishes Material Interior Finishes NL Interior Finishes NL Interior Finishes M Interior Finishes Material Elev NL Elev M Elevator Nonlabor Elevator Material

Office Phone

Employee ID

Resource ID

Title

1732

Mech NL

Heating, Air Conditioning, Plumbing Nonlabor Heating, Air Conditioning, Plumbing Material Electrical Nonlabor Electrical Material Foundation Labor

1733 1734 1735 1736 1737 1738

Mech M Electrical NL Electrical M Foundation L

Foundation NL Foundation Nonlabor Foundation M Foundation - Material

1739 1741 1742 1743

Foundation A

Foundation Added Work Force

Foundation L-1 Steve Steelman Structure L-1 Gary Heinrichs

Subcontractors Subcontractor

1744 1745 1747 1748 1749 1750 1751 1752 1753 1754 1755

Survey Innovative Resources IS Purchasing Design Engineers Management Highway Project Construct PRINTCST ENGR Project School

Site Survey Subcontractor Innovative Construction Internal Resources Information Systems Department Purchasing Department Design Engineering Department Management Resources for Highway Project Construction Department Printing Costs Resources for ENGR Project School Project

(215) 555-1212 718-456-9021

1756 1757

GR PK

George Roberts Paul Kim

Field Engineer Design Engineer Automation Systems Engineer Vendor Analyst

1758 1759 1760 1761 1762 1763 1764 1765 1766 1767

WR AC JY CostEng PMs OR StructEng InstrEng

Wendy Resner Ace Corp Jeff Young Cost Engineers Project Managers Oliver Rock Structural Engineers Instrumentation Engineers

Accounts Manager

Highway Labor Highway Labor School Subs Subcontrators

1768 1769 1770 1771 1772 1773 1774 1775 1776 1777 1778

Construct Nonlabor ENGR Labor ED ElecEng Exec CivilEng Construct Labor AM Schedulers Highway Material Arch

Material Resources Engineer Labor Ed Wood Electrical Engineers Executive Civil Engineers Labor Resources Ashok Mehta Project Managers Highway Material Senior Architects Internal Developer Program Manager

1779 1780 1781 1782 1783 1784 1785 1786 1787 1788 1789 1790 1791 1792 1793 1794 1795 1796 1797 1798 1799 1800 1801 1802 1803

MechEng Programmer Fld Eng1 Rghcarp Machinist Painter Electrcn GENCNTR Sfwr Eng HV2KATYD Plumber Hvac Tec Excavatr HV1TEDG Finisher Irwk Fld Eng2 Op Eng ME1MARKH Fld Eng3 Elev Inst ST2JENM PM1BOBP PM1SUEW Mason

Mechanical Engineers Programmer Field Eng-Senior Rough Carpenter Machinist Painter Electrician General Contractor Personnel Software Engineer Katy Dunn, HVAC Engineer Plumber Heating Ventilation & AC Technician Excavator Ted Green, HVAC Designer Finisher Ironworker Field Engineer Operating Engineer Mark Hall, Junior Mechanical Engineer Field Eng-Assistant Elevator Installer Jen Martin, Structural Engineer Bob Patterson, Project Manager Sue White, Project Manager Mason

1804 1805 1806 1807 1808 1809 1810 1811 1812 1813 1814 1815 1816 1817 1818 1819 1820 1821 1822 1823 1824 1825 1826

CT2FRANK CV2MIKEH EE1BARBW EE2BILLS Hdwr Spec PE3 PEXEC Fnshcarp Flrlyr ME2DEBO Laborer ME1GREGV PAVER ST1LISAH ST2GREGM STRIPPER SHEETING CARP FOREMAN DRIVER ELEC LABOR-G LABOR-S

Frank Danson, Cost Engineer Mike Hall, Civil Designer Barb Wire, Senior Electrical Engineer Bill Sanders, Junior Electrical Engineer Hardware Specialist Planning Engineer Project Executive Finishes Carpenter Floor and Carpet Layer Deb O'Brien, Junior Mechanical Engineer Laborer-Construction Greg Van, Senior Mechanical Engineer Asphalt Paver, 130 H.P. Lisa Hall, Structural Designer Greg Miller, Structural Engineer Paint Stripper, S.P. Sheeting Driver Carpenter Foreman Truck Driver - Heavy Electrician General Laborer Skilled Laborer

1827

Piping Mat

Piping Material Paul Kelly, Instrumentation Engineer

1828

IE2PAULK

1829 1830

IE2PETEL CV1KERIB

Pete Lopez, Instrumentation Engineer Keri Brown, Civil Engineer Bret Sanders, Instrumentation Engineer Lori White, Senior Architect** Kelly Frank, Cost Engineer Equipment Operator Light Lang Paving Post Driver Equipment Operator Bristle Paint and Paper Jolt Electrical Contractors Stony Masonry Contractors Haskle Mechnical Contractors County Line Steel Alpha Plumbing Loader/Backhoe 80 H.P. Aggregate Spreader Will Summers, Civil Engineer Roller, Tandem Roller, Steel Wheel Truck - Flatbed, 3 Ton Dump Truck Gas Engine Vibrator Truck Crane

1831 1832 1833 1834 1835 1836 1837 1838 1839 1840 1841 1842 1843 1844 1845 1846 1847 1848 1849 1850 1851 1852

IE1BRETS AR1LORIW CT1KELLY OPERL LANGPAV POSTDRVR OPERATOR BRISTLE JOLT STONY HASKLE CNTYLN ALPHA LOADER SPREADER CV2WILLS ROLLER1 ROLLER2 TRUCK TRUCKD VIBRATOR CRANE

1853 1854 1855 1856 1857 1858 1859 1860 1861

DOZER COMPR GOCRETE REGENT Edison Resources Cont

Dozer, 200 H.P. Air Compressor & Hoses Go Concrete Regent Contractors Edison High Contractor 2 Division 02

Demo Lofty Resources

Demolition Crew Lofty Heights Resources

1862 1863 1864 1865 1866 1878 1879 1880 1881 1882 1883 1884 1885 1886 1887

LH Labor

LH Labor

LH Non-Labor LH Non-Labor LH Expenses LH Material LH Subs LH Expenses LH Material LH SubContractor/Trades 1 Division 01 11 Division 11 7 Division 07 15 Division 15 8 Division 08 5 Division 05 3 Division 03 10 Division 10 6 Division 06 9 Division 09

1888 1889 1890 1891 1892 1893 1894 1895 1896 1897 1898 1899 1900 1901 1902 1903 1904 1905 1906 1907 1908 1909 1910 1911 1912

12 Division 12 14 Division 14 16 Division 16 4 Division 04 Curb Earth Pave Conc Drain Surv Irrig Mas Tilt Door Fin Win Glaz Landsc Dry Plas Tile AccC WdFlr Oflr Paint Curb & Walks Crew Earthwork Crew Paving Crew Concrete Crew Storm Drainage Crew Survey Crew Irrigation Crew Masonry Crew Tiltwall Crew Doors & Frame Crew Finish Hardware Crew Window Frame Crew Glass Crew Landscape Crew Drywall Crew Plaster Crew Tile Crew Accoustical Ceiling Crew Wood Flooring Crew Other Flooring Crew Painting Crew

1913 1914 1915 1916 1917 1918 1919 1920 1921 1922 1923 1924 1925 1926 1927 1928 1929 1930 1931

Steel Spec Clean Insul Roof Clear Ath Blind Elev HVAC Plum FS Punch Ins FGC Bond Conting OHP CF

Steel Crew Specialties Crew Cleaning Crew Insulation Crew Roofing Crew Site Clearing Crew Athletic Equipment Crew Blind & Shade Crew Elevator Crew HVAC Crew Plumbing Crew Fire Suppression Crew Punch Crew Insurance Field General Expenses Project Bonds Contingency Overhead & Profit Construction fee

1932

Environmental Consulting Environmental Subcontractor

1933

Geotech

Geotechnical Engineering

1934

Demolition

Demolition Subcontractor Concrete Foundation Subcontractor

1935

Concrete

1936

Masonry

Masonry Subcontractor

1937

Structural Steel Structural Steel Subcontractor Specialty Metals Rough Carpentry Finish Carpentry Millwork Carpentry Thermal Protection Specialty Metal Fabricator Subcontractor Rough Capentry Subcontractor Finish Carpentry Subcontractor

1938

1939

1940

1941

Millwork Subcontractor Thermal Protection Subcontractor Sheet Metal Subcontractor

