You are on page 1of 364

GE Water & Process Technologies

3239 Dundas Street West Oakville, ON, Canada L6M 4B2 Phone: 905-465-3030 Fax: 905-465-3050 Email: zenon.service@ge.com

OPERATION & MAINTENANCE MANUAL


SYSTEM: CLIENT: LOCATION: PROJECT: REV.: DATE: ZeeWeed MBR-Ultrafiltration System SCLA Industrial Wastewater Treatment Facility City of Victorville, CA 200326 0 June, 2010

NOTICE The enclosed materials are considered proprietary property of GE Water & Process Technologies. No assignments, either implied or expressed, of intellectual property rights, data, know-how, trade secrets or licenses of use thereof are given. All information is provided exclusively for the addressee for the purposes of evaluation and is not to be reproduced or divulged to other parties, nor used for manufacture or other means, or to authorize any of the above, without the express written consent of GE Water & Process Technologies. The acceptance of this document will be construed as an acceptance of the foregoing conditions. * Trademark of General Electric Company; may be registered in one or more countries.

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

TABLE OF CONTENTS
Preface
Using This Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xv Typographical Conventions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xv List of Effective Pages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xvi

Section 1 - General Safety


1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-1 1.2 Personal Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-1 1.2.1 Personal Protective Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-1 1.2.1.1 Head and Facial Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-1 1.2.1.2 Limb Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-2 1.2.1.3 Fall Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-2 1.2.2 Cleanliness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-2 1.3 Safety on Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-2 1.3.1 General Precautions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3 1.3.2 Safety Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-4 1.3.3 Electrical and Thermal Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-5 1.3.4 Mechanical and Chemical Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-5 1.3.5 Pinch and Falling Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-6 1.3.6 Noise and Vision Hazards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-6 1.3.7 Pressure and Rupture Hazards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-7 1.3.8 Bacterial Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-7 1.4 High-Risk Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-7 1.4.1 Locking Out Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-8 1.4.2 Entering Confined Spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-8

Section 2 - System Overview


2.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1 2.2 System Design Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1 2.3 Primary Subsystems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1 2.3.1 Pretreatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2 2.3.2 ZeeWeed Ultrafiltration Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2 2.3.2.1 ZeeWeed Trains and Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2 2.3.2.2 Aeration System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-3 2.3.2.3 Air Extraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-3 2.3.2.4 Recirculation/Drain Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-4 2.3.2.5 Chemical Feed System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-4 2.3.2.6 Air Compressors and Associated Equipment . . . . . . . . . . . . . . . . . . . . . . . . .2-4 2.3.2.7 Turbidimeters and Associated Eq . . . . . . . . . . . . . . . . . . . . . . . . . . . .uipment2-4

Section 3 - Pre-Installation & Initial Startup


3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1

Rev. 0 June, 2010

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

3.2 Preparing the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1 3.2.1 Foundations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1 3.2.2 Drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1 3.3 Receiving Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-2 3.3.1 Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-2 3.3.2 Vessel Internals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-2 3.3.3 Instrumentation & Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3 3.3.4 Pumps & Blowers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3 3.3.5 Control Panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3 3.4 Pre-installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4 3.4.1 Fastening & Connecting Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4 3.4.2 Installing Mechanical Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-5 3.4.3 Installing Electrical Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-6 3.4.4 Completing Pre-Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-6 3.5 Initial Startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-7 3.5.1 Preparing for Initial Startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-7 3.5.2 Powering Up the System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-8 3.5.3 Dry Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-9 3.5.3.1 Electrician . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-9 3.5.3.2 Millwright . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-9 3.5.3.3 Pipefitter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3.5.3.4 Miscellaneous . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3.5.4 Introducing Media Into the System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3.5.5 Wet Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3.5.5.1 Preparing for a Wet Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3.5.5.2 Conducting a Wet Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12

Section 4 - Operating the System


4.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-1 4.2 Common Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-1 4.3 ZeeWeed UF Subsystem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-1 4.3.1 Starting Up the ZeeWeed UF Subsystem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-1 4.4 Resuming Operation Following an Alarm Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . .4-4 4.5 Controlling Specific Equipment Manually . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-7 4.5.1 Accessing Device Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-7 4.5.2 Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-8 4.5.3 Process Pumps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-9 4.5.4 Chemical Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-9 4.5.5 Air Compressors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 4.5.6 Power Control Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 4.5.6.1 Control Panel Disconnect Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 4.5.6.2 System Stop Button . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-11 4.6 System Setpoints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-11

Section 5 - Control Documentation

ii

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Section 6 - Warranty Section 7 - Recommended Spare Parts List Section 8 - Material Safety Data Sheets Section 9 - Service & Support
9.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-1 9.2 Contacting GE W&PT Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-1 9.3 MyZENON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-1 9.4 Available Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-2 9.4.1 ZenoTrac . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-2 9.4.2 Site Visits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-3 9.4.3 Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-3

Section 10 - Glossary
10.1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1 10.2 Acronyms & Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1 10.3 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3

Appendix A - ZeeWeed 500D


A.1 - Cautions A.2 - Subsystem Overview
A.1.1 Cautions Specific to This Subsystem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-1 A.2.1 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-5 A.2.2 Membrane Fiber. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-6 A.2.3 Modules. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-6 A.2.4 Cassettes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-8 A.2.5 Theory Of Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-10 A.2.5.1 Filtration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-10 A.2.5.2 Ultrafiltration: An Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-11 A.2.5.3 ZeeWeed Ultrafiltration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-11 A.3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.2 Installation Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.3 Personal Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.4 Handling of Factory Shipped ZeeWeed Cassettes . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.4.1 Unloading Shipped Cassettes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.4.2 Confirming Equipment and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.4.3 Confirming Handling Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.5 Storing Membranes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.5.1 Storing Crated Cassettes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.5.2 Storing Bagged Modules. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.5.3 Storing Wetted Membranes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.5.4 Storing Wetted Cassettes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rev. 0 June, 2010

A.3 - Installation & Testing

A-15 A-15 A-16 A-16 A-17 A-17 A-18 A-19 A-20 A-21 A-21 A-22
iii

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4 - Membrane Care

A.3.6 Uncrating and Installing Cassettes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.1 Preparing the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.2 Installing Leveling Pins. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.3 Maneuvering the Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.4 Uncrating Cassettes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.4.1 Removing the Cassette Bag . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.5 Moving Uncrated Cassettes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.6 Inspecting the ZeeWeed 500D Cassette - Inspection 1 . . . . . . . . . . . . . . . . A.3.6.7 Installing Union to Cassettes Main Aeration Pipes. . . . . . . . . . . . . . . . . . . . . A.3.6.8 Uprighting a Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.8.1 Removing the Cassette from the Wooden Skid. . . . . . . . . . . . . . . . . . . A.3.6.8.2 Uprighting Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.9 Installing Cassette Arms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.10 Removing the Plastic Wrapping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.11 Removing the Protective Foam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.6.12 Inspecting the ZeeWeed 500D Cassette - Inspection 2 . . . . . . . . . . . . . . . A.3.6.13 Assembling Aeration Piping. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.7 Preventing Debris Contamination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.8 Installing Cassettes in the Membrane Tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.8.1 Installing Permeate and Air Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.8.2 Connecting Permeate Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.8.3 Connecting Air Piping. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.9 After Cassette Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.9.1 Flushing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.9.1.1 Purging Glycerin From Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.9.2 Checking Aeration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.9.3 Testing Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.9.4 Bubble Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.9.4.1 Bubble Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.10 Membrane Inspection/Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.10.1 Heavy Cassette Lifting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.11 Returning Damaged Membranes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.12 System Shutdown and Membrane Preservation . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.12.1 Short Term Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.3.12.2 Long Term Membrane Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.2 Membrane Fouling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.2.1 Problems Associated with Membrane Fouling. . . . . . . . . . . . . . . . . . . . . . . . . A.4.2.2 Fouling and Foulants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.2.3 Fouling Treatment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.2.4 Fouling Prevention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.2.4.1 Prescreening. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.3 Fiber Shrinkage and Slack. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.3.1 Slack Adjustment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.4.3.1.1 Manpower Requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-23 A-23 A-25 A-25 A-26 A-29 A-30 A-31 A-33 A-33 A-35 A-38 A-39 A-41 A-41 A-42 A-44 A-44 A-45 A-47 A-47 A-49 A-50 A-51 A-51 A-52 A-53 A-53 A-54 A-56 A-57 A-59 A-59 A-59 A-60 A-67 A-67 A-67 A-68 A-69 A-70 A-70 A-71 A-74 A-74

iv

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.5 - Preventive Maintenance

A.4.3.1.2 Tools/Parts Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-75 A.4.3.1.3 Definitions and Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-76 A.4.3.1.4 Slack Adjustment Procedure - Preliminary Steps . . . . . . . . . . . . . . . . . A-78 A.4.3.1.5 Adjustment for the Front/Back Beams. . . . . . . . . . . . . . . . . . . . . . . . . . . A-80 A.4.3.1.6 Adjustment for the Center Beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-84 A.4.4 Module Removal from a Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-91 A.4.4.1 Manpower and Time Requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-92 A.4.4.1.1 Tool Preparation - Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-92 A.4.4.2 Tool Preparation Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-94 A.4.4.2.1 Tools Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-95 A.4.4.2.2 Module Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-96 A.4.5 Installation of Modules into the Cassette Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . A-100 A.4.5.1 Manpower Requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-100 A.4.5.2 Tools Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-100 A.4.5.3 Checking for Slack Adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-101 A.4.5.4 Unpacking the Module. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-101 A.4.5.5 Installing the Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-101 A.4.5.5.1 Preliminary Inspection and Set Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-101 A.4.5.5.2 Installing the Top Header . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-102 A.4.5.5.3 Installing the Bottom Header . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-106 A.4.5.5.4 Completing the Module Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-108 A.4.5.5.5 Tightening the Expanders. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-109 A.4.5.6 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-109 A.4.5.7 Returning Damaged Membranes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-110 A.4.6 Fiber Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-110 A.4.6.1 Cut Fibers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-110 A.4.6.2 Leaking Fibers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-113

A.5.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-117 A.5.2 Vendor Data and Maintenance Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-118 A.5.3 Preventive Maintenance Equipment Schedule. . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-119 A.5.4 ZeeWeed 500D Inspection Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-121 A.5.4.1 Tools and Equipment Needed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-121 A.5.4.2 Information Gathering and Recording . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-121 A.5.4.3 Inspection Frequency. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-122 A.5.4.4 Aeration Patterns and Hitch Pins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-123 A.5.4.5 Hoses, Camlocks, and Straub Connections. . . . . . . . . . . . . . . . . . . . . . . . . . . A-124 A.5.4.6 Removing the Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-124 A.5.4.7 Leveling Pins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-125 A.5.4.8 Solids Accumulation Patterns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-126 A.5.4.9 Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-127 A.5.4.10 Cassette Frame and Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-127 A.5.4.11 Permeate Collection and Saddle Inspection . . . . . . . . . . . . . . . . . . . . . . . . A-128 A.5.4.12 Aeration Tube Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-129 A.5.4.12.1 Reporting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-130 A.5.5 Module Interconnecting Strip Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-130
Rev. 0 June, 2010 v

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.6 - Cleaning & Ventilation

A.5.6 Preventing Stainless Steel Corrosion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-133 A.5.6.1 Causes of Corrosion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-134 A.5.6.2 Preventing Corrosion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-134 A.5.6.3 Detecting, Cleaning, & Repairing Corrosion . . . . . . . . . . . . . . . . . . . . . . . . . . A-135 A.5.6.3.1 Detecting Embedded Iron . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-135 A.5.6.3.2 Cleaning & Repairing Surface Corrosion . . . . . . . . . . . . . . . . . . . . . . . . A-135

A.7 - Troubleshooting

A.6.1 Cleaning Chemicals. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-139 A.6.2 Frequency of Cleanings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-140 A.6.3 Types of Cleanings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-140 A.6.3.1 Cleaning Logsheet. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-141 A.6.3.2 Relax . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-141 A.6.3.3 Backpulse. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-142 A.6.3.3.1 Entering Backpulse Setpoints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-142 A.6.3.3.2 Initiating Backpulses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-143 A.6.3.4 Maintenance Clean. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-144 A.6.3.4.1 Scheduling a Maintenance Clean . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-145 A.6.3.4.2 Performing a Maintenance Clean . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-146 A.6.3.4.3 Alternative Maintenance Clean . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-146 A.6.3.5 Recovery Clean . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-147 A.6.3.5.1 Preparing for a Recovery Clean . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-148 A.6.3.5.2 Performing a Recovery Clean . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-148 A.6.4 Ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-149

A.8 - Performance Monitoring

A.7.1 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-153 A.7.2 Equipment Troubleshooting Guide. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-154 A.7.3 Permeate Quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-156 A.7.3.1 Membrane Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-156 A.7.3.2 Cassette Seal Leakage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-157 A.7.4 Process Pump Has Lost Prime . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-157 A.7.5 Air Release Valves (Crispin Valve with ejector) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-159 A.7.6 Aeration Problem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-160 A.7.7 System Component Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-160 A.8.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-165 A.8.2 Logsheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-165 A.8.3 ZenoTrac. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-165 A.9.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-169 A.9.1.1 Unit Conversions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-169 A.9.2 General Dosing Calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-171 A.9.3 Calculating Membrane Permeability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-172

A.9 - Calculations

vi

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

LIST OF TABLES
Table 1.1.1 - Safety Checklist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-4 Table 2.1.1 - Membrane System Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1 Table 3.1.1 - Initial Startup Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-8 Table 10.1.1 - Acronyms & Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1 Table 10.1.2 - Log Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-18 Table A.2.1 - Module Specifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-7 Table A.2.2 - Cassette Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-9 Table A.3.1 - Handling Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-18 Table A.4.1 - Recommended Inspection Intervals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-72 Table A.4.2 - Pin Location and Function. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-92 Table A.5.1 - Preventive Maintenance Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-119 Table A.5.2 - Ingredients to the Ferroxyl Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-135 Table A.5.3 - Effective Cleaning Methods. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-136 Table A.6.1 - Chemicals Required for ZeeWeed Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . A-139 Table A.7.1 - Troubleshooting Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-155 Table A.9.1 - Solution Concentrations and Densities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-170 Table A.9.2 - Mass Percent Nitrogen or Phosphorus in Chemical . . . . . . . . . . . . . . . . . . . . A-172 Table A.9.3 - Water Viscosity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-173

Rev. 0 June, 2010

ix

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

LIST OF FIGURES
Figure 4.1 - ZeeWeed UF System Overview Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3 Figure 4.2 - ZeeWeed UF Train Overview Screen. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3 Figure 4.3 - ZeeWeed UF Mode Control Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-4 Figure 4.4 - Alarm Banner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-5 Figure 4.5 - Alarm Summary Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-6 Figure 4.6 - Alarm History Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-6 Figure 4.7 - Valve Device Control Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-8 Figure 4.8 - Process Pump Device Control Screen. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-9 Figure 4.9 - Chemical Skid Screen. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 Figure A.2.1 - ZeeWeed 500D Cassettes in a Treatment System . . . . . . . . . . . . . . . . . . . . . . .A-5 Figure A.2.2 - ZeeWeed 500D Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-6 Figure A.2.3 - ZeeWeed 500D Cassette. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-8 Figure A.2.4 - Filtration Spectrum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-10 Figure A.3.1 - Harness and Lanyard. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-16 Figure A.3.2 - Shipping Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-19 Figure A.3.3 - Top of Crate Removed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-28 Figure A.3.4 - Cassette Sealed in Plastic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-28 Figure A.3.5 - Bag Sealing the Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-29 Figure A.3.6 - Removing the Cassette Bag . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-30 Figure A.3.7 - Cassette Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-32 Figure A.3.8 - Aerators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-32 Figure A.3.9 - Union Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-33 Figure A.3.10 - Hoist Ring Location. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-35 Figure A.3.11 - Hoist Ring Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-36 Figure A.3.12 - Lifting a Cassette Without a Four-Point Lift Frame and Spreader Bar. . A-37 Figure A.3.13 - Uprighting a Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-39 Figure A.3.14 - Cassette Arms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-40 Figure A.3.15 - Installed Cassette Arms with Lifting Bracket . . . . . . . . . . . . . . . . . . . . . . . . . A-40 Figure A.3.16 - Cutting the Wrapper . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-41 Figure A.3.17 - Removing the Protective Foam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-42 Figure A.3.18 - Tighten Expander Blocks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-43 Figure A.3.19 - Aeration Piping. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-44 Figure A.3.20 - Lifting Bracket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-46 Figure A.3.21 - Permeate and Air Connections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-47 Figure A.3.22 - Cassette Header . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-48 Figure A.3.23 - Air Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-50 Figure A.3.24 - Bubble Sizes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-55 Figure A.4.1 - Solids Accumulation Between Fibers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-69 Figure A.4.2 - Correct Slack for ZeeWeed 500D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-73 Figure A.4.3 - Incorrect Slack for ZeeWeed 500D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-73 Figure A.4.4 - Water Pressure Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-75 Figure A.4.5 - Center Beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-77 Figure A.4.6 - Loosen Support Expanders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-78 Figure A.4.7 - Locked and Unlocked Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-78

Rev. 0 June, 2010

xi

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Figure A.4.8 - Remove the Aeration Tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-79 Figure A.4.9 - Module Slid Out of Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-80 Figure A.4.10 - Modules Removed From These Positions . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-81 Figure A.4.11 - Removing the Bolts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-81 Figure A.4.12 - Front Adjustable Bottom Beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-82 Figure A.4.13 - Adjusting the Front Adjustable Bottom Beam . . . . . . . . . . . . . . . . . . . . . . . . A-83 Figure A.4.14 - Align the Holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-83 Figure A.4.15 - Slide the Modules to the Stop Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-84 Figure A.4.16 - Tighten the Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-85 Figure A.4.17 - Remove the Slack Adjustment Clip . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-85 Figure A.4.18 - Insert Jacking Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-86 Figure A.4.19 - Drill Out Saddle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-87 Figure A.4.20 - Flush Away Debris. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-87 Figure A.4.21 - Remove Center Beam Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-88 Figure A.4.22 - Adjust the Center Beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-88 Figure A.4.23 - Align the Middle Bolt Hole. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-89 Figure A.4.24 - Torque the Bolts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-90 Figure A.4.25 - Tighten Support Expanders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-91 Figure A.4.26 - Module Removal Tool. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-92 Figure A.4.27 - Pin Removal From The Top . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-93 Figure A.4.28 - Pin Removal From The Bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-93 Figure A.4.29 - Faceplate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-94 Figure A.4.30 - Standard and Repaired Header (Repair Adapter) . . . . . . . . . . . . . . . . . . . . . A-94 Figure A.4.31 - Installation Assistance From The Top. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-95 Figure A.4.32 - Installation Assistance From The Bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-95 Figure A.4.33 - Prohibited Removal Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-96 Figure A.4.34 - Attach the Removal Tool. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-97 Figure A.4.35 - Module Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-97 Figure A.4.36 - Turn Rotating Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-98 Figure A.4.37 - Module Removal Handle. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-99 Figure A.4.38 - ZeeWeed 500D Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-100 Figure A.4.39 - Correct Position of the O-rings on the Permeate Spigot . . . . . . . . . . . . . A-102 Figure A.4.40 - Module Header . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-103 Figure A.4.41 - Cassette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-103 Figure A.4.42 - Handling the Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-104 Figure A.4.43 - Aligning the Rail on the Module with the Cassette Frame . . . . . . . . . . . . A-105 Figure A.4.44 - Turning the Bottom Header Sideways During Installation . . . . . . . . . . . A-106 Figure A.4.45 - Inserting the Bottom Header. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-107 Figure A.4.46 - Locating Nipples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-107 Figure A.4.47 - Lock Position. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-108 Figure A.4.48 - Tightening Expanders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-109 Figure A.4.49 - Membrane Cut Position. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-111 Figure A.4.50 - Axial Silicone Injection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-112 Figure A.4.51 - Subjacent Silicone Injection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-114 Figure A.5.1 - Correct Aeration Pattern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-123 Figure A.5.2 - Water Pressure Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-125

xii

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Figure A.5.3 - Typical Levelling Pin Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-125 Figure A.5.4 - Solids Accumulation (OK). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-126 Figure A.5.5 - High Solids Accumulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-127 Figure A.5.6 - Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-127 Figure A.5.7 - Bottom Permeate Collection Port. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-128 Figure A.5.8 - Top Permeate Saddle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-128 Figure A.5.9 - Location of Collection Port and Saddle. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-129 Figure A.5.10 - Aerator Caps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-129 Figure A.5.11 - MIS Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-130 Figure A.5.12 - Locking Key Locked Position (Vertical) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-131 Figure A.5.13 - Locking Key Unlocked Position (Horizontal) . . . . . . . . . . . . . . . . . . . . . . . . . A-131 Figure A.5.14 - Locking Pin Locked Position (Vertical). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-132 Figure A.5.15 - Locking Pin Unlocked Position (Diagonal) . . . . . . . . . . . . . . . . . . . . . . . . . . . A-132 Figure A.5.16 - Module Header, Showing Wear Location . . . . . . . . . . . . . . . . . . . . . . . . . . . A-133 Figure A.1 - Train Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-142 Figure A.2 - Train Setpoints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-143 Figure A.3 - Mode of Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-144 Figure A.4 - Maintenance Clean Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-145 Figure A.6.1 - Maintenance Clean Setpoints Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-146 Figure A.9.1 - Dosing Calculation Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-171

Rev. 0 June, 2010

xiii

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

PREFACE
This manual provides installation, operation, maintenance, and ownership information for the SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System, and should be read and internalized in its entirety by all system operators.

Failure to adhere to the instructions provided in this manual may result in severe injury or damage to property, and will render the warranty null and void.

USING THIS MANUAL


Sections 1 - 10 of this manual provide a high-level description of overall system design and functionality, while information specific to individual subsystems can be found in the accompanying appendices. Refer to Volume I - Vendor Data Manual for information regarding individual pieces of equipment, such as pumps and valves.

TYPOGRAPHICAL CONVENTIONS
Typographical conventions used within this manual are defined as follows: Bold - indicates a control with which the reader is required to interact. Bold italics - indicates important information.

Rev. 0 June, 2010

xv

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Warns against an unsafe situation or practice that, if not avoided, could result in property damage.

Warns against an unsafe situation or practice that, if not avoided, could result in minor or moderate injury.

Warns against an unsafe situation or practice that, if not avoided, could result in severe injury or death.

Warns against an unsafe situation or practice that, if not avoided, will result in severe injury or death.

