You are on page 1of 37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

ABB Oy

1-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


Contents:

RTU560 Step By Step

1. INTRODUCTION...................................................................................................................................3 2. INSTALLATION....................................................................................................................................4 3. EXCEL IMPORT....................................................................................................................................6 3.1 PRECONDITION................................................................................................................................. 6 3.2 EDIT THE EXCEL FILE....................................................................................................................... 6 3.3 EDIT THE PATTERN FILE................................................................................................................... 8 ...................................................................................................................................................................11 3.4 START EXCEL IMPORT.................................................................................................................... 14 3.5 BUILD RTU FILES........................................................................................................................... 22 4. RTU560 WEB SERVER.......................................................................................................................27 4.1 PRECONDITION............................................................................................................................... 27 4.2 ESTABLISH PPP- CONNECTION........................................................................................................ 27 4.3 START INTERNET EXPLORER WITH ADDRESS HTTP//10.0.10.50........................................................29 4.4 LOAD CONFIG.IOD (I/O DATA)....................................................................................................... 30 4.5 LOAD CONFIG.GCD (GENERAL CONFIGURATION DATA)...................................................................32 4.6 LOAD CONFIG.IOD (TEXTS FROM ARCHIV OR PRINTER)...................................................................34 4.7 RESTART RTU560.......................................................................................................................... 36

ABB Oy

2-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


1. Introduction

RTU560 Step By Step

This brief description does not replace the standard 560RTUtil NT Users Guide and RTU560 Web Servers Users Guide. For details please refer to the manuals mentioned. This description is made to show, how to change or add an item to an existing configuration in the RTU, in case the user has not been working with the tool for a while, or to help a newcomer to get easily started with the 560RTUtil NT. This brief description handles: Installation The description for this installation procedure is complete different from the installation procedure described in the UsersGuide. This way of installation is mainly based on field experience. Excel import This Excel import procedure shows each step that has to be done if a change the RTU configuration is required. The precondition is, that this steps have been carried out before. This is the standard case when the RTU is delivered from the factory with the appropriate configuration files and the customer make changes for example during commissioning. This guide advises you to keep the actual files which are in use in the RTU as backup. If everything goes wrong during Excel-import, you will still have the healthy GCD, IOD and PTX file which can be loaded to the RTU. This steps seem more complicate as they really are. It is a matter of practice. The main goal for Excel import is, if you have a large amaount of I/Os or IDEs. The Excel-import helps to keep track of the parameters used in the RTU. The output of this Excel-import chapter are the RTU-Files. The GCD-, IOD- and the PTX File will be loaded to the CPU with the WEB Server Tool.

ABB Oy

3-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities 2. Installation

RTU560 Step By Step

RTUtil NT is distributed as CD-ROM and is developed for the Windows NT 4.0 operating system. Copy the packed file RTUtilNT_xx_xx_xxx_00.exe into a directory with the release name Wbtr xxx and unpack the file into the same directory. This will create the sub-directory Disk1 with additional subdirectories as shown below. Keep this directory for future use, for example when you have to re-install the RTUtil NT

Double-click Setup.exe in the directory Disk1. The installation Process guides you through the installation process.

ABB Oy

4-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Follow the steps from the installation program and click through the following dialog sheets: 1. Acknowledge welcome page 2. Accept license agreements 3. Select the program path, where the files should be installed

4. Select the program group of RTUtil NT 5. Restart your computer. If you are working with different RTUtil NT releases as in the picture above, create your Release specific directory and name it accordingly. Keep your projects in the appropriate release directories. If upgrade is required to the next higher release, please ask your supplier for support. If you currently are working with release 6 and you need to edit a project made with release 5, just re-install RTUtil NT release 5 over the already existing directory from release 5. This will not affect the project files, but will set registry to keep track of internal paths.

ABB Oy

5-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


3.
3.1

RTU560 Step By Step

Excel import
Precondition RTUtil NT is installed and at least the Pattern and the Excel file(s) exist in the appropriate directory.

The Pattern file contains: Complete Network Tree (Including all links to the Hardware Tree) The Hardware Tree down to RTU560 board level (Without I/O signal definitions and assignments The Excel file(s) contains: Project Signal Tree (Signal names structured according to the project settings of the project pattern) The data objects hardware assignment to RTU I/O points Data object parameters and addresses The Pattern file and the Excel sheet will be merged into the RTU File! 3.2 Edit the Excel file Open directory xls_import under your current release ant open your project directory.

ABB Oy

6-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Make a copy of the ACTIVE xls file, change the date and remove the ACTIVE from the old version to keep track of history.

Open the Excel file and select the sheet in question.

For example change input range from 20 mA to 5 mA.

Save the changes and close the file.

ABB Oy

7-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


3.3 Edit the Pattern file

RTU560 Step By Step

Open directory pattern under your current release and open your project directory.

Make a copy of the ACTIVE TU file, change the date and remove the ACTIVE from the old version to keep track of history.

ABB Oy

8-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Start RTUtil from your work-directory or create a shortcut on your desktop or.

Start RTUtil via Windows Start / Programs / RTUtil NT/ RTUtil NT

ABB Oy

9-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

RTUtil NT workspace offers to setup a new project. As we are editing an already existing Project press Cancel!

Select Open (existing pattern)

ABB Oy

10-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


RTUtil NT offers you as default the project directory. Go one level higher by pressing this button

RTU560 Step By Step


Now select the pattern directory.

In the pattern directory select your project directory

Now select your ACTIVE pattern file and select Open

Your project specific pattern file with View Network Tree is now open.

ABB Oy

11-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Check that your pattern file does not contain any signals in the View Signal Tree.

Check that your pattern file does not contain any signals in the View Signal Tree.

