Last but not the least, I would like to thank my parents & all my
fellow trainees who have been a constant source of encouragement &
inspiration during my studies & have always provided me support in
every walk of life.
PREFACE
During the course of training, the trainees are expected to use and
apply there academic knowledge and again valuable insight into
corporate cultures with all its environment operational complexity the
said training offers, a valuable of the trainings to meet their academic
knowledge with the real world situation.
This project work has been conducted for partial fulfilment of the
degree of MASTER OF BUSSINESS ADMNISTRATION (MBA) in
DR. BHIM RAO AMBEDKAR UNIVERSITY, (SETH PADAM
CHAND JAIN INSTITUTE OF COMMERCE BUSINESS
MANAGEMENT & ECONOMICS), AGRA.
MANISHA SHAKYWAR
OBJECTIVES OF TRAINING
1. To impart new entrants the basic knowledge & skill required for
efficient performance of definite tasks.
Introduction
• Objective of the Study
• Scope of the Study
• Research Methodology
• Limitation of Study
COMPANY PROFILE
• A Brief Introduction
• Growth of Production & Milestone
ROTATION REPORT
INDUSTRIAL RELATION
(A Theoretical Approach)
INDUSTRIAL RELATION
(In BHEL, Jhansi)
FACTORIES ACT
Findings & Analysis
(Graphical & Tabulate Presentation)
Conclusion & Suggestion
Annexure (Questionnaire)
Bibliography
INTRODUCTION
1.OBJECTIVE OF THE STUDY
2.SCOPE OF THE STUDY
3.RESEARCH METHODOLOGY
4. LIMITATION OF STUDY
OBJECTIVE OF THE STUDY
The main objective of the project “INDUSTRIAL RELATIONSHIP”
in B.H.E.L. Jhansi is to know the philosophy of trade unionism in
B.H.E.L. which maintains sound and spontaneous relationship
between management and workers. It also designed to:-
SIZE OF SAMPLE:
Sample size for the survey was units of units in
which are workers, management and trade unions. The sample
represented the whole of workers, management and trade union, which
are selected through “Random Sampling Method” on the basis of data
collected, and conclusions are drawn.
SURVEY WORK:
The information regarding the functioning of trade
unions is obtained from almost every department of organisation on I
DATA SOURCES:
Data is collected in three ways:-
1. Interview and Discussion
2. Observation.
3. Questionnaires
OBSERVATION:
Second step for collecting data is observation. At the time of
field survey, observation were made at there natural setting, employees
were being observed therefore, observation were under taking in every
realistic conditions.
QUESTIONNAIRE:
The third steps for collecting the data are structured
questionnaire consist of a set of question presented to a respondent for
his response.
A structured questionnaire is one were the listing of
question was in a pre-arranged order and were the object of inquiry
was revealed to the respondent.
The form of question was used in questionnaire such as
ended question dichotomous question. The present work is based on
the open-ended question.
DATA PROCESSING:
In the last step, collected data have been presented in the
form of table, which has been analysed subsequently below the table.
This analysis finally helped in drawing conclusion and making
suggestion.
LIMITATION OF THE STUDY
INDUSTRIES
BHEL is a major contributor of equipment and systems to industries,
cement, sugar, fertilizer, refineries, petrochemicals, paper, oil and gas,
metallurgical and other process industries. The range of systems &
equipment supplied includes: captive power plants, co-generation
plants, DG power plants, industrial steam turbines, industrial boilers
and auxiliaries, waste heat recovery boilers, gas turbines, heat
exchangers and pressure vessels, centrifugal compressors, electrical
machines, pumps, valves, seamless steel tubes, electrostatic
precipitators, fabric filters, reactors, fluidized bed combustion boilers,
chemical recovery boilers and process controls.
TRANSPORTATION
BHEL is involved in the development, design, engineering, marketing,
production, installation, and maintenance and after-sales service of
rolling stock and traction propulsions systems. BHEL manufactures
electric locomotives up to 5000 HP, diesel electric locomotives from
350 HP to 3100 HP, both for mainline and shunting duty applications.
It also produces rolling stock for special applications viz. overhead
equipment cars, special well wagons, and Rail-cum road vehicle.
TELECOMMUNICATION
BHEL also caters to Telecommunication Sector by way of small,
medium and large switching systems.
RENEWABLE ENERGY
Technologies that can be offered by BHEL for exploiting non-
conventional and renewable sources of energy include: wind electric
generators, solar photovoltaic systems, solar heating systems, solar
lanterns and battery-powered road vehicles.
INTERNATIONAL OPERATIONS
BHEL is one of the largest exporters of engineering products &
services from India, ranking among the major power plant equipment
suppliers in the world.
VISION
A World-Class Engineering Enterprise Committed to Enhancing
Stakeholder Value.
MISSION
To be an Indian Multinational Engineering Enterprise providing Total
Business Solutions through Quality Products, Systems and Services in
the fields of Energy, Industry, Transportation, Infrastructure and other
potential areas.
VALUES
ENVIRONMENTAL POLICY
• Compliance with applicable Environmental
Legislation/Regulation;
• Continual Improvement in Environment Management Systems to
protect our natural environment and control pollution;
• Promotion of activities for conservation of resources by
Environmental Management.
• Enhancement of Environmental awareness amongst employees,
customers and suppliers.
2. SYSTEMS/SERVICES
3. TRASPORTATION SECTOR
4. INDUSTRY SECTOR
• Boilers.
• Valves.
• T.G. sets.
• Power devices.
• Solar Cells.
• Photo Voltaic cells.
• Gas Turbines.
• Compressors.