LIST OF EFFECTIVE PAGES


When updating this document, insert new pages and dispose of outdated versions before recording all changes using the tables below. Record the date of each change in the following table:
Change
0 (original) 1 2 3

Date

Change
4 5 6 7

Date

Change
8 9 10 11

Date

xvi

Rev. 0 June, 2010

SECTION 1

GENERAL SAFETY

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

1.1

INTRODUCTION
This section provides general personal and environmental safety information for all system operators. Material Safety Data Sheets (MSDSs) for chemicals provided by GE W&PT can be found in Section 8 Material Safety Data Sheets (MSDSs for chemicals provided by other manufacturers may be inserted here as well), while safety information for specific equipment can be found in Volume I - Vendor Data Manual.

Failure by facility management or system operators to adhere to the information provided in this section may put personnel at significant risk of injury.

1.2

PERSONAL SAFETY
The following sections provide general guidelines regarding personal safety and cleanliness. Refer to local codes and regulations for more detailed information.

1.2.1

PERSONAL PROTECTIVE EQUIPMENT


The following equipment list constitutes the minimum scope of protective gear that should be available to all system operators. Local codes and regulations may require the use of additional equipment beyond that mentioned below.

1.2.1.1

HEAD AND FACIAL PROTECTION


At all times while in the plant operating area, wear a hard hat and safety glasses with side shields. When handling chemicals or working near pressurized lines, (air and liquid), wear a full face shield.

Rev. 0 June, 2010

General Safety 1-1

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

When exposed to noise levels that exceed 85 dB, wear adequate hearing protection.

1.2.1.2

LIMB PROTECTION
When working near pinch or thermal hazards, wear protective gloves. When handling chemicals, wear chemical-resistant gloves. At all times while in the plant operating area, wear safety boots with steel toe and shank inserts.

1.2.1.3

FALL PROTECTION
When working in a position where the possibility of falling a significant distance (approximately 10 ft) is present, wear an approved safety harness in accordance with local safety requirements. The harness safety line should not allow the person to fall more than 5 ft before arresting the fall.

1.2.2

CLEANLINESS
A water treatment plant poses a number of potential health hazards that make consistent personal and site cleanliness practices essential. Immunization protects against infection, but common sense and care are required at all times when in the plant operating area. Do not expose cuts or open sores to feedwater, and ensure that hands are washed with an antibacterial soap on a regular basis, especially prior to eating, drinking, or smoking.

1.3

SAFETY ON SITE
The following sections provide information regarding general site safety and proper conduct during various procedures, and are not intended to replace or override local codes and regulations.

General Safety 1-2

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

1.3.1

GENERAL PRECAUTIONS
The following list provides general recommendations intended to ensure the safety of personnel working in and around the plant operating area: Ensure that all personnel have been made familiar with the proper operating procedures described in this manual and the accompanying Volume I - Vendor Data Manual. In particular, procedures related to the handling of acidic or caustic chemicals and the maintenance of pressurized lines or equipment with rotating components should be emphasized. Ensure that safety shower and eye wash stations are operational and in close proximity to areas where chemicals will be used. Consider installing an alarm (visible and audible throughout the plant operating area) that will activate if an emergency shower or eye wash station is used. Install flange guards on all chemical lines. Install spray curtains or Plexiglas shields around all chemical skids and ensure that dilution stations are available nearby in case of a chemical spray or leak. Ensure that chemical-resistant protective clothing is worn by all personnel working near acidic or caustic substances or equipment that may contain such substances. When preparing to perform maintenance on pipes or tubing, ensure that all connected lines are either isolated or emptied. Ensure that all personnel working with hazardous chemicals are properly trained and familiar with both government and plantspecific safety requirements. Ensure that areas where chemicals will be handled are well lit and that access is not restricted. Personnel engaged in a procedure that involves obvious risk of injury (example: entering a confined space) should work under the supervision of a colleague prepared to provide assistance if required.

Rev. 0 June, 2010

General Safety 1-3

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Personnel engaged in a procedure for which they do not feel properly trained must cease action immediately and seek advice from a supervisor.

1.3.2

SAFETY CHECKLIST
Prior to initial system startup, review the following list and ensure that all items are confirmed by both the plant supervisor and an appointed GE W&PT representative.
Table 1.1.1 - Safety Checklist Task
Test all safety showers and eye wash stations Ensure that all chemical flange guards are fitted properly Post contact information for emergency services in a highly visible location Ensure that all operators are familiar with applicable safe workplace practices and regulations Confirm all pump shutoff and emergency kill-switch locations Confirm that all equipment is properly tagged Ensure adequate space and lighting around all equipment Supply all required acid/caustic protective gear, including fullface shields, rubber suits, and gloves; and store near chemical skids Ensure all equipment is clean and undamaged Provide adequate ventilation to all plant locations Ensure that a system for maintaining up-to-date operating records is in place Ensure that guidelines are in place to prevent operating temperatures from exceeding maximum limits

Plant
[ [ [ [ [ [ [ [ ] ] ] ] ] ] ] ]

GE W&PT
[ [ [ [ [ [ [ [ ] ] ] ] ] ] ] ]

[ [ [ [

] ] ] ]

[ [ [ [

] ] ] ]

General Safety 1-4

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

1.3.3

ELECTRICAL AND THERMAL HAZARDS

Only qualified personnel should perform installation and maintenance procedures for electrical equipment. SERVICING ENERGIZED EQUIPMENT: Even with the power switch in the OFF position, certain components inside a control panel or other electrical device will remain energized. Servicing must not begin unless the power supply to the device is first disconnected. HEATED SURFACES: Areas on certain pieces of equipment, such as pumps, can become heated to the point where contact with skin will inflict severe burns. Ensure that all safety guards and other protective measures are in place and familiarize personnel working with or around such equipment with the relevant documentation in Volume I - Vendor Data Manual.

1.3.4

MECHANICAL AND CHEMICAL HAZARDS


MSDSS: For ease of reference, add MSDSs for chemicals purchased from suppliers other than GE W&PT to Section 8 - Material Safety Data Sheets. PUMPS: When working with or around pumps, take the following precautions: Before performing maintenance, isolate and drain all piping connected to a pump. Before performing maintenance, turn off power to a pump and complete all lockout procedures required by government and plant-specific regulations, as well as any included in Volume I Vendor Data Manual. Refer to 1.4.1 Locking Out Equipment for more information. After completing maintenance, replace any guards or other safety components removed during the procedure.

Rev. 0 June, 2010

General Safety 1-5

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Personnel working on pumps used to transfer chemicals must be familiar with the safe-handling procedures associated with the chemical(s) involved. When working with diaphragm pumps used to transfer chemicals, be aware that some media may remain within the pumps diaphragm chamber even after the pump has been drained.

1.3.5

PINCH AND FALLING HAZARDS

Exposed rotating parts can catch clothing, fingers, or tools and cause severe personal injury or death. ROTATING EQUIPMENT: Before operating equipment with rotating components or other possible pinch hazards, ensure that all shields, guards, and emergency kill-switches are in place. FALLING HAZARDS: Falling hazards include any situation where the possibility of either personnel or equipment falling from a significant height (approximately 10 ft) is present. Ensure that personnel exposed to this risk are secured using a harness as described in 1.2.1 Personal Protective Equipment, and that all equipment involved is stored and handled in a way that prevents it from falling.

1.3.6

NOISE AND VISION HAZARDS


HEARING PROTECTION: Extended exposure to noise levels greater than 85 dB can be harmful to human hearing. When the possibility of exposure to such noise levels is present, use adequate hearing protection at all times.

Exposure to UV lamps can cause severe burns to skin and eyes.

General Safety 1-6

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

ULTRAVIOLET (UV) LAMPS: Do not look directly at blue UV lamps or operate UV lamps outside of the UV disinfection chamber.

1.3.7

PRESSURE AND RUPTURE HAZARDS


Some pumps and compressors are capable of pressurizing lines to 30 1,000 psi, and the danger of an explosion due to overpressurization may arise if proper operating procedures are not observed. In particular, pressure relief valves should be checked regularly, and tubing used to convey pressurized air, such as actuated valve air lines (typically operated at 80 psi), should be regularly inspected for cracks.

1.3.8

BACTERIAL HAZARDS
Personnel should take every measure to avoid contact with or ingestion of feedwater. If brought into contact with feedwater, eyes should be immediately rinsed at an eye wash station and exposed skin should be cleaned thoroughly with soap and warm water, particularly before eating, drinking or smoking. If feedwater is ingested, notify a supervisor immediately. GE W&PT recommends that all employees working in a water treatment plant should be vaccinated for tetanus and Hepatitis A and B. Any concerns about possible infection should be brought to the attention of a medical physician immediately.

1.4

HIGH-RISK PROCEDURES
The procedures described in this section pose a significant risk to personnel involved. The possibility of severe injury or death will be significant if the instructions provided below, as well as all relevant plant and local regulatory practices, are not followed.

Rev. 0 June, 2010

General Safety 1-7

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

1.4.1

LOCKING OUT EQUIPMENT


When preparing to lock out a device for service, replacement, or repair, ensure the following: All relevant local guidelines and procedures must be observed. Only system operators qualified to work with the device should perform a lockout procedure. Lockout tags should be applied before performing the lockout procedure and should be removed only after work has been completed and by the person who applied them.

1.4.2

ENTERING CONFINED SPACES


Any area characterized by 1 or more of the following features should be considered a confined space: The accumulation of hazardous gases, vapors, dust, fumes, biological contaminants, or the creation of an oxygen-deficient atmosphere may occur. A space not intended for frequent or extended human occupancy. Access is gained through a restricted entry as a result of design, orientation, or location.

GE W&PT strongly recommends that any personnel required to enter a confined space first complete an official confined space entry training program. Prior to entering a confined space, ensure that the following equipment is available and functional: Gas detector. Tripod. Body harness and safety line.

General Safety 1-8

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Charged cellular phone and list of emergency numbers. Portable ventilator and generator. Suitable breathing apparatus. Protective clothing (if exposure to harmful substances is possible). Ladder (where required). Flashlight and alarm horn (where required). Manhole opener (where required). Traffic control equipment (where required).

The above list of required equipment may vary according to local regulations. Any item that does not pass inspection or which cannot be calibrated properly must be replaced or repaired before work may begin.

Rev. 0 June, 2010

General Safety 1-9

This page has been intentionally left blank

SECTION 2

SYSTEM OVERVIEW

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

2.1

INTRODUCTION
This section provides a high-level description of the SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System, including performance specifications, structure, and production process. Detailed information about the design and operation of specific subsystems can be found in the accompanying appendices, while technical illustrations are provided in Volume III - Drawings Binder.

2.2

SYSTEM DESIGN PARAMETERS


The SCLA Industrial Wastewater Treatment Facility ZeeWeed MBRUltrafiltration System is designed with an average treated water (permeate) flowrate of 2.23 MGD.
Table 2.1.1 - Membrane System Design Parameter
Membrane Model Module Surface Area Number of Trains Number of Cassettes per Train Number of Modules per Cassette Minimum Temperature Maximum Temperature

Value
ZeeWeed 500D 340 ft2 4 6 48 per Cassette for 5 Trains 28 per Cassette for 1 Train 18 35

2.3

PRIMARY SUBSYSTEMS
The following sections provide brief descriptions of the primary subsystems that compose the SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System, and describe the order of subsystems that feed water moves through as it is processed.

Rev. 0 June, 2010

System Overview 2-1

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Information regarding specific equipment used in the subsystems described below has been created and supplied by the third-party vendors who manufactured the equipment, and is provided in Volume I - Vendor Data Manual. GE W&PT has not independently verified information provided by vendors and offers no representations or warranties of any kind, express or implied, as to its quality, suitability, accuracy, timeliness, or completeness. GE W&PT does not accept liability for the consequences of any action or inaction taken on the basis of information provided by third-party vendors.

2.3.1

PRETREATMENT
Water in the pretreatment stage has yet to be introduced into the SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System supplied by GE W&PT. Equipment and procedures used to control water in the pretreatment stage have been provided by others and cannot be accurately documented within this manual. Mixed liquor from the bioreactor flows into the membrane tanks.

2.3.2

ZEEWEED ULTRAFILTRATION MEMBRANES


ZeeWeed membranes are grouped into 4 process trains with associated equipment dedicated to each train.

2.3.2.1

ZEEWEED TRAINS AND MEMBRANES


A ZeeWeed train is composed of series of cassettes, each containing several ZeeWeed modules and connected together by a common permeate collection header. Each of the 4 trains has 6 cassettes of 48 modules per cassette for 5 cassette and 28 module per cassette for 1 cassette. The surface area of each membrane module is 340 ft2.

System Overview 2-2

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

The membranes, which consist of bundles of hollow fibers, are suspended in the feed water. The membranes operate under a slight negative pressure created within the hollow membrane fibers by the process pump (20-P-301-1/2/3/4). This negative pressure draws permeate through the membranes, leaving contaminants behind in the membrane tanks. The process pump (20-P-301-1/2/3/4) moves permeate to a common permeate header and then to a storage tank.

2.3.2.2

AERATION SYSTEM
Membrane blowers introduce air into the membrane tanks near the bottom of the membranes to create turbulence within the feed water. This aeration scours the outside of the membrane fibers and also oxidizes iron and organic compounds. Aeration enhances the functionality of the membrane system and must be performed whenever the system is operating. If the system is shut down, blowers must be manually activated for a minimum of one 30minute span every 24 hours. Refer to the Control Documentation for more information on membrane blower operation.

2.3.2.3

AIR EXTRACTION
A vacuum ejector (20-E-801-1/2/3/4) is used to intermittently remove air from the permeate header. This process, known as priming, prevents large pockets of air from being drawn into the process pump (20-P-3011/2/3/4). The vacuum ejector uses compressed air flowing through an orifice to create a vacuum (the Venturi effect). Water (liquid or vapor) entering the ejector is discharged to drain along with the ejected air. The line to the ejector forms a tee in the permeate header, creating turbulence that helps break up any larger bubbles formed in the permeate header.

Rev. 0 June, 2010

System Overview 2-3

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

2.3.2.4

RECIRCULATION/DRAIN PUMP
The recirculation/drain pump (16-P-801-1/2/3/4) draws the thickened waste activated sludge from the membrane tanks and delivers it to the sludge holding tank. This pump also pumps return activated sludge from the membrane tank to mix tank and also drains the membrane tank after the maintenance and recovery cleans.

2.3.2.5

CHEMICAL FEED SYSTEM


The chemical feed system consists of a citric acid tank (by others), two citric acid pumps (23-P-310/320), a sodium hypochlorite tank (by others) and two sodium hypochlorite pumps (23-P-110/120). This system pumps citric acid and sodium hypochlorite to recirc/ neutralization pumps (P-9700A/B) during maintenance clean and recovery clean. Refer to the control documentation for more information.

2.3.2.6

AIR COMPRESSORS AND ASSOCIATED EQUIPMENT


The compressed air receiver tanks (90-TK-001-1/2), receive compressed air from the air compressors (90-AC-001-1/2). This compressed air acts as the instrument air for this water treatment plant. The refrigerated air drier (90-DR-001-1/2) removes any moisture from the compressed air.

2.3.2.7

TURBIDIMETERS AND ASSOCIATED EQUIPMENT


The integrity of each train is monitored by on-line turbidimeters (20-AE/ AIT-320-1/2/3/4). Refer to the control documentation for more information.

System Overview 2-4

Rev. 0 June, 2010

PRE-INSTALLATION & INITIAL STARTUP

SECTION 3

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3.1
TIP: Refer to Volume I - Vendor Data Manual. for installation information regarding GE W&PT system components not manufactured by GE W&PT.

INTRODUCTION
This section provides general information about system pre-installation and initial startup procedures. Refer to the accompanying appendices for information about specific subsystems, and to Volume I - Vendor Data Manual for specific equipment. The pre-installation process includes all procedures in this section up to and including those described in 3.4.4 Completing Pre-Installation, and must be completed before a GE W&PT Field Service Representative (FSR) will be sent to the site.

3.2

PREPARING THE SITE


The following sections describe site requirements that must be fulfilled prior to the arrival of system components.

3.2.1

FOUNDATIONS
The foundation for a piece of equipment must be designed to support the full operating weight of the unit as defined in the applicable drawing(s) provided in Volume III - Drawings Binder.

3.2.2

DRAINS
Drains must be designed to accommodate a minimum flowrate equal to the maximum flowrate (service or regeneration) of one process line. This is normally the maximum flow encountered, but higher rates may occur during initial startup or other abnormal processes.

Rev. 0 June, 2010

Pre-installation & Initial Startup 3-1

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

3.3

RECEIVING EQUIPMENT
All components should be examined immediately upon arrival. Compare all received components with items listed in the shipping manifest and report any damage or discrepancy to GE W&PT immediately upon discovery.

Information in the sections below must be followed in order to avoid causing damage when receiving, handling, or storing particular types of equipment. Refer to Volume I - Vendor Data Manual for detailed information about a particular piece of equipment.

3.3.1

PIPING
Do not bump, weld, or heat piping or fittings, as doing so may seriously compromise the integrity of the lining. Protect piping from exposure to sudden extreme temperature changes. Do not handle roughly, and exercise extreme caution when handling PVC piping. Do not stack carbon steel piping with stainless steel piping.

3.3.2

VESSEL INTERNALS
Vessel internals are installed and inspected prior to shipment. However, damage or loosening can occur during shipping and installation. All vessel internals must be carefully inspected after shipment and again immediately following vessel installation.

Pre-installation & Initial Startup 3-2

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3.3.3

INSTRUMENTATION & VALVES


Protect all valves and instrumentation from exposure to the elements or contamination by dirt and moisture, and store indoors in a temperaturecontrolled location.

3.3.4

PUMPS & BLOWERS


Inspect immediately upon receiving for missing or damaged components. Store indoors if possible. If equipment must be stored outdoors, protect from exposure to the elements and extreme temperatures. Rotate motor shafts monthly by hand. Refer to Volume I - Vendor Data Manual for lubrication and maintenance schedules.

3.3.5

CONTROL PANELS
To prevent exposure to dirt and moisture, keep cabinet doors closed. To protect PLC memory, connect panels to a power supply as soon as possible. If necessary, build temporary shelter(s) to protect panels from the elements during field wiring. Store panels indoors in a temperature-controlled location and away from large transistors, transformers, fuse boxes, strong magnets, and any other sources of electromagnetic radiation.

Rev. 0 June, 2010

Pre-installation & Initial Startup 3-3

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

3.4

PRE-INSTALLATION
The following sections provide information regarding the installation and alignment of common system components, such as piping, tanks, and pumps. This equipment must be installed and tested prior to the installation of subsystem-specific equipment, such as UF membranes. The procedures outlined in these sections are intended to provide a general indication of the order in which common equipment is installed. Refer to Volume I - Vendor Data Manual for detailed installation information regarding specific components.

3.4.1

FASTENING & CONNECTING EQUIPMENT


Review the following information before attempting to bolt, fasten, or connect components during the procedures outlined in the upcoming sections. Metal washers should be used to prevent all bolt-heads and nuts from coming into direct contact with a fiberglass surface. Before tightening bolts or other fasteners, ensure that both connecting surfaces are properly aligned. Nut and bolt threads should be lubricated before tightening. When using bolts to secure fiberglass tanks, take-up torque should be applied uniformly, alternating 180 and rotating as near to 90 as possible. A bolt torque pressure of 30 lbf.ft. is normally sufficient to create a seal. All joints are to be marked with a torque tag which indicates the date installed, name of installer, and torque value applied. Whenever possible, all fasteners should be tightened by hand (that is, without the use of power tools).

Pre-installation & Initial Startup 3-4

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3.4.2

INSTALLING MECHANICAL EQUIPMENT


This section outlines the general procedure for installing mechanical system components, such as pumps, valves, or blowers. Refer to Volume I - Vendor Data Manual for installation information regarding specific equipment. After receiving and inspecting all mechanical components, install by performing the following steps: 1. Position all major components, such as pumps and blowers, as shown in drawings provided in Volume III - Drawings Binder. 2. Install any valves and piping that were removed from components prior to shipping. 3. Install all interconnecting piping. 4. Install pipe supports in accordance with ANSI B31.3 or other recognized standards. 5. Secure all components using the appropriate bolts or other fasteners. 6. Connect a filter regulator and a pressurized supply of clean, dry, oil-free air to each solenoid box. 7. After grouting has been completed, align all pumps. 8. Perform initial startup procedures for all pumps as per manufacturer instructions (refer to Volume I - Vendor Data Manual). 9. Install flange guards on all chemical lines.

It is highly recommended that, to avoid injury caused by leaks or ruptures, spray curtains or similar barriers be installed around acid and caustic regeneration components.

Rev. 0 June, 2010

Pre-installation & Initial Startup 3-5

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

3.4.3

INSTALLING ELECTRICAL EQUIPMENT


This section outlines the general procedure for installing electrical system components, such as control panels and wiring. Refer to Volume I - Vendor Data Manual for installation information regarding specific equipment. After receiving and inspecting all electrical components, install by performing the following steps: 1. Install the PLC panel. 2. Install all field-mounted instrumentation. 3. Install all field-run wiring and tubing in accordance with applicable drawing(s) provided in Volume III - Drawings Binder. 4. Perform a continuity test for all field wiring. 5. Calibrate all instruments. 6. Ensure that all analog and digital signals to and from the PLC are transmitting properly.

3.4.4

COMPLETING PRE-INSTALLATION
After all common mechanical and electrical components have been installed, ensure the following: All terminal points have been connected to the appropriate supply source, drain, or storage facility. All manual valves are closed. All manual overrides on solenoid valves have been released. All pumps are set to OFF. All step times are preset to 3 minutes.

Pre-installation & Initial Startup 3-6

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3.5

INITIAL STARTUP
After completing all pre-installation procedures described in the sections above, notify GE W&PT that the system is prepped for the initial startup process and provide all necessary reports. An FSR will then be sent out to the site to assist with the procedures outlined in the following sections.

3.5.1

PREPARING FOR INITIAL STARTUP


After completing the pre-installation process, initiate a service and shutdown flush cycle to ensure that the program cycles properly. Override alarms as required in order to enable the program to advance through the sequence. This can be performed by an FSR if assistance is required. Before beginning the initial startup procedure, ensure the following: A supply of feed water is available and at the correct pressure level. Drains, drain system, and neutralization systems are in place and functional. Air supply is connected and operational. All rotating equipment has been lubricated, all motor rotations checked, and all couplings aligned. All instruments have been calibrated. Safety equipment, such as spray curtains and eye wash stations, is installed and operational.

Rev. 0 June, 2010

Pre-installation & Initial Startup 3-7

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

The following checklist should be used to ensure that all initial startup requirements have been met:
Table 3.1.1 - Initial Startup Checklist Activity
Are all facility systems installed and ready for uninterrupted service? Is there a PLC interface terminal and communications cable that can be dedicated to the GE W&PT control panel during startup? Have pipe-flushing and hydrotest procedures been completed? Has all field wiring been installed and tested? Are formal safety procedures in place and has adequate safety equipment been provided for all personnel?