1942

1943

Sheet Metal

1944

Roofing

Roofing Subcontractor Glass & Glazing Subcontractor

1945

Glass

1946

Drywall

Drywall Subcontractor Finishes & Fit-out Subcontractor

1947

Finishes

1948

Flooring

Flooring Subcontractor

1949

Painting

Painting Subcontractor

1950

Specialties

FF&E Specialties Pool Installation Subcontractor

1951

Pools

1952

Conveying Fire Suppression

Conveying Subcontractor Fire Suppression Subcontractor

1953

1954

Plumbing

Plumbing Subcontractor Heating, Ventilation and Air-conditioning Subcontractor Integrated Automation, Computers, LAN Subcontractor

1955

HVAC Sub Integrated Automatio

1956

1957

Electrical

Electrical Subcontractor

1958

Communicatio Telecommunications ns Subcontractor Electronic Safety Electronic Safety Subcontractor

1959

1960

Earthwork

Earthwork Subcontractor Paving & Roadways Subcontractor

1961

Paving

1962

Utilities

Utilities Subcontractor Process Integration Subcontractor Landscaping Subcontractor Carpentry Crew Electrical Crew Ed Mallard

1963

Process

1965 1967 1968 1973

Landscaping Carptr Electr EMA

1974

JLA

Jeff Lange

1975

KAN

Ken Anderson

1976

JRO

John Rock

1977

LBA

Lourdes Barietto

1978

ATE

Angel Tejada

1979

BBU

Buck Buchanon

1980

MMA

Mark Malloy

1981

MNE

Mark Newton

1982

SRO

Steve Rohaz

1983

BFE

Bill Feeley

1984

TCA

Tom Campbell

1985

JGA

Juan Garcia

1986

DLO

Don Louser

1987

HEP

Harry Epstein

1988

TNI

Tim Nichols

1989

JME

Jose Mendez

1990

SKE

Sean Kennedy

1991

SFO

Sally Foon

1992

JMI

Jane Miller

1993

SJE

Scott Jefferson

1994

CSA

Chris Sawyer

1995

JDI

Juan Diaz

1996

BSM

Barb Smith

1997

JMO

Joe Monmouth

1998

ACO

Alice Cooper

1999

JMA

Jorge Martin

2000

RCR

Ray Crammer

2001

MMO

Michael Moore

2002 2003 2004

ASW GC Frame

Al Switcher General Contractor Framing Contractor

2005 2006 2007 2008 2011

Cranes Stucco LABOR-H Project Specific CV1ERUA

Cranes Stucco Highway Laborer Project Specific Resources Erun Azia, Civil Engineer

2013 2055 2057 2077 2091 2092 2093 2094 2095 2096 2097 2098 2099 2100 2101 2102 2104 2105 2106 2107 2110 2112 2114 2116 2121 2122 2123

EXT IMC MKC School Labor School Carp mikeb bobm trents johnm charlesn frankl georgea rajp team GN17 - Root APEX - Root ACCTS ANALYST ATM ENG DES ENG EQUIPMNT FLD ENG* HWSPEC FNISHR PIPING OPENG PROGRMR

External resources IMC MKC Labor School Carpenter Mike Brown, CIO Bob McArthur, Dir of Marketing Trent Smith, PMO Director John McDougal Charles North Frank Lee George Abrams, VP of Development Raj Patel, Dir of Programming TEAM MEMBER Resources for project GN17 Resources for project APEX Accounts Manager Analyst-Systems Automation Automation Systems Engineer Design Engineer Equipment-Crane Field Eng-All Hardware Specialist Finisher Piping Material Operating Engineer Programmer Senior Programmer

555-1234 610 949-6800 610 949-6800 610 949-6800 610 949-6800 610 949-6800

610 949-6800 12345 610 949-6800

2126 2127 2128

PRG MGR VENDOR SW ENG

Program Manager Vendor Software Engineer

CCI

Chris Ikadeh

Planner

Parent Resource ID

Labor? (Read-only)

Default Units/Time

1 Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

RT_Equip RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Equip RT_Mat RT_Equip RT_Mat RT_Equip RT_Mat RT_Equip RT_Mat RT_Equip RT_Mat

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

overtime allowed?
N N N N N N N N N N N N N N N N N N N

E-Mail Address

Other Phone

Active?

Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs Project Costs

RT_Equip

1 1 1 1 1 1

RT_Mat RT_Equip RT_Mat RT_Labor RT_Equip RT_Mat

Y Y Y Y Y Y

N N N N N N

Project Costs Foundation L gheinrichs@GC.com Structure L

1 1 1 1

RT_Labor RT_Labor RT_Labor RT_Labor

Y Y Y Y

N N N N

Site_Survey@yahoo.com 203-121-2323 systems@bankcorp.com

Subcontract ors

1 1

RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor

Y Y Y Y Y Y Y Y Y Y Y

N N N N N N Y N Y Y N

Innovative Resources Innovative Resources Innovative Resources Innovative Resources Project Specific Innovative Resources Project Costs Project Specific Project Specific

1 1 1 1

RT_Labor RT_Equip RT_Labor

RT_Labor

IS Design Engineers Design Engineers Purchasing Design Engineers Design Engineers Manageme nt Purchasing Design Engineers Design Engineers Highway Project School

1 1

RT_Labor RT_Labor

Y Y

N N

1 1 1

RT_Labor RT_Labor RT_Labor RT_Labor

Y Y Y Y Y Y Y Y Y Y

N N N Y N N Y Y N N

1 1

RT_Labor RT_Labor RT_Labor RT_Labor

1 1

RT_Labor RT_Equip

Construct ENGR Project Design Engineers Design Engineers Manageme nt Design Engineers Construct IS Manageme nt Highway Project Design Engineers

1 1 1

RT_Mat RT_Labor RT_Labor RT_Labor

Y Y Y Y Y Y Y Y Y Y Y

N N N Y N Y N N N N Y

RT_Labor RT_Labor

1 1 1 1

RT_Labor RT_Labor RT_Labor RT_Mat RT_Labor

Design Engineers AM GR Construct Labor Construct Labor Construct Labor Construct Labor ENGR Labor AM MechEng Construct Labor Construct Labor Construct Labor MechEng Construct Labor Construct Labor GR Construct Labor MechEng GR Construct Labor StructEng PMs PMs Construct Labor 1 1 1 1 1 1 1 1

RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor 1 RT_Labor RT_Labor 1 1 1 RT_Labor RT_Labor RT_Labor RT_Labor 1 1 1 1 RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor 1 RT_Labor

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Y N N N N N N Y N Y N N N Y N N N N Y N N Y Y Y N

CostEng CivilEng ElecEng ElecEng AM Schedulers Exec Construct Labor Construct Labor MechEng Construct Labor MechEng Highway Labor StructEng StructEng Highway Labor Highway Labor Highway Labor Highway Labor Highway Labor Highway Labor Highway Labor Highway Labor 1

RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor 1 RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Y Y Y Y N Y Y N N Y N Y Y Y Y Y Y Y Y Y Y Y Y

1 1

Construct Nonlabor

RT_Mat

InstrEng

RT_Labor

InstrEng CivilEng

RT_Labor RT_Labor

Y Y

Y Y

InstrEng Arch CostEng Highway Labor School Subs Highway Labor Highway Labor School Subs School Subs School Subs School Subs School Subs School Subs Highway Material Highway Material CivilEng Highway Material Highway Material Highway Material Highway Material Highway Material Highway Material

RT_Labor RT_Labor RT_Labor RT_Labor 1 RT_Equip RT_Labor RT_Labor 1 1 1 1 1 1 1 RT_Mat RT_Equip RT_Equip RT_Equip RT_Equip RT_Mat RT_Mat RT_Mat RT_Labor RT_Mat RT_Mat RT_Mat RT_Mat RT_Mat RT_Mat

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Y Y Y Y N Y Y N N N N N N N N Y N N N N N N

Highway Material Highway Material School Subs School Subs Project Specific Edison Resources Cont 2 Project Specific Lofty Resources Lofty Resources Lofty Resources Lofty Resources Lofty Resources Cont Cont Cont Cont Cont Cont Cont Cont Cont Cont

RT_Mat RT_Mat 1 1 1 1 1 1 1 RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip

Y Y Y Y Y Y Y Y Y

N N N N N N N N N

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

RT_Labor RT_Equip RT_Equip RT_Mat RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

N N N N N N N N N N N N N N N

Cont Cont Cont Cont 2 2 2 3 2 1 2 4 3 8 8 8 8 2 9 9 9 9 9 9 9

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

N N N N N N N N N N N N N N N N N N N N N N N N N

5 10 1 7 7 2 11 12 14 15 15 15 1 1 1 1 1 1 1 Subcontract ors Subcontract ors Subcontract ors Subcontract ors

