You are on page 1of 5

S.

NO
A
Excavation

DESCRIPTION OF ITEM

Pipe Rack ext 5 TREASUL footing level +0 to +1500

Pipe Rack ext 5 TREASUL footing level -1500 to -3100

2
3
4

BACK FILLING
EXT PIPE RACK 5 EARTH WORK EXCVATION-3100 TO 150
EXT PIPE RACK 5 EARTH WORK EXCVATION-500 TO 150
PCC FOR PIPE RACK 5
RCC RAFT
PEDRATAL

II

Pipe Rack ext 5 TREASUL footing level -3100 to +200

I
1

1
2
3
4
5
6
C
I
II

EXT PIPE RACK 5 EARTH WORK EXCVATION-500 TO 150 TRASUL


PCC FOR PIPE RACK 5
RCC RAFT
PEDRATAL
DRAIN CUTING RCC
DRAIN CUTING PCC
PCC
DRAIN NEAR TREASUL
Pipe Rack ext 5 TREASUL footing level -3100 to +200
FOR PCC

III

RCC
Pipe Rack ext 5 TREASUL footing level -3000 to -2500
for raft
Pipe Rack ext 5 TREASUL footing level -3000 to -2500
for pedestal
Drain raft near pipe rack ext 5 treasul footing
Drain wall near pipe rack ext 5treasul footing
EXT pipe rack 5 RCC -1250 TO -250 tower

IV

CT - DCW SLAB at LEVEL+4000 TO +4400MM

II

NOS

LENGTH

WIDTH

HIGHT

QTY M3

7.000

4.000

1.500

42.000

7.000

4.000

1.600

44.800

6.000

5.500

2.950

97.350

-1
-1
-1
-4

6.000
5.200
5.000
1.050

5.500
4.700
4.000
0.750

0.350
0.100
0.500
2.000
Cu.M

-11.550
-2.444
-10.000
-6.300
67.056

7.000

4.000

3.300

92.400

-1
-1
-1
-2
-1
-1

6.000
5.200
5.000
1.050
6.500
6.700

5.500
2.200
2.000
0.750
1.100
1.300

0.350
0.100
0.500
2.000
1.300
0.100
Cu.M

-11.550
-1.144
-5.000
-3.150
-9.295
-0.871
61.390

6.700

1.300

0.100

0.871

5.200

2.200

0.100

1.144

5.000

2.000

0.500

5.000

2
1
2
4

1.050
6.700
6.700
1.050

0.750
0.900
0.200
0.750

2.300
0.200
1.000
1.000

3.623
1.206
2.680
3.150
15.659

1
2
3
4
5
6
7

CT CHANNEL 1 EAST FACE


SLAB
CT CHANNEL 2 WEST FACE
DEDUCATION 2 OPENING
BEAM WEST CT CHANNEL 2
BEAM
BEAM EAST CT CHANNEL 1

1
1
1
-2
1
5
1

3.15
21.35
3.15
1.00
3.15
1.00
3.15

1.25
1.60
1.26
1.00
0.35
0.35
0.35

0.20
0.10
0.20
0.10
0.25
0.25
0.25
Cu.M

0.788
3.416
0.794
-0.200
0.276
0.438
0.276
5.786

E
1
2
3
4
5

FOOTING GP2 GROUTING


fandesk foundation
pockets
fandesk moter foundation
pockets
pockets near sanfiltration

12
3
6
3
8
4

0.200
0.900
0.500
1.250
0.500
0.500

0.150
0.900
0.350
0.750
0.350
0.300

0.250
0.075
0.300
0.050
0.300
0.350
Cu.M

0.090
0.182
0.315
0.141
0.420
0.210
1.358

S.NO
DESCRIPTION OF ITEM
F
SHUTTERING
EXT PIPE RACK 5 EARTH WORK TRASUL FOR PCC
I
EXT PIPE RACK 5 EARTH WORK TRASUL FOR RCC
RAFT
1
EXT PIPE RACK 5 EARTH WORK TRASUL FOR RCC
PEDESTAL
2
EXT PIPE RACK 5 EARTH WORK TOWER FOR RCC
PEDESTAL
3
DRAIN PCC
4
DRAIN RAFT RCC
5
DRAIN WALL
6

