Professional Documents
Culture Documents
\\vboxsrv\conversion_tmp\scratch_2\[153893161.xls.ms_office.xls]Table
Flow (gpd)
Flow (m3/s)
Velocity m/s
Length (m)
Lengthx1.05 (m)
Area (m2)
Remarks
Available head at tapping point External Water Supply From existing 250mm water supply main along Jalan 5/21D to Proposed Retail Complex 88.42 24,097 0.0013 0.0015 0.09 19.00 19.95 150.00 0.02 0.0026 0.1383 88.42 is 88.42m. ( Head loss is < 2.0 m/km - ok)
Note : All elevation are in meters ODL. peak factor = 1.2 Head loss to include losses through valve, meter, etc. = 5% of total loss in total pipe length Hf = 10.6L x Q1.85 / (D4.865 x C1.85 ) V = Q/A where, Q = flow rate (m3/s) C = Hazen Williams Coefficient = 100 D = internal diameter of pipe (m) Hf = head loss (m) L = length of pipe (m) A = internal diameter of pipe (m)