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip RT_Equip

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

N N N N N N N N N N N N N N N N N N N

RT_Labor

RT_Labor

RT_Labor

RT_Labor

Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors Subcontract ors 6 16 LH Labor LH Labo+I245: R245r

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

RT_Labor

1 1 1 1

RT_Labor RT_Equip RT_Equip RT_Labor

Y Y Y Y

N N N N

RT_Labor

Planner+I2 45:R245

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor

RT_Labor

LH Labor Subcontract ors Subcontract ors Subcontract ors Subcontract ors Highway Labor

1 1 1

RT_Labor RT_Labor RT_Labor

Y Y Y

N N N

1 1

RT_Labor RT_Labor RT_Labor

Y Y Y Y Y

N N Y N Y

1 CivilEng

RT_Labor RT_Labor

1 EXT EXT School School Labor 203-121-2323 mbrown@isorg.com teamplayhelp@primavera.com teamplayhelp@primavera.com teamplayhelp@primavera.com teamplayhelp@primavera.com teamplayhelp@primavera.com mikeb mikeb trents bobm trents mikeb teamplayhelp@primavera.com 718-592-1108 TeamMember@IT.com georgea rajp 1 1 1 1 1 1 1 1 1 1 1 1 1

RT_Labor RT_Equip RT_Equip RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor RT_Labor

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

N N N N N N Y N N N N N N Y Y Y Y Y Y Y N Y Y Y N Y Y

APEX Root APEX Root APEX Root APEX Root APEX Root APEX Root APEX Root APEX Root APEX Root APEX Root APEX Root

RT_Labor RT_Labor RT_Labor RT_Labor RT_Mat RT_Labor RT_Labor RT_Labor RT_Mat RT_Labor RT_Labor

APEX Root APEX Root APEX Root Planner+I2 45:R245

RT_Labor RT_Labor RT_Labor

Y Y Y

Y Y Y

RT_Labor

Time Approval Mgr

Uses Timesheets?

Internal ID (Read-Only)

AutoCompute Actuals?

Calc costs from units?

overtime factor

User Login

Y Y Y Y Y Y Y Y Y Y 0 Y Y 0 Y Y 0 Y Y 0 Y Y 0 Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek

N N N N N N N N N N N N N N N N N N N

DELETE ?
N N N N N N N N N N N N N N N N N N N

Currency

Calendar

Y Dollar

Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 24/7 Workweek Schedule (non-labor) Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek PRINTCST - Cal Standard 5 Day Workweek Standard 5 Day Workweek

Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

N N N N N N

N N N N N N

Y Y Y

Y Y Y Y

Y Dollar Y Dollar Y Dollar N Dollar

N N N N

N N N N

N 1 Y Y Y Y Y 0 Y Y 0 N 0 Y Y

N Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

N N N N N N N N N N N

N N N N N N N N N N N

Y Y

Y Dollar Y Dollar

Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek CT* - Cal Standard 5 Day Workweek Standard 5 Day Workweek ST* - Cal IE* - Cal Standard 5 Day Workweek Standard 5 Day Workweek Standard 24/7 Workweek Schedule (non-labor) Standard 5 Day Workweek Standard 5 Day Workweek EE* - Cal Standard 5 Day Workweek CV* - Cal Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek AR1* - Cal

N N

N N

Y Y Y 0 Y Y Y 0 0 Y Y Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

N N N N N N N N N N

N N N N N N N N N N

Y Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

N N N N N N N N N N N

N N N N N N N N N N N

Y Y

Y Y Y Y

0 0

Y Y

Y Y Y Y Y Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

ME* - Cal Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek GENCNTR - Cal Standard 5 Day Workweek HV2KATYD - Cal Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek HV1TEDG - Cal Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek ME1MARKH - Cal Standard 5 Day Workweek Standard 5 Day Workweek ST2JENM - Cal PM1BOBP - Cal PM1SUEW - Cal Standard 5 Day Workweek

N N N N N N N N N N N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N N N N N N N N N N N

Y Y

Y Y Y Y

Y Y Y Y Y

Y Y Y

0 0 0

Y Y Y Y

0 0 0 0

Y Y Y Y Y Y Y Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

CT2FRANK - Cal CV2MIKEH - Cal EE1BARBW - Cal EE2BILLS - Cal Standard 5 Day Workweek PE3 - Cal PEXEC - Cal Standard 5 Day Workweek Standard 5 Day Workweek ME2DEBO - Cal Standard 5 Day Workweek ME1GREGV - Cal Standard 5 Day Workweek ST1LISAH - Cal ST2GREGM - Cal Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 24/7 Workweek Schedule (non-labor)

N N N N N N N N N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N N N N N N N N N

0 0

Y Y

0 0 0 0 0 0 0 0 0 0 0 0

Y Y Y Y Y Y Y Y Y Y Y Y

Y Dollar

Y Dollar

IE2PAULK - Cal

0 0

Y Y

Y Dollar Y Dollar

IE2PETEL - Cal CV1KERIB - Cal

N N

N N

0 0 0 0

Y Y Y Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

IE1BRETS - Cal AR1LORIW - Cal CT1KELLY - Cal Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek CV2WILLS - Cal Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek

N N N N N N N N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N N N N N N N N

0 0

Y Y Y Y Y Y Y Y

0 0 0 0 0 0 0 0 0

Y Y Y Y Y Y Y Y Y

0 0

Y Y Y Y N N Y Y Y

Y Dollar Y Dollar Y Dollar Y Dollar N Dollar N Dollar N Dollar Y Dollar Y Dollar

Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek School District 5 Day School District 5 Day School District 5 Day School District 5 Day Standard 5 Day Workweek Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day

N N N N N N N N N

N N N N N N N N N

Y Y Y 0 Y Y N Y Y Y Y Y Y Y Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar N Dollar N Dollar N Dollar N Dollar N Dollar N Dollar N Dollar N Dollar N Dollar N Dollar

N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

N Dollar N Dollar N Dollar N Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar N Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day

N N N N N N N N N N N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N N N N N N N N N N N

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Y Dollar Y Dollar N Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar N Dollar N Dollar N Dollar N Dollar N Dollar N Dollar N Dollar

School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day School District 5 Day Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays

N N N N N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N N N N N

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays School District 5 Day School District 5 Day Standard 5 Day Workweek Standard 5 Day Workweek w/ Basic Holidays

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Dollar

N Y Y N

N Dollar Y Dollar Y Dollar Y Dollar

N N N N

N N N N

Y Dollar

Y Dollar

Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek w/ Basic Holidays Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek CV1KERIB - Cal

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y Dollar

Y N N

Y Dollar Y Dollar Y Dollar

N N N

N N N

N N 0 Y Y Y

N Dollar Y Dollar Y Dollar Y Dollar Y Dollar

N N N N N

N N N N N

Y Y Y Y Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Y Y Y Dollar Dollar Dollar Dollar

Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek Standard 5 Day Workweek 7-Day Workweek Standard Standard Standard Standard Standard Standard Standard Standard Standard Corporate Standard Full Time Corporate Standard Full Time ACCTS - Cal Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time

N N N N N N N N N N N N N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N N N N N N N N N N N N N

1.5 N N N N N N N 1.5 N 0 0 0 0 0 0 Y Y Y Y Y Y Y 0 0 0 Y Y Y Y 0 0 Y Y

Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar Y Dollar

0 0 0

Y Y Y

Y Dollar Y Dollar Y Dollar

Corporate Standard Full Time Corporate Standard Full Time Corporate Standard Full Time Standard 5 Day Workweek w/ Basic Holidays

N N N

N N N

Y Dollar

ROLES
Internal ID (Read-Only)

Role (Read_only)

Parent Role ID

Role ID

504 506 508 365 366 367 368 390 465 452 467 400 486 496 402 338 342 403 349 340 341 350 351 352 370 373 374 405 354 404 356 339 357 392 393 399 394 500 398

1 1.PS 1.PS.CON Engr Engr.SE Engr.EE Engr.ME PM PM.TM PM.QAM PM.PPDC Construction Construction.Trade Construction.Trade.Carpen try Construction.Manage Sub Sub.Site Sub.Found Sub.Conc Sub.Mason Sub.Struct Sub.Rough Sub.Mill Sub.Doors Sub.CW Sub.DW Sub.Floor Sub.Part Sub.Access Sub.Plumb Sub.Fire Sub.HVAC Sub.Elec Supt Foreman EOper Labor QAM Controls

1 1.PS Engr Engr Engr PM PM PM Construction Construction.Trade Construction Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub

1 PS CON Engr SE EE ME PM TM QAM PPDC Construction Trade Carpentry Manage Sub Site Found Conc Mason Struct Rough Mill Doors CW DW Floor Part Access Plumb Fire HVAC Elec Supt Foreman EOper Labor QAM Controls

395 396 397 336 332 401 333 391 503 444 501 505 507 509 510 514 513 512 511 502

Clerical/Admin Engineer Inspector Trades Corp Corp.IT Corp.Accounting Corp.PE BA IMC SD SD.WEB SD.WEB.JAVA SD.WEB.JAVA.JR SD.WEB.JAVA.SN SD.WEB.ASP SD.MF SD.CS INT IMP

Corp Corp Corp

SD SD.WEB SD.WEB.JAVA SD.WEB.JAVA SD.WEB SD SD

Clerical/Admin Engineer Inspector Trades Corp IT Accounting PE BA IMC SD WEB JAVA JR SN ASP MF CS INT IMP

Role Name

Delete?

