THIS REVISION IS NOT TO BE

COMPLETELY REDRAWN & ADDED INDEX "O".

UNTIL CERTIFIED AND DATED

USED FOR CONSTRUCTION

SAUDI ARABIAN OIL COMPANY


GENERAL:
INCLUDING PLOT PLANS, AREA MAPS, DIAGRAMS (PROCESS FLOW/

PIPING & INSTRUMENT/VALVE OPERATING/HYDROSTATIC TEST), EQUIPMENT ARRANGEMENTS, LINE DESIGNATION TABLES, DRAWING CONTROLS, SCOPE OF WORK, SAFETY INSTRUCTION SHEETS, EQUIPMENT INSPECTION SCHEDULES AND SIGNAGE.

B
C D

LOSS PREVENTION: COLUMNS: VESSELS:

INCLUDING FIRE PROTECTION, FIREPROOFING & AREA CLASSIFICATION.

INCLUDING FRACTIONATING, VACUUM, RERUN, CATALYTIC REACTORS,

PLUS APPURTENANCES AS APPROPRIATE. INCLUDING DRUMS, PRESSURE VESSELS, PRESSURE TANKS, ATMOSPHERIC

TANKS AND SPHEROIDS PLUS APPURTENANCES AND INTERNALS.

03-00644

E F
G
H

HEAT EXCHANGERS: FURNACES:

INCLUDING SHELL/TUBE, AIR COOLED, PLATE

JOB ORDER/EWO NO.

EXCHANGER, ETC., PLUS APPURTENANCES AND EXTERNALS AS APPROPRIATE. INCLUDING BOILERS, HEATERS, INCINERATORS, ETC., PLUS ASSOCIATED STACKS. INCLUDING CENTRIFUGAL PUMPS

LIQUID HANDLING EQUIPMENT: PAINTS/COATINGS:

REV. NO.

RECIPROCATING PUMPS, ROTARY PUMPS, GEAR PUMPS AND EJECTORS. FOR INDUSTRIAL FACILITIES AND PIPELINES.

J
OTHER
BY/DATE

INSTRUMENTATION: INCLUDING ROTATING EQUIP. INSTRUMENTATION AND INSTALL. DETAILS. GAS HANDLING/HVAC EQUIPMENT:

GAS HANDLING-INCLUDING COMPRESSORS, FANS, VACUUM PUMPS, TURBINES & AIR DRYERS. HVAC- INCLUDING CHILLERS, AIR HANDLING UNITS, HVAC FANS, REFRIGERANT COMPRESSORS AND DUCTING.

PIPING:

INCLUDING PIPING LAYOUTS AND PIPING ISOMETRICS. INCLUDING PREFABRICATED METAL BUILDINGS

M N O
P

STEEL/STEEL STRUCTURES: INSULATION:

(W/CLADDING), PIPEWAYS, PIPE ANCHORS/SUPPORTS, STEEL PILING AND FENCING. INCLUDING BUILDING, PIPING AND EQUIPMENT INSULATION.

SECURITY DRAWINGS: SECURITY-AREA MAP, OVERALL PLAN, FACILITY LAYOUT,


FENCE, PATROL ROAD, GATE, GATEHOUSE, NETWORK/SYSTEMS, EQUIPMENT & ETC.

CERTIFIED/DATE

ELECTRICAL POWER SYSTEMS:

INCLUDING OVERHEAD & UNDERGROUND

DISTRIBUTION, GROUNDING, LIGHTING, BATTERY, UPS SYSTEM, MOTORS & GENERATORS.

CONCRETE: INCLUDING POURED-IN-PLACE CONCRETE FOUNDATIONS, PRECAST

Q
6/24/08

CONCRETE STRUCTURES, CONCRETE BLOCK, CONCRETE PILES/PILE CAPS, PLUS FORMING/REINFORCING MATERIAL AS APPROPRIATE.

ENGG./DATE

JDS

BUILDING ARCHITECTURE:

INCLUDING MISC. WOOD/STEEL/CONCRETE/MASONRY

STRUCTURES, BUILT-UP ROOFING, FINISHED CARPENTRY AND BUILDING FURNISHINGS.

UTILITY SERVICES/CIVIL WORKS:

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

UTILITY-INCLUDING PLUMBING, SEWER AND SEWAGE SYSTEMS, WATER TREATMENT SYSTEMS AND FIRE PROTECTION/WATER SUPPLY/AC PIPING.

CIVIL-INCLUDING ROADS, GRADING, PAVING, BERMS AND LANDSCAPING. (FOR FENCING SEE "M")

T
U

COMMUNICATIONS:

INCLUDING TELEPHONE, RADIO, MICROWAVE, MICROWAVE

WITH MULTIPLEX, DATA-COMM AND INTER-COMM.

REVISION VALIDATION

SPECIAL EQUIPMENT:

INCLUDING HOSPITAL, LABORATORY, KITCHEN, OFFICE,

DRAWING COMPLETION CERTIFICATE NO:

CRANES AND SPECIAL SAFETY.

V
W

RAILROAD AND MARINE:

EQUIPMENT ONLY.

WELDING: INCLUDING EQUIPMENT AND SUPPLIES. CATHODIC PROTECTION:


INCLUDING EQUIPMENT AND SUPPLIES. STANDARD DRAWINGS.

15

X Y Z

THIS REVISION NO.

ROYALTY AND CUSTODY MEASUREMENT:

PROCESS CONTROL SYSTEMS: INCLUDING EQUIPMENT AND CABLING.


DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

DRAWING AND EQUIPMENT INDEX KEY

STD

990
STD. DWG.
SAUDI ARABIA

AE-036411

001 OF 003
VECTOR

15

Saudi Aramco 2616 ENG. (09/03) CADD-04

CopyrightSaudi Aramco 2009. All rights reserved.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.

REVISION DESCRIPTION DATE

REVIEW FOR KEY DRAWINGS

15 (SAUDI ARAMCO) REQUIRED CONST. AGENCY/DATE OPERATIONS/DATE

JUN08

DESIGN CERTIFICATION

(DESIGN AGENCY)

IS COVERED, FOR ALL APPROVAL

6/24/08 765220-0608-001

KHK