Completed/NA
[ [ [ [ [ ] ] ] ] ]

Additional Notes

3.5.2
TIP: The Distributed Control System (DCS) retains settings and statuses from the last system power-up for all system components.

POWERING UP THE SYSTEM


This section describes how to properly power up the system after all preinstallation procedures described above have been completed. Before beginning the power-up procedure, set valves and pumps according to the Operations Sequence Chart (OSC) provided in Section 5 - Control Documentation. To power up your system, perform the following steps: 1. Ensure that the main incoming power connection is connected to the cabinet. 2. Power up the supply cable at the main breaker.

Pre-installation & Initial Startup 3-8

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3. On the control panel, set the main power breaker to ON. Several indicator lights on the control cabinet illuminate and the HMI displays the startup screen. 4. Press the Control Power Switch. The DCS activates. 5. Ensure that all motor disconnect switches are in the ON position. The system is now powered up. To obtain access to the control program, input the user name and password.

3.5.3

DRY TEST
The following checks must be performed before feed water is introduced into the system:

3.5.3.1

ELECTRICIAN
All input and output signals to the DCS must be checked by an electrician with an FSR present for confirmation. All motors must be dry "bump" tested to ensure correct motor rotation. All remote valves must be trigger-tested using the DCS. Completed Mechanical and Electrical Installation Checklists must be returned to GE W&PT. Completion of all actions listed above must be reported to and signed off on by a GE W&PT representative.

3.5.3.2

MILLWRIGHT
All pumps that require alignment must be checked and an Alignment Report issued to GE W&PT.

Rev. 0 June, 2010

Pre-installation & Initial Startup 3-9

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

3.5.3.3

PIPEFITTER
All piping must be verified according to applicable drawing(s) provided in Volume III - Drawings Binder, and all hand valves must be verified with the OSC provided in Section 5 - Control Documentation.

3.5.3.4

MISCELLANEOUS
The following points must also be verified: Pumps and blowers are aligned, oiled, and ready for operation (provide reports to GE W&PT). Air supply for instrumentation is available. Adequate feed water is available. Water drainage system is functioning. Chemicals required for all system operation modes are available in sufficient quantities. Valves are stroked and timed at 3 - 5 seconds travel time for small valves, and up to 15 seconds for larger pneumatic valves. The FSR will provide the contractor with a detailed listing of all system valves. Instrumentation is configured and calibrated (provide reports to GE W&PT).

3.5.4

INTRODUCING MEDIA INTO THE SYSTEM


After completing all procedures outlined in the sections above, introduce media into the system by performing the following steps:

Pre-installation & Initial Startup 3-10

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

TIP: Prior to loading media into vessels, the internals should be inspected by a GE W&PT representative to ensure that all components are secure and undamaged.

1. Hydrotest the entire system with the exception of the concentrated chemical systems, which should be pneumatically tested to 0.69 bar(g) (10 psig) with all connections being soap-tested for leaks. 2. Flush all piping with the exception of concentrated chemical piping. 3. Drain and isolate all vessels, and then inspect vessel internals for cleanliness. 4. Load media into each individual subsystem in accordance with media-loading instructions provided in the accompanying appendices.

3.5.5

WET TEST
An FSR will assist with conducting a wet test during the initial startup process.

3.5.5.1

PREPARING FOR A WET TEST


In preparation for the wet test and prior to the FSRs arrival, perform the following steps: 1. Close all hand valves that connect the ZeeWeed main permeate header to the individual ZeeWeed membrane permeate headers. 2. Close all hand valves that connect the ZeeWeed air lines to the individual ZeeWeed membrane air lines. 3. Ensure that the membrane tank is empty and that all debris is vacuumed out. 4. Flush all piping by opening all necessary hand valves, automatic valves, and pumps as shown in Volume III - Drawings Binder. This flushing includes, but is not limited to, feed, blower, permeate, and chemical piping systems. All debris in piping and tanks must be removed prior to initiating the wet test. 5. Repair any leaks detected.

Rev. 0 June, 2010

Pre-installation & Initial Startup 3-11

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

TIP: Some piping may not be conducive to pressure testing due to lack of isolation components.

6. After flushing has been completed, all piping must be pressure tested to detect leaks. During installation, it is the contractors responsibility to determine the required testing specifications and carry out the pressure testing procedure. The piping must be flooded and all air removed. Any system components that are not rated for test pressure must be removed or isolated. 7. Repair any leaks detected during pressure testing and repeat testing until successful. 8. Fill the membrane tanks to approximately 15 cm (6 in.) below the top of the overflow with fresh water by opening all hand valves and the feed flow control valve, as shown in Volume III - Drawings Binder. Check that the feed system does not leak while filling the membrane tanks. 9. Completely fill all other tanks and check for deflection, distortion, or leakage. 10. Complete the Mechanical Installation Checklist and return it to GE W&PT.

3.5.5.2

CONDUCTING A WET TEST

A Wet test cannot be performed until the procedures outlined in both 3.5.3 Dry Test and 3.5.5.1 Preparing for a Wet Test have been completed. A source of potable water at greater than 276 kPa (40 psi) must be available for wet testing procedures. After completing the steps listed above and with the assistance of an FSR, perform the wet test procedure by completing the following steps: 1. With the FSRs assistance, align the valves for a backpulse. Refer to the OSC provided in Section 5 - Control Documentation.

Pre-installation & Initial Startup 3-12

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

2. Alternately open each membrane cassette isolation valve until all piping is flushed. Drain the membrane tanks and remove any remaining debris. 3. Open the air line isolation valve for a single cassette (the air line isolation valves for all other cassettes should remain closed), and then align the blower valve as shown in Volume III - Drawings Binder. 4. Set the blower to ON to blow any dirt out of the lines. Repeat steps 4 and 5 for each air line isolation valve, and then remove any debris that has been blown out of the air lines.

It may be unsafe to test acid and polymer systems with water. To determine whether water can be used to test these systems, refer to Volume I - Vendor Data Manual for manufacturers instructions. 5. Check the chemical systems, and their respective interlocks by performing the following steps: a. Connect the chemical feed system to a local municipal pressure line at 138 kPa (20 psi) for initial integrity testing. b. Repair any leaks detected. c. Partially fill the chemical feed tanks with potable water, and then test the chemical feed systems with the pumps operating at full capacity. d. Repair any leaks detected. e. Set the chemical pumps for proper dosing. f. Drain and refill chemical tanks with the actual chemical(s) prior to final startup.

g. Verify dosing rates again while purging water from chemical lines.

Rev. 0 June, 2010

Pre-installation & Initial Startup 3-13

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

After the steps listed above have been performed, the wet test is complete.

Pre-installation & Initial Startup 3-14

Rev. 0 June, 2010

SECTION 4

OPERATING THE SYSTEM

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

4.1

INTRODUCTION
This section provides general information regarding Standard Operating Procedures (SOPs) used to start up and operate various subsystems and equipment. Refer to the accompanying appendices for detailed information regarding SOPs for specific subsystems, and to Volume I Vendor Data Manual for information regarding specific equipment.

4.2

COMMON EQUIPMENT
Before starting up any subsystem-specific equipment, ensure that the following common equipment is activated and functioning properly: AIR COMPRESSORS: At the Motor Control Center (MCC), ensure that all air compressor circuit-breakers are ON and that all air compressor selector switches are set to Auto.

4.3

ZEEWEED UF SUBSYSTEM
The following sections provide general SOPs required both prior to and while operating the ZeeWeed UF subsystem.

4.3.1

STARTING UP THE ZEEWEED UF SUBSYSTEM


Use the following SOP to start up the ZeeWeed UF subsystem under normal operating conditions. If restarting the ZeeWeed UF subsystem after an alarm shutdown, refer to 4.4 Resuming Operation Following an Alarm Shutdown.

Rev. 0 June, 2010

Operating the System 4-1

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

1. At the ZeeWeed UF MCC, ensure that the circuit-breaker is set to ON and that the selector switches for all equipment related to the subsystem are set to Auto. Refer to Volume I - Vendor Data Manual for information regarding startup procedures for specific equipment. TIP: Automatic valves may not function properly if air pressure falls below this level. 2. Ensure that pressure within the air compressor tank is at 100 kPa (14.5 psi) or greater. 3. Set all manually operated valves in the proper position for normal operation. Refer to Volume III - Drawings Binder for information regarding valve positioning, and to Volume I - Vendor Data Manual for information regarding valve operation. 4. At the PLC control panel(s), ensure that power is ON. 5. At the HMI, ensure that power is ON and that the screen displays the ZeeWeed UF subsystem control graphics. If power is ON but the screen remains dark, touch the screen to activate. 6. In the HMI main screen, enter the user name and password, and then touch (HMI) the OK button. The System Overview screen appears.

Operating the System 4-2

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

7. In the System Overview screen, select the train required for production. The Train Overview screen for that train appears.

Figure 4.1 - ZeeWeed UF System Overview Screen

8. To set an operating mode for all equipment associated with the selected train, in the Train Overview screen, touch (HMI) the Mode Control button. The Mode Control screen appears.

Figure 4.2 - ZeeWeed UF Train Overview Screen

Rev. 0 June, 2010

Operating the System 4-3

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

TIP: The All Off button is only available if the train is in Off mode.

Figure 4.3 - ZeeWeed UF Mode Control Screen

TIP: The train will first enter standby mode after being activated.

9. To activate the train, in the Mode Control screen, touch (HMI) the On button. The train begins operating in automatic mode. 10. Click Exit when finished. The Mode Control screen closes. If more trains are to be activated, repeat steps 8 - 12 for each additional train.

4.4

RESUMING OPERATION FOLLOWING AN ALARM SHUTDOWN


Use the following SOP to acknowledge an alarm, address the cause(s), and resume system operation:

Operating the System 4-4

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

TIP: An alarm banner (Figure 4.4 - Alarm Banner) will appear on screen displaying information that includes time of activation and of acknowledgement.

1. To deactivate the alarm horn, touch (HMI) the Horn Silence button found in both the Process and Alarm screens.

Figure 4.4 - Alarm Banner

Rev. 0 June, 2010

Operating the System 4-5

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

2. Based on the information provided in the Alarm Summary and Alarm History screens, determine what condition(s) caused the emergency shutdown.

Figure 4.5 - Alarm Summary Screen

Figure 4.6 - Alarm History Screen

3. To acknowledge the alarm, in the Alarm Banner screen, touch (HMI) the Acknowledge All button.

Operating the System 4-6

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

TIP: If an alarm condition remains when the system operator attempts to resume operation, the alarm will sound again and this procedure will need to be repeated.

4. Resolve the alarm condition(s) before proceeding. Refer to the accompanying appendices for information regarding issues related to specific subsystems, and to Volume I - Vendor Data Manual for information regarding particular equipment. 5. After all alarm conditions have been resolved, to reset the alarm, in the [Screen Name] screen, touch (HMI) the Alarm Reset button. 6. To resume operation, perform the relevant step(s) from among those listed below, depending upon the subsystem in question: For the ZeeWeed UF subsystem, perform steps 8 - 12 under 4.3.1 Starting Up the ZeeWeed UF Subsystem.If an alarm sounds but does not trigger a shutdown of any subsystem or associated equipment and deactivates automatically, consult the Alarm History screen for an explanation. In most cases where this occurs, the condition that triggered the alarm was resolved automatically. However, system operators should confirm this in order to rule out the possibility of a faulty alarm.

4.5

CONTROLLING SPECIFIC EQUIPMENT MANUALLY


The following sections provide general instructions for controlling specific equipment, such as valves, pumps, and blowers, from the HMI. Refer to Volume I - Vendor Data Manual for detailed information regarding the operating procedures for specific equipment.

4.5.1

ACCESSING DEVICE CONTROLS


To open the Device Control screen for a specific device, in the Process screen, touch (HMI) the symbol for that device. The Device Control screen opens.

Rev. 0 June, 2010

Operating the System 4-7

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

4.5.2

VALVES
Valves can be set in the following modes: Auto - the valve is controlled by the PLC. Open - the valve is opened manually. Close - the valve is closed manually.

Valves in Open or Close mode must be monitored and controlled manually (that is, the PLC will only control valves in Auto mode).

Figure 4.7 - Valve Device Control Screen

Operating the System 4-8

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

4.5.3

PROCESS PUMPS

A subsystem that has been set in Manual mode must not be left unattended.

Figure 4.8 - Process Pump Device Control Screen

4.5.4

CHEMICAL PUMPS
Chemical pumps can be set in the following modes: Auto - the pump is controlled by the PLC. Start - the pump is activated manually. Stop - the pump is deactivated manually.

Pumps that are in Start or Stop mode must be monitored and controlled manually (that is, the PLC will only control pumps in Auto mode).

Rev. 0 June, 2010

Operating the System 4-9

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Figure 4.9 - Chemical Skid Screen

4.5.5

AIR COMPRESSORS
Before activating an air compressor, set the duty cycle timer to the required setting. The factory default value is provided in the CLC.

4.5.6

POWER CONTROL HARDWARE


The control panel disconnect switch, PLC stop button, and pilot light are located on the outside of the control panel(s).

4.5.6.1

CONTROL PANEL DISCONNECT SWITCH


The disconnect switch can be used to cut power to the control panel, which will in turn de-energize the PLC and any equipment controlled by the PLC.

Operating the System 4-10

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

4.5.6.2

SYSTEM STOP BUTTON


Pressing the System Stop Button immediately places all PLC-controlled equipment into OFF mode. To resume operation, after the button has been pulled back out, the operator must follow the startup procedures outlined in the applicable sections above and in the accompanying appendices.

TIP: All manually operated equipment will retain preshutdown status and equipment in Auto mode remain in Auto mode.

Pressing the System Stop Button immediately places all PLC-controlled equipment into OFF mode. After this button is pulled back out, operation will resume automatically in accordance with the startup sequence outlined in the CLC provided in Section 5 - Control Documentation. A power-up status bar will display on the HMI as operation resumes.

4.6

SYSTEM SETPOINTS
The design values for system setpoints are listed in the CLC provided in Section 5 - Control Documentation. These values can be changed from the setpoints screen of a particular system component.

Record all setpoint changes. In the event of a complete loss of power, the system will restart with setpoints taken from the electronically erasable programmable read only memory (E2PROM) and any recent changes will be lost. To change a setpoint, perform the following steps: 1. In the System Overview screen, click the Plant Setpoints button. The Plant Setpoints screen is displayed. 2. In the Plant Setpoints screen, click the gray box corresponding to the applicable setpoint. 3. Type the new setpoint value into the box, and then touch (HMI) the Enter button. The setpoint is changed.

Rev. 0 June, 2010

Operating the System 4-11

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

4. To close the Plant Setpoints screen, touch (HMI) the Exit button. The Plant Setpoints screen closes.

Operating the System 4-12

Rev. 0 June, 2010

SECTION 5

CONTROL DOCUMENTATION

This page has been intentionally left blank

NOTICE
The enclosed materials are considered proprietary property of GE Water & Process Technologies. No assignments, either implied or expressed, of intellectual property rights, data, know how, trade secrets or licensees of use thereof are given. All information is provided exclusively to the addressee for the purpose of evaluation and is not to be reproduced or divulged to other parties, nor used for manufacture or other means, or authorize any of the above, without the express written consent of GE Water & Process Technologies. The acceptance of this document will be construed as an acceptance of the foregoing conditions.

GE Water & Process Technologies SCLA Victorville, CA CONTROL NARRATIVE

Issued: November 16, 2009


AO# 200326 3239 Dundas Street West, Oakville, ON CANADA Phone: (905) 465-3030 Fax: (905) 465-3050
CN_200236_Victorville_Rdraft@_12Nov09_DC.doc

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

Table of Contents 1 2 3 PLANT OVERVIEW .....................................................................................................................................4 GENERAL INFORMATION .........................................................................................................................4 ZEEWEED PERMEATE EQUIPMENT OPERATION & CONTROL ..........................................................4 3.1 3.1.1 3.1.2 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 4 ZEEWEED TRAINS ..........................................................................................................................................................4 Membrane Tank Isolation Gate........................................................................................................................5 Influent Flow, Membrane Tanks Level & Permeate Flow Control ....................................................5 THICKENER TRAIN ............................................................................................................................................................6 Membrane Tank Isolation Gate........................................................................................................................6 Recirculation/Drain Pump...................................................................................................................................6 Process Pump ...........................................................................................................................................................6 Thickener Aeration .................................................................................................................................................7 Thickener Operation ..............................................................................................................................................7 Drain..............................................................................................................................................................................8

FLOW CONTROL........................................................................................................................................8 4.1 4.2 4.3 4.4 4.5 4.6 4.7 PRODUCTION TRANSMEMBRANE PRESSURE (TMP)..............................................................................................8 TRANSMEMBRANE PRESSURE (TMP) CALCULATION ............................................................................................9 START & STOP TRAIN TRIGGERS ............................................................................................................................... 10 PUTTING A ZEEWEED TRAIN TO STANDBY ......................................................................................................10 PUTTING A THICKENER TRAIN TO STANDBY/PRODUCTION.........................................................................10 WINTER MODE ENABLED ...........................................................................................................................................11 TRAIN ROTATION ...........................................................................................................................................................11

BACKPULSE EQUIPMENT CONTROL.................................................................................................... 11 5.1 5.2 BACKPULSE SEQUENCING .........................................................................................................................................12 RELAX ...............................................................................................................................................................................12

MEMBRANE AERATION CONTROL....................................................................................................... 12 6.1 6.2 6.3 SEQUENTIAL AERATION ..............................................................................................................................................13 STANDBY AERATION ...................................................................................................................................................13 BLOWER LOW AIRFLOW .............................................................................................................................................13 Page 2 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

RECIRCULATION FLOW CONTROL ...................................................................................................... 13 7.1 7.2 RECIRCULATION/DRAIN PUMPS ............................................................................................................................... 13 STANDBY RECIRCULATION .........................................................................................................................................13

8 9

INTEGRITY MONITORING & CONTROL................................................................................................ 14 CLEAN IN PLACE (CIP) CONTROLS ....................................................................................................... 14 9.1 9.2 9.3 9.3.1 9.4 SODIUM HYPOCHLORITE CLEANING EQUIPMENT ..............................................................................................14 CITRIC ACID CLEANING EQUIPMENT....................................................................................................................... 14 MAINTENANCE CLEAN .............................................................................................................................................15 Maintenance Clean Sequence.......................................................................................................................15 RECOVERY CLEAN .........................................................................................................................................................15

10 11 12 13

NEUTRALIZATION CONTROLS.............................................................................................................. 16 PRIMING SYSTEM CONTROL................................................................................................................. 16 AIR COMPRESSOR CONTROL ............................................................................................................... 17 ZEEWEED MODES OF OPERATION .................................................................................................... 17 13.1 ZEEWEED TRAIN & THICKENER ON & OFF BUTTONS .....................................................................................18

14

ZEEWEED TRIGGERS & ALARMS ........................................................................................................ 18 14.1 ALARMS ............................................................................................................................................................................18

15

ZEEWEED PLANT OPERATING INTERFACE....................................................................................... 20 15.1 15.2 PASSWORD ACCESS & PRIVILEGES ......................................................................................................................... 20 SCREEN COLOR-CODING ...........................................................................................................................................20

16 17

POWER INTERRUPTION / POWER UP ................................................................................................. 20 LOSS OF COMMUNICATION ALARMS.................................................................................................. 21 17.1 LOSS OF COMMUNICATION ALARM WITH PLANT SCADA...............................................................................21

18

SIGNALS FOR COMMUNICATION......................................................................................................... 21 18.1 18.2 PLANT PLC TO THE GE W&PT PLC SIGNALS .......................................................................................................21 GE W&PT PLC TO THE PLANT PLC SIGNALS .......................................................................................................22

Page 3 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

Plant Overview This document covers a general description of the controls by GE W&PT for the following unit processes: ZeeWeed Trains, (One of ZeeWeed Trains can function as a thickener) Backpulse Equipment, Aeration Equipment, Clean-In-Place (CIP) Equipment, Compressed Air.

General Information The reader should refer to the Piping and Instrumentation Diagrams (P&IDs), Operations Sequence Chart (OSC) and the Control Logic Summary Chart (CLSC) for a complete understanding of the plant control scheme as described below. The PLC follows specific steps to automatically control valves, pumps, etc. during the operating states for the treatment plant. These steps are listed and described in the OSC. Details of the control logic, setpoints, etc. that are required to operate the plant are given in the CLSC. In the documentation the Programmable Logic Controller is referred to as the PLC. The PLC provides automated control of the ZeeWeed equipment. All the programming for the control of the ZeeWeed plant is stored in the PLC. Setpoints, alarms, and calculated parameters, etc., are assigned tags in the PLC code. When tags are used in the Control Narrative, they are identified by an alpha-numeric label, for example, 20-P-301, for a Process pump. Modes are a series of steps the train follows to perform various operations, such as a cleaning. A specific mode discussed in this document is shown in capital letters, such as MAINTENANCE CLEAN. Buttons displayed on the HMI screen that the operator can press to initiate a mode or other operation are shown with the first letter capitalized. For example, one button that is used to put a train to OFF mode is the Off button.

ZeeWeed Permeate Equipment Operation & Control 3.1 ZeeWeed Trains

A ZeeWeed train is functionally described as a group of ZeeWeed modules and cassettes connected by a common permeate collection header. During PRODUCTION the process pump draws water through the membranes and delivers it to the common permeate header and then the UV channel.

Page 4 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

3.1.1

Membrane Tank Isolation Gate

Membrane tank isolation gate is used to isolate the membrane tank from the influent flow during RECOVERY CLEANS. Consult the OSC for further details on the gates position. 3.1.2 Influent Flow, Membrane Tanks Level & Permeate Flow Control

The influent flow signal is used in the calculation of the plant flow demand, which controls the speed of the process pump. As the influent flow increases the plant flow demand increases, causing the process pump(s) to speed up. To prevent standby and overflow conditions, the average level in the membrane tanks is used to trim the plant flow demand. Level control is accomplished with Proportional control. The PLC performs these calculations. The plant flow demand is the net permeate flowrate required from the trains and does not include additional permeate the trains produce for non-production operations, such as BACKPULSE. The trim flowrate, which is a calculated flow, is added to or subtracted from the influent flowrate according to the average level in the membrane tanks and the difference from the level setpoint. As the level increases above the setpoint in the membrane tanks, the trim increases causing the overall plant flow demand to increase. When the plant flow demand increases, the process pumps for the trains in operation are ramped up to increase the plant permeate production which brings the level down in the membrane tanks. Conversely, if the membrane tanks are below the setpoint, the calculated trim flowrate is a negative flow and the overall plant flow demand decreases. The process pumps are ramped down, decreasing permeate production, and the membrane tanks level increases as a result of the decreased permeate production. The flow setpoints for trains with a manual flow setpoint are added together and subtracted from the plant flow demand which includes the level trim. This revised plant flow demand is then divided equally to the trains in operation without a manually entered flow setpoint. This value becomes the net production flow setpoint for a train. A correction factor is calculated to account for the time when the train is not producing water (i.e. Relax or Backpulse) and to produce additional water required for backpulsing the train, when trains are being backpulsed. The net production flow setpoint multiplied by the correction factor is then used to calculate the instantaneous flow setpoint for the train. This value controls the process pump speed through the flow PID loop. A flow setpoint may also be entered for each train manually. The supervisor can do this by setting the production flowrate for some or all of the trains on the HMI. The PLC will maintain the entered production flowrate or PLC calculated production flowrate up to a maximum TransMembrane Pressure (TMP) or a minimum membrane tank level.

