Miranda Suarez Nataly Angela

Obras Hidraulicas I

Contenido
1.

INTRODUCCION .......................................................................................................................................... 1

2.

OBJETIVO ..................................................................................................................................................... 1

3.

MARCO TEORICO ....................................................................................................................................... 1

4.

DESARROLLO .............................................................................................................................................. 1

5.

PRESENTACION DE RESULTADOS ........................................................................................................ 6

6.

CONCLUSIONES .......................................................................................................................................... 7

Miranda Suarez Nataly Angela

Obras Hidraulicas I

EXAMEN HEC-RAS
1. INTRODUCCION
En el ejercicio de la carrera de ingeniera civil se ha visto necesario la aplicacin de todos los
conocimientos adquiridos por ello la eficiencia es un factor muy importantereferido en cuanto a tiempo,
exactitud, optimizacin,etc. Por ello se ha visto necesiro la utilizacin de sostwares para la ayuda del
ingeniero asi como lo es el programa HEC RAS en la aplicacin de Obras Hidraulicas.
2. OBJETIVO
El objetivo de esta practica es el de evaluar al estudiante en cuanto el aprndizaje logrado en el curso
dictado de HEC-RAS para ello se deber seguir y cumplir los requerimientos planteados en la gua de
trabajo.
- Cargado en HEC- RAS
- Muestra del procedimiento de cargado
- Corrida en el programa
3. MARCO TEORICO
HEC-RAS, modelo de dominio pblico desarrollado del Centro de Ingeniera Hidrolgica (Hydrologic
Engineering Center) del cuerpo de ingenieros de la armada de los EE.UU. (US Army Corps of
Engineers), surge como evolucin del conocido y ampliamente utilizado HEC-2, con varias mejoras
con respecto a ste, entre las que destaca la interfase grfica de usuario que facilita las labores de
preproceso y postproceso, as como la posibilidad de intercambio de datos con el sistema de
informacin geogrfica ArcGIS mediante HEC-GeoRAS. El modelo numrico incluido en este
programa permite realizar anlisis del flujo permanente unidimensional gradualmente variado en
lmina libre.
3.1. Caractersticas tcnicas.
- Clculo hidrulico de estructuras (puentes, aliviaderos, alcantarillas, etc.).
- Visualizacin grfica de datos y resultados
- Edicin grfica de secciones.
- Ejecutable en entorno Microsoft Windows.
3.2. Aplicaciones.
Modelacin hidrulica en rgimen permanente de cauces abiertos, ros y canales artificiales.
4. DESARROLLO
Para el desarrollo de la practica se deben seguir los pasos especificados en el curso los cuales son:
4.1. Crear nuevo proyecto y guardarlo en una carpeta de fcil acceso que tambin debe encontrarse en
un disco diferente en el cual esta instalado Windows.
4.2. Crear la geometra proporcionada en la gua tanto longitudinal como transversalmete con las
secciones, zonas, ros y estaciones correspondientes.
1

Miranda Suarez Nataly Angela

Obras Hidraulicas I

4.3. Posteriormente realizar la interpolacin cada metro en todos los ros, para posteriormente
guardar los datos geomtricos ingresados
4.4. Una vez cumplidos estos pasos se debe ingresar los datos de caudales que se calcularan apartir de
los datos proporcionados de precipitacon mxima.
A continuacin se muestran los graficos correspondientes a los pasos especificados.

4.5. Los clculos y formulas utilizadas en la determinacin de caudales segn tiempo de concentracin
y peridodos de retorno se muentran a continuacin.
2

Miranda Suarez Nataly Angela

Obras Hidraulicas I

)]
(

)
(

CUENCA 1
Ao
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010

(n-1)

Precip.
max
12
9
11
8
13
48
40
30
32
38
28
26
40
48
58
30
30
50
48
44
50
45
42
45
40
51
49
42
45
40
36.40
13.99

12 Hrs

6 Hrs

3 Hrs

1 Hrs

0.5 Hrs

8.76
6.57
8.03
5.84
9.49
35.04
29.2
21.9
23.36
27.74
20.44
18.98
29.2
35.04
42.34
21.9
21.9
36.5
35.04
32.12
36.5
32.85
30.66
32.85
29.2
37.23
35.77
30.66
32.85
29.2
26.57
10.21

8.28
6.21
7.59
5.52
8.97
33.12
27.6
20.7
22.08
26.22
19.32
17.94
27.6
33.12
40.02
20.7
20.7
34.5
33.12
30.36
34.5
31.05
28.98
31.05
27.6
35.19
33.81
28.98
31.05
27.6
25.12
9.65