Roles Heirarchy Services Department Consultant Engineer Structural Engineer Electrical Engineer Mechanical Engineer Project Manager Training Manager Quality Assurance Manager Project Problem / Defect Controller Construction Trades Carpentry Management Subcontrator Sitework Foundation Concrete Masonry Structural Steel Rough Carpentry Millwork Doors and Windows Curtain walls Dry Wallboard Flooring Partitions Accessories Plumbing Fire Protection HVAC Electrical Superintendant Foreman Equipment Operator Labor Quality Assurance Manager Project Controls

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Admin/Clerical Engineers Inspectors Trades Corporate Roles IT Accounting Project Executive Business Analyst Integrated Management Concepts Software Developer Web Developer Java Programmer Junior Java Programmer Senoir Java Programmer ASP Developer Mainframe Developer Client / Server Developer Integration Specialist Implementation Consultant

N N N N N N N N N N N N N N N N N N N N

OBS
Internal ID (Read-Only)

565 630 604 622 615 640 616 603 612 613 617 636 610 637 606 641 643 647 646 642 644 645

Innovative GC
0 Engineering/ Construction 0 Facilities 1 Health Care 2 Education 0 School Projects 4 Commercial 1 Infrastructure 0 Transportation 1 Water / Waste 2 Industrial 0 Automtive 1 101 Manufacturing 400 Corporate Services 300 Construction - Tim Evans 6 Andy Mason 0 Tom Mills 1 Linda Haris 506 Meg Foley 1006 Joe Nolan 1106 Therese Swan

Order

Delete?
N N N N N N N N N N N N N N N N N N N N N

RESOURCE CODES
Internal ID (Read-Only)

Code Parent Code ID (Read-Only)

Resource Code Value

Max Length Order

DELETE ?

Code Description

PROJECT CODES
Internal ID (Read-Only)

73 238 235 237 272 270 274 236 271 273

Code

Contract Type
GC GMP CPFF CMR AIA CONS DB EJCDC SUB General Contracting Guaranteed Maximum Price Cost Plus Fixed Fee CM at Risk Architect/Design Consulting Design-Build EJCDC Contract Subcontractor

93 315 316

Code

Division
Eng Ops Engineering Operations

18 188 198 230 204 229 223 207 226 220 222 191 201 215 211 213 192 221 224 205 199 208 189

Code

Division/Office
AMER AUG CHNR CLT DUB EUR IND LON MEX MON NER PHL PHX SEA ANC MAR TOR AFR ATL BOS CHI EAME Americas Division Augusta, ME Office China Region Charlotte, NC Office Dubai, UAE Office European Region Indianapolis, IN Office London, UK Office Mexico City, Mexico Office Montreal, Canada Office Northeast Region Philadelphia, PA Office Pheonix, AZ Office Seattle, WA Office Ancorage, AK Office Mid-Atlantic Region Toronto, Canada Office African Region Atlanta, GA Office Boston, MA Chicago, IL Office Europe/Africa/Middle East Division

Description

Code Value

231 216 227 218 193 212 202 190 194 214 209 228 225 206 200 203 217 210 195 196 197 219

JPNR LAX MUN SDM SER SFO WAS Asia CER DEN HOU MAD MER MIA NYC RCM SDO DET NWR SWR LAR CAN Code

Japan Region Los Angeles, CA Office Munich, Germany Office San Juan, PR Office Southeast Region San Francisco, CA Office Washington D.C. Office Asia Division Central Region Denver, CO Office Houston, TX Office Madrid, Spain Office Middle East Region Miami, FL Office New York, NY Richmond, VA Office San Diego, CA Office Detroit, MI Office Northwest Region Southwest Region Latin American Region Canada Region

95 310 311

Industry
Ind Infras Industrial Infrastructure

65 144 145 146 276 260 261 262 263 265 266 267 268

Code

Project Manager
GANNON GREEN MOYER AIZA EPSTEIN SMITH LOUSER LUKE SHERIDAN CARROLL BISHOP TEJADA LISA GANNON JIM GREEN JOHN MOYER NURE AIZA HARRY EPSTEIN JOHN SMITH DON LEWIS PETER LUKE JOHN SHERIDAN CHRIS CARROLL HUETT BISHOP ANGEL TEJADA

90 301 302 286 303 305

Code

Project Region
E W US NE SE East West United States Northeast SouthEast

86

Code

Win Confidence

277 278 279 280 281 282 283

10% 30% 50% 70% 90% 99% 100%

Have Relationship With Owner Commitment From Owner To Receive RFP RFP Accepted and Made Shortlist Invited To Contract Negotiation Contract Pending Signatures All Contracts Signed Live Project

Max Length

7
0 100 200 300 400 500 600 700 800

5
0 100

5
0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 100 100 100 100 100

DELETE ?

Order

N
N N N N N N N N N

N
N N

N
N N N N N N N N N N N N N N N N N N N N N N

100 100 100 100 100 100 100 200 200 200 200 200 200 200 200 200 200 300 300 400 500 600

N N N N N N N N N N N N N N N N N N N N N N

10
200 500

N
N N

10
255 255 255 256 355 455 555 655 855 955 1055 1155

N
N N N N N N N N N N N N

10
101 201 255 501 601

N
N N N N N

0 100 200 300 400 500 600

N N N N N N N

ACTIVITY CODES
Internal ID (Read-Only)

Global / Project

7300

PROJECT EPS

(New Activity Code) Contractors


SELF STDPAV BIGC BRINK BUTTON DESIGN ELECTR MASON MECH LOTUS STEEL STRESS FREMONT

7175 12083 12084 12085 12086 12087 12077 12078 12079 12082 12080 12081 12075 12076

305 4712 4713 4714 4715 4716 4717 4718 4719 4720 4721 4722 4723 4724

EPS

Contractor
SELF STDPAV BIGC BRINK BUTTON DESIGN ELECTR MASON MECH LOTUS STEEL STRESS FREMONT

7160 11943 11944 11946 11945 11984

GLOBAL

Department
ENG PCH CON ISD MGT

Code Value

7243 12661 12662 12663 12664

GLOBAL

IPT Leader
ZEKE SACCULL CONANT CURINA

7109 11722

GLOBAL

NOTES
Yes

7240 12655 12656

GLOBAL

PRIORITY-LVL
a b

7161 11947 11948 11949 11950 11951 11952 11953 11954 11955 11956

GLOBAL

Phase
DESGN PROCR SYST1 SYST2 INSTL FOUND STRUC ROUGH CLOSE FINSH

7162 11969 11968 11972 11971 11970 11964 11963 11962 11967 11966 11965 11959 11958 11957 11961 11960

GLOBAL

Resp. Discipline
PMGT PROT SYST INTR STRT CIVL ELEC ARCH PROC HVAC MECH ESTM CNTR ALL INST PROD

7163 11976 11980 11981

GLOBAL

Responsibility
RS MF JN

11982 11983 11985 11979 11973 11974 11975 11977 11978

LH TE AM KL AW GG PR JM JAM

Code Description

Max Length

7 7
Self Paving Contractors Concrete Contractors Brink Contractors Paint & Paper Contractors The Design Group Electrical Contractors Mason Contractors Mechanical Contractors Elevator Contractors Steel Contractors Stresson Industrials Plumbing Contractors 0 1 2 3 4 5 6 7 8 9 10 11 12

7
Self Standard Paving Big Concrete Brink Contractors Button Paint & Paper The Design Group Electrical Contractors ACE Mason Contractors Mechanical Contractors Lotus Elevator Tri-State Steel Stresson Industrials Fremont Plumbing 0 1 2 3 4 5 6 7 8 9 10 11 12

3
Engineering Department Purchasing Department Construction Department Information Systems Department Management 0 1 100 200 300

Order

7
ZEKE SACULLO CONANT CURINA 0 3 5 6

10
See Note attached 0

2
3 2 2450 2550

5
Design and Engineering Phase Procurement Phase System Integration Phase I System Integration Phase II Installation Phase Foundation Construction Phase Structural Phase Rough-In Phase Close-In Phase Finishes and Closeout Phase 0 100 200 300 400 500 600 700 800 900

4
Project Management Prototyping Systems Engineering Interior Systems Structural Engineering Civil Engineering Electrical Engineering Architectural Process Engnieering HVAC Engineering Mechanical Engineering Estimating Contracts All Disciplines Instrumentation Engineering Production Management 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

3
Richard Stevens - Site Project Manager Meg Foley Joe Nolan 10 11 12

Linda Haris Tim Evans Andy Mason Ken Lang - Design Team Alice White - Purchasing George Green - Sitework Crew Foreman Pete Reynolds - Electrical Crew Foreman Joe Martin - Structural Crew Foreman Joyce A. Miller - Paving Crew Foreman

14 15 16 17 20 30 40 50 60

Parent Code ID

DELETE ?