Page 5 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

Figure 1: Influent Flow, Level Control & Permeate Flow Control Chart
Measured Level Level Setpoint Trim Influent Flow
Add Flow and Trim

Total of all supervisory entered train flows

Actual train flow from transmitter

Plant Flow Demand

Subtract supervisory Revised entered train flows Plant Flow from plant flow Demand demand

Divide net control output by the number of units in a production cycle without a supervisory setpoint

Convert the production flow setpoint per train to the instantaneous production setpoint

Process Pump Speed

Indicates Control Loop

3.2

Thickener Train

The operator is required to waste sludge from the membrane tanks in order to maintain good membrane performance. The operator should analyze the sludge to ensure a mixed liquor concentration of less than 10,000 mg/L, for example, to maximize membrane performance for a ZeeWeed train. The operator can select at the HMI to operate train 4 as either a ZeeWeed train or as a thickener. 3.2.1 Membrane Tank Isolation Gate

Membrane tank isolation gate is used to isolate the membrane tank from the influent flow during DRAIN. Consult the OSC for further details on the gates position. 3.2.2 Recirculation/Drain Pump

When operating as a thickener, the recirculation/drain pump does not run during PRODUCTION and BACKPULSE. It is used to drain the membrane tank to the sludge holding tank during DRAIN. 3.2.3 Process Pump

The process pump draws permeate through the membranes which increases the concentration of the mixed liquor suspended solids in the membrane tank from less than 1% to 3%. In PRODUCTION, a permeate flow setpoint controls the speed of the process pump until the concentration of mixed liquor increases above a concentration setpoint. As the concentration of solids increases above this concentration setpoint, the flow setpoint decreases with increasing concentration of solids.

Page 6 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

3.2.4

Thickener Aeration

The membranes are aerated in 10/10 aeration in STANDBY, PRIME, PRODUCTION, and BACKPULSE. The membrane tank is not aerated while the membrane tank is being drained. 3.2.5 Thickener Operation

To operate the train 4 as a thickener, the operator selects the Thickener button at the HMI. The following setpoints are entered at the HMI. 1) The concentration of the mixed liquor solids in the membrane tank distribution channel; Setpoint for the Mixed Liquor Suspended Solids Concentration to drain the thickener

A typical waste activated sludge thickening cycle is as follows: In Off, the operator selects the enable thickener button. The thickener goes to PRODUCTION. The process pump draws permeate through the membranes while leaving the thickened activated sludge in the membrane tank [20-TK-201-4]. The permeate volume is totalized by the PLC. Using the permeate volume, volume of the membrane tank, and the mixed liquor solids concentration is measured in the membrane tank distribution channel, the PLC calculates the mixed liquor suspended solids concentration in the membrane tank. 2) Whenever the mixed liquor solids concentration in the membrane tank is greater than the Mixed Liquor Suspended Solids Concentration to drain the thickener, the thickener goes to STANDBY and the HMI displays a banner Drain the thickener. In STANDBY, aeration continues. The operator selects the Drain button. 3) The recirculation/drain pump [20-P-801-4] draws the thickened waste activated sludge from the membrane tank and delivers it to sludge holding tank through valve [16-FV-821]. The recirculation/drain pump operates until the membrane tank level reaches an operator adjustable low level setpoint (as close to empty as possible). The membrane tank gate [20-FV-110-4] opens and refills the membrane tank to the operating level. (The membrane gate opens for set duration and stops opening for a duration. This prevents damage to the membranes.) The membrane tank is aerated for fifteen to thirty minutes. The thickener status switches back to train status. The Mixed Liquor Suspended Solids Concentration to Drain the Thickener

4)

5) 6) 3.2.5.1

The Mixed Liquor Suspended Solids Concentration to drain the thickener is an operator adjustable setpoint on the HMI with a maximum value of 3%. The operator enters at the HMI the concentration of mix liquor suspended solids feeding the thickener. The PLC totalizes the permeate flow from the thickener. The percent mixed liquor solids concentration in a thickener is calculated as follows: Page 7 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

Percent MLSS in the thickener = Total net permeate volume divided by the membrane thickener tank volume multiplied by percent solids in the thickener feed. = (Totalized permeate volume minus the totalized backpulse volume in the backpulse) divided by the level in the thickener multiplied by the thickener tank area multiplied by percent Mixed Liquor Suspended Solids in the feed. 3.2.6 Drain

The operator selects the Drain button at the HMI to start Drain mode. The steps for DRAIN are: 1. 2. The valves [20-FV-501-4 and 16-FV-821] open; The recirculation/drain pump [20-P-801-4] draws the thickened waste activated sludge from the membrane tank and delivers it to sludge holding tank through valve [16-FV-821]. The membranes are backpulsed every fifteen minutes. The valves [20-FV-501-4 and 16-FV-821] close; Refill the membrane tank to the cleaning level from the membrane tank distribution channel. The membrane tank gates position is controlled based on timers to prevent damage to the membrane and sending the other trains to STANDBY on low level. The membrane tank is aerated for fifteen to thirty minutes. Proceeds to OFF.

3. 4.

5. 6.

Consult the OSC and CLSC for setpoints and additional operation information. 4 Flow Control

The production cycle for a train is PRODUCTION followed by either BACKPULSE or RELAX. The production cycle for a thickener is PRODUCTION followed by BACKPULSE. The thickener and train used the same timer to control the production cycle. The default value for this timer is twelve minutes. 4.1 Production TransMembrane Pressure (TMP)

The PLC continuously calculates the TMP value while in PRODUCTION. If the TMP is too low, (i.e., too negative) the TMP low trigger is active and the flow control PID loop output is captured. This value becomes the maximum value for the flow control PID loop output. When the TMP low trigger becomes active, the PLC gradually reduces the maximum for the flow PID loop output until the TMP low trigger is not active, (i.e., TMP is less negative). At the moment when the TMP low trigger becomes inactive, the maximum value is then gradually increased until the TMP low trigger is active again, or continues to increase until the maximum value for the flow control PID loop Page 8 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

output equals 100%. This control strategy allows the PLC to vary the pump speed to maximize flow while avoiding excessive TMP across the membranes. 4.2 TransMembrane Pressure (TMP) Calculation

TMP is calculated by using the equation below. During PRODUCTION the value is negative, for backpulses and CIP, it is positive. The transmembrane pressure calculation is the same for the ZeeWeed trains and the thickener. TMP = Header Pressure + C x (A + B - Membrane Tank Level) Where: A is the height of the pressure transmitter above the top of the membranes. B is the height to the top of membranes in the membrane tank. C is a conversion factor (water depth to pressure); consult the CLSC for the value. In PRODUCTION, an increased TMP value means a larger pressure differential because the pressure inside the membranes is lower than outside the membranes. This corresponds to a lower number as expressed in engineering units. Therefore a high production TMP is actually expressed as a Pressure Differential Alarm Low.

Page 9 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

Figure 2 TMP Chart

4.3

Start & Stop Train Triggers

The number of trains in operation at any given time will vary depending on the plant flow demand. As this demand increases, the number of trains in PRODUCTION increases. Start and stop train triggers determine when another train is to start or when a train in PRODUCTION is switched to STANDBY respectively. These triggers are defined in the CLSC. 4.4 Putting a ZeeWeed Train to STANDBY

Several triggers may cause a train to go to STANDBY rather than shutting it down. These triggers include a low membrane tank level, low plant flow demand, or a loss of compressed air. If a low membrane tank level occurs, the train will immediately proceed to STANDBY. If the STANDBY triggers no longer exist and a Start trigger is active, the train proceeds into PRODUCTION. 4.5 Putting a Thickener Train to STANDBY/PRODUCTION

Several triggers may cause the thickener to go to STANDBY rather than shutting it down. These triggers include a low membrane tank level, a loss of compressed air; the Calculated MLSS Page 10 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

Concentration in the Thickener is greater than The Mixed Liquor Suspended Solids Concentration to drain the thickener. If the Calculated MLSS Concentration in the Thickener is less than the Mixed Liquor Suspended Solids Concentration to drain the thickener; and the membrane tank level is above the low level trigger then the thickener proceeds to PRODUCTION. 4.6 Winter Mode Enabled

Winter mode operation is for plants that can freeze. Winter mode only works as long as there is demand for at least one train to be in the Production cycle. It is not applicable to the thickener operation. The PLC is programmed to force a train, which is in Standby more than 30 minutes to go to Production (this train stays in the Production cycle for at least 200 seconds) another trains in the Production cycle will be pushed (by logic) into Standby because of high production time. After 200 seconds, the PLC check again all the Standby trains and select the train which has more than 30 minutes standby time and the highest standby time to repeat the same process again, one train at the time. The timers are operator adjustable at the HMI. The number of trains in the Production cycle is still controlled by the start/stop triggers. There are selector switches on the HMI to select either Enable Winter or Disable Winter Mode. During this switching time the request for the number of running blowers is held constant. 4.7 Train Rotation

When there are long periods of low plant flow demand, the same trains in a plant run most of the time. The operator can select the Train Rotation button at the HMI. When the plant is operating with Train Rotation, a timer starts. The timer specifies the running time for the next train to go to STANDBY. This train goes to STANDBY after the timer times out and the train has completed either a Backpulse or a Relax. The timer is reset to zero. This rotation only occurs when there is at least one train in STANDBY and at least one train is in the Production cycle. The number of trains in the Production cycle is controlled by the start/stop triggers. The blower operation does not change during this rotation. Winter Mode and Train Rotation cannot be selected at the same time. When train 4 is functioning as a thickener, it is not included in Train Rotation. 5 Backpulse Equipment Control The membranes are backpulsed using process pump. Treated water is periodically reversed back through the membranes to maintain stable transmembrane pressures. The PLC controls the pump speed to backpulse the trains at a set flow rate per train up to a maximum TMP. A transmitter on the membrane header is used to calculate the BACKPULSE TMP. This provides membrane protection against over-pressurization. If the TMP is too high, the TMP high trigger is active and the flow control PID loop output is captured. This value becomes the maximum value for the output of the flow control PID loop. Page 11 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

When the TMP high trigger becomes active, the PLC gradually reduces the maximum for the flow PID loop output until the TMP high trigger is not active, (i.e., TMP is less positive). At the moment when the TMP high trigger becomes inactive, the maximum value is then gradually increased until the TMP high trigger is active again, or continues to increase until the maximum value for the flow control PID loop output equals 100%. This control strategy allows the PLC to vary the pump speed to maximize flow while avoiding excessive TMP across the membranes. The backpulse duration, production cycle duration, TMP setpoint and flow setpoint for all ZeeWeed trains can be set through the HMI. All ZeeWeed trains in the plant share the same backpulse duration and production cycle duration. 5.1 Backpulse Sequencing

The PLC staggers the backpulses of the trains and thickener throughout each cycle to distribute the backpulses evenly when all trains/thickener are in the Production cycle. Each train/thickener is given a fixed scheduled time in the master Production cycle timer to begin either a BACKPULSE or RELAX. Train 1 is assigned the first time slot, train 2 is assigned the second time slot, and so on for all trains/thickener in the system. Regardless of the number of trains/thickener in the Production cycle, each train/thickener is always backpulsed at the same time slot of the master Production cycle timer. For example, when there are four trains (three trains and one thickener) in the system and the Production cycle time is 12 minutes, the first time slot is at time 0 min. and the second time slot, to backpulse Train 2, is at 3 minutes of the master Production cycle timer. The master Production cycle timer starts when there are no trains/thickener in Production and one train/thickener is requested to start PRODUCTION. The timer restarts every time it times out. The operator can initiate a BACKPULSE from the HMI for any ZeeWeed train by pressing the Backpulse button. This button is disabled if any other train is in BACKPULSE. 5.2 Relax

RELAX control is an alternative to backpulsing. If a backpulse failure occurs and no pump is available, the PLC will place the trains into RELAX mode. In RELAX mode, the PLC will stop permeating and the membranes sits for an operator entered duration before continuing PRODUCTION. During this time solids that have concentrated around the membrane will be distributed away from the membrane surface by the aeration. 6 Membrane Aeration Control There are four membrane blowers, 20-P-201. The PLC determines the number of blowers required to run and the flow setpoint for these blowers. Blower duty is alternated according to an operator entered run time. The blowers supply low pressure air into a common air header. This common air header then divides into multiple air headers to the membrane tanks. For further details on blower operation, refer to the OSC and CLSC for the occurrence and number of blowers to be running at any given time. The blowers operate at a constant speed. The PLC starts and stops membrane blowers as necessary based on the aeration demand. Page 12 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

6.1

Sequential Aeration

Each train/thickener operates under sequential aeration, which is accomplished by aerating a given membrane module for 10 seconds, then not aerating it for 10 seconds. The cyclic aeration valves will cycle air within a train/thickener, reducing both the air required to run the system and the operating costs. 6.2 STANDBY Aeration

In STANDBY, the train are aerated intermittently based on timers. The PLC aerates trains sequentially to limit the number of starts and stops on the membrane aeration blowers. The trains are aerated starting with the first train followed by the second train, then the third train, without stopping the blower. Trains are aerated in the order of their train number. If, for example, train 2, and 3 are in Standby, train 2 is aerated first, and then train 3. Sequential aeration involves an overlap of aeration to allow the membrane aeration blower to continue to operate as one train completes its aeration and another train begins its aeration. In STANDBY, the thickener is aerated continuously in 10/10 aeration. 6.3 Blower Low Airflow

A low air flow switch is located on the discharge of each blower, for blower protection. If the switch is active, an alarm occurs and the PLC changes the lead to the next available blower. If there is no other blower available, a different alarm occurs and the PLC shuts down trains until there is sufficient aeration capacity. If all blowers are faulted, then all the trains are shut down. 7 Recirculation Flow Control The recirculation/drain pumps circulate RAS at an operator adjustable ratio based on the required plant flow demand. As the plant flow demand increases the recirculation flow demand increases, causing the recirculation/drain pump(s) to speed up. The PLC performs these calculations. 7.1 Recirculation/Drain Pumps

Each membrane tank has a dedicated recirculation/drain pump. Recirculation/drain pumps will operate during all modes of operation for a ZeeWeed train excluding MAINTENANCE CLEAN and NEUTRALIZATION. In RECOVERY CLEAN, the recirculation/drain pump drains the membrane tank. When a train is functioning as a thickener, the recirculation/drain pump does not operate in PRODUCTION, RELAX, and BACKPULSE. In DRAIN, the recirculation/drain pump drains the membrane tank. 7.2 Standby Recirculation

In the event all of the trains are in STANDBY, a RAS pump will remain running on one train. When a train in STANDBY is aerated, the recirculation/drain pump will operate for the Standby aeration duration. Page 13 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

Integrity Monitoring & Control Integrity of each train/thickener is monitored with on-line turbidimeters. There are three turbidity alarms used to assist the operator in running the system. One alarm is used to detect a problem that is not a spike and will immediately shutdown the train/thickener in PRODUCTION. For example, a train/thickener will be shutdown when the turbidity is above the setpoint, 0.5 NTU, for 60 seconds. A second alarm is used to detect a spike in turbidity and will set all trains that are in BACKPULSE mode to RELAX mode. For example, the alarm is active when the turbidity is above the setpoint, 5 NTU, for 10 seconds. The alarm will also skip all scheduled MAINTENANCE CLEANS until the turbidity alarm condition no longer exists. From this time on, MAINTENANCE CLEANS will again be completed as scheduled. The third alarm also detects turbidity spikes but at a lower setpoint and is used to notify the operator of a potential problem which needs to be addressed. For example, the alarm is active when the turbidity is above the setpoint, 0.2 NTU for 60 seconds. The turbidity alarm setpoints and the time delays, before the alarms become active, are adjustable at the HMI. For further details consult the CLSC.

Clean In Place (CIP) Controls The membranes require cleaning to maintain peak performance. There are two types of cleaning methods; Maintenance Cleans and Recovery Cleans. The cleaning chemical is either citric acid or sodium hypochlorite for Maintenance Cleans and Recovery Cleans. RECOVERY CLEANS are operator initiated from OFF and should have the operator present during the majority of this clean. When train 4 is operating as a thickener then Maintenance Clean and Recovery Clean are not available. 9.1 Sodium Hypochlorite Cleaning Equipment

Sodium hypochlorite is used to remove organic contaminants from the membranes. The sodium hypochlorite pumps 23-P-110/23-P-120 are an air diaphragm pumps. The GE W&PT PLC requests a sodium hypochlorite valve, 23-FV-101 for MAINTENANCE CLEANS or 23-FV-102 for RECOVERY CLEANS, to open to run the pump in specific steps during the cleaning procedure. Consult the OSC for these steps. 9.2 Citric Acid Cleaning Equipment

Citric acid is periodically used to remove inorganic contaminants from the membranes such as calcium carbonate, manganese and iron compounds. The citric acid pumps 23-P-310/23-P-320 are an air diaphragm pumps. The GE W&PT PLC requests a citric acid valve, 23-FV-301 for MAINTENANCE CLEANS or 23-FV-302 for RECOVERY CLEANS, to open to run the pump in specific steps during the cleaning procedure. Consult the OSC for these steps. Page 14 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

9.3

MAINTENANCE CLEAN

Maintenance Cleans are scheduled through the HMI and are automatically initiated by the PLC based on a 24 hour clock. The operator is able to schedule one Maintenance Clean per train per day. He/She enters the starting time and selects the cleaning chemical for the clean. When it is time to carry out a Maintenance Clean, the PLC compares the current plant flow demand with the available capacity of the plant if one train is not in service. If the plant flow demand exceeds this capacity, then the scheduled MAINTENANCE CLEAN is skipped but the request remains active and will be started when demand is lower. When a Maintenance Clean is skipped or aborted, an alarm occurs to inform the operator. If the plant flow demand does not exceed this capacity, when it is time to carry out a Maintenance Clean, the train will complete its current production cycle before starting the cleaning procedure. If a train is in STANDBY it will go directly to MAINTENANCE CLEAN. 9.3.1 Maintenance Clean Sequence

The steps for Maintenance Clean are: 1) 2) 3) 4) 5) 6) 7) 8) 9) 9.4 Aerates the membrane tank; Initial chemically enhanced pulse for all cassettes; Relaxation period for all cassettes; Chemically enhanced pulse for all cassettes; Relaxation period for all cassettes; Steps 4 and 5 are repeated for a number of iterations; Non-chemically enhanced pulse for all cassettes; Aerates the membrane tank; Proceeds to STANDBY. Recovery Clean

Recovery Cleans can only be carried out for a train if it is in RECOVERY CLEAN. The cleaning chemical is either citric acid or sodium hypochlorite. The operator turns the train OFF and then selects either the R. Clean with Citric Acid button or R. Clean with Sodium Hypochlorite button for the cleaning to begin. During a Recovery Clean there are several prompts which the operator must address. Consult the OSC and CLSC for further details. As a result it is suggested to have the operator present during the Recovery Clean so that these prompts can be responded to in a timely manner. The steps for Recovery Clean are: 1. Aerates the membrane tank; 2. Drains the membrane tank with the recirculation/drain pump; 3. Manual drain and flush step. The PLC will proceed to the next step after a defined duration. Page 15 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

4. Steps 5 to 8 are repeated for a number of iterations and then proceed to step 9. 5. Backpulses the membrane tank for a defined duration then proceeds to next step or until the membrane tank is at a defined level then proceeds to step 7; 6. Relaxation period for all cassettes for a defined duration and then proceed to step 5. 7. Aerates the membrane tank for a defined duration; 8. Drains the membrane tank with the recirculation/drain pump; 9. Chemically enhanced pulse to all the cassettes for a defined duration then proceeds to next step or until the tank is at a defined level then proceeds to step 11; 10. Relaxation period for all cassettes for a defined duration and then proceeds to step 9; 11. Final, extended relaxation period with intermittent aeration; 12. The operator selects the Neutralization button to proceed to NEUTRALIZATION mode. The Neutralization button is available in OFF and in the last step of RECOVERY CLEAN. The steps for Neutralization are: 1. Fills the membrane tank to defined level from the membrane distribution channel; 2. Aerates the membrane tank; 3. Relaxation period for all cassettes for a defined duration and then either proceed to next step if the clean was with sodium hypochlorite or proceed to step 5 if the clean was with citric acid. 4. The operator manually checks the residual chlorine concentration. The operator selects the Confirm Neutralization button to proceed to next step when the residual chlorine concentration is less than 10 ppm. The operator selects the Resume Neutralization button when the residual chlorine concentration is greater than 10 ppm. The PLC will proceed to step 3. 5. Non-chemically enhanced pulse to all the cassettes; 6. Proceeds to OFF. Consult the OSC and CLSC for specific details on the steps and setpoints used in this mode. 10 Neutralization Controls The NEUTRALIZATION is initiated by the operator after the extended chemical soak step in Recovery Clean. The operator is then responsible for confirming the neutralization if the clean was with sodium hypochlorite. 11 Priming System Control Each train is provided with an ejector, 20-E-801, which uses compressed air to operate and primes the process pump during PRIME, at the beginning of BACKPULSE/RELAX and intermittently the trains in STANDBY and PRODUCTION.