• Drive Turbines.
• Oil rigs.
• Blow out preventers.
• Wind mills.
• Control systems for electric devices.
A Brief Introduction
This unit of Jhansi was established around 14 km from the city on the
N.H. No 26 on Jhansi Lalitpur road. It is called second-generation plant
of BHEL set up in 1974 at an estimated cost of Rs 16.22 crores
inclusive of Rs 2.1 crores for township. Its foundation was laid by late
Mrs. Indira Gandhi the prime minister on 9th Jan. 1974. The
commercial production of the unit began in 1976-77 with an output of
Rs 53 lacs since then there has been no looking back for BHEL Jhansi.
The raw material that are produced for manufacture are used only after
thorough material testing in the testing lab and with strict quality
checks at various stages of productions. This unit of BHEL is basically
engaged in the production and manufacturing of various types of
transformers and capacities with the growing competition in the
transformer section, in 1985-86 it under took the re-powering of DESL,
but it took the complete year for the manufacturing to begin. In 1987-
88, BHEL has progressed a step further in under taking the production
of AC locomotives, and subsequently it manufacturing ACD/DC
locomotives also.
SECTIONS OF BHEL JHANSI UNIT
BHEL has many departments, while production and administrative
departments are separate.
Broadly speaking BHEL has two-production categories-
1. Transformer section.
2. Loco section.
AN IMPACT FEATURE
BHARAT HEAVY ELECTRICALS LIMITED
BRIGHTENING LIVES……
POWERING PROGRESS
Establishment of B.H.E.L.
At the time of independence, there was
hardly any industrial infrastructure worth the name except perhaps the
railways, post & telegraph and the only large steel mill of TISKO. Over
two-third of India’s GNP was contributed by the agriculture sector and
the country was woefully short of the basic ingredient for economic
development, power.
For a country with a population of 360
million in 1947, the total power generation was a meagre 1347 MW,
with a per capita electric consumption of 14kWh. Led by Pt. Nehru’s
vision, policy planners realized that without an adequate base to
manufacture equipment required for generation, transmission and
distribution of electric power, the desired levels of industrialization
and economic development could not be achieved for the growth of the
country.
This led to the setting up of Bharat Heavy
Electricals Limited (BHEL) in the late 1950s. Its mandate was to make
the country self-sufficient in the indigenous manufacture of power
equipment.
The power equipment industry was thus
established in India with setting up of the plant of BHEL at Bhopal
in 1956 (under Heavy Electricals India Ltd. – HEIL).
Subsequently, during the third five year plan, 3 more
manufacturing plants were set up at HARIDWAR, HYDRABAD
and TIRUCHIRAPALLI under BHEL. The formal merger of HEIL
with BHEL happened in January, 1974. Since then, there has been no
looking back and BHEL has fulfilled the objective of making India
self-reliant in the field of power plant equipment. BHEL has the unique
distinction of being one of the very few companies in the world,
manufacturing all major power plant equipment under one roof.
With all its highs and lows, the heavy Electricals industry has
managed to survive even in the most difficult situations, and today,
when the market scenario seems favourable, it can look ahead for
bigger gains.
STRENGTHS OF BHEL
The country, which had only 1.300 mw of power capacity in 1947, has
an installed generating capacity of over 11,800 mw, nearly six decades
after independence. This has to be further increased to more than
20,000 mw in the next six years if the government has to accomplish it
mission of “POWER FOR ALL BY 2012”. About Rs. 80,000 crores
will be required for doubling the power capacity by that period. Of this,
Rs. 20,000 crores will required for the associated transmission system.
One of the major task of this department is to earn decent profits over
all negotiations. Transformer industry has become very competitive.
The company offering the lowest price gets the contract but this
process may continue does the work on very low profits. To avoid such
a situation, a body by the name of India Electrical Manufactures
Association (IEMA) was set up. This association helps to maintain a
healthy competitive atmosphere in the manufacturing of electrical
appliances.
The main work of the TRC is classified as: -
Tenders and notices.
Interaction with design department.
Place of the work.
Approximate cost of the work.
Earnest money.
The place and time where contract documents can be seen.
The place and time where tender documents can be obtained.
The time up to which the tender documents will be sold.
The amount if any to be paid for such documents.
The place and the date and the time when tenders are to be submitted
and are to be opened.
In certain cases the required voltage may be less than the output
voltage, so in order to obtain it we require a tapping circuit. The output
voltage may have a certain percentage variation, which may be tapped
in 4 or 6 equal steps.
FABRICATION:
Fabrication is nothing but production. It comprises of 03 bays
i.e., Bay0, Bay1 &Bay 2.
BAY-0:
It is the preparation shop while the other two bays form the
assembly shop.
This section has the following machines :
o Planner machine – To reduce thickness
o Shearing machine
o CNC / ANC Flame Cutting machine – To cut Complicated
shaft items using Oxy-Acetylene flame
o Bending machine
o Rolling machine
o Flattening machine
o Drilling machine
o Nibbling machine
o Pantograph flame cutting machine
BAY-1:
It is an assembly shop where different parts of tank come from
bay 0.Here welding processes are used for assembly, after which
a rough surface is obtained Grinder operating at 1200 rpm is used
to eliminate the roughness.
BAY-2:
It is an assembly shop dealing with making different objects
mentioned below.
1-Tank assembly 5-cross feed assembly
2-Tank cover assembly 6-core clamp assembly
3-End Frame assembly 7-pin and pad assembly
4-foot assembly
Before assembly, short blasting (firing of small materials i.e., acid
picketing) is done on different parts of jobs to clean the surface
before painting.