HIGHT

QTY M3

14.80

0.10

1.480

14.00

0.50

7.000

3.60

2.30

16.560

4
2
2
4

3.60
6.70
6.70
6.70

1.30
0.10
0.20
1.00
Sq.m

18.720
1.340
2.680
26.800
74.580

NOS

LENGTH

WIDTH

II
1
2
3
4
5
6
7

CT - DCW SLAB INSIDE at LEVEL+4400 TO


+4500MM
Connecting Chnnel 1 EAST FACE
SLAB
Connecting Chnnel 2 WEST FACE
DEDUCATION 2 OPENING
BEAM WEST Connecting Chnnel 2
BEAM
BEAM EAST Connecting Chnnel 2

1
1
1
-2
2
10
2

3.15
21.35
0.40
0.80
2.65
1.00
2.45

2.65
1.00
1.60
0.80
0.25
0.25
0.25
Sq.m

8.348
21.350
0.640
-1.280
1.325
2.500
1.225
34.108

III
1
2
3
4
5
6
7
8
9
10
11
12

CT - DCW SLAB OUTSIDE at LEVEL+4400 TO


+4500MM
Connecting Chnnel 1 north face
East face
Connecting Chnnel 2 West face
Column offset noth face
rcph
near rcph
Column offse north face
west face
Column offset south face
south face
Connecting Chnnel 1 West east face
Beam east Connecting Chnnel 2

1
1
1
10
1
1
2
1
6
1
1
2

3.15
2.50
17.70
0.10
1.70
1.95
0.10
2.50
0.10
14.85
1.05
0.80

0.20
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.25
Sq.m

0.630
0.250
1.770
0.100
0.170
0.195
0.020
0.250
0.060
1.485
0.105
0.400
5.435

SCREED CONCRETED Paving M-15 with 100 mm


CT -ICW FLOORING SCREED CONCRETED M10 LEVEL
+350 TO +450 MM
Connecting Chnnel 1
beam
east to west
Connecting Chnnel 2
east to west
beam
rcph

1
3
1
1
1
1
1

2.800
0.350
4.260
2.450
3.920
1.000
1.650

1.000
0.950
1.000
2.750
1.000
0.350
1.300

0.100
0.100
0.100
0.100
0.100
0.100
0.100
Cu.M

0.280
0.100
0.426
0.674
0.392
0.035
0.215
2.121

CT - DCW WALL at LEVEL+1700 TO +1800MM


SCREED CONCRETED 100 mm THICK M10
Connecting Chnnel 1
Connecting Chnnel 1 to Connecting Chnnel 1
Connecting Chnnel 2

1
1
1

2.550
20.650
2.650

1.000
1.000
1.100

0.100
0.100
0.100
Cu.M

0.255
2.065
0.292
2.612

G
I
1
2
3
4
5
6
7
II
1
2
3

S.NO
H
1
2
3
4
5
6
7
8
I
I
1
2
3
4
5
6
7
8
9
10
II

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
H
1
2
3
4

HIGHT

QTY M3

1.300
0.150
0.150
0.300
0.300
0.250
0.250
0.300
Cu.M

9.295
0.037
0.044
0.168
0.305
0.175
0.175
0.019
10.217

1.800
17.660
1.850
1.950
2.650
1.175
15.650
0.100
1.000
2.550

2.700
2.700
2.700
2.700
2.700
2.700
2.700
2.700
2.700
2.700
Sq.m

4.860
47.682
4.995
5.265
7.155
3.173
42.255
0.540
2.700
6.885
125.510

4
8

12.000
8.500

2.725
2.725
Sq.m

130.800
185.300
316.100

openig

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
-4

2.800
11.380
1.650
2.650
3.920
0.500
1.900
2.450
1.900
0.500
4.260
0.500
1.900
1.000
4.000
5.000
4.200
5.200
0.650

4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
0.650
Sq.M

11.340
46.089
6.683
10.733
15.876
2.025
7.695
9.923
7.695
2.025
17.253
2.025
7.695
4.050
16.200
20.250
34.020
42.120
-1.690
262.006