Page 16 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

When the operator selects the On button, the train goes to PRIME. The trains ejector compressed air valve opens which also opens the permeate header isolation valve. During this time, air in the permeate header is pulled up and out through the ejector, which also pulls water into the membranes and process pump suction. Any water that is drawn into the ejector drains out by gravity. After the priming duration, the train proceeds to STANDBY. The PLC staggers the priming of the trains throughout the Master Ejector cycle to distribute the priming when trains are in Production and Standby. Each train is given a fixed scheduled time in the Master Ejector Cycle Timer to begin priming. Train 1 is assigned the first time slot, train 2 is assigned the second time slot, and so on for all trains in the system. Regardless of the number of trains, each train is always primed at the same time slot of the Master Ejector Cycle Timer. The Master Ejector Cycle Timer starts once any train is in STANDBY and continues while there is at least one train in STANDBY, PRODUCTION, BACKPULSE, & RELAX. When train 4 is functioning as a thickener, its ejector runs according to the Master Ejector cycle in Standby for Thickener and Production for Thickener. The operator can manually initiate the priming sequence in STANDBY by pressing the Prime button at the HMI. 12 Air Compressor Control Local control panels, supplied by the Vendor, control the compressors. Refer to Vendor supplied information for more details. There is a low pressure switch on the common discharge piping which is used to alarm and callout. When this alarm is active, all trains/thickener in PRODUCTION, RELAX, and BACKPULSE switch to STANDBY. 13 ZeeWeed Modes of Operation Each ZeeWeed train has separate mode buttons. There are several modes for each train, these modes are: OFF, SHUTDOWN, POWER OFF, STANDBY for train, PRIME, BACKPULSE for train, RELAX, PRODUCTION for train, MAINTENANCE CLEAN, RECOVERY CLEAN and NEUTRALIZATION. Using the ZeeWeed train mode buttons on the HMI, the operator can put each ZeeWeed train into a different mode. There are some interlocks present to prevent the user from proceeding to one mode from another. These interlocks are for membrane protection. Not all modes are selectable. Consult the CLSC and OSC for further details on the modes. A train/thickener is in POWER OFF because a loss of power alarm is active or the system stop button is selected. A train/thickener is in SHUTDOWN because a shutdown alarm is active. A train/thickener is in STANDBY because a stop trigger or a standby trigger is active. The thickeners modes are OFF, SHUTDOWN, POWER OFF, STANDBY for thickener, PRIME, BACKPULSE for thickener, and PRODUCTION for thickener.

Page 17 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

13.1 ZeeWeed Train & Thickener On & Off Buttons For the train to operate automatically the operator needs to have all devices set to auto and On button for the train selected. The On button is only active for a train if it is in either OFF or SHUTDOWN. Pressing the On button places the train into PRIME and then into STANDBY mode. When a start trigger is active, the train proceeds to PRODUCTION and then either BACKPULSE or RELAX modes. The train will continue in the production cycle, alternating between PRODUCTION and either BACKPULSE or RELAX modes, until the plant flow demand to treat wastewater decreases placing the train to STANDBY. A scheduled MAINTENANCE CLEAN will automatically interrupt the production cycle. An alarm may also place a train to STANDBY or SHUTDOWN. The operator may interrupt the production cycle by pressing either the Maintenance Clean or Backpulse button. The train will proceed to the selected mode once the resources are available. There are interlocks preventing more than one train from entering the same mode at the same time. Consult the CLSC and the OSC for details on the interlocks. The operator may turn a train/thickener OFF at any time. Pressing the Off button places the train/thickener into OFF mode. It is the responsibility of the operator to ensure that if the Off button is pressed when a train is in the MAINTENANCE CLEAN or RECOVERY CLEAN modes the membrane tanks contents are suitable for a train to proceed to another mode. Neutralization may be required, or the membrane tank may need to be drained. For the thickener to operate automatically the operator needs to have all devices set to auto and On button for the thickener selected. The On button is only active for a thickener if it is in either OFF or SHUTDOWN. Pressing the On button places the thickener into PRIME and then into STANDBY for thickener mode. When a start trigger is active, the thickener proceeds to PRODUCTION and then BACKPULSE mode. The thickener will continue in the production cycle, alternating between PRODUCTION and BACKPULSE modes, until the Calculated MLSS Concentration in the Thickener is greater than the Mixed Liquor Suspended Solids Concentration to drain the thickener placing the thickener to STANDBY. An alarm may also place a thickener to STANDBY or SHUTDOWN. 14 ZEEWEED Triggers & Alarms A trigger is a normal event that can clear an alarm or be one of several points in a sequence of events. 14.1 Alarms Alarms are used to identify a problem with the system. Depending on the nature of the problem the alarm may either shutdown the train(s), place a train to STANDBY, and initiate a callout to notify the operator that there is a problem. It is understood that the operator will acknowledge the alarm and address the situation. If the problem is not corrected, production quality and quantity will drop off quickly. An alarm that is activated by an instrument, pressure transmitter, flow transmitters, or level instrumentation, typically requires a pump or certain device to be on to generate the required flow or pressure. Otherwise, the alarm will be ignored if the device to be protected is off. Page 18 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

All alarms are indicated with a message on the screen. The operator cannot reset the alarm without the correct password. All alarms and the time they occurred are recorded on the alarm history screen. Some alarms can shutdown a ZeeWeed train or all the trains and the thickener. These alarms close appropriate valves and stop the pumps. The shutdown alarm puts the train to SHUTDOWN mode. Restarting after a shutdown will require the alarm to be reset. The shutdown alarm puts the thickener to SHUTDOWN mode. Restarting after a shutdown will require the alarm to be reset. Devices which are being controlled remotely cannot have their status changed by the PLC. Consult the CLSC for details on specific alarms, the corresponding actions and reset procedures. Typical alarms that shutdown a train and alarms that put a train/thickener to STANDBY are listed in the following tables. Table 1: Train Shutdown Alarms Alarm Description High Flow Alarm - permeate Low Flow Alarm - permeate Pressure High-High Alarm permeate (measured by pressure Transmitter) Transmembrane Pressure Low, Low Process pump Fault Compressed Air Low pressure and train is in Recovery Clean Possible Causes for Alarm Suction hose disconnecting from fittings. Loss of prime of process pump Suction hose disconnecting from fittings. Fouled UF membranes VFD Fault Insufficient Compressed Air Supply to operate pneumatically actuated valves

Table 2: Train Standby Alarms Alarm Description Low Level Alarm membrane tank Power Failure Low Flow Demand Standby Trigger Compressed Air Low pressure and train is in Production, Backpulse, or Relax, or Maintenance Clean. Possible Causes for Alarm Permeate flowrate is higher than the Feed flowrate Tripped breaker inside panel Decreased Feed train is not required for Production Insufficient Compressed Air Supply to operate pneumatically actuated valves

Page 19 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

15 ZeeWeed PLANT OPERATING Interface To accommodate the above operational requirements and all other control, display, and monitoring requirements, this plant employs a Human Machine Interface (HMI) for access to plant controls. The HMI communicates with the Programmable Logic Controller (PLC (referred to as PLC in the documentation)), which in turn controls the plant. 15.1 Password Access & Privileges The entire plant is controlled from the PLC through a HMI. The ability to silence the horn and acknowledge alarms does not require a password, but alarms can not be reset. To gain access to make changes on the HMI, the operator is required to enter the correct password. A screensaver blanks the screen after a set amount of time of inactivity. The screen is reactivated by a single touch. Reactivation cannot select a device or operating mode. In order to access the control screens, the individual must enter a correct password then press Enter. There are three levels of password protection; Operator, Supervisor, & GE W&PT. The operator password is factory set; consult the CLSC for the operator password. The supervisor password can be modified from the HMI. There is no limit to the number of times another password can be attempted. The password must be re-entered after a set amount of time of inactivity. For details of password privileges consult the CLSC. 15.2 Screen Color-Coding The color-coded status indicates whether the device is either running automatically, shutdown, in STANDBY, off, manually overridden, etc. The HMI uses the color-coding shown below. Table 3: HMI Color Code Devices Chart Color Green Red Grey 16 Power Interruption / Power Up When a loss of power occurs, the affected trains/thickener will immediately proceed to POWER OFF mode. After power returns, the plant powers up common equipment and then the trains/thickener will start-up automatically in the order of the membrane tank number. The CLSC lists the order in which the common equipment and trains will power up; it also specifies the mode that a train/thickener will proceed to from POWER OFF mode. Page 20 of 22 Valve Open Fault Close Pump On Fault Off

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

17 Loss of Communication Alarms During operation of the GE W&PT system, there are heartbeat signals generated by each PLC. Each heartbeat signal is a counter that increases by one unit each second. When the communication with a PLC is lost, the PLC that is monitoring the heartbeat counter detects that the value of the counter has not changed for a preset time, for example after 5 seconds, and alarms. When the counter reaches 10,000 it restarts counting from zero. Discussions of the alarms and the changes that occur to the control systems are given in the following sections. 17.1 Loss of Communication Alarm with Plant SCADA When there is a loss of communication with the plant SCADA, the trains proceed to SHUTDOWN. 18 Signals for Communication For the GE W&PT membrane system to maintain optimal performance, information must be communicated between the plant SCADA and the GE W&PT PLC. Operating parameters of the GE W&PT system such as flowrates, pressures, train modes, etc. are available for communication, if necessary, when the plant SCADA is required to only monitor these parameters. A list showing this information, however, is not provided in this document due to the large number of parameters available. The MBR system operates in a continuous automatic mode controlled by GE W&PT PLC, which shall interface with the plant SCADA system. 18.1 Plant PLC to the GE W&PT PLC Signals The list given below shows the signals that are communicated from the plant SCADA over the network to the GE W&PT PLC to operate the membrane system. 1. Feed Flowrate 2. Permissive to run the trains and thickener (the UV is ready) 3. Running signal for blower 20-B-201-1 4. Running signal for blower 20-B-201-2 5. Running signal for blower 20-B-201-3 6. Running signal for blower 20-B-201-4 7. Running signal for process pump 20-P-301-1 8. Running signal for process pump 20-P-301-2 9. Running signal for process pump 20-P-301-3 10. Running signal for process pump 20-P-301-4 11. Running signal for recirculation drain pump 16-P-801-1 Page 21 of 22

AO# 200326

CN_200326_Victorville_R02_28May10_AV.doc

SCLA Victorville Control Narrative

Printed: June 16, 2010

12. Running signal for recirculation drain pump 16-P-801-2 13. Running signal for recirculation drain pump 16-P-801-3 14. Running signal for recirculation drain pump 16-P-801-4 18.2 GE W&PT PLC to the Plant PLC Signals The list given below shows the signals that are communicated from the GE W&PT PLC over the network to the plant PLC to assist in the operation of the membrane system. 1. Required flow for blower 20-B-201-1 2. Required flow for blower 20-B-201-2 3. Required flow for blower 20-B-201-3 4. Required flow for blower 20-B-201-4 5. Required flow for process pump 20-P-301-1 6. Required flow for process pump 20-P-301-2 7. Required flow for process pump 20-P-301-3 8. Required flow for process pump 20-P-301-4 9. Required flow for recirculation drain pump 16-P-801-1 10. Required flow for recirculation drain pump 16-P-801-2 11. Required flow for recirculation drain pump 16-P-801-3 12. Required flow for recirculation drain pump 16-P-801-4

Page 22 of 22

GE Water & Process Technologies SCLA Victorville, CA Operations Sequence Chart for Train Sequenced Equipment

Operating Mode

ME M. A

FE ED

pD ela y

IR -

Step Description

Step #

Se qu en tia -M l em bra PE ne RM Ta EA nk TE Iso -H lat PE ea io n RM de r to EA TE Pu - In m CL p str EA um Nen So t Is diu o la CL m tio EA Hy n Npo ch C it l r o ic A rite Re cid c ir Iso cu Iso lat la t lat io n io n io n /Dr RA ain St oM ix T an DR k Is AIN o la -S tio N lud n 6 ge M. H CL old EA ing NIso Cit M. lat ric CL i o n N6 Ac EA id NS od R. ium CL EA Hy Npo C it ch R. r lo r i cA CL it e cid EA NSo diu VA CU m Hy UM po -E ch jec lo r Ac tor it e tiv co ate mp dS res l u d Me sed ge mb -R air ran eci rcu eA lat era Pro i on tio ces /Dr nD s ain em an d

Legend This column is for the GE W&PT Tags T - Indicates that the valve is throttling in Auto. O - Indicates that the valve/motor is open/on in Auto. X - Indicates that the valve/motor is closed/OFF in Auto. C - Indicates that valve cycles though an open/close sequence. -x - Indicates that there are multiple trains associated with this tag number. LS - Indicates that the valve/pump will retain the last state it had (open/closed, on/OFF) to avoid damaging equipment.

Ste

Tag Numbers 20-FV-210-x 20-FV-211-x 20-FV-110-x 20-FV-320-x 20-FV-301

Valves 23-FV-131-x 23-FV-331-x 20-FV-501-x 16-FV-820 16-FV-821 23-FV-301 23-FV-101 23-FV-302 23-FV-102

Pumps & Blowers 20-FV-802-x For 20-E-801x 20-B-201-x 16-P-801-x 20-P-301-x The Operations Sequence Chart (OSC), Control Logic Summary Chart (CLSC) and the Control Narrative (CN) should all be read to assist in the understanding of plant operations. Comments & Sequencing Logic

OFF

1 Step 1 LS LS LS LS LS LS LS LS LS X X X X X X X X 6 1 Stops all rotating equipment, and leaves valves as they were. Waits for step delay, then proceeds to the next step. Train/thickener remains OFF until the operator changes it to another operational mode. If the ON button is pressed proceeds to PRIME - step 1. For a train, if the BACKPULSE button is pressed proceeds to BACKPULSE - step 1 for a train. For the thickener, if the BACKPULSE button is pressed proceeds to BACKPULSE - step 1 for thickener. When the train 4 is operating as a thickener the Drain button is available. If the Drain button is pressed proceeds to DRAIN - step 1. If the NEUTRALIZATION button is pressed proceeds to NEUTRALIZATION - step 1. (This button is not available for the thickener.) If the MAINTENANCE CLEAN button is pressed proceeds to MAINTENANCE CLEAN - step 1. (This button is not available for the thickener.) If the RECOVERY CLEAN button is pressed proceeds to RECOVERY CLEAN - step 1. (This button is not available for the thickener.) If PRIME pushbutton is pressed proceeds to PRIME - step 1. Only proceeds to the step indicated if the resources are available and the interlocks preventing the action are not present. Stops all rotating equipment, and leaves valves as they were. Waits for step delay, then proceeds to the next step. When 20-LS-201Q-x is active, then open the gate for 20-KQS-110C seconds gate stop opening the gate for 20-KQS-110D seconds. Repeat opening the gate with the frequency and duration timers. When 20-LS-201Q-x is not active, then request to open the gate continously and ignore the timers. When 20-LS-201E-x is active, proceeds to the next step. Train/thickener remains in this mode until the operator changes the train/thickener to ON or OFF mode. If the ON button is pressed proceeds to PRIME - step 1. If the OFF button is pressed proceeds to OFF - step 1. Train remains in this step until it is enabled by the start-up sequence steps. Consult the CLSC for specific details.

Step 2

SHUTDOWN Shutdown Tank Fill

2 Step 1 Step 2 LS X LS O LS X LS X LS X LS X LS X LS X LS X X X X X X X X X X X X X X X X X 6 1 2

Shutdown POWER OFF All Devices OFF STANDBY for Train

Step 3 3 Step 1 5 Step 1

Ste

3 3 1 5

LS X

O O

LS X

LS X

LS X

LS X

LS X

LS X

LS X

X X

X X

X X

X X

X X

X X

X X

X X

1 2

Tank Fill

Step 2

STANDBY

Step 3 CN1

ON4

ON3,5

ON1

Stops all rotating equipment, and leaves valves as they were. Waits for step delay, then proceeds to the next step. When 20-LS-201E-x is active, proceeds to the next step. Aerates for 20-KQS-201C seconds every 20-KQS-201D seconds. Runs the ejector intermittently according to Master Ejector Cycle Timer. The train remains in this step indefinitely until one of the following occurs: If a start train trigger is active, defined in the CLSC, the train proceeds to the PRODUCTION - step 1 for a train. If the BACKPULSE button is pressed proceeds to BACKPULSE - step 1 for a train. If the RELAX button is pressed proceeds to RELAX - step 1. If the MAINTENANCE CLEAN button is pressed proceeds to MAINTENANCE CLEAN - step 1. If the PRIME TRAIN button is pressed proceeds to PRIME - step 1. Only proceeds to the step indicated if the resources are available and the interlocks preventing the action are not present.

STANDBY for Thickener

5 Step 1 C C O O LS X LS X LS X LS X LS X LS X LS X X X X X X X X X X X X X LS O X X 6

5 1 2 Stops all rotating equipment, and leaves valves as they were. Waits for step delay, then proceeds to the next step. When 20-LS-201E-4 is active, proceeds to the next step. Runs the ejector intermittently according to Master Ejector Cycle Timer. The thickener remains in this step indefinitely until one of the following occurs: If the Drain the Thickener Trigger is not active, defined in the CLSC, the thickener proceeds to PRODUCTION - step 1 for thickener. If the PRIME button is pressed proceeds to PRIME - step 1. If the BACKPULSE button is pressed proceeds to BACKPULSE - step 1 for the thickener. If the Drain button is pressed proceeds to DRAIN - step 1. Only proceeds to the step indicated if the resources are available and the interlocks preventing the action are not present. Only one train/thickener can be in PRIME mode at a time but more than one train/thickener can be in a priming step (when an ejector is running). Holds this step for step duration IF PRIME was initiated from STANDBY then for a train proceeds to STANDBY - step 1 for a train. IF PRIME was initiated from STANDBY then for a thickener proceeds to STANDBY - step 1 for thickener. If the On button was pressed in Off or Shutdown, then for a train proceeds to STANDBY - step 1 for a train. If the On button was pressed in Off or Shutdown, then for a thickener proceeds to STANDBY - step 1 for a thickener. Waits for step delay, then proceeds to the next step. Permeates until the end of the current Production cycle, then: If there is a demand for the train to run and there are no mode requests noted below, proceeds to either BACKPULSE for a train - step 1 or RELAX - step 1. If a MAINTENANCE CLEAN request is active proceeds to MAINTENANCE CLEAN - step 1. Only train 4 can function as a thickener. Waits for step delay, then proceeds to the next step. Permeates until the end of the current Production cycle, then: If the Drain the Thickener Trigger is not active, the thickener proceeds to BACKPULSE - step 1 for thickener. If the Drain the Thickener Trigger is active, the thickener proceeds to STANDBY - step 1 for thickener. Page 1 of 4
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

Tank Fill

Step 2

STANDBY

Step 3

ON4

PRIME

Priming Train

Step 1

20-KQS-801

PRODUCTION for Train

14 Step 1 Step 2

C C

O O

O O

O O

X X

X X

O O

O O

X X

X X

X X

X X

X X

X ON4

LS O

LS O

X O

14 1 2

Permeate

PRODUCTION for Thickener Valve Alignment Permeate

19 Step 1 Step 2

C C

O O

O O

O O

X X

X X

X X

X X

X X

X X

X X

X X

X X

X ON4

X X

O O

X O

19 1 2

Issued: Nov 16, 2009 Process Controls: D. Courtney

OSC_200326_Victorville_R02_11May10_MdK2.xls

GE Water & Process Technologies SCLA Victorville, CA Operations Sequence Chart for Train Sequenced Equipment

Operating Mode

ME M. A

FE ED

pD ela y

IR -

Step Description

Step #

Se qu en tia -M l em bra PE ne RM Ta EA nk TE Iso -H lat PE ea io n RM de r to EA TE Pu - In m CL p str EA um Nen So t Is diu o la CL m tio EA Hy n Npo ch C it l r o ic A rite Re cid c ir Iso cu Iso lat la t lat io n io n io n /Dr RA ain St oM ix T an DR k Is AIN o la -S tio N lud n 6 ge M. H CL old EA ing NIso Cit M. lat ric CL i o n N6 Ac EA id NS od R. ium CL EA Hy Npo C it ch R. r lo r i cA CL it e cid EA NSo diu VA CU m Hy UM po -E ch jec lo r Ac tor it e tiv co ate mp dS res l u d Me sed ge mb -R air ran eci rcu eA lat era Pro i on tio ces /Dr nD s ain em an d

Legend This column is for the GE W&PT Tags T - Indicates that the valve is throttling in Auto. O - Indicates that the valve/motor is open/on in Auto. X - Indicates that the valve/motor is closed/OFF in Auto. C - Indicates that valve cycles though an open/close sequence. -x - Indicates that there are multiple trains associated with this tag number. LS - Indicates that the valve/pump will retain the last state it had (open/closed, on/OFF) to avoid damaging equipment.

