Dear Sir Greetings Here Is the work schedule for the finishing, in residence: For civil contractor: 1. 2. 3. 4. 5.

Casting the roof of stair Brick kowa over roof Placement of iron jall over roof and back wall Parapet wall over new roof Making design work over mummty

After 20 days: 1. Fixing of all wooden chaukhat in room & toilet 2. Plaster over wall, inside & out side 3. Fixing of electrical board & air conditioner pipe etc For Carpenter: 1. 2. 3. 4. Making all the wooden frame as per drawing attached Making all the shutter of window Making flush door Making ward robe & furniture