After assembly some tests are done known as NON
DESTRUCTIVE TEST
1. Ultrasonic test: to detect the welding fault on the CRO at the
fault place high amplitude waves are obtained.
2. Die Penetration test: Red solution is put at the welding and
then cleaned. After some time white solution is put.
Appearance of a red spot indicates a fault at the welding.
3. Magnetic crack detection: Magnetic field is created and then
iron powder is put at the welding. Sticking of the iron powder
in the welding indicated a fault.
4. X-Ray Test: It is same as human testing and the fault is seen in
X-ray film.
BAY-3:
Here are basically three sections in the bay:
1. Machine section
2. Copper section
3. Tooling section
MACHINE SECTION :
The operations to form small components of power and traction
transformer are done in this section. The shop consist of
following machines:
CENTRAL LATHE: it consist one tailstock, headstock, lower
part of tailstock is fixed and tail stock spindle is moving. On this
machine facing, turning and threading is done
TURRET LATHE: its function is same as central lathe but it is
used for mass production. Here turret head is used in presence of
tailstock because turret head contains many tailstocks around six.
CAPSTAN LATHE: It is belt drive.
RADIAL ARM DRILLING MACHINE: It is used for drilling
and boring.
HORIZONTAL BORING MACHINE: It is computerized and
used for making bore, facing etc.
MILLING MACHINE:
a) Horizontal milling machine: It is used for making gear and
cutting operations.
b) Vertical milling machine: By the machine facing cutting, and
T-slot cutting is done
COPPER SECTION:
All the processes related to copper are done here.
TUBE SLITTING MACHINE: This machine is developed here
and is used for cutting the tube along its length and across its
diameter. Its blade thickness is 3mm.
SHEARING MACHINE: Ii is operated hydraulically and its
blade has V-shape and a thickness of 15mm
DIE AND PUNCHING MACHINE: It is also hydraulically
operated and has a die and punch for making holes.
HYDRAULIC BENDING MACHINE: It is used for bending
the job upto 90°.
SHEARING MACHINE: It is fully mechanical and is used to
cut the job along its width.
FLY PRESS MACHINE: It is used to press the job. It is
operated mechanically by a wheel, which is on the top of the
machine.
TOOLING SECTION:
In this section the servicing of tools is done.
BLADE SHARP MACHINE: It sharpens the blade using a
circular diamond cutter. Blade of CNC cropping line machine is
sharpened here.
MINI SURFACE GRINDER MACHINE: It serves grinding
purposes. It has a grinding wheel made of “Aluminium Oxide”.
TOOL & SURFACE GRINDING MACHINE: This is
specially used to grind the tools used in Bay 7.
DRILL GRINDING MACHINE To grind the drills.
BAY 4:
It is the winding section.
TYPES OF WINDING:
1. Reverse section winding.
2. Helical winding
3. Spiral winding
4. Interleaved winding
5. Half sectional winding
There are four TYPES OF COIL fixed in a transformer, they
are:
1. Low voltage coil (LV)
2. High voltage coil (HV)
3. Tertiary coil
4. Tap coil
The type of winding depends upon job requirement. Also, the
width and thickness of the conductors are designed particulars
and are decided by design department. Conductors used for
winding is in the form of very long strips wound on a spool, the
conductor is covered by cellulose paper for insulation.
BAY-5:
It is core and punch section. The lamination used in power, dry,
ESP transformer etc for making core is cut in this section.
CRGO(cold rolled grain oriented) silicon steel is used for
lamination, which is imported in India from Japan ,U.K.
Germany. It is available in 0.27 and 0.28 mm thick sheets, 1mt
wide and measured in Kg.The sheet s are coated with very thin
layer of insulating material called “carlites”.
For the purpose of cutting and punching the core three machines
are installed in shop
1. SLITTING MACHINE: It is used to cut CRGO sheets in
different width. It has a circular cutter whose position can be
changed as per the requirement.
2. CNC CROPPING LINE PNEUMATIC: It contains only one
blade, which can rotate 90° about the sheet .It is operated
pneumatically.
3. CNC CROPPING LINE HYDRAULIC: It is also used to cut
the CRGO sheet. It contains two blades, one is fixed and the
other rotates 90° above the sheet. It is operated hydraulically .M4
quality sheet 0.23-0.33 mm thickness is used
BAY-6:
Single-phase traction transformer for AC locomotives is
assembled in this section. These Freight locomotive transformers
are used where there is frequent change in speed. In this bay core
winding and all the assembly and testing of traction transformer
is done.
BAY-7:
This is the insulation shop. Various types of insulations are
1-AWWW: All Wood Water Washed press paper.
The paper is 0.2-0.5mm thick cellulose paper and is wound on the
conductors for insulation.
2-PRE-COMPRESSED BOARD: This is widely used for
general insulation & separation of conductors in the forms of
blocks.
3-PRESS BOARD: This is used for separation of coils e.g. L.V.
from H.V. It is up to 38 mm thick.
4-UDEL: UnDemnified Electrical Laminated wood or
Permawood
This is special type of plywood made for insulation purposes.
5-FIBRE GLASS: This is a resin material and is used in fire
pron areas.
6-BAKELLITE
7-GASKET-It is used for protection against leakage.
8-SILICON RUBBER SHEET-It is used for dry type
transformer.
The machines used for shaping the insulation material are:-
1-Cylindrical machines
2-Circle cutting machine
3 Scarfing machines
4-Punching press machine
5-Drilling machine
6-Guilletin machines
7-Bench saw (spl for OD)
8-Jig saw (spl for ID)
9-Circular saw
10-Linesin machines
BAY 8:
It is the instrument transformer and ESP transformer
manufacturing section.