Ste

Tag Numbers 20-FV-210-x 20-FV-211-x 20-FV-110-x 20-FV-320-x 20-FV-301

Valves 23-FV-131-x 23-FV-331-x 20-FV-501-x 16-FV-820 16-FV-821 23-FV-301 23-FV-101 23-FV-302 23-FV-102

Pumps & Blowers 20-FV-802-x For 20-E-801x 20-B-201-x 16-P-801-x 20-P-301-x The Operations Sequence Chart (OSC), Control Logic Summary Chart (CLSC) and the Control Narrative (CN) should all be read to assist in the understanding of plant operations. Comments & Sequencing Logic 99 1 2 3 4 6 20-KQS-201N 6 6 6 20-KQS-301B 6 5 6 7 20 1 2 3 4 Only train 4 can function as a thickener. Waits for step delay, and then proceeds to the next step. When 20-LS-201S-4 is active, then proceeds to the next step. Waits for step delay, and then proceeds to the next step. When 20-LS-201Q-4 is active, then open the gate for 20-KQS-110C seconds gate stop opening the gate for 20-KQS-110D seconds. Repeat opening the gate with the frequency and duration timers. When 20-LS-201Q-4 is not active, then open the gate. When 20-LS-201C-4 is active, proceeds to the next step. Waits for step delay, and then proceeds to the next step. Waits for step delay, default time 15 to 30 minutes and then proceeds to the next step. Proceeds to OFF - step 1. The thickener is enabled as a train. The thickener flag is cleared. Only one train/thickener can be in BACKPULSE at a time. Waits for step delay, and then proceeds to the next step. Waits for step delay, and then proceeds to the next step. Backpulses the membrane train. Holds this step for step delay then proceeds to the next step . Waits for step delay, for flow to stop, then proceeds to the next step. If the Drain the Thickener Trigger is not active, proceeds to PRODUCTION - step 1 for thickener. If the Drain the Thickener Trigger is active, the thickener proceeds to STANDBY - step 1 for thickener. If the BACKPULSE was initiated from OFF, proceeds to OFF - step 1. If the BACKPULSE was initiated from STANDBY, proceeds to STANDBY - step 1. Only one train/thickener can be in BACKPULSE at a time. Only one train can be in BACKPULSE or RELAX at a time. Waits for step delay, and then proceeds to the next step. Waits for step delay, and then proceeds to the next step. Backpulses the membrane train. Holds this step for step delay then proceeds to the next step . Waits for step delay, for flow to stop, then proceeds to the next step. If there is a demand for the train to run, proceeds to PRODUCTION - step 1. If there is no demand for the train to run, proceeds to STANDBY - step 1. If the BACKPULSE was initiated from OFF, proceeds to OFF - step 1. If the BACKPULSE was initiated from STANDBY, proceeds to STANDBY - step 1. Only one train can be in RELAX and BACKPULSE at a time. Waits for step delay then proceeds to the next step. Holds this step for step delay then proceeds to the next step . If there is a demand for the train to run, proceeds to PRODUCTION - step 1. If there is no demand for the train to run, proceeds to STANDBY - step 1. Only one train can be in MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION at a time. Note Train 4 can only perform a maintenance clean when it is enabled as a train. Waits 12 seconds, for valve alignment, then proceeds to the next step. Aerates the membrane train. Holds this step for step delay, then proceeds to the next step. Waits for step delay, for valve alignment, then proceeds to the next step. Only the selected chemical valve opens. Backpulses the membrane train. Holds this step for step delay then proceeds to the next step. Only the selected chemical pump/valve run/open. Holds this step for step delay then proceeds to the next step. Only the selected chemical valve opens. Waits for step delay, for valve alignment, then proceeds to the next step. Backpulses the membrane train. Holds for step delay then proceeds to the next step. Holds this step for step delay then: Repeats MAINTENANCE CLEAN - steps 6 to 8 for 20-KQS-301F iterations. After the last iteration proceeds to the next step. Waits for step delay, for valve alignment, then proceeds to the next step. Backpulses the membrane train. Holds this step for step delay then proceeds to the next step. Aerates the membrane train. Holds this step for step delay, typically 300 seconds, then proceeds to the next step. Waits for step delay, for valve alignment, then proceeds to STANDBY - step 1. Only one train can be in MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION at a time. Note Train 4 can only perform Neutralization when it is enabled as a train. When 20-LS-201Q-x is active, then open the gate for 20-KQS-110C seconds gate stop opening the gate for 20-KQS-110D seconds. Repeat opening the gate with the frequency and duration timers. When 20-LS-201Q-x is not active, then open the gate until 20-LS-201C-x is active then proceeds to next step. Waits for step delay, for valve alignment, then proceeds to the next step.

DRAIN for Thickener Valve Alignment Drain Membrane Tank Valve Alignment Refill Membrane Tank Valve Alignment Aeration Valve Alignment BACKPULSE for Thickener Permeating Stops B.P. Starts

99 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 20 Step 1 Step 2 Step 3 Step 4

X X X X C C C C C C C

X X X O X X X O O O O

X ON7 X X X X X O O O O

X X X X X X X LS X X X

X X X X X X X X X X X

X X X X X X X X X X X

O O O X X X X X X X X

X X X X X X X X X X X

O O O X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X O O X X

X O X X X X X X X X X

X X X X X O O LS O O O

X ON7 X X X X X X X ON9 X

6 6

B.P. Stops

Step 5

BACKPULSE for Train Permeating Stops B.P. Starts

20 Step 1 Step 2 Step 3 Step 4 C C C C O O O O O O O O LS X X X X X X X X X X X O O O O O O O O X X X X X X X X X X X X X X X X X X X X O O X X LS O O O LS O O O X X ON9 X 6 6 20-KQS-301B 6

20 1 2 3 4

B.P. Stops

Step 5

RELAX Permeating Stops Relax Stops MAINTENANCE CLEAN Permeating Stops Tank Aeration Initial B.P. B.P. Train Train Soak Repeated B.P. B.P. Train Train Soak Water B.P. B.P. Train Mem. Tk. Aeration M. Clean Complete NEUTRALIZATION Tk. Fill

25 Step 1 Step 2 Step 3 53 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 71 Step 1 Step 2

C C C

O O O

X X X

O X X

X X X

X X X

O O O

O O O

X X X

X X X

X X X

X X X

X X X

O X X

O O O

O O O

X X X

12 20-KQS-301B

25 1 2 3 53

C C C X X X X X X C C C

OX OX OX OX OX OX OX OX OX OX OX OX

X X O O O O O O O O O X

X X X X X X X X X X X X

X X ON8 ON8 ON8 ON8 ON8 ON8 X X X X

X X ON8 ON8 ON8 ON8 ON8 ON8 X X X X

LS X X X X X X X X X X X

X X X X X X X X X X X X

X X X X X X X X X X X X

X X X ON8 X X ON8 X X X X X

X X X ON8 X X ON8 X X X X X

X X X X X X X X X X X X

X X X X X X X X X X X X

O X X X X X X X X X X X

X X X X X X X X X X X X

LS O X X X X X X X X O X

X X X O X X O X X O X X

12 20-KQS-201A 6 20-KQS-301D 20-KQS-301E 6 20-KQS-301C 20-KQS-301E 6 20-KQS-301D 20-KQS-201A 6

10 11 12 71

X C

O OX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X 6

Ste

1 2 3 4 5 6 7 8 9

1 2

Issued: Nov 16, 2009 Process Controls: D. Courtney

Page 2 of 4
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

OSC_200326_Victorville_R02_11May10_MdK2.xls

GE Water & Process Technologies SCLA Victorville, CA Operations Sequence Chart for Train Sequenced Equipment

Operating Mode

ME M. A

FE ED

pD ela y

IR -

Step Description

Step #

Se qu en tia -M l em bra PE ne RM Ta EA nk TE Iso -H lat PE ea io n RM de r to EA TE Pu - In m CL p str EA um Nen So t Is diu o la CL m tio EA Hy n Npo ch C it l r o ic A rite Re cid c ir Iso cu Iso lat la t lat io n io n io n /Dr RA ain St oM ix T an DR k Is AIN o la -S tio N lud n 6 ge M. H CL old EA ing NIso Cit M. lat ric CL i o n N6 Ac EA id NS od R. ium CL EA Hy Npo C it ch R. r lo r i cA CL it e cid EA NSo diu VA CU m Hy UM po -E ch jec lo r Ac tor it e tiv co ate mp dS res l u d Me sed ge mb -R air ran eci rcu eA lat era Pro i on tio ces /Dr nD s ain em an d

Legend This column is for the GE W&PT Tags T - Indicates that the valve is throttling in Auto. O - Indicates that the valve/motor is open/on in Auto. X - Indicates that the valve/motor is closed/OFF in Auto. C - Indicates that valve cycles though an open/close sequence. -x - Indicates that there are multiple trains associated with this tag number. LS - Indicates that the valve/pump will retain the last state it had (open/closed, on/OFF) to avoid damaging equipment.

Ste

Tag Numbers 20-FV-210-x 20-FV-211-x 20-FV-110-x 20-FV-320-x 20-FV-301

Valves 23-FV-131-x 23-FV-331-x 20-FV-501-x 16-FV-820 16-FV-821 23-FV-301 23-FV-101 23-FV-302 23-FV-102

Pumps & Blowers 20-FV-802-x For 20-E-801x 20-B-201-x 16-P-801-x 20-P-301-x The Operations Sequence Chart (OSC), Control Logic Summary Chart (CLSC) and the Control Narrative (CN) should all be read to assist in the understanding of plant operations. Comments & Sequencing Logic 20-KQS-201J 6 20-KQS-301U 3 4 5 Aerates the membrane train. Holds this step for step delay, typically 60 seconds, then proceeds to the next step. Waits for step delay, for valve alignment, then proceeds to the next step. Train soaks without aeration for step delay, typically 900 seconds, then either proceeds to the next step if clean was with sodium hypochlorite or proceed to step 7 if clean was with citric acid. Prompts operator. "Check the chlorine concentration in the membrane tank. Solution is neutralized if chlorine concentration is below 10 mg/L." Operator presses CONFIRM NEUTRALIZATION to proceed to next step, or presses RESUME NEUTRALIZATION to return to NEUTRALIZATION step 5. Waits for step delay, for valve alignment, then proceeds to the next step. Backpulses the membrane train. Holds this step for step delay then proceeds to the next step. Waits for step delay, for valve alignment, then proceeds to OFF - step 1. Only one train can be in MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION at a time. Note Train 4 can only perform a recovery clean when it is enabled as a train. Waits for step delay, for valve alignment, then proceeds to the next step. Aerates the membrane train. Holds this step for step delay, then proceeds to the next step. Waits for step delay, for valve alignment, then proceeds to the next step. Drains the membrane tank. When 20-LS-201S-x is active then go to the next step. Waits for step delay, for valve alignment, then proceeds to the next step. Holds this step for step delay (0 seconds adjustable from 0-1800 seconds) then proceeds to the next step. RECOVERY CLEAN - steps 8 to 15 are executed for 20-KQS-301V iterations (1 Iteration, adjustable from 0 - 3). After the last iteration proceeds to Step 16. IF 20-KQS-301V is 0, proceeds to Step 16. Waits for step delay, for valve alignment, then proceeds to the next step. Waits for step delay, for valve alignment, then proceeds to the next step. Backpulses the membrane train. Holds this step for step delay or until 20-LAL-303 is active then proceeds to the next step. When in this step and the membrane tank level is at or above 20-LS-601B 20-LS-201E-x (Cleaning level trigger) setpoint then proceeds to RECOVERY CLEAN step 11. Holds this step for step delay and/or 20-LSL-302 is not active then: Repeats RECOVERY CLEAN - steps 8 to 10. Waits for step delay, for valve alignment, then proceeds to the next step. Aerates the membrane train. Holds this step for step delay, then proceeds to the next step. Waits for step delay, for valve alignment, then proceeds to the next step. Drains the membrane tank. When 20-LS-201S-x is active then go to the next step. Waits for step delay, for valve alignment, then proceeds to the next step or step 8. Waits for step delay, for valve alignment, then proceeds to the next step. Backpulses the membrane train. Holds this step for step delay or until 20-LAL-303 is active then proceeds to the next step. When in this step and the membrane tank level is at or above (90% x 20-LS-201E-x setpoint) then proceeds to RECOVERY CLEAN step 19. Holds this step for step delay and/or 20-LSL-302 is not active then: Repeats RECOVERY CLEAN - steps 16 to 18. Backpulses the membrane train. Holds this step for step delay or until 20-LAL-303 is active then proceeds to the next step. When in this step and the membrane tank level is at or above (20-LS-201E-x setpoint) then proceeds to step 21. Holds this step for step delay and/or 20-LSL-302 is not active then: Repeats RECOVERY CLEAN - steps 19 to 20. Waits for step delay, for valve alignment, then proceeds to the next step. Aerates the membrane tank, if enabled, for 20-KQS-301Q seconds every 20-KQS-301R seconds in this step. Holds this step for step delay then proceeds to the next step. Prompts operator to press button and "Proceed to NEUTRALIZATION". When button is pressed, proceeds to NEUTRALIZATION step 1.

Tk. Aeration Tk. Soak

Step 3 Step 4 Step 5

C C X

OX OX OX

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

O X X

X X X

Operator prompt

Step 6

OX

Step 7 Flush Permeate Header NEUTRALIZATION complete RECOVERY CLEAN Step 8 Step 9 82 Step 1 Tk. Aeration Step 2 Step 3 Tk. Drain Manual Flush Tk Flush (Auto) Step 4 Step 5 Step 6 Step 7 Step 8 Repeat B.P with Permeate Train Soak (Pause Tank Fill) Step 9 Step 10 Step 11 Tk. Aeration Step 12 Step 13 Tk. Drain Step 14 Step 15 Step 16 Repeat B.P. with Chemical Train Soak Tk Fill with Permeate Step 17 Step 18 Step 19 Step 20 Step 21 Mem. Tk. Chemical Soak RECOVERY CLEAN COMPLETE DEVICE SPECIFIC NOTES: N1

X X X

OX OX OX

O O O

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X O X

6 20-KQS-301M 6

82 C C C X X X X X X X C C C X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X O O O X X X X X O O O O O O X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ON8 ON8 ON8 X X X X X X X X X X X X X X X X X X X X ON8 ON8 ON8 X X X X X X X O O O X X X X X X X O O O X X X X X X X X X X O O O X X X X X X X O O O X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ON8 X X X X X X X X X X X X X X X X X X X X X X ON8 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X O X X X X X X X X X O X X X X X X X X X X O X X X X X X X X X O X X X X X X X X X ON2 X X X X X X X X X O X X X X X X X O X O X X X X 6 6 20-KQS-301M 20-KQS-301N 20-KQS-301M 20-KQS-301N 6 20-KQS-301P 6 20-KQS-301T 6 6 20-KQS-301M 20-KQS-301N 6 20-KQS-201B 6 6 20-KQS-201B 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Step 22 CN2 Step 23 X

(Intermittent aeration in Standby) Aeration valves open every 20-KQS-201D seconds. The blower starts 6 seconds (if necessary) after the first train to be aerated valve is requested open and the train is aerated for 20-KQS-201C seconds. If more than one train is being aerated the next train's valve opens and after six second the previous train's valve closes. When the last train is aerated, the aeration valves close 6 seconds after the blower stops (if necessary). N2 (Intermittent aeration in Recovery Clean) Aeration valves open every 20-KQS-301R seconds. The blower starts 6 seconds (if necessary) after the valve is requested open and the train is aerated for 20-KQS-301Q. Aeration valves close 6 seconds after blower stops (if necessary). (Intermittent Recirculation in Standby) When duration timer for standby aeration is active and the value of the iterations counter 16-KQS-801 equals the value of its setpoint the recirculation/drain pumps for the trains in Standby run. When the standby duration timer 20-KQS-201C times out for the LAST train in the standby aeration cycle and the value of the counter equals the setpoint value then the N3 recirculation/drain pumps stop. N4 (intermittent priming in Standby step 3 and Production step 2) Master Ejector Cycle Timer operates train ejectors to maintain prime on all trains that are in STANDBY step 3 and PRODUCTION step 2. N5 When none of the trains are in the production cycle, then for the train with the highest Starting priority the recirculation/drain valve open and after 6 seconds the recirculation/drain pump runs. There should not be a time without at least one recirculation/drain pump running unless all the trains are in OFF. N6 These valves are located only on the recirculation line for train 4. They only open and close according to train 4 OSC. N7 Every 20-KQS-301H second and when 20-LSL-302 is not active then the valve opens and after six seconds the process pump backpulses the membranes for 20-KQS-301B. The process pump stops and then after six seconds the valve closes. N8 Depending on the chemical requested for the clean. The sodium hypochlorite and citric acid cannot be selected for the same clean. N9 If 20-LAL-303 is active, the process pump does not run. GENERAL NOTES: 1 For operator protection, sodium hypochlorite pumps are interlocked at the PLC with the citric acid pumps to prevent them from running at the same time Mixing sodium hypochlorite and citric acid generates chlorine gas. Chlorine gas is toxic at levels greater than 1 ppm. Refer to CLSC for further information. 2 Devices will follow the start-up sequence in the CLSC when powering up from the E2PROM. Page 3 of 4
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

Issued: Nov 16, 2009 Process Controls: D. Courtney

Ste

7 8 9

OSC_200326_Victorville_R02_11May10_MdK2.xls

GE Water & Process Technologies SCLA Victorville, CA Operations Sequence Chart for Train Sequenced Equipment

Operating Mode

ME M. A

FE ED

pD ela y

IR -

Step Description

Step #

Se qu en tia -M l em bra PE ne RM Ta EA nk TE Iso -H lat PE ea io n RM de r to EA TE Pu - In m CL p str EA um Nen So t Is diu o la CL m tio EA Hy n Npo ch C it l r o ic A rite Re cid c ir Iso cu Iso lat la t lat io n io n io n /Dr RA ain St oM ix T an DR k Is AIN o la -S tio N lud n 6 ge M. H CL old EA ing NIso Cit M. lat ric CL i o n N6 Ac EA id NS od R. ium CL EA Hy Npo C it ch R. r lo r i cA CL it e cid EA NSo diu VA CU m Hy UM po -E ch jec lo r Ac tor it e tiv co ate mp dS res l u d Me sed ge mb -R air ran eci rcu eA lat era Pro i on tio ces /Dr nD s ain em an d

Legend This column is for the GE W&PT Tags T - Indicates that the valve is throttling in Auto. O - Indicates that the valve/motor is open/on in Auto. X - Indicates that the valve/motor is closed/OFF in Auto. C - Indicates that valve cycles though an open/close sequence. -x - Indicates that there are multiple trains associated with this tag number. LS - Indicates that the valve/pump will retain the last state it had (open/closed, on/OFF) to avoid damaging equipment.

Ste

Tag Numbers 20-FV-210-x 20-FV-211-x 20-FV-110-x 20-FV-320-x 20-FV-301

Valves 23-FV-131-x 23-FV-331-x 20-FV-501-x 16-FV-820 16-FV-821 23-FV-301 23-FV-101 23-FV-302 23-FV-102

Pumps & Blowers 20-FV-802-x For 20-E-801x 20-B-201-x 16-P-801-x 20-P-301-x The Operations Sequence Chart (OSC), Control Logic Summary Chart (CLSC) and the Control Narrative (CN) should all be read to assist in the understanding of plant operations. Comments & Sequencing Logic

3 B.P. is short for BACKPULSE in the step descriptions.

Ste

Issued: Nov 16, 2009 Process Controls: D. Courtney

Page 4 of 4
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

OSC_200326_Victorville_R02_11May10_MdK2.xls

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart

Notification

SORTING

GE W&PT

Type

Description

Component

Equipment

Setpoint

Units

Set

Action or Derivation

Reset

Plant Information and Control Panel Devices


A. Info ZeeWeed Trains Plant All There are 4 similar, ZeeWeed trains. Tags with a suffix of "-x" represent 4 tags, one for each train. The "-x" represents a -1, through to -4 for each of the trains. Only the fourth train can function as a thickener. The OSC, CLSC and Control Narrative with the P&ID's should be reviewed in their entirety to assist in the understanding of plant operations. Any action, i.e. an alarm, which causes a train to shutdown will require the operator to put the train back to ON from SHUTDOWN. Any device which is placed into manual, i.e. due to an alarm, will need to be placed back into Auto by the operator. All setpoints to be verified in the field. Changes may be required for field conditions & requirements. The following color scheme is used for device status: Green - indicates a pump/blower is on and a valve is open. Red - indicates a pump/blower is faulted and a valve is failed. Grey - indicates a pump/blower is off or valve is closed.

1 A. Info 1 1 1 1 A. Info A. Info A. Info A. Info Returning a Train to Run Returning a Device to Auto Setpoints Device Display Colors, Line Display Colors & Status (HMI & SCADA) Plant Plant Plant Plant All All All All Controls Documents Plant All

1 A device placed in MCC control will have MCC displayed over or beside the device. A device placed in MANUAL control will have MAN displayed over or beside the device. All active alarms are displayed on the screen. Alarms are tracked on the alarm summary screen. All setpoints and selections, for example "Auto/Start/Stop", are displayed on the screen. The following items are to be displayed: 1) All analog instrumentation signals wired directly to the GE W&PT PLC. (e.g., Flow, Pressure, Turbidity) 2) All analog instrumentation signals communicated to the GE W&PT PLC by another PLC. (e.g., Flow, Pressure, Turbidity) 3) Transmembrane Pressure (TMP) On plants which incorporate a SCADA system the items below are to be trended. 1) All analog instrumentation signals wired directly to the GE W&PT PLC. (e.g., Flow, Pressure, Turbidity) 2) All analog instrumentation signals communicated to the GE W&PT PLC by another PLC. (e.g., Flow, Pressure, Turbidity) 3) Transmembrane Pressure (TMP) Update time is 5 sec. for all items. Minimum storage time is 2 months. All PID loop parameters are trended. HMI screen graphically displays Setpoint (SP), Process Variable (PV), and Control Variable (CV). I/P Address: Sub Net Mask: Gateway (LAN Modem assigned address): I/P Address: Sub Net Mask: The PLC date and time are synchronized to the HMI/SCADA Date & Time .

A. Info 1

Displays/Alarms, Setpoints & Selections (HMI & SCADA)

Plant

All

A. Info

Display Instrumentation Values (HMI & SCADA)

Plant

All

A. Info

Trending Analog Values

Plant

All

A. Info 1 A. Info 1 1 A. Info A. Info 1

Trending PID Loops

Plant

All

PLC Address(es)

Ethernet

Control

HMI Address(es) Date & Time Synchronization (HMI & SCADA)

Ethernet Plant

Control All

Every day when the time is 2:22 am, OR When the operator presses the "Synchronize PLC Date & Time shown on the HMI/SCADA screens are the PLC date and Clock Now" button. time. IN ALL MODES: When there is a clock synchronization request for 10 seconds.

PLC_TIME.SYNC_ALM 1

Alarm

Clock Synchronization Failed

Settings

All

IN ALL MODES: When synchronization occurs. A "heartbeat" is required between the GE W&PT PLC and the client's PLC to ensure there is communication. Each PLC will maintains a independent "heartbeat", which increments every second. The PLC's will look at the other PLC's "heartbeat" to see if it is changing.

A. Info

Heartbeat

Settings

Control

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 1 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

Callout

Range Min

Range Max

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Range Min
IN ALL MODES: When there is at least one device, wired to the GE PLC, that is not in Auto. IN ALL MODES: When the "heartbeat" in the clients PLC is not incremented in 5 seconds. IN ALL MODES: - all steps, displays on HMI screen "All Devices Not In Auto." IN ALL MODES: - all steps, displays on alarm banner "Communication with other PLC has been lost." - all trains and thickener proceed to SHUTDOWN - step 1. IN ALL MODES: - all steps, if communication module failure is on a train IO rack, the train/thickener proceeds to POWER OFF- step 1. - all steps, if communication module failure is on a common equipment IO rack , disables common equipment wired to that rack. IN ALL MODES: When all devices are in Auto. IN ALL MODES: When the "heartbeat" in the client's PLC is incremented. Y

SORTING

GE W&PT

Type

Description
All Devices Not In Auto

Component
Settings

Equipment
Control

GLB_CTRL.UA_0030_ALM Alarm 1 HEARTBEAT_LOST Alarm (GLB_CMN.COMM_FAILED )

Loss of Heartbeat

Settings

Control

IONET_SLAVE_FAIL_ALM

Alarm

"IO Network" Slave Communication Module Failure. IO Network may refer to ControlNet, Ethernet, etc. or a combination thereof. Alarm shall be generated for each slave module.

Settings

Control

IN ALL MODES: When the communication module status register indicates a communication failure for 5 seconds.