N N
N N N N N N N N N N N N N

N
N N N N N N N N N N N N N

N
N N N N N

N
N N N N

N
N

N
N N

N
N N N N N N N N N N

N
N N N N N N N N N N N N N N N N

N
N N N

N N N N N N N N N

CALENDARS
Internal ID (Read-Only)

Default?

Calendar Name

593 597 644 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687

Calendar 1 Standard 5 Day Workweek Standard 24/7 Workweek Schedule (non-labor) MACHINEB - Cal MACHINEA - Cal ME* - Cal ME1MARKH - Cal ME1GREGV - Cal IE1CALB - Cal IE1BRETS - Cal IE2KARLN - Cal IE2PETEL - Cal IE2PAULK - Cal ME2DEBO - Cal ST* - Cal PRINTCST - Cal ST1LISAH - Cal ST2JENM - Cal ST2GREGM - Cal PEXEC - Cal PE3 - Cal PM* - Cal PM1SUEW - Cal PM1BOBP - Cal IE* - Cal CT1KELLY - Cal CT* - Cal CT2FRANK - Cal CV1KERIB - Cal CV* - Cal AR1* - Cal AR* - Cal AR1BUDW - Cal AR2JIMG - Cal AR1LORIW - Cal CV1TEDM - Cal EE2GLENB - Cal EE2BILLS - Cal GENCNTR - Cal HV2KATYD - Cal

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Project Global Global Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource Resource

Project

Type

688 689 690 691 692 693 696 700 717 720 721 732 733 735 736 737 738 739 740 782 794 796 826 827 829 830 831 832 833 835 838 841 842 843 844 845

HV1TEDG - Cal CV2WILLS - Cal CV2MIKEH - Cal EE* - Cal EE1BOBN - Cal EE1BARBW - Cal WIRING - Cal LUMPSUM - Cal ACCTS - Cal Standard 5 Day Workweek w/ Basic Holidays 5 Day 24 hour Milestones only EM11 - 4 - 7 DAYS EM11 - 5 - Unit 10 Treaters EM11 - 1 - 4 DAYS EM11 - 2 - 5 DAYS BRD - Cal CBI - Cal AIE - Cal BLS - Cal School District 5 Day 7-Day Workweek Office Building Addition Calendar 1 7 x 24hr. Days Frank Lee 13h/d TE M BA TS ME Standard Corporate - Standard Full Time GN17 - 1 APEX - Global APEX - 1 - Standard 5-day PAINT - Cal

N N N N N N N N N Y N N N N N N N N N N N N N N N N N N N N N N N N N N

Resource Resource Resource Resource Resource Resource Resource Resource Resource Global Global Global Global Global Global Resource Resource Resource Resource Global Global Project Global Resource Global Resource Resource Resource Resource Resource Global Global Global Global Global Resource

Bldg

DELETE ?
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

RESOURCE SHIFTS (cannot add or delete shifts or shift periods)


Internal ID (Read-Only) Shift # (Read-Only)

Shift Name

Start Hour

Duration(Hrs) (Read-Only)

shift periods)

COST ACCOUNTS
Internal ID (Read-Only)

Cost Account (Read_only)

Parent Account ID

743 747 749 753 744 745 746 748 750 756 751 755 757 759 758 752 754 760 762 764 761 763 1152 1167 1166 800 816 847 817 815 846 855 854 813 849 831 814 826 832 818

PRJ PRJ.DESN PRJ.DESN.6 PRJ.DESN.6.31 PRJ.DOCM PRJ.DOCM.11 Con Con.11 Con.11.1 Con.11.1.01 Con.11.2 Con.11.2.11 Con.11.2.13 Con.11.2.23 Con.11.2.31 Con.11.4 Con.11.4.15 Con.13 Con.13.1 Con.13.1.06 Con.13.4 Con.13.4.36 A 101 201 HWY1 HWY1.010100 HWY1.010100.G HWY1.010??? HWY1.015300 HWY1.015300.G HWY1.015300.L HWY1.015300.E HWY1.015500 HWY1.015500.L HWY1.015500.E HWY1.015800 HWY1.015800.L HWY1.015800.E HWY1.021100

PRJ PRJ.DESN PRJ.DESN.6 PRJ PRJ.DOCM Con Con.11 Con.11.1 Con.11 Con.11.2 Con.11.2 Con.11.2 Con.11.2 Con.11 Con.11.4 Con Con.13 Con.13.1 Con.13 Con.13.4

HWY1 HWY1.010100 HWY1 HWY1 HWY1.015300 HWY1.015300 HWY1.015300 HWY1 HWY1.015500 HWY1.015500 HWY1 HWY1.015800 HWY1.015800 HWY1

845 848 822 840 839 823 838 837 821 819 857 856 820 824 827 812 804 851 850 853 805 852 829 828 803 801 830 825 802 842 806 810 841 844 843 811 809 834 835 807 833 836 808 1083 1084 1112 1085 1118 1086 1114

HWY1.021100.E HWY1.021100.L HWY1.021200 HWY1.021200.L HWY1.021200.E HWY1.021600 HWY1.021600.L HWY1.021600.E HWY1.021??? HWY1.022250 HWY1.022250.L HWY1.022250.E HWY1.022270 HWY1.022270.L HWY1.022270.M HWY1.022??? HWY1.025100 HWY1.025100.E HWY1.025100.L HWY1.025100.M HWY1.025400 HWY1.025400.L HWY1.025400.M HWY1.025400.E HWY1.025??? HWY1.027100 HWY1.027100.L HWY1.027100.E HWY1.028400 HWY1.028400.M HWY1.028??? HWY1.033100 HWY1.033100.L HWY1.033100.E HWY1.033100.M HWY1.033??? HWY1.160100 HWY1.160100.L HWY1.160100.M HWY1.160700 HWY1.160700.L HWY1.160700.E HWY1.160??? APEX APEX.11101 APEX.11101.L APEX.11211 APEX.11211.L APEX.11213 APEX.11213.L

HWY1.021100 HWY1.021100 HWY1 HWY1.021200 HWY1.021200 HWY1 HWY1.021600 HWY1.021600 HWY1 HWY1 HWY1.022250 HWY1.022250 HWY1 HWY1.022270 HWY1.022270 HWY1 HWY1 HWY1.025100 HWY1.025100 HWY1.025100 HWY1 HWY1.025400 HWY1.025400 HWY1.025400 HWY1 HWY1 HWY1.027100 HWY1.027100 HWY1 HWY1.028400 HWY1 HWY1 HWY1.033100 HWY1.033100 HWY1.033100 HWY1 HWY1 HWY1.160100 HWY1.160100 HWY1 HWY1.160700 HWY1.160700 HWY1 APEX APEX.11101 APEX APEX.11211 APEX APEX.11213

1119 1087 1088 1113 1089 1120 1090 1115 1121 1091 1116 1092 1117 1093 1145 1094 1147 1095 1146 1096 1149 1097 1148 1150 1098 1151 1099 1122 1100 1129 1130 1101 1131 1132 1102 1139 1142 1103 1124 1126 1104 1137 1138 1105 1125 1127 1133 1106 1135 1136

APEX.11213.M APEX.11221 APEX.11223 APEX.11223.L APEX.11231 APEX.11231.L APEX.11233 APEX.11233.L APEX.11233.M APEX.11314 APEX.11314.L APEX.11415 APEX.11415.L APEX.12101 APEX.12101.L APEX.12213 APEX.12213.L APEX.12223 APEX.12223.L APEX.12311 APEX.12311.L APEX.12312 APEX.12312.L APEX.12312.M APEX.12325 APEX.12325.L APEX.13106 APEX.13106.L APEX.13206 APEX.13206.L APEX.13206.E APEX.13306 APEX.13306.L APEX.13306.E APEX.13416 APEX.13416.C APEX.13416.L APEX.13426 APEX.13426.L APEX.13426.M APEX.13436 APEX.13436.L APEX.13436.M APEX.13516 APEX.13516.L APEX.13516.M APEX.13516.E APEX.13526 APEX.13526.M APEX.13526.E