Painting for Cooling Tower DCW Cement Wash


Short beam
column
pin beam long
long beam

10
8
24
5

15.200
12.000
28.000
18.000

1.400
1.400
0.800
1.400
Sq.M

212.800
134.400
537.600
126.000
1010.800

NOS

LENGTH

WIDTH

1
1
1
1
1
2
2
1

6.500
0.550
0.650
1.600
2.900
1.000
1.000
0.250

1.100
0.450
0.450
0.350
0.350
0.350
0.350
0.250

PLASTER OF INTERNAL FACE 3% WATERPROOFING


CT - DCW WALL PLASTERING INSIDE at LEVEL+1700
TO +4400MM
Connecting Chnnel 1 East face
North face
Near rcph North wall
West face
Connecting Chnnel 2 South face
Connecting Chnnel 2 West face
SOUTH WALL
Column offset
Connecting Chnnel 1 West face
Connecting Chnnel 1 South face

1
1
1
1
1
1
1
2
1
1

COOLING TOWER - DCW WALL PLASTERING INSIDE


at LEVEL+2000 TO +4500MM
SHORT SPAN
LONG SPAN

DESCRIPTION OF ITEM
CHIPPING
Drain cuting length 6.5m pipe rack ext -5treasul
RCPH FOOTING PCC
RCPH FOOTING PCC
icw slab chipping conecting chanal-1
icw slab chipping conecting chanal - 2
icw slab chipping conecting chanal-1 wall
icw slab chipping conecting chanal- 2 wall
louver chipping

CT - ICW AT PLASTING LEVEL +1700 TO +4400MM


Connecting channel 1 East face
north face
rcph east wall
rcph west wall
south wall
column offset c2
CT Channel 2 west wall
CT Channel 2 south wall
CT Channel 2 east wall
column offset c2
south wall
column offset c2
CT Channel 1 west wall
CT Channel 1 south wall
channel opening -1
channel opening -1

S.NO

DESCRIPTION OF ITEM

I
1
2
3
4
5

BITUMEN PAINT
Pipe Rack ext 5 TREASUL footing level raft
Top area
Deduction
Pedestal
Drain wall

LOUVER CONCRETED RCC M25


COOLING TOWER - DCW FOR RCC M25 LOUVER 4.5
LEVEL - I
COOLING TOWER - DCW FOR RCC M25 LOUVER 4.5
LEVEL - I
COOLING TOWER - DCW FOR RCC M25 LOUVER
6.635 LEVEL - 22
COOLING TOWER - DCW FOR RCC M25 LOUVER
6.635 LEVEL - 22
Beam B-1
Beam B-1
slop beam

1
2
3
4
5
6
K
L

ROD CUTING
ER building floor for electrical eath plate SCREED
CONCRETED 100 mm THICK
Frist Line

second line

HIGHT

QTY M3

0.500
2.000
0.750
2.800
1.200
Sq.m

7.000
10.000
-1.575
20.160
15.120
50.705

1.50

0.25

8.306

4.15

0.25

0.15

0.778

22.15

1.25

0.12

3.323

1
9
5
5

22.15
0.50
3.50
1.75

0.20
0.25
0.25
0.35

0.12
0.25
0.30
0.43
Cu.M

0.532
0.281
1.31
1.302
15.834

nos

20.000

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

13.100
5.500
1.200
1.300
1.300
1.100
1.200
1.200
7.600
0.700
1.300
13.500
1.100
1.100
0.700
7.000

0.700
0.700
0.600
0.600
0.600
0.500
0.450
0.450
0.700
0.600
0.700
0.700
0.700
0.700
0.700
0.700

0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
Cu.M

0.917
0.385
0.072
0.078
0.078
0.055
0.054
0.054
0.532
0.042
0.091
0.945
0.077
0.077
0.049
0.490
3.996

NOS

LENGTH

1
1
-2
2
2

14.000
5.000
1.050
3.600
6.300

22.15

WIDTH

S.NO
1
2
3
4
5

DESCRIPTION OF ITEM
Connecting channel DCW
Drain at trestle ext -5
louver level - I 22.15 m
louver level - II 22.15 m
pipe rack ext -2

MT
MT
MT
MT
MT
total

Steel Wight
0.911
0.797
0.777
0.641
2.254
5.380