Y IN ALL MODES: When the communication module communication failure condition is no longer present. ZeeWeed trains that were in STANDBY, PRODUCTION, or BACKPULSE/RELAX, prior to POWER OFF, proceed to STANDBY for train step 1. Thickener that was in STANDBY, PRODUCTION, or BACKPULSE, prior to POWER OFF, proceed to STANDBY for thickener - step 1 ZeeWeed trains that were in MAINTENANCE CLEAN, prior to POWER OFF, proceed to SHUTDOWN STBY- step 1. Displays on alarm banner "Maintenance Clean Aborted." ZeeWeed trains that were in RECOVERY CLEAN, prior to POWER OFF, proceed to SHUTDOWN - step 1 . Displays on alarm banner "Recovery Clean Aborted." ZeeWeed trains that were in NEUTRALIZATION, prior to POWER OFF, proceed to SHUTDOWN - step 1. Displays on alarm banner "Neutralization Aborted." Thickener that was in DRAIN prior to POWER OFF, proceed to SHUTDOWN - step 1. Displays on alarm banner "Drain Aborted."

1 1 1 1 1

CP_SURGE_SUPPRESSO Alarm R-y PLC_LOW_BAT LOG_OFF GENERAL_CALLOUT Alarm Button Alarm

Control Panel 'Y' Surge Suppressor Needs Replacing PLC 'Y' Battery Low Log Off General Callout

Surge Suppressor Control Security Interface

Control

Control Control Control

CLEAR_NOTIFICATION ALRM_NOTIFICATION

Button Digital Out

Clear Notification Alarm Notification

Interface Interface

Control Control

IN ALL MODES: - all steps, when the control panel surge suppressor contact indicates a failure IN ALL MODES: - all steps, when the PLC Battery is low When the button is pressed. IN ALL MODES: - all steps, when any condition requiring a callout is activated. When the button is pressed. When an alarm is initiated.

When the control panel surge suppressor contact no longer indicates a failure When the PLC battery is normal. Returns Security Level to Viewer. When the conditions requiring the callout are cleared. Clears the notification signal. Provides signal for device to notify the operator an alarm has occurred. Conditions requiring notification are identified by the "NOTIFICATION" column on the right side of the CLSC. Device may be a horn, light or other means of notification. Starts 4 hour timer. Provides the following: Access to view all screens. Access to view and make adjustments of Setpoints. Access to view and make adjustments of all train operational modes. Access to view and selection of train ON/OFF buttons. Resetting of all Alarms. Manual & Auto view Operation of all Pumps and Valves. Access to view and make adjustments of all set points, including PID tuning parameters. Manual control of PID's. Starts 4 hour timer. Provides the following: Access to view all screens. Access to view and make adjustments of Setpoints. Access to view and make adjustments of all train operational modes. Access to view and selection of train ON/OFF button views. Resetting of all Alarms. Manual & Auto view Operation of all Pumps and Valves. Manual control of PID's. Access to view PID control setpoints & graphics, but can not adjust PID tuning parameters.

When the Clear Alarm Notification or 10 minutes have passed since the signal was activated.

A. Info

ADMIN Password Access

Security

Control

When the proper Username and Password are entered. User name: ADMIN Password: (available only to GE W&PT Personnel)

When ADMIN logs out or after timer times out.

A. Info

HMI Supervisor Password Access

Security

Control

When the proper Username and Password are entered. User name: SUPER Password: (available only to Supervisor)

When the Supervisor logs out or after timer times out.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 2 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT

Type
A. Info

Description
HMI Operator Password Access

Component
Security

Equipment
Control

Setpoint

Units

Set
When the proper Username and Password are entered. User name: OPER Password: GE W&PT six digit AO number

Action or Derivation
Starts 4 hour timer. Provides the following: Access to view all screens. Access only to view Setpoints. Access to view and make adjustments of all train operational modes, excluding manual. Access to view and selection of train ON/OFF button views. Resetting of all Alarms. Auto view Operation of all Pumps and Valves, not Manual. Access only to view PID control setpoints & graphics. Access to major screens. Silence horn and acknowledge alarms. No access to alarm reset. Automatically turns off screen after 30 minutes of continuous idle time. Configured in Control Panel - Displays Properties. The trains and thickener are placed to POWER OFF

Reset
When the Operator logs out or after timer times out.

A. Info 1 A. Info 1 00-HA-005 Alarm

HMI Default Password Access

Security

Control

HMI Screen Blanking

Security

Control

When the screen is touched in any location.

System Stop button

Mode

Control

ALWAYS: - when System Stop Button is pressed.

Y When the System Stop button is no longer pressed ZeeWeed trains that were in STANDBY, PRODUCTION, or BACKPULSE/RELAX, prior to POWER OFF, proceed to STANDBY for train step 1. Thickener that was in STANDBY, PRODUCTION, or BACKPULSE, prior to POWER OFF, proceed to STANDBY for thickener - step 1 ZeeWeed trains that were in MAINTENANCE CLEAN, prior to POWER OFF, proceed to SHUTDOWN stby - step 1. Displays on alarm banner "Maintenance Clean Aborted." ZeeWeed trains that were in RECOVERY CLEAN, prior to POWER OFF, proceed to SHUTDOWN - step 1 . Displays on alarm banner "Recovery Clean Aborted." ZeeWeed trains that were in NEUTRALIZATION, prior to POWER OFF, proceed to SHUTDOWN - step 1. Displays on alarm banner "Neutralization Aborted." Thickener that was in DRAIN prior to POWER OFF, proceed to SHUTDOWN - step 1. Displays on alarm banner "Drain Aborted."

A. Info

Winter Mode

Mode

Control

Winter mode operation for plants that can freeze are programmed to force a train which is in standby more than 30 minutes (typically) to go to service (this train will stay in service for at least 200 sec (typically)) other service trains will be pushed (by logic) into Standby because of high production time. There are selector switches on the HMI to enable/disable Winter Mode. During this switching time the request for the number of running blowers is the same as before. When train 4 is operating as a thickener, it is not part of the winter mode rotation. When the Button is Pressed Enable Winter Mode: Trains will Proceed to Production according to the Starting Priority, Start Triggers and 20-KQS-201K-x Disable Train Rotation Disable Winter mode: Trains Proceed to Production according to Starting Priority and Start Trigger only Enable train rotation. IN STANDBY for train: - the train proceeds to PRODUCTION as per the OSC. IN PRODUCTION for train: - after timer for 20-KQS-201L-x is started.

Button 1 Button 1 20-US-201-x Trigger

Winter Mode Enabled

Mode

Control

Winter Mode Disabled

Mode

Control

When the Button is Pressed

Winter Mode - Force Train to PRODUCTION from STANDBY Trigger

Sequence

ZeeWeed

IN STANDBY for train: - all steps, when Winter Mode is Enabled AND 20-KQS-201K-x is active, AND the Train has the highest Starting Priority AND 20-KQS-201L has timed out for any train in PRODUCTION.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 3 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

Callout

Range Min

Range Max

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-KQS-201K-x

Type
Setpoint

Description
Winter Mode STANDBY duration

Component
Sequence

Equipment
ZeeWeed

Setpoint
1800

Units
sec.

Set
IN STANDBY & WINTER MODE IS ENABLED: - all steps, the train is in STANDBY for the setpoint duration or longer.

Action or Derivation
Trigger is used in the SET conditions for 20-US-201-x.

Reset

600

3600

20-KQS-201L-x

Setpoint

Winter Mode Train Minimum time in PRODUCTION

Sequence

ZeeWeed

100

500

200

sec.

TR_ROT_TIME

Setpoint

Train Rotation Time

Trains

Control

72

hr.

IN PRODUCTION: - step 1, when 20-US-201-x is active. OR IN PRODUCTION & TRAIN HAS HIGHEST PRIORITY FOR STANDBY: - when the "Enable Winter Mode" button is pressed. WHEN WINTER MODE IS DISABLED IN PRODUCTION: - as soon as there is at least one train in PRODUCTION, timer starts. - the thickener is not included in train rotation.

IN PRODUCTION: - step 1, starts timer. Trains proceed to PRODUCTION from STANDBY when 20-US-201-x is active for the train, or a train start trigger, 20-FSYH-601A/B/C is active.

When not in PRODUCTION, BACKPULSE, RELAX, timer resets.

When timer times out, at the setpoint; System triggers a Standby request, if there is a train in STANDBY step 3 with no Standby alarms and is available to start. If there are no trains in STANDBY step 3 available to start, when timer times out, Standby request is ignored and maintained. The number of operating blowers does not change during while one train goes to Standby and another train goes to Production.

When timer times out and there is at least one train in STANDBY, timer resets and resumes timing, OR when the train with the highest priority to stop is not in the Production cycle, timer resets and resumes timing, OR when there are no trains in PRODUCTION, BACKPULSE, or RELAX, timer resets and stops.

5 5

Feed System
16-FI-401 Comm Plant Feed Flow Flow Feed 0 5000 gpm Displays value with engineering units on screen. Actual instrument is 16-FE/FIT-401. The moving average is for 15 minutes and the sample time is once every 1 minute. These times can be adjusted if required. Unless process provides the information use the default values. Totalize feed flow. At midnight after current value is put into 16FQI3-401. At midnight this value is stored at 16-FQI3-401. Set valve to 16-FQI2-401 at midnight. The current operating mode and the step number is displayed on the screen. Time remaining for some steps is displayed. IN OFF & SHUTDOWN: - as required in OSC steps of each mode, if the ON button is pressed the train proceeds to PRIME - step 1 and then to STANDBY for a train - step 1 will cycle through modes automatically as required provided all necessary equipment is in auto and available. Consult the OSC for details. When the button is pressed. For train 4, the train must be enabled for a train for this button to be available. IN OFF & SHUTDOWN: - steps as per OSC, proceeds to PRIME - step 1 and then to STANDBY for a Train. Consult interlocks in CLSC and OSC for more information. 20-HMS-201B-x Button OFF Button for Train and Thickener Mode Control When the button is pressed. IN ALL MODES : - steps as per OSC, proceeds to OFF - step 1. Consult interlocks in CLSC and OSC for more information. NOTE: User is responsible for the use of this button to ensure that a cleaning solution will be handled as required before proceeding to production. IN OFF & STANDBY: - steps as per OSC, proceeds to PRIME - step 1. Consult interlocks in CLSC and OSC for more information. IN OFF, STANDBY for train & PRODUCTION: - steps as per OSC, proceeds to BACKPULSE for train - step 1. Consult interlocks in CLSC and OSC for more information. IN STANDBY for train & PRODUCTION: - steps as per OSC, proceeds to RELAX - step 1. Consult interlocks in CLSC and OSC for more information. 16-FXI-401 Derived Moving Average Plant Feed Flow Flow Feed 0 5000 gpm

5 16-FQI2-401 5 5 15 16-FQI3-401 Derived A. Info 15 A. Info 15 Yesterday's Plant Feed Volume Display of Operational Mode and step number. Volume Mode Feed Control 0 1000000000 gal At midnight. Derived Today's Plant Feed Volume Volume Feed 0 1000000000 gal

Callout

Range Min

Range Max

ZeeWeed Process Information

Mode Selection through ON

Mode

Control

15 20-HMS-201A-x 15

Interlock Button

Number of trains permitted in a given mode ON Button for Train

Mode Mode

Control Control

15

20-HMS-201C-x 15 20-HMS-201D-x 15 20-HMS-201E-x 15

Button

PRIME Button for Train and Thickener

Mode

Control

When the button is pressed.

Button

BACKPULSE Button for Train

Mode

Control

When the button is pressed.

Button

RELAX Button for Train

Mode

Control

When the button is pressed.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 4 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-HMS-201F-x

Type
Button

Description
M. CLEAN Hypochlorite Button for Train

Component
Mode

Equipment
Control

Setpoint

Units

Set
When the button is pressed. Train 4 must be enabled as a train.

Action or Derivation
IN OFF, STANDBY & PRODUCTION: - steps as per OSC, proceeds to MAINTENANCE CLEAN - step 1. Consult interlocks in CLSC and OSC for more information.

Reset

15

20-HMS-201G-x 15

Button

M. CLEAN Citric Acid Button for Train

Mode

Control

When the button is pressed. Train 4 must be enabled as a train.

IN OFF, STANDBY & PRODUCTION: - steps as per OSC, proceeds to MAINTENANCE CLEAN - step 1. Consult interlocks in CLSC and OSC for more information.

20-HMS-201I-x 15

Button

R. CLEAN WITH CITRIC ACID Button for Mode Train

Control

When the button is pressed. Train 4 must be enabled as a train.

IN OFF: - steps as per OSC, proceeds to RECOVERY CLEAN - step 1. Consult interlocks in CLSC and OSC for more information. Initiates a recovery clean with citric acid. IN OFF: - steps as per OSC, proceeds to RECOVERY CLEAN - step 1. Consult interlocks in CLSC and OSC for more information. Initiates a recovery clean with sodium hypochlorite. IN OFF & RECOVERY CLEAN: - steps as per OSC, proceeds to NEUTRALIZATION - step 1. Consult interlocks in CLSC and OSC for more information. A train that has been in PRODUCTION the longest time has the highest priority to proceed to STANDBY from PRODUCTION. A train in demand override, has the lowest priority to proceed to STANDBY. A train that has been in STANDBY the longest time has the highest priority to proceed to PRODUCTION from STANDBY. This is the number of trains in PRODUCTION for train, BACKPULSE for train, RELAX, PRIME. This is the number of trains in PRODUCTION for train, BACKPULSE for train, RELAX or PRIME, with a supervisory flow setpoint.

20-HMS-201J-x 15

Button

R. CLEAN WITH SODIUM HYPOCHLORITE Button for Train

Mode

Control

When the button is pressed. Train 4 must be enabled as a train.

20-HMS-201K-x 15

Button

NEUTRALIZATION Button for Train

Mode

Control

When the button is pressed.

A. Info 15 A. Info NUM_TR_PROD NUM_TR_PROD_SUP 15 20-KQS-801 15 20-KQY-301 Setpoint Setpoint Derived Derived

Standby Priority

Demand

ZeeWeed

15 15

Starting Priority

Demand

ZeeWeed ZeeWeed ZeeWeed

Number of Trains Cycling through Trains Production Number of Trains Cycling through Trains Production with supervisory Flow Setpoint Priming Duration Sequence

ZeeWeed

30

300

60

sec.

IN PRIME: - step 1.

IN PRIME: - starts timer, action when the timer times out proceeds as per the OSC.

When the timer times out.

Production Cycle Timer - total time to complete one Production sequence plus one Backpulse sequence.

Sequence

ZeeWeed

15

12

min.

When a train/thickener enters the production cycle Value entered at the HMI, in minutes. When the full production duration has expired. for the first time and no other train/thickener is in the production cycle. Time remaining in the production cycle for each train/thickener, 20-KI-301-x, is displayed, in seconds. The timer keeps running through all of the valve alignment steps and through backpulse. If all trains/thickener are in OFF or POWER OFF the time is retained. When trains enter the production cycle the timer resumes.

15

15

Thickener Process Information


A. Info A. Info Thickener Display of Operational Mode and step number. Mode Mode Control Control Only train 4 can function as a thickener. The following buttons are only available for train 4 when enabled as a thickener. The current operating mode and the step number is displayed on the screen. Time remaining for some steps is displayed. IN OFF & SHUTDOWN: - as required in OSC steps of each mode, if the ON button is pressed the thickener proceeds to PRIME - step 1 and then to STANDBY for thickener step 1 will cycle through modes automatically as required provided all necessary equipment is in auto and available. IN OFF & SHUTDOWN: - steps as per OSC, proceeds to PRIME - step 1 and then to STANDBY for thickener. Consult interlocks in CLSC and OSC for more information. 20-HMS-201D-x Button BACKPULSE Button Mode Control When the button is pressed. IN OFF, STANDBY for thickener & PRODUCTION for thickener: - steps as per OSC, proceeds to BACKPULSE - step 1 for a thickener. Consult interlocks in CLSC and OSC for more information. IN OFF, STANDBY for thickener: - steps as per OSC, proceeds to DRAIN - step 1. Consult interlocks in CLSC and OSC for more information.

15 A. Info 15

Mode Selection through ON

Mode

Control

Callout

Range Min

Range Max

20-HMS-201A-x 15

Button

ON Button for Thickner

Mode

Control

When the button is pressed. Train 4 must be enabled as a thickener for this button to be available.

15 16-HMS-801B-4 15 Button DRAIN Button Mode Control When the button is pressed.

20

Membrane Aeration System


Page 5 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-KX-201

Type
Derived

Description
Standby Aeration Order

Component
Sequence

Equipment
Membrane Aeration

Setpoint

Units

Set

Action or Derivation
IN STANDBY: - step 3, trains are aerated for 20-KQS-201C seconds one at a time, immediately one after another until the last train in STANDBY is aerated. Trains are aerated in order according to the train number. For example, if trains 1, and 2 are in STANDBY, train 1 is aerated first, followed by train 2. The aeration order is repeated for the trains in STANDBY every 20-KQS201D seconds.

Reset

20

20-UA-201A

Alarm

Insufficient Number of Membrane Blowers Blower Available

Membrane Aeration

IN STANDBY for train & thickener, PRODUCTION for train & thickener, BACKPULSE for train & thickener, MAINTENANCE CLEAN, RECOVERY CLEAN & NEUTRALIZATION & DRAIN: - all steps, when the number of blowers required to run is not sufficient for the number of aeration demands.

20

Shutdown trains/thickener in the following order until there are sufficient When there are sufficient blowers blowers IN STANDBY for trains & thickener & DRAIN: - close the cyclic aeration valves and do not run a blower for this aeration demand. -delay six seconds and if there is still insufficient number of blowers IN MAINTENANCE CLEAN, RECOVERY CLEAN & NEUTRALIZATION: - all steps, continues steps without blower and close the cyclic aeration valves. -delay six seconds and if there is still insufficient number of blowers IN PRODUCTION for trains & thickener, RELAX, & BACKPULSE for trains & thickener: - the train with the highest standby priority goes to SHUTDOWN step 1. -delay six seconds and if there is still insufficient number of blowers, repeat this process until the available blowers can meet the aeration demand or all the trains/thickener are Shutdown.

Callout

Range Min

Range Max

20-UA-201B

Alarm

No Membrane Blowers Available

Blower

Membrane Aeration

20

IN STANDBY for train & thickener, PRODUCTION for train & thickener, BACKPULSE for train & thickener, MAINTENANCE CLEAN, RECOVERY CLEAN & NEUTRALIZATION & DRAIN: - all steps, when there are no blowers available.

20-FV-210-x 20-FV-211-x 20

Valve

Cyclic Valve, Mem. Tk.

Valve

Membrane Aeration

AUTO: - per OSC. MANUAL: - only available with HMI Security Level equal to Supervisor. IN ALL MODES: - all steps, when the open limit switch is not activated for 60 seconds when the valve is asked to open. (The 60 seconds time delay means the PLC tried to open the valve six times.)

IN STANDBY for trains & thickener, PRODUCTION for trains & thickener, RELAX, BACKPULSE for trains & thickener: - all steps, proceeds to SHUTDOWN - step 1. IN MAINTENANCE CLEAN, RECOVERY CLEAN & NEUTRALIZATION & DRAIN: - all steps, continues steps without blower and close the cyclic aeration valves. When the valve called to open then the PLC energizes discrete output to open valve.

When a blower is available.

20-ZAO-210-x 20-ZAO-211-x 20

Alarm

Cyclic Valve, Mem. Tk. Failed to Open

Valve

Membrane Aeration

IN PRODUCTION for trains & thickener, BACKPULSE for trains & thickener When the ON button is pressed. & RELAX - all steps, proceeds to SHUTDOWN - step 1. IN MAINTENANCE CLEAN & RECOVERY CLEAN: - all steps, continues Maintenance Clean or Recovery Clean without aeration. Once steps are complete, proceeds to SHUTDOWN - step 1. IN PRODUCTION for trains & thickener & BACKPULSE for trains & When the close limit switch is activated. thickener, RELAX: - all steps, continues to cycle valve. Displays on alarm banner "Train has a Cyclic Valve Failure, Inadequate Membrane Aeration may be Occurring". Train does not proceed to Standby due to an active Plant Permeate Demand Standby Trigger, (i.e., 20-FSYL-201 has no effect for this train). Maintenance Cleans and Recovery Cleans are prevented.

20-ZAC-210-x 20-ZAC-211-x

Alarm

Cyclic Valve, Mem. Tk. Failed to Close

Valve

Membrane Aeration

IN ALL MODES: - all steps, when the close limit switch is not activated for 60 seconds when the valve is asked to close. (The 60 seconds time delay means the PLC tried to close the valve six times.)

20

IN MAINTENANCE CLEAN: - all steps, proceeds to SHUTDOWN - step 1. Displays on alarm banner "Maintenance Clean Aborted." IN RECOVERY CLEAN: - all steps, proceeds to SHUTDOWN - step 1. Displays on alarm banner "Recovery Clean Aborted." IN NEUTRALIZATION: - continues steps.

20

20-KQS-210

Setpoint

Mem. Tk. Cyclic Valve Cycle Time

Valve

Membrane Aeration

10

sec.

Valves will alternate between open and close positions every 10 seconds. One valve will be open and another will be closed.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 6 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT

Type
A. Info

Description
Membrane Blowers Alternating Lead

Component
Blower

Equipment
Membrane Aeration

Setpoint

Units

Set
IN ALL MODES: - all steps, when the accumulated run time is equal to or greater than 20-KQS-201F, the lead blower is not running, OR - all steps, when the lead blower is not available, (Blower is available if in Auto at HMI and is in Remote at the MCC). IN ALL MODES: - all steps, when the blower is running. One setpoint with multiple equipment run times.

Action or Derivation
IN ALL MODES: - all steps, changes the lead of the blowers. Lead is not switched if other blower is not available.

Reset
When lead is switched.

20

20-KQS-201F 20

Setpoint

Membrane Blowers Lead Alternating Time

Blower

Membrane Aeration

12

72

24

hr.

This is the actual accumulated run time of the equipment. This is not displayed.

When lead is switched.

20-KQS-201C 20 20-KQS-201D 20

Setpoint

Train in Standby Aeration Duration

Sequence

Membrane Aeration Membrane Aeration Membrane Aeration

120

600

300

sec.

IN STANDBY for train: - step 3. IN STANDBY for train: - step 3. This setpoint is not adjustable.

Setpoint

Train in Standby Aeration Frequency

Sequence

1800

sec.