INSTRUMENT TRANSFORMER -
These are used for measurement. Actual measurement is done by
measuring instruments but these transformers serve the purpose
of stepping down the voltage to protect the measuring instrument.
They are used in AC system for measurement of current voltage
and energy and can also be used for measuring power factor,
frequency and for indication of synchronism. They find
application in protection of power system and for the operation of
over voltage, over current, earth fault and various other types of
relays.
They are of two types.
1-Current transformer (CT)
2-Voltage transformer (VT)
CURRENT TRANSFORMER-
It is a step down transformer. High current is not directly
measured by the CT but is stepped down to lower measurable
voltages.
BODY:
• The main body is a bushing, which houses the winding and
also acts as an insulator.
• The CT has a bottom and top chamber.
• The top chamber is a cylindrical tank of mild steel. It has
terminals for connection of HV coils. It also has a glass
window to indicate the oil level.
• Below the top chamber is the bushing made of porcelain. It has
several folds or “rain sheds” to provide a specific electric field
distribution and long leakage path. Some bushings are
cylindrical while modern ones are conical as amount of oil
porcelain used is reduced without any undesirable defect.
• Bottom chamber houses the secondary winding. There is also
connection box to which the connection of the low voltage
(LV) coil is made.
WINDINGS:
The primary winding consist of hollow copper/aluminium pipe
bent in form of a ‘U’ aluminium is used for low rating. For higher
rating a set of wires is passed through the pipe. For still higher
ratings, a copper pipe is used and for highest rating copper pipe
with copper wires passing through it is used. This arrangement
depends on the current carrying capacity. The bent portion of
primary as in the bottom chamber where as the free end is the top
chamber. The straight portion lies inside the bushing.
The primary is wound with crepe paper insulation. The thickness
of the insulation goes in increasing as we go downwards in the
bottom chamber. The free ends are provided with ‘ferrules’,
which are, small hollow cylinders through which wires can pass
connection to the primary are made through these ferrules.
VOLTAGE TRANSFORMERS:
This is also a stepped down transformer. The outer construction is
same as that of the CT that is this also has a top chamber, bushing
and a bottom chamber. The difference is only in the winding.
WINDINGS:
The primary winding is of the thick wire having a few turns. The
winding is heavily insulated with paper insulation. It has a hollow
cylinder passing centrally through it, which houses the secondary
winding. The clean and painted with either enamel or epoxy
paint. The customer gives the choice of paint. Epoxy paint is
generally used in chemical plants and seashore installation.
Terminals are then mark and ratings and diagram plate is fixed.
The job is then sent to the shipping department, which takes care
of its dispatch by packing it in the wooden boxes.
ESP TRANSFORMER:
The Electrostatic Precipitator transformer is used for
environmental application. It is used to filter in a suspended
charge particle in the waste gases of an industry. They are of
particular use in thermal power stations and cement industry.
The ESP is a single-phase transformer. It has a primary and
secondary. The core is laminated and is made up of CRGOS. It is
a step up transformer. An AC reactor is connected in series with
primary coil. The output of the transformer must be DC the is
obtained by rectifying AC using a bridge rectifier (bridge rectifier
is a combination of several hundred diodes). A radio frequency
choke (RF choke) is connected in series with the DC output for
the protection of the secondary circuit and filter circuit. The
output is chosen negative because the particles are positively
charged. The DC output from the secondary is given to a set of
plates arrange one after the others. Impurity particles being
positively charged stick to these plates, which can be jerked off.
For this a network of plates has to be setup all across the plant.
This is very costly process in comparison with the transformer
cost. A relive vent is also provided to prevent the transformer
from bursting it higher pressure develops, inside it. It is the
weakest point in the transformer body. An oil temperature
indicator and the secondary supply spark detector are also
provided.
One side of the transformer output is taken and other side has an
‘marshalling box’ which is the control box of the transformer.
BAY-9:
1. Core building
2. Core Lifting.
3. Unlacing.
4. Delacing and end-frame mounting.
5. High voltage terminal gear and low volt terminal gear
mounting.
6. Vapour phasing and oil soaking
7. Final servicing and tanking.
8. Case fitting.
Core Building:
It is made of cold rolled grain oriented steel ‘CRGO’. The
punched core is sent to this shop from core punching shop. Here it is
assembled with the help of drawing a set of 4 laminations is called a
packet. The vertical portion of the core is called a ‘leg’ the horizontal
one is called as ‘yoke’. Packets of both are interlinked. It is
undesirable to keep the X section of core circular to provide low
reluctance part with out air space. A perfect circle can not be made so
the core is stepped to achieve a near circle. Whatever spaces left are
filled with thin wooden rod. After core building the end frames are
bolted. The bolts are insulated from the core.
Core Lifting:
The core is lifted by a crane and is placed vertical. The rest
of assembly is done on the core in this position.
STORE:
There are three sections in store:
• Control Receiving Section
• Custody Section
• Scrap Disposal Section
FUNCTIONS:
list of material coming in stores is prepared and Quality Control
people are called for inspection. If material is found as per
standard, SRV (Store Receipt Voucher) is issued for each
material. A total of 08 SRV’s are prepared. Some materials such
as Silicon oil, Transformer oil, Insulating material etc are directly
stored in the Bays.
