SQUEEZE CEMENT

DATA
LENGTH OF CEMENT PLUG (E25) TOP OF PLUG YIELD OF CEMENT; CF/SK Excess cemenet fill factor W eights per foots of cementing string ID of cement strng Volume of water per sack of cement

267 ft 1300 ft 1.18cuft/sk 1.34cuft/cuft 21.00lbs/ft 2.5 inches 5.27gall/sk


119.88 bbls 1295.375264 ft 7.86 bbls 951.69 119.42 bbls

AVERAGE HOLE DIAMETER HOLE DIA


21 in c h es 18 in c h es 19 in c h es 17.5 in c h es 28 in c h es 23 in c h es 19 in c h es

LENGTH
12 ft 26 ft 40 ft 60 ft 55 ft 42 ft 32 ft

VOLUME 5 cu.ft 8 cu.ft 14 cu.ft 18 cu.ft 42 cu.ft 22 cu.ft 11 cu.ft

ANWSERS
CEMENT SLURRY VOLUME DISPLACEMENT DEPTH DISPLACEMENT VOLUME SACKS OF CEMENT; SK VOLUME OF W ATER

PURPOSE: Designs Primary and Squeeze Cementations COMPUTATIONS: 1. Volumes of mix water 2. Sacks of cement 3. Displacements volumes 4. Additive volumes and weight TOTALS AVG. HOLE DIA. 267 ft 120 cu.ft

21 inches