ABB Oy

12-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Check so that your pattern file does not contain any signals in the View Hardware Tree.

Note: If there are already any signals in the View Signal Tree or in the View Hardware Tree They must be deleted, otherwise due to additive import will signals will be doubled, and will cause an error message for each duplicated signals during RTU file generation.

ABB Oy

13-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities 3.4 Start Excel Import


From the menu Extra select Excel Import.

RTU560 Step By Step

As the pattern file is already open, RTUtil NT suggests the open file as pattern file. Accept with Next.

ABB Oy

14-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Accept your RTU RHK. (In standard projects is normally only one RTU available. Accept with Next.

Now select the Excel file that belongs to this project. Select Browse..

ABB Oy

15-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


Select your project directory!

RTU560 Step By Step


Select the ACTIVE Excel file of the project to be imported and continue with Select

Check that path and filename of the excel file is correct! Then select next!

ABB Oy

16-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Now as the Excel file is selected, you have to define the sheet(s) within the excel file to be imported. (The sheet for an IEC 870-5-103 Sub-Dev.Line is currently not used in this example. Otherwise this sheet would have to be selected too.) With the > or < button one single file is selected or deselected. With the >> or << button all existing files are selected or deselected. Select the Local IO sheet.

Continue with Next!

ABB Oy

17-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Before the actual import RTUtil NT shows the selected files involved in the import procedure. Scroll the window if necessary. Continue with Start!

The Excel file is automatically opened for the import procedure. A log file with the extension log and an error file with the extension err are generated during this phase. If warnings or errors appear during this phase, the cells in the Excel file will be marked yellow for warnings and red for errors.

ABB Oy

18-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Import has finished with 0 error(s) and 0 warning(s). The RTU file contains now the imported signals and must be saved. Continue with Browse to check the file name and directory to place the file.

Select your project directory!

For the first time, the directory is empty. Continue with Select. The RTU file will have the same name as the pattern file, but stored under the proj directory.

ABB Oy

19-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Check that the path and filename of the project file is correct! Then select Finish!

Check that your project file does contain the imported signals in the View Signal Tree.

ABB Oy

20-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Check that your project file does contain the imported signals in the View Hardware Tree.

ABB Oy

21-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities 3.5 Build RTU files


Select Project and then Build RTU Files

RTU560 Step By Step

Accept your RTU RHK. (In standard projects is normally only one RTU available. Default name for the RTU file: RTU name.iod. Continue with Browse!

ABB Oy

22-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


Select your project directory!

RTU560 Step By Step


Name the RTU file for example RTU name & build date This name can be seen on the CPU after down loading. Continue with Select!

Check that the path and filename of the RTU file is correct! Continue with Next!

ABB Oy

23-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

RTUtil NT prompts for Plausibility Check. Continue with Plausibility

Ensure there are no Errors, Warnings or Informations. This requires that the RTU configuration is build in a way that no plausibility messages is generated. Continue with Generate File!

During RTU File generation a DOS window can be noticed.

ABB Oy

24-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Finally RTUtil NT reports RTU files are generated Continue with OK. The window will close.

ABB Oy

25-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


Close the session with File and Exit.

RTU560 Step By Step

Check the generated files in the directory rtufile

ABB Oy

26-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


4.
4.1

RTU560 Step By Step

RTU560 Web Server


Precondition Refer to manual Users Guide to RTU560 Web Server Installation and Configuration Release Chapter: PPP Installation and RAS Configuration Chapter: Establish PPP-Connection

4.2

Establish PPP- Connection Establish PPP-Connection. Continue with Dial No passwort is required. Continue with OK.

Connection is establishing..

Connected to: PPP Line speed: 38 400 bps

Field is flashing due to active link.

ABB Oy

27-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

ABB Oy

28-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


4.3 Start Internet Explorer with address http//10.0.10.50

RTU560 Step By Step

You will get the basic picture with the menu list on the left hand side. Choose Configuration.

Enter User Name and Password and accept with OK.

ABB Oy

29-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


4.4 Load config.iod (I/O Data)

RTU560 Step By Step

Load the basic Configuration files to the RTU window appears. Continue with Browse.

Browse for the config.iod file in your project rtufile directory and select Open.

ABB Oy

30-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities

RTU560 Step By Step

Check for correct selected file. And continue with Load RTU.

Uploading takes from aprox. 1 to 5 minutes depending of the size of configuration.

ABB Oy

31-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


File succsessfully transferred! Continue with Configuration

RTU560 Step By Step

4.5

Load config.gcd (General Configuration Data) Browse for the config.gcd file in your project rtufile directory and select Open.

ABB Oy

32-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


Check for correct selected file. And continue with Load RTU.

RTU560 Step By Step

Uploading takes only a few seconds depending of the size of configuration.

ABB Oy

33-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


File succsessfully transferred! Continue with Configuration.

RTU560 Step By Step

4.6

Load config.iod (Texts from Archiv or Printer) Browse for the config.ptx file in your project rtufile directory and select Open.

ABB Oy

34-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


Check for correct selected file. And continue with Load RTU.

RTU560 Step By Step

Uploading takes only a few seconds depending of the size of configuration.

ABB Oy

35-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


File succsessfully transferred! Continue with Configuration.

RTU560 Step By Step

4.7

Restart RTU560 Reset RTU to activate the new configuration files. Continue with Reset.

ABB Oy

36-37

ABB Oy PSS/SAS RTU560 Revision: 4 Cities


Connection lost due to restart of RTU

RTU560 Step By Step

Establish the web Server connection again and check the System Diagnostic for possible errors. Check the new functionality of the RTU560 and make also spot checks of the old functionality.

ABB Oy

37-37