LOCOMOTIVE PRODUCTION(LMP):
There are two products
• Alternating Current Locomotive (ac Loco)
WAG-5H
AC./D.C. Loco
o WCAM-2P
o WCAM-3
W-broad gauge A-running in AC mode
C-running in DC mode G-hauling goods train
P-hauling passenger train M-hauling passenger&
goods train
• Diesel Electric Locomotive Shunting (DESL)
350 HP
700 HP
o Single Power Pack (SPP): One 700 HP m/c is made as a single
unit. It is a meter gauge locomotive.
o Twin Power Pack (TPP): 2 350HP m/cs are combined in 1
engine & can be operated individually or in combination
depending on the load.
450 HP
1400 HP
1150 HP
1350 HP
2600 HP
1150 HP and 1350 HP DESL s are non-standard locomotives and
are modified versions of 1400 HP DESL based on requirement of
customer.
TECHNOLOGY:
This department analyses the changes taking place in the world.
and suggest changes accordingly. This is very important because
the products must not get obsolete in the market otherwise they
will be rejected by the customer.
FUNCTIONS:
Technology functions can be classified as :
Processing Sequence: The sequence of process of
manufacturing is decided for timely and economic completion
of the job.
Operation time estimate : It includes incentive scheme
management
BUS DUCT:
Bus ducts are used as connections between generators and
transformers. They are used in power connections over 150 MV. The
question now arises why are bus duct preferred over ordinary
conductors, in such connections? In high power applications, insulation
is the major problem and frequent insulation breakdown occurs. If this
does happen then there is a possibility of shorting of conductors and
hence serious damage may occur t both the transformer and generator.
These cubicles have the circuits and the controls of the bus duct
assembly. The connections may be star or delta. The line enters from
the top of the top of the top chamber. The top chamber has the neutral
side and the line side. On each side there are three terminals of
aluminium to provide connections. The bottom chamber lies below the
top chamber. These chambers are provided just below the generator.
COMPONENTS OF INDUSTRIAL
RELATION
According to JOHN T. DUNLOP, “Industrial societies necessarily
create industrial relation defined as the complex of interrelations
among workers, management and workers”.
There major participants or actors of Industrial relation:-
1. Workers and their organization.
2. Management.
3. Government.
FACTOR AFFECTING INDUSTRIAL
RELATION
3. Social Factor- Under social factor items like social group (like caste
or joint family) creed, social values, norms, social status (high or low)
influences industrial relation in the early stage of industrialization,
these factors gradually lose their entity but one cannot overlook their
importance.
5.PSYCHOLOGICAL FACTORS
6.POLITICAL FACTORS
7.ENTERPRISE-RELATED FACTORS
8.GLOBAL FACTORS
INDUSTRIAL RELATION IN
B.H.E.L., JHANSI
1. PLANT COUNCIL.
2. CULTURAL COMMITTEE
4. SAFETY COMMITTEE
5. CANTEEN COMMITTEE
6. MEDICAL COMMITTEE
7. TOWNSHIP COMMITTEE
In July 2002 JCM election, BMS secured the highest vote stood at
first position which is 33.62% of total votes. As it is secured more than
10% vote it got the chance to represent the joint committee & councils.
BHEL sharmik sangh affiliated with BMS (Bhartiya Mazdoor Sangh).
Eventually in 2002 elections, its got 119 votes and stood at 5th position. It is
affiliated with AITUC (All India Trade Union Congress).
Eventually they had to pay for that in 1997 election it placed at 5th place and in
2002 election it continue to loose its reputation and placed at 6th position. It got
only 78 votes which was only 6.67% of total votes. It is affiliated with INTUC
(The Indian National Trade Union Congress).
(1) Education:
A scheme of workers education was envisaged on all India bases
by the government of India, way back in 1957.
The scheme had four main objectives.
• To develop strong unions through trained officials and more
enlightened members.
• To develop leadership from the rank and file.
• To equip organised labour to take its place in 9 democratic societies
and discharge its social and economic function.
• To promote among workers a greater understanding of the problems
of their economic environment and their privileges and obligations
as unions members and official and as citizen.
After assessing the scheme the National Commission on labour,
1969 (NCL) felt that scheme is not perfect and requires improvement.
The committee on labour welfare 1969 recommended that trade unions
should assume on active role in educating workers and run school for
promoting literacy among the children of workers. To be effective the
programme of workers education should be formulated administered
and implemented by the trade union themselves.
(2) Transportation:
The committee on labour welfare 1969, recommended the
provision of transport facilities to workers so that they can reach the
work place punctually and comfortable, most employers have, how
even recognised the workers need for transport services and therefore
responded favourably by providing company owned/leased vehicles to
workers in major industrial centers- especially in the private sector.
They have also come out with innovative financing schemes in recent
times enabling workers to buy their own bicycle, scooters, motorcycle
etc.
(3) Housing:
Housing is the primary need of a family in civilized life without
of roof to cover his head, the worker naturally feels frustrated about his
poor standard of living in big cities. Good houses mean possibility of
home life happiness and health; bad houses spell squalor, drink,
diseases, immorality crime etc. Overcrowding of people in dark quarter
in slum areas is mainly responsible for the outbreak of tuberculosis.
According to Radha Kamal Mukherjee “In the thousand slums of the
industrial centres, manhood is unquestiable brutalised womanhood
dishonoured and childhood poisoned at its very source. Recognising
the need for housing accommodation.
An industrial housing scheme was introduced in 1952. Under this
scheme the central government offers loans to industrial workers for
constructing houses at confessional rates. The low-income group-
housing scheme (1954) subsidized housing scheme for economically
weaker section of society (1952). Rural house site-cum-hut
construction scheme for landless workers (1972) has been introduced
to reduce the housing shortage to workers. The government has also
introduced housing scheme for winners and plantation workers in early
50s. Housing scheme for dockworkers was drawn up in 1964. To
reduce shortage of housing units in major industrial centers the central
government must extend it’s helping hand in a big way. Employers and
housing finance institution must also join hand to improve the lot of
workers. The problem of housing in India is of such a nasty climenslon
that no single agency can reasonably be expected to solve it.