APEX.11213 APEX APEX APEX.11223 APEX APEX.11231 APEX APEX.11233 APEX.11233 APEX APEX.11314 APEX APEX.11415 APEX APEX.12101 APEX APEX.12213 APEX APEX.12223 APEX APEX.12311 APEX APEX.12312 APEX.12312 APEX APEX.12325 APEX APEX.13106 APEX APEX.13206 APEX.13206 APEX APEX.13306 APEX.13306 APEX APEX.13416 APEX.13416 APEX APEX.13426 APEX.13426 APEX APEX.13436 APEX.13436 APEX APEX.13516 APEX.13516 APEX.13516 APEX APEX.13526 APEX.13526

1107 1134 1108 1123 1128 1109 1141 1110 1140 1111 1143 1144 765 777 794 778 795 775 792 776 796 781 797 782 798 779 793 799 780 785 774 768 791 790 769 788 766 784 767 786 772 783 773 789 770 787 771 979 1069 1051

APEX.13536 APEX.13536.L APEX.13616 APEX.13616.L APEX.13616.M APEX.13626 APEX.13626.L APEX.13636 APEX.13636.L APEX.13646 APEX.13646.M APEX.13646.L ENGR ENGR.1.0 ENGR.1.0.L ENGR.1.1 ENGR.1.1.L ENGR.1.2 ENGR.1.2.L ENGR.1.3 ENGR.1.3.L ENGR.1.4 ENGR.1.4.L ENGR.1.5 ENGR.1.5.L ENGR.1.6 ENGR.1.6.L ENGR.1.6.M ENGR.1.7 ENGR.1.7.L ENGR.1?? ENGR.2.0 ENGR.2.0.L ENGR.2.0.E ENGR.2.1 ENGR.2.1.L ENGR.2.2 ENGR.2.2.L ENGR.2.3 ENGR.2.3.L ENGR.2.4 ENGR.2.4.L ENGR.2.5 ENGR.2.5.L ENGR.2.6 ENGR.2.6.E ENGR.2?? CA CA.00 CA.01

APEX APEX.13536 APEX APEX.13616 APEX.13616 APEX APEX.13626 APEX APEX.13636 APEX APEX.13646 APEX.13646 ENGR ENGR.1.0 ENGR ENGR.1.1 ENGR ENGR.1.2 ENGR ENGR.1.3 ENGR ENGR.1.4 ENGR ENGR.1.5 ENGR ENGR.1.6 ENGR.1.6 ENGR ENGR.1.7 ENGR ENGR ENGR.2.0 ENGR.2.0 ENGR ENGR.2.1 ENGR ENGR.2.2 ENGR ENGR.2.3 ENGR ENGR.2.4 ENGR ENGR.2.5 ENGR ENGR.2.6 ENGR CA CA

984 1044 985 993 1043 1041 1042 1052 992 986 987 988 989 990 991 983 982 981 1053 994 995 1054 996 997 998 999 1055 1000 1001 1002 1003 1070 1004 1005 1006 1071 1007 1008 1009 1010 1072 1011 1012 1013 1014 1073 1016 1015 1017 1019

CA.01.01100 CA.01.01200 CA.01.01300 CA.01.01400 CA.01.01600 CA.01.01700 CA.01.01800 CA.02 CA.02.02000 CA.02.02050 CA.02.02100 CA.02.02200 CA.02.02220 CA.02.02410 CA.02.02480 CA.02.02500 CA.02.02700 CA.02.02800 CA.03 CA.03.03000 CA.03.03300 CA.04 CA.04.04000 CA.04.04200 CA.04.04210 CA.04.04400 CA.05 CA.05.05120 CA.05.05300 CA.05.05500 CA.05.05700 CA.06 CA.06.06100 CA.06.06200 CA.06.06220 CA.07 CA.07.07200 CA.07.07250 CA.07.07500 CA.07.07510 CA.08 CA.08.08100 CA.08.08350 CA.08.08400 CA.08.08600 CA.09 CA.09.09000 CA.09.09250 CA.09.09300 CA.09.09500

CA.01 CA.01 CA.01 CA.01 CA.01 CA.01 CA.01 CA CA.02 CA.02 CA.02 CA.02 CA.02 CA.02 CA.02 CA.02 CA.02 CA.02 CA CA.03 CA.03 CA CA.04 CA.04 CA.04 CA.04 CA CA.05 CA.05 CA.05 CA.05 CA CA.06 CA.06 CA.06 CA CA.07 CA.07 CA.07 CA.07 CA CA.08 CA.08 CA.08 CA.08 CA CA.09 CA.09 CA.09 CA.09

1020 1021 1074 1022 1023 1075 1024 1025 1026 1076 1027 1028 1077 1029 1078 1030 1031 1079 1032 1033 1034 1080 1035 1036 1018 1037 1081 1038 1039 1082 1040 1153 1157 1156 1163 1158 1162 1161 1159 1160 1154 1155 1168 1164 1170 1169 1165

CA.09.09650 CA.09.09900 CA.10 CA.10.10600 CA.10.10800 CA.11 CA.11.11400 CA.11.11500 CA.11.11700 CA.12 CA.12.12500 CA.12.12600 CA.13 CA.13.13040 CA.14 CA.14.14200 CA.14.14500 CA.15 CA.15.15400 CA.15.15500 CA.15.15600 CA.16 CA.16.16000 CA.16.16500 CA.16.16700 CA.16.16900 CA.17 CA.17.17100 CA.17.17300 CA.20 CA.20.20600 FCC2 FCC2.A FCC2.I FCC2.I.M FCC2.L FCC2.L.M FCC2.L.O FCC2.L.C FCC2.L.P FCC2.M FCC2.R 301 ENG ENG.HW ENG.SW 401

CA.09 CA.09 CA CA.10 CA.10 CA CA.11 CA.11 CA.11 CA CA.12 CA.12 CA CA.13 CA CA.14 CA.14 CA CA.15 CA.15 CA.15 CA CA.16 CA.16 CA.16 CA.16 CA CA.17 CA.17 CA CA.20 FCC2 FCC2 FCC2.I FCC2 FCC2.L FCC2.L FCC2.L FCC2.L FCC2 FCC2

ENG ENG

Cost Account ID

PRJ DESN 6 31 DOCM 11 Con 11 1 1 2 11 13 23 31 4 15 13 1 6 4 36 A 101 201 HWY1 10100 G 010??? 15300 G L E 15500 L E 15800 L E 21100

E L 21200 L E 21600 L E 021??? 22250 L E 22270 L M 022??? 25100 E L M 25400 L M E 025??? 27100 L E 28400 M 028??? 33100 L E M 033??? 160100 L M 160700 L E 160??? APEX 11101 L 11211 L 11213 L

M 11221 11223 L 11231 L 11233 L M 11314 L 11415 L 12101 L 12213 L 12223 L 12311 L 12312 L M 12325 L 13106 L 13206 L E 13306 L E 13416 C L 13426 L M 13436 L M 13516 L M E 13526 M E

13536 L 13616 L M 13626 L 13636 L 13646 M L ENGR 1 L 1.1 L 1.2 L 1.3 L 1.4 L 1.5 L 1.6 L M 1.7 L 1?? 2 L E 2.1 L 2.2 L 2.3 L 2.4 L 2.5 L 2.6 E 2?? CA 0 1

1100 1200 1300 1400 1600 1700 1800 2 2000 2050 2100 2200 2220 2410 2480 2500 2700 2800 3 3000 3300 4 4000 4200 4210 4400 5 5120 5300 5500 5700 6 6100 6200 6220 7 7200 7250 7500 7510 8 8100 8350 8400 8600 9 9000 9250 9300 9500

9650 9900 10 10600 10800 11 11400 11500 11700 12 12500 12600 13 13040 14 14200 14500 15 15400 15500 15600 16 16000 16500 16700 16900 17 17100 17300 20 20600 FCC2 A I M L M O C P M R 301 ENG HW SW 401

Cost Account Name

Delete?