6.72
5.04
6.16
4.48
7.28
26.88
22.4
16.8
17.92
21.28
15.68
14.56
22.4
26.88
32.48
16.8
16.8
28
26.88
24.64
28
25.2
23.52
25.2
22.4
28.56
27.44
23.52
25.2
22.4
20.38
7.83

5.04
3.78
4.62
3.36
5.46
20.16
16.8
12.6
13.44
15.96
11.76
10.92
16.8
20.16
24.36
12.6
12.6
21
20.16
18.48
21
18.9
17.64
18.9
16.8
21.42
20.58
17.64
18.9
16.8
15.29
5.88

8.52
6.39
7.81
5.68
9.23
34.08
28.4
21.3
22.72
26.98
19.88
18.46
28.4
34.08
41.18
21.3
21.3
35.5
34.08
31.24
35.5
31.95
29.82
31.95
28.4
36.21
34.79
29.82
31.95
28.4
25.84
9.93

0.09

0.13

0.13

0.16

0.22

0.13

30.10

21.98

20.77

16.86

12.64

21.37
3

Miranda Suarez Nataly Angela

T
(aos)
5
15
30
50

720
33.92
43.26
48.92
53.04

Obras Hidraulicas I

Duracion en (min)
360
180
60
32.06
26.02
19.51
40.89
33.19
24.89
46.24
37.53
28.15
50.14
40.69
30.52

30
32.99
42.08
47.58
51.59

CUENCA 1
Area (km2) =
1.5
Coef C =
0.55
T (aos) I (m/s) Q (m3/s)
5
40.1
9.20
15
51.15
11.73
30
57.83
13.26
50
60.73
13.93

Miranda Suarez Nataly Angela

Obras Hidraulicas I

CUENCA 2

Precip.
max
22
29
24
21
22
32
26
26
29
26
23
20
31
36
35
30
26
36
30
30
35
38
42
41
37
38
39
36
38
34
31.07

(n-1)

6.41

4.68

4.42

3.59

2.69

4.55

0.20

0.27

0.29

0.36

0.48

0.28

28.18

20.57

19.45

15.78

11.84

20.01

Ao
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010

12 Hrs

6 Hrs

3 Hrs

1 Hrs

0.5 Hrs

16.06
21.17
17.52
15.33
16.06
23.36
18.98
18.98
21.17
18.98
16.79
14.6
22.63
26.28
25.55
21.9
18.98
26.28
21.9
21.9
25.55
27.74
30.66
29.93
27.01
27.74
28.47
26.28
27.74
24.82
22.68

15.18
20.01
16.56
14.49
15.18
22.08
17.94
17.94
20.01
17.94
15.87
13.8
21.39
24.84
24.15
20.7
17.94
24.84
20.7
20.7
24.15
26.22
28.98
28.29
25.53
26.22
26.91
24.84
26.22
23.46
21.44

12.32
16.24
13.44
11.76
12.32
17.92
14.56
14.56
16.24
14.56
12.88
11.2
17.36
20.16
19.6
16.8
14.56
20.16
16.8
16.8
19.6
21.28
23.52
22.96
20.72
21.28
21.84
20.16
21.28
19.04
17.40

9.24
12.18
10.08
8.82
9.24
13.44
10.92
10.92
12.18
10.92
9.66
8.4
13.02
15.12
14.7
12.6
10.92
15.12
12.6
12.6
14.7
15.96
17.64
17.22
15.54
15.96
16.38
15.12
15.96
14.28
13.05

15.62
20.59
17.04
14.91
15.62
22.72
18.46
18.46
20.59
18.46
16.33
14.2
22.01
25.56
24.85
21.3
18.46
25.56
21.3
21.3
24.85
26.98
29.82
29.11
26.27
26.98
27.69
25.56
26.98
24.14
22.06

Miranda Suarez Nataly Angela

T
(aos)
5
15
30
50

720
26.05
30.33
32.92
34.81

Obras Hidraulicas I

Duracion en (min)
360
180
60
24.62
19.98
14.99
28.67
23.27
17.45
31.12
25.25
18.94
32.90
26.70
20.03

30
25.33
29.50
32.02
33.86

CUENCA 2
Area (km2) =
1.4
Coef C =
0.55
T (aos) I (m/s) Q (m3/s)
5
30.78
6.59
15
35.86
7.68
30
38.92
8.33
50
41.2
8.82
5. PRESENTACION DE RESULTADOS
Se puede observar desde distinos algulos el caudal para los diferentes periodos

Miranda Suarez Nataly Angela

Obras Hidraulicas I

6. CONCLUSIONES
Como se ha podido observar en el presente trabajo el programa HEC RAS es muy til en cuanto a tiempo y
eficiencia ya q nos brinda un anlisis de los caudales presentes en el minimo tiempo de reaizacion posible
siempre y cuando los datos ingresados sean correctos y controlados.