Other facilities:
Other amenities such as washing facilities, drinking water
provision of first aid box, rest room, canteens, recreation centres have
more or less, because statutory obligation of employers now a days.
Consumer cooperative societies have also been flooded in various units
to meet the credit needs of industrial workers.
Employers:
Enlightened employers like TISCO, Hindustan lever, Godrej,
L&T Siemens, Voltas, Philips, HMTY, LIC, and B.H.E.L. have
undertaken welfare activities in the interest of workers. The
management of TISCO runs a well-equipped hospital in Jamshedpur,
supported by health centers and dispensaries in different residential
gymnasiums. Clubs, & school are also set up by TISCO for the benefit
of workers. Employers association have also joined hand with
employers in doing some welfare work for their workers. The Indian
jute mill Association, The Bombay mill owner Association are worth
mentioning here medical educational recreation facilities are also
extended in paper, sugar, steel, engineering industries also by the
“employers to employers” association.
QUESTIONNAIRE
(TRADE UNIONS)
Table no. 1
S.No. %
Response No. Of response
a. 20 100
Yes
b. 0 0
No
Total 20 100
b
0%
a
b
a
100%
Graph no. 1
2. Do you think that you are raising the life standard of workers and
also the developing the company?
Table no. 2
S.No. %
Response No. Of response
a. Raising the life standard 0 0
b. Development of the company 6 30
c. Both 14 70
d. 0 0
None of them
20 100
Total
d
a
0%
b
30%
a
b
c
d
c
70%
Graph no. 2
3. Which of the following steps you would take in order to solve the
problems of workers?
Table no. 3
S.No. %
Response No. Of response
1. Through communication 18 90
2. Through Notices 2 10
3. Gheroas 0 0
4. 0 0
Lockout
5. 0 0
Strikes
20 100
Total
Most of the trade unions are peace oriented they don’t believe in any
militant/negative activities which has shown by the table no. 3. 90% of
the trade union wants to solve their problems through communication
(peaceful talk) and other 10% through notice.
b ce
d
10% 0%
a
b
c
d
e
a
90%
Graph no. 3
Table no. 4 shows that for the welfare of the workers (40%) trade union
programmes.
d
20%
a
40% a
b
c c
10% d
b
30%
Graph no. 4
5. Are more number of trade unions an obstacle for the development of
the company?
Table no. 5
S.No. %
Response No. Of response
a. 15 75
Yes
b. 5 25
No
Total 20 100
b
25%
a
b
a
75%
Graph no. 5
6. What are the reasons for the more numbers of unions in an
organisation?
Table no. 6
S.No. %
Response No. Of response
a. Individual welfare 6 30
b. Giving preference to 8 40
personnel benefits
c. Personnel welfare 6 30
Total 20 100
Table no.6 shows that 40% trade union members says that the reasons
behind more numbers of unions is that they give preference to
personnel benefits and 30% says that they give preference to individual
welfare and personnel
c a
30% 30%
a
b
c
b
40%
Graph no. 6
7. For the welfare of the workers whether all the unions should come
on the same platform to communicate with the management?
Table no. 7
S.No. %
Response No. Of response
a. 18 90
Yes
b. 2 10
No
Total 20 100
b
10%
a
b
a
90%
Graph no. 7
Table no. 8
S.No. %
Response No. Of response
a. 12 60
Yes
b. 8 40
No
Total 20 100
Table no.8 showing the responses that 60% trade union members are
agreed that the effect of union is decreasing and 40% are disagreed
with this.
b
40%
a
b
a
60%
Graph no. 8
c
d a
0% 10%
a
b
c
d
b
90%
Graph no. 9
Table no. 10
S.No. %
Response No. Of response
a. 6 30
Yes
b. 14 70
No
Total 20 100
Table no. 10 shows that (70%) of the trade union discarded third party
intervention.
a
30%
a
b
b
70%
Graph no. 10
SUMMARY:
After the analyzing questionnaire and it is coming out
that trade unions understand their role in the organization and try to
fulfil their basic objective of harmonizing the relationship between
workers and management. They are well aware of factories act and
labour laws. The most striking fact which is coming out from the
survey that is, more number of trade unions are an obstacle for the
development the company which is also accepted by the trade union
leaders and their workers and suggested to reduce the number of trade
union so as to lessen the inter-rivalry and intra-rivalry and improving
the industrial relationship. Another fact which came out from this
survey that trade union leaders are concerned about workers and they
struggle against management for its irrational policies if those are not
in favour of workers.
QUESTONNAIRE
(FOR MANAGEMENT)
Table no. 11
S.No. %
Response No. Of response
a. Direct communication 22 44
b. Through trade union 8 16
c. Both 20 40
50 100
Total
c a
40% 44% a
b
c
b
16%
Graph no. 11
2. What kind of personality development programme organised by the
management?
Table no. 12
S.No. %
Response No. Of response
a. Training programme 39 78
b. Touring programme 3 6
c. Higher education programme 8 16
50 100
Total
c
16%
b
6%
a
b
c
a
78%
Graph no. 12
3.Do you think that all the statutory/non statutory benefits provided to
workers are reviewed and implemented at regular period of time?