Project Costing Design Design Development System Controller Design Documentation Operation Manuals Construction Division Automated System Engineering Automation System Design Hardware Temperature Control Equipment - Design Temperature Control Equipment - Install Robot Controller - Install System Controller - Design Training Automation System Training & Manuals Office Building Addition Engineering Building Addition Design Mechanical/Electrical Systems Plumbing/Piping/Electrical (New Account) Mechanical Engineering Finance HWY1 General Field Conditions General Field Conditions - Category G General Conditions Construction Facilities & Temp. Controls Construction Facilities & Temp. Controls - Category G Construction Facilities & Temp. Controls - Category L Construction Facilities & Temp. Controls - Category E Access Roads Access Roads - Category L Access Roads - Category E Signs Signs - Category L Signs - Category E Site Clearing

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Site Clearing - Category E Site Clearing - Category L Site Removals Site Removals - Category L Site Removals - Category E Underpinning Underpinning - Category L Underpinning - Category E Site Preparation Excavation & Backfill Excavation & Backfill - Category L Excavation & Backfill - Category E Erosion Control Erosion Control - Category L Erosion Control - Category M Earthwork Asphaltic Concrete Pavement Asphaltic Concrete Pavement - Category E Asphaltic Concrete Pavement - Category L Asphaltic Concrete Pavement - Category M Pavement Surfacing Pavement Surfacing - Category L Pavement Surfacing - Category M Pavement Surfacing - Category E Paving and Surfacing Subdrainage Systems Subdrainage Systems - Category L Subdrainage Systems - Category E Site Improvements - Road Appurtenances Site Improvements - Road Appurtenances - Category M Site Improvements Structural Concrete Structural Concrete - Category L Structural Concrete - Category E Structural Concrete - Category M Cast-in-place Concrete Electric Conductors Electric Conductors - Category L Electric Conductors - Category M Underground Utilities Underground Utilities - Category L Underground Utilities - Category E Electrical APEX Automation System Design Automation System Design - Category L Temperature Control Equipment-Design Temperature Control Equipment-Design - Category L Temperature Control Equipment-Install Temperature Control Equipment-Install - Category L

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Temperature Control Equipment-Install - Category M Robot Controller-Design Robot Controller-Install Robot Controller-Install - Category L System Controller-Design System Controller-Design - Category L System Controller-Install System Controller-Install - Category L System Controller-Install - Category M Software Processor Software Processor - Category L Automation System Training & Manuals Automation System Training & Manuals - Category L Conveyor System Design Conveyor System Design - Category L Conveyor System Installation Conveyor System Installation - Category L Conveyor System Testing Conveyor System Testing - Category L Conveyors-Design Conveyors-Design - Category L Conveyors Conveyors - Category L Conveyors - Category M Conveyor System Operation Manuals Conveyor System Operation Manuals - Category L Building Addition Design Building Addition Design - Category L Foundation & Site Woek (Civil) Foundation & Site Woek (Civil) - Category L Foundation & Site Woek (Civil) - Category E Building Structure Building Structure - Category L Building Structure - Category E Elevator Elevator - Category C Elevator - Category L HVAC HVAC - Category L HVAC - Category M Plumbing/Piping/Electrical Plumbing/Piping/Electrical - Category L Plumbing/Piping/Electrical - Category M Brick Brick - Category L Brick - Category M Brick - Category E Roof Roof - Category M Roof - Category E

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Doors/Windows Doors/Windows - Category L Floors/Carpeting Floors/Carpeting - Category L Floors/Carpeting - Category M Plumbing and Lighting Fixtures Plumbing and Lighting Fixtures - Category L Carpentry Carpentry - Category L Painting Painting - Category M Painting - Category L ENGR Pre-Proposal Selections/Negotiations Pre-Proposal Selections/Negotiations - Category L Proposal Proposal - Category L Pre-Design Services Pre-Design Services - Category L Site Analysis Site Analysis - Category L Schematic Design Schematic Design - Category L Design Development Design Development - Category L Construction Documents Construction Documents - Category L Construction Documents - Category M Post Contract Award Services Post Contract Award Services - Category L Engineering Costs General Installation General Installation - Category L General Installation - Category E Architectural Architectural - Category L Structural Structural - Category L Electrical Electrical - Category L Mechanical Mechanical - Category L Process Process - Category L Equipment Equipment - Category E Installation Costs Cost Accounts Management Indirect Cost

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Temp Facilities Hoists Temp Utilities Cleaning General Expense Staff Fringes, Taxes, Ins, Bonds Sitework General Sitework Demolition Site Prep Earthwork Excavation Storm Sewers Landscaping Paving Piped Utilities Power and Comm Utils Concrete General Concrete Cast-In-Place Concrete Masonry Masonry Unit Masonry Brick Masonry Stone Metals Structural Steel Metal Decking Misc Metal Ornamental Metal Oranamental Metals Rough Carpentry Finish Carpentry Millwork Thermal & Moisture Protection Insulation Spray on Fireproofing Roofing and Slate siding Built up Bituminous Roofing Doors & Windows Metal Doors and Frames Folding Doors Entrances and Stores Wood and Plastic Windows Finishes General Finishes Gypsum Wallboard Ceramic Tile Accoutic Ceilings

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Resiliient FLooring Painting Specialties Partitions Toilet and Bath Accessories Equipment Food Service Equipment Industrial and Process Equipment Medical Equipment Furnishings Window Treatments Furniture and Accessories Special Construction Cleanrooms Conveying Systems Elevators Material Handling Systems Plumbing General Plumbing Fire Protection HVAC Electrical General Electrical Lighting Communications Controls Building Managment Systems Environmental Security Systems Miscellaneous Architectural FCC2 Added Work Budget Indirect Labor Indirect Labor - Category M Direct Field Labor Direct Field Labor - Category M Direct Field Labor - Category O Direct Field Labor - Category C Direct Field Labor - Category P Material Charges Rentals Technical Support Engineering Hardware Software Marketing

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Internal ID (Read-Only)

Resource ID

RESOURCE RATES
Description Shift Number Effective Date Max Units/Time Price/Unit Price/Unit2 Price/Unit3 Price/Unit4

Price/Unit5 DELETE

FUNDING SOURCES
Internal ID (Read-Only)

Funding Source Name

Parent Funding Source

21 22 23 24 25

Apex School Construction Authority City Schools Board IT Budget Arts Budget

City Schools Board City Schools Board

Delete?

N N N N N

RESOURCE CURVES (cannot add new curves or modify default ones)


Internal ID (Read-Only)

Resource Curve Name

Default / Global

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

Back Loaded Bell Shaped Front Loaded Linear Offset Triangular Three Step Trapezoidal Triangular Triangular Decrease Triangular Increase Double Peak Early Peak ENGR - TRIANGULAR ENGR - TRIANGULAR INCREASE ENGR - TRIANGULAR DECREASE ENGR - BACK LOADED ENGR - FRONT LOADED ENGR - TRAPEZOIDAL ENGR - BELL SHAPED ENGR - THREE STEP ENGR - OFFSET TRIANGULAR HWY1 - LINEAR HWY1 - TRIANGULAR HWY1 - TRIANGULAR INCREASE HWY1 - TRIANGULAR DECREASE HWY1 - BACK LOADED HWY1 - FRONT LOADED HWY1 - TRAPEZOIDAL HWY1 - BELL SHAPED HWY1 - THREE STEP HWY1 - OFFSET TRIANGULAR DEMO - Linear DEMO - Triangular DEMO - Triangular Increase DEMO - Triangular Decrease DEMO - Back Loaded DEMO - Front Loaded DEMO - Trapezoidal

Default Default Default Default Default Default Default Default Default Default Default Default Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global

48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

DEMO - Bell Shape DEMO - Three Step Concave ENGR - LINEAR APEX - LINEAR APEX - TRIANGULAR APEX - TRIANGULAR INCREASE APEX - TRIANGULAR DECREASE APEX - BACK LOADED APEX - FRONT LOADED APEX - TRAPEZOIDAL APEX - BELL SHAPED APEX - THREE STEP APEX - OFFSET TRIANGULAR EM11 - Linear At Start At Finish

Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global Global

ew curves or modify default ones)

Curve Pct (Read-Only)

Delete?