Table no. 13
S.No. %
Response No. Of response
a. 36 72
Yes
b. 14 28
No
Total 50 100
b
28%
a
b
a
72%
Graph no. 13
Table no. 14
S.No. %
Response No. Of response
a. Lockout 0 0
b. Strikes 14 29
c. Gheroas 3 6
d. 27 53
Peacefully table talk
e. 6 12
Dharna
50 100
Total
Most of the trade unions are peace oriented they don’t believe in any
militant/negative activities which has shown by the table no.14. 53%
responses came in the favour peacefully table talk. Sometimes they
also use other tools for making their demands acceptable for the
organisation, which are strikes, Gheroas and Dharna but percentage of
using these tools are very less.
e a
12% 0% b
28%
a
b
c
d
c
6% e
d
54%
Graph no. 14
5.In case of peacefully talk what’s steps are taken by the management
regarding this matter?
Table no. 15
S.No. %
Response No. Of response
a. Timely talk with unions 25 50
b. Open meetings with workers 10 20
c. Timely 10 20
Implementation/solution
d. 5 10
Any grievance committee
50 100
Total
d
10%
c
20% a
b
a c
50%
d
b
20%
Graph no. 15
Table no. 16
S.No. %
Response No. Of response
a. In favour of workers 22 44
b. For their own benefit 8 16
c. For both 17 34
d. 3 6
Can’t say
50 100
Total
In the table. no. 16. It shows that 44% of the management thinks trade
unions are active for the workers, 16% thinks they works for their own
benefits & 34% are in the favour of both while 6% doesn’t share their
views.
d
6%
c a
a
34% 44%
b
c
d
b
16%
Graph no. 16
1. Giving more rights to unions will affect in decisions making and the
development of the company?
Table no. 17
S.No. %
Response No. Of response
a. 31 62
Yes
b. 19 38
No
Total 50 100
In the table no. 17 regarding question no.7 we have received 62%
answer in favour of first option which shows that giving more rights to
unions will effect in decisions making and the development of the
company while 38% says that it doesn’t effect.
b
38%
a
b
a
62%
Graph no. 17
Table no. 18
S.No. %
Response No. Of response
a. 34 68
Yes
b. 16 32
No
Total 50 100
a
b
a
68%
Graph no. 18
Table no. 19
S.No. %
Response No. Of response
a. 22 44
Yes
b. 28 56
No
Total 50 100
Graph no. 19
Table no. 20
S.No. %
Response No. Of response
a. Very good 14 28
b. Good 19 38
c. Satisfactory 17 34
d. 0 0
Dissatisfactory
50 100
Total
b
38%
Graph no. 20
SUMMARY:
After the analysis it came out from survey that
management and trade unions maintained a sound and spontaneous
relationship in the organization except sometimes, they have strained
relationship on some matters like presently trade unions are not
satisfied with the promotional policies of the management. According
to management trade unions also maintained good relationship with
workers and they are concerned about the workers welfare.
Management provides all kind of statutory & non-statutory benefits to
the workers and at regular period of time they provide different kind of
training programme to educate and develop them. Management and
trade union both are peace oriented and always try to resolve the
disputed matters through peaceful talk.
QUESTIONNAIRE
(FOR WORKERS)
Table no. 21
S.No. %
Response No. Of response
a. Harmonious 46 23
b. General 138 69
c. Formal 6 3
d. 4 2
Moderate
e. 6 3
Tensionful
200 100
Total
In the table no. 21 regarding question no.1, most of the workers thinks
that the relation between them and union leaders are general(69%) &
harmonious (23%).
c d e
a
3% 2% 3%
23%
a
b
c
d
e
b
69%
Graph no. 21
2. How is the relation between trade unions and management?
Table no. 22
S.No. %
Response No. Of response
a. Harmonious 42 21
b. General 132 66
c. Formal 16 8
d. 4 2
Moderate
e. 6 3
Tensionful
200 100
Total
In the table no. 22 regarding question no.2, most of the workers thinks
that the relation between management and trade unions are general
(66%) & harmonious (21%).
c d e
a
8% 2% 3%
21%
a
b
c
d
e
b
66%
Graph no. 22
3. How you convey your needs and complaints to management?
Table no. 23
S.No. %
Response No. Of response
a. Self 128 64
b. Through colleague workers 32 16
c. Through union leader 36 18
d. 4 2
There is no union
200 100
Total
d
c
2%
18%
a
b
c
b
16% a d
64%
Graph no. 23
4. Would you like to accept third party intervention in case of industrial
disputes?
Table no. 24
S.No. %
Response No. Of response
a. 72 36
Yes
b. 128 64
No
Total 200 100
When this question asked by the workers during the survey we have
received 128(64%) responses in against which means they are not
ready to accept the third party intervention so it is analysed that in case
of disputes they have complete faith on management policies.
Remaining 72(36%) workers don’t rely on management policies
regarding industrial disputes.
a
36%
a
b
b
64%
Graph no. 24
5. Are you aware of factories Act?
Table no. 25
S.No. %
Response No. Of response
a. 174 87
Yes
b. 26 13
No
Total 200 100
b
13%
a
b
a
87%
Graph no. 25
Table no. 26
S.No. %
Response No. Of response
a. Yes 100 50
b. No 38 19
c. To some extend 62 31
Total 200 100
c
31%
a
b
a
50% c
b
19%
Graph no. 26
Table no. 27
S.No. %
Response No. Of response
a. Yes 132 63
b. No 56 27
c. Can’t say 22 10
Total 200 100
According to table no.27, 63% of the responses are in favour that trade
unions work properly for labour welfare 27% are against and 10%
can’t say anything.
c
10%
b
27% a
b
c
a
63%
Graph no. 27
Table no. 28
S.No. %
Response No. Of response
a. Selfish elements 48 24
b. Lack of coordination with 48 24
management
c. Preference to personal work 54 27
d. 50 25
All of the above
200 100
Total
Regarding this question we got the responses as that 27% workers
thinks trade unions do not work properly because they give preference
to personal work and 24% workers responded as because of selfish
elements and lack of coordination with management while 25%
workers are in the favour of all the above options.
d a
25% 24%
a
b
c
d
b
c
24%
27%
Graph no. 28
Table no. 29
S.No. %
Response No. Of response
a. For workers 128 64
b. For management 40 20
c. For union leader’s 26 13
d. 6 3
Can’t say
200 100
Total
These responses shows that 64% of workers are in favour that trade
unions works for the workers benefits, 20% responded that they work
for management and 13% says they works for union leaders while 3%
can’t says anything.
d
c
3%
13%
a
b
b c
20% a d
64%
Graph no. 29
Table no. 30
S.No. %
Response No. Of response
a. Yes 30 15
b. No 164 82
c. Can’t say 6 3
Total 200 100
a
b
c
b
82%
Graph no. 30
Table no. 31
S.No. %
Response No. Of response
a. One 4 2
b. Two 180 90
c. More 16 8
Total 200 100
Table no.31 shows that how many trade unions are acceptable by the
workers in the organisation. 90% of workers wants only 2 unions in the
organisation, 2% wants only 1 union while 8% of workers can accept
more than 2 unions.
c a
8% 2%
a
b
c
b
90%
Graph no. 31
Table no. 32
S.No. %
Response No. Of response
a. Fully satisfied 26 13
b. Partially satisfied 146 73
c. Fully dissatisfied 14 7
d. 10 5
Moderate
e. 4 2
Tensionful
200 100
Total
Table no.32 shows the satisfaction level of workers regarding the role
of trade unions in the organisation. This table clearly shows that the
workers are not fully satisfied with the unions only (13%) workers are
fully satisfied. Most of the workers are partially satisfied. Remaining
either fully dissatisfied or moderate or Tensionful.
d e a
c
5% 2% 13%
7%
a
b
c
d
e
b
73%
Graph no. 32
Table no. 33
S.No. %
Response No. Of response
a. Secure the objective of unions 22 11
b. Security from management’s 98 49
monopoly
c. Unity in workers through 38 19
unions
d. 32 16
Desired fulfilled through
unions
e. 10 5
Above all
200 100
Total
Graph no. 33
Table no. 34
S NO> %
Response No. Of response
a. Improper working by unions 132 66
b. Puppet of management 42 21
c. Inactive union 8 4
d. 10 5
Leaders of unions are corrupted
e. 8 44
Emotional harassment of workers by
union
200 100
Total
Graph no. 34
Table no. 35
S.No. %
Response No. Of response
a. 140 70
Yes
b. 60 30
No
Total 200 100
Although workers are not completely satisfied with the trade union but
they have given (70%) response to first option in which they consider
that trade unions are helpful in establishing the good relationship with
the management and remaining (30%) said that they are not helpful.
b
30%
a
b
a
70%
Graph no. 35
Table no. 36
S.No. %
Response No. Of response
a. Dedication for work 28 14
b. Dutiful and liable 38 19
c. Organise awareness 38 19
workshops
d. 96 48
Honest and transparent
200 100
Total
d b a
48% 19% b
c
d
c
19%
Graph no. 36
SUMMARY:
This analysis which is based on workers questionnaire
has given the correct view of the organization. After the analyzing, the
very fact which came out is that workers are partially satisfied with the
trade unions. During the survey it was found that those who are close
to the trade unions are satisfied with them but those who are neutral to
them are not satisfied with them. Although workers are no satisfied
with them but still they consider that trade unions are helpful in
harmonizing the relationship between management and workers in
some extent also accept their existence in the organization for their
betterment.
SUGGESTIONS
B.H.E.L. Jhansi a very good Industrial relationship is maintained
between trade union and management.
By following all the suggestion trade union may prove productive for
the organization which directly or indirectly benefited the industry,
nation and more that is benefited to humanity.
In this way, very HEALTHY INDUSTRIAL
a
RELATIONSHIP is maintained between workers (trade
union) and management in B.H.E.L. JHANSI.
CONCLUSION
After analysis every aspect by the data obtained through
personal interview questionnaires, the main substance that is extracted
is that “a very healthy industrial relationship is maintaining
between the trade unions and management in B.H.E.L. Jhansi”.
Although workers are not fully satisfied with the trade union’s
polices but still they consider that unions play important role in the
organization for their welfare. Trade union act as bargainers for
demanding the fair wages from management for them and also act as
enemies if they find that management is trying to exploit the workers.
Every police which is made by the management has got the full
support of the trade union which was in power. Management also
accept the importance of the trade union in an enterprise.
SOME MORE SUGGESTIONS FOR
ORGANIZATION
1. Number of trade union must be decreased so as to reduce the inter
rivalry and intra rivalry in the organization.
2. Management must talk to representative of trade unions timely to
make them aware of the new polices.
3. Management must have complete faith on the workers.
4. Management and trade union must work as team and provide
workers adequate support to enhance their efficiency.
5. Higher management should need to reduce the lower grade
management so that it can reduce the over-head.
6. Management should adopt fair polices for all workers.
7. Management should constitute a grievance committee which can
understand the problem of workers and recommend the solution to
management.
8. Adopt positive attitude towards workers.
9. Surveys regarding the problems in plant should be done frequently.
10. Management should give equal respect for the suggestion for
problems from the worker level.
1. www.bhel.com
2. www.bheljhs.co.in
3. www.google.com