0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 0 0.5 0.5 1.5 1.5 4 4 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4 4 1.5 1.5 0.5 0.5 0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 055555555555555555555 0 1 1 2.5 2.5 3.5 3.5 5 5 6.5 6.5 7.5 7.5 8.5 8.5 7 7 5 5 3.5 3.5 0 4 4 4 4 4 4 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4 4 4 4 4 4 0 1 1 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1 1 011335577999977553311 0 9 9 8.5 8.5 7 7 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3 3 1.5 1.5 1 1 0 1 1 1.5 1.5 3 3 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7 7 8.5 8.5 9 9 0.0 1.3 2.5 3.8 5.1 7.6 10.1 7.6 5.1 3.8 2.5 2.5 2.5 3.8 5.1 7.6 10.1 7.6 5.1 3.8 2.5 0.0 1.2 2.5 3.8 5.0 7.5 10.1 10.1 10.1 8.8 7.5 6.3 5.0 5.0 5.0 3.8 2.5 2.0 1.5 1.3 1.0 011335577999977553311 0 1 1 1.5 1.5 3 3 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7 7 8.5 8.5 9 9 0.0 9.0 9.0 8.5 8.5 7.0 7.0 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3.0 3.0 1.5 1.5 1.0 1.0 0.0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 0.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0.0 1.0 1.0 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1.0 1.0 0.0 0.5 0.5 1.5 1.5 4.0 4.0 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4.0 4.0 1.5 1.5 0.5 0.5 0.0 4.0 4.0 4.0 4.0 4.0 4.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4.0 4.0 4.0 4.0 4.0 4.0 0.0 1.0 1.0 2.5 2.5 3.5 3.5 5.0 5.0 6.5 6.5 7.5 7.5 8.5 8.5 7.0 7.0 5.0 5.0 3.5 3.5 0.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 0.0 1.0 1.0 3.0 3.0 5.0 5.0 7.0 7.0 9.0 9.0 9.0 9.0 7.0 7.0 5.0 5.0 3.0 3.0 1.0 1.0 0.0 1.0 1.0 1.5 1.5 3.0 3.0 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7.0 7.0 8.5 8.5 9.0 9.0 0 9 9 8.5 8.5 7 7 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3 3 1.5 1.5 1 1 0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0.0 1.0 1.0 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1.0 1.0 0.0 0.5 0.5 1.5 1.5 4.0 4.0 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4.0 4.0 1.5 1.5 0.5 0.5 0.0 4.0 4.0 4.0 4.0 4.0 4.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4.0 4.0 4.0 4.0 4.0 4.0 0.0 1.0 1.0 2.5 2.5 3.5 3.5 5.0 5.0 6.5 6.5 7.5 7.5 8.5 8.5 7.0 7.0 5.0 5.0 3.5 3.5 0.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 0.0 1.0 1.0 3.0 3.0 5.0 5.0 7.0 7.0 9.0 9.0 9.0 9.0 7.0 7.0 5.0 5.0 3.0 3.0 1.0 1.0 0.0 1.0 1.0 1.5 1.5 3.0 3.0 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7.0 7.0 8.5 8.5 9.0 9.0 0.0 9.0 9.0 8.5 8.5 7.0 7.0 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3.0 3.0 1.5 1.5 1.0 1.0 0.0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 0.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0.0 1.0 1.0 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1.0 1.0

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

0.0 0.5 0.5 1.5 1.5 4.0 4.0 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4.0 4.0 1.5 1.5 0.5 0.5 0.0 4.0 4.0 4.0 4.0 4.0 4.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4.0 4.0 4.0 4.0 4.0 4.0 0 10.4 11.2 11.2 11.2 0 0 0 0 0 0 0 0 0 0 0 11.2 11.2 11.2 11.2 11.2 0.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 055555555555555555555 011335577999977553311 0 1 1 1.5 1.5 3 3 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7 7 8.5 8.5 9 9 0 9 9 8.5 8.5 7 7 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3 3 1.5 1.5 1 1 0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0 1 1 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1 1 0 0.5 0.5 1.5 1.5 4 4 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4 4 1.5 1.5 0.5 0.5 0 4 4 4 4 4 4 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4 4 4 4 4 4 0 1 1 2.5 2.5 3.5 3.5 5 5 6.5 6.5 7.5 7.5 8.5 8.5 7 7 5 5 3.5 3.5 055555555555555555555 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100

N N N N N N N N N N N N N N N N N

USERS

Internal ID (Read-Only)

Login Name

Personal Name

Office Phone

Email Address

25 83 87 88

admin Bruce Jeff Chuck

Adminstrator Bruce (V.P. of Construction) Jeff (Project Manager) Chuck (Scheduling Manager)

310 555 5555

bruce@gs.com

<Admin Superuser> End User End User End User

Global Profile Resource ID

Y Y Y Y Y Y Y Y N N N N

Project Management Team Member Progress Reporter Web Access Portfolios Web Access Projects Web Access Resources Integration API Web Services DELETE ?
(Read-Only) Module Access:

CURRENCIES (read-only)
Currency Symbol
Internal ID (Read-Only)

1 10 11 13 14 15 16 17 20 21 23 24 25 26 28 29 30

Y N N N N N N N N N N N N N N N N

USD ARS AUST BRL U.K. CAD CNY EUR HKD INR JPY KRW MXN RUB SEK CHF ILS

Dollar Argentine Peso Australian Dollar Brazilian Real British Pound Canadian Dollar Chinese Yuan EURO Hong Kong Dollar Indian Rupee Japanese Yen Korean Won Mexican Peso Russian Rouble Swedish Krona Swiss Franc Israel Shekel

$ $ A$ R$ CA$ Y HK$ Rs K N$ R Sk kr NIS

1 3.077 1.208 2.014 0.685097 1.10573 7.694 0.739088 7.81967 40.67 120.167 924.743 10.7938 25.8085 6.80579 1.21864 3.96384

. . . . . . . . . . . . . . . . .

# Decimal Digits
0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Decimal Symbol

Currency Name

Exchange Rate

Currency ID

Base?

Digit Group Symbol

Pos Currency Format

, , , , , , , , , , , , , , , , ,

#1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1 #1.1

(#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1) (#1.1)

Neg Currency Format

BASELINE TYPES
Internal ID (Read-Only)

Baseline Type

Order

Delete?

104 120 111 105 107 103

Customer Sign-Off Prior Month Update Initial Plan What-if Project Plan Mid-Project Status Management Sign-Off

1 2 9 10510 20510 20511

N N N N N N

EXPENSE CATEGORIES
Internal ID (Read-Only)

Expense Category

Order

Delete?

PROJECT PHASES / WBS CATEGORIES


Internal ID (Read-Only)

Category Value

Order

Delete?

1148 1149 1000 1147 1117 1139 1156 1154 1150 1151 1100 1129 1138 1101 1153 1152 1144 1155 1141 1157

Close-Out Commissioning / Delivery Design and Engineering Installation and Testing Implementation / Deployment Manufacturing / Production Requirements Definition Design Needs Analysis / Requirements Procurement Project Management Project Planning Prototyping Quality Assurance Regulatory / Compliance Scope Definition Shutdown Implementation Startup Deployment

10 110 210 310 410 510 521 540 610 710 810 910 1010 1110 1210 1310 1410 1500 1510 3303

N N N N N N N N N N N N N N N N N N N N

DOCUMENT CATEGORIES
Internal ID (Read-Only)

Document Category

Order

Delete?

DOCUMENT STATUS CODES


Internal ID (Read-Only)

Status Code

Order

Delete?

OVERHEAD CODES
Internal ID (Read-Only)

OH Code

Overhead Description

Order

Delete?

RISK TYPES
Internal ID (Read-Only)

Risk Type

Order

Delete?

NOTEBOOK TOPICS
Internal ID (Read-Only)

Notebook Topic

EPS

Proj

WBS Actv

30 64 69 63 76 59 22 65 32 58 68 47 21 70 71 24 25 20 29 67 28 26 27 50 40 42 19 43 77 44 51 72 1 2 75 74 73 78

Anticipated Problems Basis & Assumptions Caution Change Order Objectives Constraints and Assumptions Corrective Actions Current Status Customer Problem Delay Impacts Description District Issues Estimation Explanation Executive Feedback Justification Lessons Learned P3 Activity Log Info Problems Encountered Progress Photographs Project Manager's Narrative Project Objectives Project Rationale Project Status Recent Highlights Resolution Review Comments Scope Purpose Status Report Team Member Feedback Entry Criteria Vendor Issues WBS Description Core Requirements Verification / Validation Exit Criteria Description-proj

Y N Y Y Y N Y Y N N Y N N Y Y Y Y N Y Y Y Y Y N Y N N Y N Y N Y Y N Y Y Y N

Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y N N Y Y Y Y Y Y Y Y Y Y Y

Y Y Y Y Y Y Y Y N Y N N Y Y Y N Y N Y Y Y N N N Y N Y Y N Y N Y Y Y Y Y Y Y

Y Y Y Y Y Y Y Y Y Y N N Y Y Y N Y Y Y Y N N N N Y Y Y Y Y Y Y Y Y N Y Y Y Y

Order

Delete?

1 101 201 301 400 401 501 601 701 801 901 1001 1101 1201 1202 1301 1401 1501 1601 1701 1801 1901 2001 2101 2201 2301 2401 2501 2600 2601 2701 2800 2801 2901 3200 3300 3600 5401

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

Dictionary.xls - Error Report

You might also like