A. Info 20 20-PAL-201-x Alarm

Number of Blowers per Membrane Aeration Demand

Blower

Inlet Low Pressure for Membrane Blower Blower

Membrane Aeration

IN ALL MODES: - all steps, when the blower is running and the switch is active for 5 seconds IN ALL MODES: - all steps, when the blower is running and the switch is active for 5 seconds IN ALL MODES: - all steps, when the blower is running and the switch is active for 5 seconds 1487 1572 1500 SCFM Use 1500 when the temperature is approx. 18C Use 1487 when the temperature is approx. 35C

20-PAH-201-x

Alarm

Outlet High Pressure for Membrane Blower

Blower

Membrane Aeration

20-TAH-201-x

Alarm

Outlet High Temperature for Membrane Blower

Blower

Membrane Aeration

20-FC-201 20 20-MK-201-x

Derived

Mem. Tk. Membrane Aeration Air Flow Requirement Per Train

Flow

Membrane Aeration

IN STANDBY: - step 3, aerates the membrane tank for 20-KQS-201C seconds every 20KQS-201D seconds. Starts step with no mixing. IN STANDBY: - step 3, aerates the membrane tank for 20-KQS-201C seconds every 20KQS-201D seconds. Starts step with no mixing. One aeration demand requires one blower to operate; two aeration demands require two blowers to operate; three or four aeration demands require three blowers to operate. The number of aeration demands refers to trains and thickener. IN PRODUCTION for trains & thickener, BACKPULSE for trains & thickener, RELAX, MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION & DRAIN: - all steps, places blower into manual-stop. IN PRODUCTION for trains & thickener, BACKPULSE for trains & thickener, RELAX, MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION & DRAIN: - all steps, places blower into manual-stop. IN PRODUCTION for trains & thickener, BACKPULSE for trains & thickener, RELAX, MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION & DRAIN: - all steps, places blower into manual-stop. Membrane Aeration Requirement Per Train = the value of the setpoint 20-FC-201 equals the value of the setpoint. This is a plant setpoint.

When train is not in Standby - step 3.

When the timer times out.

When the switch is not active

When the switch is not active

When the switch is not active

Comm

Membrane Aeration Required Air Flow Per Blower

Flow

Membrane Aeration

20

A. Info 20-YA-201-x 20 20-KQI-201-x 20-B-201-x Alarm/com m..

Membrane Blowers Membrane Aeration Blower Fail

Blower Blower

Membrane Aeration Membrane Aeration

When there are zero aeration demand 20-MK-201-x =zero and no blowers operate When there is one aeration demand 20-MK-201-x =20-FC-201. One blower operates When there are two aeration demands 20-MK-201-x =20-FC-201. Two blowers operate When there are three aeration demands 20-MK-201-x =20-FC-201. Three blowers operate. When there are four aeration demands 20-MK-201-x =(20-FC-201 multiplied by 4 and divided by 3). Three blowers operate. (The four refers to the number of aeration demands. The three refers to the number of operating blowers.) Communicate this value to the client's PLC. The controls for the membrane blowers are through the Ethernet IN ALL MODES: - all steps, when the blower is requested to run. When the MCC running confirmation is missing for 5 seconds. IN ALL MODES: When the blower is operating. MANUAL: - only available with SUPER password IN PRODUCTION for trains & thickener, BACKPULSE for trains & thickener, RELAX, MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION & DRAIN: - all steps, places blower into fault. IN ALL MODES: Displays accumulated run time for the blower on the screen. When the blower is called to run, energizes the PLC discrete output to operate motor. If VFD called to start, the flow command is set at the setpoint. Otherwise set to zero When the Blower Auto button is pressed. Y Y

20

Derived Comm

Membrane Aeration Blower Accumulated Run Time Membrane Aeration Blower Run Command

Blower Blower

Membrane Aeration Membrane Aeration

30000

hours

When the Reset Run Time button is pressed, run time resets to 0 hours.

20

20-FAL-201-x 20

Alarm

Membrane Aeration Blower Air Flow Low Flow

Membrane Aeration

AUTO: - according to the OSC DISABLED (in AUTO or MANUAL): - when any of the following are true: blower Fail 20-YA-201-x System Stop Activated 00-HA-005 IN ALL MODES: IN ALL MODES: - all steps, when a blower -1/2/3/4 has been - all steps, places blower into fault. requested to run and its switch, 20-FAL-201-1, 20FAL-201-2, 20-FAL-201-3, 20-FAL-201-3, is active for 10 seconds. Design is N+1, N is = 3.

When the Blower Auto button is pressed.

25

Membrane Tank
A. Info Design Basis

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 7 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

Callout

Range Min

Range Max

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-LI-201A-x

Type
Analog In

Description
Mem. Tk Level

Component
Level

Equipment
ZeeWeed

Setpoint
in.

Units

Set

Action or Derivation
Displays value with engineering units on screen.

Reset

160

Callout

Range Min

Range Max

25 25 20-LXI-201 20-LAT-201A-x Derived Alarm Average Mem. Tk Level Level

ZeeWeed

0 0

160 160

in. in.

Mem. Tk Level Transmitter Out of Range Level

ZeeWeed

Actual instrument is 20-LE/LIT-201A-x. The average is calculated for all trains/thickener in Standby, Prime, Production, Backpulse, Relax. IN ALL MODES: IN PRODUCTION for trains & thickener, BACKPULSE for trains & When the transmitter is out of range by 1% of the thickener, RELAX, MAINTENANCE CLEAN, RECOVERY CLEAN except calibrated range for 2 seconds. steps 22 and 23, NEUTRALIZATION: (i.e. calibrated range = range max. - range min.) - all steps, proceeds to SHUTDOWN - step 1. IN MAINTENANCE CLEAN: - Displays on alarm banner "Maintenance Clean Aborted." IN RECOVERY CLEAN steps 1 to 21: - Displays on alarm banner "Recovery Clean Aborted." IN RECOVERY CLEAN step 22 and 23: - continue with sequence. IN NEUTRALIZATION: - Displays on alarm banner "Neutralization Aborted." IN DRAIN: - holds step - all steps, places all operating pumps into man off and after a delay of six seconds close the valves. - 20-KQS-301W starts Displays, "Thickener will be Shutdown due to active alarm" .

IN PRODUCTION for trains & thickener, BACKPULSE for trains & thickener, RELAX, MAINTENANCE CLEAN, RECOVERY CLEAN except steps 22 and 23, NEUTRALIZATION:When the ON or OFF button is pressed. IN DRAIN: When the pumps are put back into auto and Fault Timer clears then align valves as per OSC step after a six second delay resume step, as shown in the OSC.

25

20-LAHH-201-x 25 20-LAH-201A-x

Alarm

Mem. Tk Level High High

Level

ZeeWeed

Alarm

Mem. Tk Level High

Level

ZeeWeed

160

140

in.

IN ALL MODES: When the level Alarm high has been active for more than 90 seconds. IN ALL MODES: When the level is at or above this level for 8 seconds.

When the level Alarm high is no longer active.

25

IN ALL MODES: - all steps, sets the plant flow demand equal to the peak flow for the plant. The peak flow equals 3098 gpm IN MAINTENANCE CLEAN: - all steps, alarm only. IN RECOVERY CLEAN, NEUTRALIZATION, DRAIN: - all steps, alarm only.

When 20-LS-201A-x is active.

20-LS-201A-x 25 20-LS-201C-x 25

Trigger

Mem. Tk Level to Enable Membrane Tank Level Feed Mem. Tk Level 3 for Fill and Aerate Level

ZeeWeed

160

108

in.

Trigger

ZeeWeed

160

127

in.

20-LS-201E-x 25

Trigger

Mem. Tk Level Above Membranes

Level

ZeeWeed

160

103.2

in.

IN ALL MODES: When the level is at or below this level for 8 seconds. IN NEUTRALIZATION & DRAIN: - step 4, when the level is at or above the setpoint for 8 seconds. This level should be close to the operating level of the trains to prevent stealing the air from the other trains. IN ALL MODES: When the level is at or above this level for 8 seconds.

Resets 20-LAH-201A-x

IN NEUTRALIZATION & DRAIN: - proceeds to the next step. Target setpoint is a level about 24 inches above the 20-LS-201E-x setpoint but prevents the high level alarm from becoming active. Resets 20-LAL-201A-x. The train will come out of standby and resume production if there is a demand to produce water. The thickener will come out of standby and resume production if the Drain the Thickener Trigger is not active. IN PRODUCTION: - all steps, proceeds to STANDBY - step 1. This level is just above the membrane fibers in the cassette. IN ALL MODES: - all steps, displays on alarm banner "Membrane Tank 'X' Possible Membrane Exposure."

20-LAL-201A-x 25 20-LALL-201A-x 25 20-LS-201Q-x

Alarm

Mem. Tk Level Low

Level

ZeeWeed

160

102

in.

Alarm

Mem. Tk Level Low Low

Level

ZeeWeed

20-LAL-201A

in.

IN ALL MODES except RECOVERY CLEAN & DRAIN: When the level is at or below this level for 8 seconds. IN ALL MODES: When the level is at or below the setpoint for more than 3600 seconds.

When 20-LS-201E-x is active.

When the level is above the setpoint.

Trigger

Fill Membrane Tk with Inlet Gate Timers

Level

ZeeWeed

160

100

in.

20-LS-201S-x 25 20-LCH-201A 25 20-LC-201A 25

Trigger

Mem. Tk Empty Tank

Level

ZeeWeed

160

10

in.

Setpoint

Mem. Tk Level Setpoint High

Level

ZeeWeed

160

150

in.

Setpoint

Mem. Tk Level Setpoint

Level

ZeeWeed

160

118

in.

IN SHUTDOWN & NEUTRALIZATION & DRAIN: IN SHUTDOWN & NEUTRALIZATION & DRAIN: When the level is at or above this setpoint. When the level is at or below this setpoint for 2 - use the frequency and duration timers to open the membrane tank seconds in the steps as indicated in the OSC. isolation gate. Consult the OSC, shutdown & neutralization & drain steps, for details. IN RECOVERY CLEAN & DRAIN: IN RECOVERY CLEAN & DRAIN: When the level is at or above this setpoint for 5 When the level is at or below this setpoint for 2 - steps as indicated in the OSC, proceeds to next step. seconds seconds in the steps as indicated in the OSC. This is a plant setpoint. This is the maximum membrane level setpoint where flow demand is at the peak flow value. Used to calculate trim flow/plant flow demand 20-FCY201B. Operator entered value. This is a plant setpoint. Operator entered level setpoint. This level is used to calculate the trim plant flow demand. It is in the middle of the maximum and minimum levels for the trim volume

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 8 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac Y Y

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-FCY-201B

Type
Pcontroller

Description
Mem. Tk Level Proportional Integral Derivative Controller

Component
Level

Equipment
ZeeWeed

Setpoint

Units

Set

Action or Derivation
Plant Flow Demand = proportional to average tank level, as shown below. 20-FCY-201B = [Max. Peak Flow x (20-LXI-201A - 20-LC-201A) / (20-LCH-201A - 20-LC201A))]

Reset

25

Where: Maximum control level is 20-LCH-201A where plant flow demand must equal the maximum peak flow for the entire plant. Control level is 20-LC-201A is in the middle of the maximum and minimum levels for the trim volume. This is the plant permeate trim flow used to calculate the net permeate flow for each train in PRODUCTION, 20-FCY-301A-x. 20-LAL-201B-x Alarm Mem. Tk Level Low Level ZeeWeed

25 20-LALL-201C-x 25 20-ZAC-110-x Alarm Mem. Tk. Feed Gate Failed to Close Valve ZeeWeed

IN PRODUCTION for trains and thickeners: - all steps, when switch is active for more than 5 seconds. IN ALL MODES: - all steps, when switch is active for 3600 seconds.

IN PRODUCTION for trains and thickeners: - all steps, proceeds to STANDBY - step 1. This level is just above the membrane fibers in the cassette. IN ALL MODES: - all steps, displays on alarm banner "Membrane Tank 'X' Possible Membrane Exposure."

When the switch is no longer active.

Callout

Range Min

Range Max

Alarm

Mem. Tk Level Low Low

Level

ZeeWeed

When the switch is no longer active.

25

20-ZAO-110-x

Alarm

Mem. Tk. Feed Gate Failed to Open

Valve

ZeeWeed

25

20-FV-110-x 25

Valve

Mem. Tk. Feed Gate

Valve

ZeeWeed

20-FV-501-x 25

Valve

Mem. Tk. Drain Valve

Valve

ZeeWeed

IN STANDBY for train & thickener, PRODUCTION for train & thickener, BACKPULSE for train & thickener, RELAX, DRAIN, MAINTENANCE CLEAN, RECOVERY CLEAN. NEUTRALIZATION: - all steps, when the close limit switch is not activated for 300 seconds when the valve is asked to close. IN STANDBY for train & thickener, PRODUCTION for train & thickener, BACKPULSE for train & thickener, RELAX, DRAIN, MAINTENANCE CLEAN, RECOVERY CLEAN. NEUTRALIZATION: - all steps, when the open limit switch is not activated for 300 seconds when the valve is asked to open. AUTO: When the valve called to open then the PLC energizes discrete output to - per OSC. open valve. When the valve called to close then the PLC energizes discrete output to MANUAL: close valve. - only available with HMI Security Level equal to Supervisor. AUTO: When the valve called to open then the PLC energizes discrete output to - per OSC. open valve. MANUAL: - only available with HMI Security Level equal to Supervisor.

When the close limit switch is activated.

When the valve open limit switch is activated.

30

Permeate System for the Trains


20-FAH-301A-x Alarm Instantaneous Permeate Flow, Flow High Flow Permeate 800 1750 1374 gpm IN PRODUCTION: - all steps when the flow is at or above the setpoint for 10 seconds. This is a common setpoint with multiple Alarms. IN PRODUCTION: - all steps, proceeds to SHUTDOWN - step 1. When the ON button is pressed. Y Y Y

35

35

20-FCH-301A 20-FCYH-301A

Setpoint Setpoint

Instantaneous Permeate Flow Maximum Flow Setpoint Net Permeate Flow Maximum Setpoint 1

Flow Flow

Permeate Permeate

800 800

1300 1300

1249 1032

gpm gpm When all trains are available. All trains are available when there are no trains in OFF, SHUTDOWN, MAINTENANCE CLEAN or RECOVERY CLEAN/NEUTRALIZATION. When there is one train, or more than one train, not in service. When train 4 is enabled as a thickener, it doesn't count as not in service. (It is an N=3 design.) A train is not in service when it is in OFF, SHUTDOWN, MAINTENANCE CLEAN or RECOVERY CLEAN/NEUTRALIZATION. When the plant flow demand is at or above this setpoint for 10 seconds When the plant flow demand is at or below this setpoint for 10 seconds When the plant flow demand is at or above this setpoint for 10 seconds When the plant flow demand is at or below this setpoint for 10 seconds

This is the upper limit for 20-FC-301A-x This is the upper limit for 20-FCY-301A-x and 20-FCY-301B-x.

35 20-FCYH-301B Setpoint Net Permeate Flow Maximum Setpoint 2 Flow Permeate 800 1300 774 gpm

This is the upper limit for 20-FCY-301A-x and 20-FCY-301B-x.

35

35 35 35 35

Trigger 20-FSYH-201A Trigger 20-FSYL-201A Trigger 20-FSYH-201B Trigger 20-FSYL-201B

Plant Permeate Demand Start Trigger for Demand One Train Running Plant Permeate Demand Standby Trigger -Demand One to No Trains Running Plant Permeate Demand Start Trigger for Demand Two Trains Running Plant Permeate Demand Standby Trigger -Demand Two to One Train Running

Permeate Permeate Permeate Permeate

210 81 420 290

338 209 592 419

212 209 515 418

gpm gpm gpm gpm

Puts one train to production that has the highest starting priority. Puts one train to standby that has the highest standby priority. Puts one train to production that has the highest starting priority. Puts one train to standby that has the highest standby priority. Y Y

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 9 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT

Type
Trigger

Description

Component

Equipment
Permeate Permeate Permeate Permeate Permeate Permeate

Setpoint
1030 627 1548 836 140 126

Units
gpm gpm gpm gpm gpm gpm

Set
When the plant flow demand is at or above this setpoint for 10 seconds When the plant flow demand is at or below this setpoint for 10 seconds When the plant flow demand is at or above this setpoint for 10 seconds When the plant flow demand is at or below this setpoint for 10 seconds

Action or Derivation
Puts one train to production that has the highest starting priority. Puts one train to standby that has the highest standby priority. Puts one train to production that has the highest starting priority. Puts one train to standby that has the highest standby priority. This is the lower limit for 20-FC-301A-x

Reset

35 35 35 35 35

20-FSYH-201C Trigger 20-FSYL-201C Trigger 20-FSYH-201D Trigger 20-FSYL-201D 20-FCL-301A 20-FAL-301A-x Setpoint Alarm

Plant Permeate Demand Start Trigger for Demand Three Trains Running Plant Permeate Demand Standby Trigger -Demand Three to Two Trains Running Plant Permeate Demand Start Trigger for Demand Four Trains Running Plant Permeate Demand Standby Trigger -Demand Four to Three Trains Running Instantaneous Permeate Flow Minimum Flow Flow Setpoint Instantaneous Permeate Flow, Flow Low Flow

801 499 1060 630 100 100

1057 755 1600 964 150 140

Callout

Range Min

Range Max

35

IN PRODUCTION: IN PRODUCTION: - all steps, when the pump is running and the flow - all steps, proceeds to SHUTDOWN - step 1. is at or below the setpoint for 10 seconds. This is a common setpoint with multiple Alarms. IN ALL MODES: When the transmitter is out of range by 1% of the calibrated range for 2 seconds. (i.e. calibrated range = range max. - range min.) IN PRODUCTION for train & thickener, BACKPULSE for train & thickener, MAINTENANCE CLEAN, RECOVERY CLEAN & NEUTRALIZATION: - all steps, proceeds to SHUTDOWN - step 1. IN DRAIN: - place the process pump in fault, continue steps without the backpulses.

When the ON button is pressed.

20-FAT-301-x

Alarm

Permeate Flow Transmitter Out of Range Flow

Permeate

2000

gpm

When the ON button is pressed.

35

20-FI-301A-x 35 20-FQIY-301A-x 35 20-FQIY-301B-x

Analog In

Instantaneous Permeate Flow for Train and Thickener Last Production Cycle's Net Permeate Volume for Train

Flow

Permeate

2000

gpm

Displays value with engineering units on screen. Actual instrument is 20-FE/FIT-301-x. Totalize the net permeate flow during the last production cycle. Net permeate flow = Totalized Permeate volume during Production - steps 1 through to the end of the cycle minus Total Backpulse volume from Backpulsing pump Total Train Production Volume for Today = Totalized Permeate volume At midnight after current value is put into 20during Production - steps 1 through to the end of the cycle minus Total FQIY-301C-x. Backpulse volume from Backpulsing pump. At midnight this value is stored at 20-FQIY-301C-x. 20-FQIY-301B-x = Totalized 20-FI-301A-x (In Production) - Totalized 20-FI301B-x (During Backpulse) At midnight. Set value to 20-FQIY-301B-x. IN PRODUCTION for the train and thickener: Captures and Displays value and engineering units in Backpulse Analysis When the Pre-Backpulse trigger, BP_TRIG_PRE, Chart: is active. - prior to last backpulse - during last backpulse - after last backpulse - after previous backpulse IN PRODUCTION for the train and thickener: Captures and Displays value and engineering units in Backpulse Analysis When the Post-backpulse trigger, Chart: BP_TRIG_POST, is active. - prior to last backpulse - during last backpulse - after last backpulse - after previous backpulse IN PRODUCTION for the train and thickener: Move value of 20-FIR-301C-x into 20-FIR-301D-x. When the Post-backpulse trigger, BP_TRIG_POST, is active. Displays value and engineering units in Backpulse Analysis Chart: - prior to last backpulse - during last backpulse - after last backpulse - after previous backpulse The system recalculates then freezes this value in In Auto Production step 2 when 20-FIC-301A-x is set to 20-FFY-301A-x = (20-KQY-301 + 20-FQI-301B-x/20-FCY-301A-x)/(20-KIAuto. 301-x) In Sup 20-FFY-301A-x = (20-KQY-301 + 20-FQI-301B-x/20-FCY-301B-x)/(20-KI301-x) Where: KI-3500-x is the time remaining to next Backpulse, and, In Auto SP: 20-FC-301A-x = (20-FCY-301A-x) 20-FFY-301A-x In Sup SP: 20-FC-301A-x = (20-FCY-301B-x) 20-FFY-301A-x

Derived

Volume

Permeate

-10000

1000000000

gal

Derived

Today's Permeate Volume for Train

Volume

Permeate

-10000

1000000000

gal

35

35

20-FQIY-301C-x 20-FIR-301A-x

Derived Derived

Yesterday's Permeate Volume for Train Backpulse Analysis Flow Prior to Last Backpulse for Train and Thickener

Volume Flow

Permeate Permeate

-10000

1000000000

gal

Y Y

35

20-FIR-301C-x 35

Derived

Backpulse Analysis Flow After Last Backpulse for Train and Thickener

Flow

Permeate

20-FIR-301D-x

Derived

Backpulse Analysis Flow After Previous Backpulse for Train and Thickener

Flow

Permeate

35

20-FFY-301A-x

Setpoint

Flow Net Instantaneous Production Flow Correction Factor for Train and Thickener

Permeate

1.00

1.3

35

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 10 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-FCY-301A-x

Type
Derived

Description

Component

Equipment
Permeate

Setpoint

Units

Set
When auto setpoint is selected.

Action or Derivation
This is the value used in the calculation of 20-FC-301A-x. Target Net Permeate Flow = (Plant Flow Demand - Supervisory Entered Flows - Thickener flow when in thickener mode) (Number of Trains In Production/Backpulse - Number of Trains In Production/Backpulse with a Supervisory Setpoint) 20-FCY-301A-x = (20-FCY-201A - ( 20-FCY-301B-x for trains with supervisory SP)-(20-FCY-301C-4 when train 4 is in thickening mode with an auto setpoint)-(20-FCY-301D-4 when train 4 is in thickening mode with a manual setpoint)) (NUM_TR_PROD - NUM_TR_PROD_SUP).

Reset

Target Net Permeate Flow Calculated for Flow Train

20-FAL301A-x

20-FCYH301A

35

20-FCY-301B-x 35

Setpoint

Target Net Permeate Flow Operator Entered for Train

Flow

Permeate

20-FAL301A-x

20-FCYH301A

###

gpm

When supervisory setpoint is selected.

This is the value used in the calculation of 20-FC-301A-x. Initially: 20-FCY-301B-x = 20-FCY-301A-x when alternating between auto and supervisory setpoint. This is a bumpless transfer. PV is the permeate flow, 20-FI-301A-x SP = 20-FC-301A-x for Train SP = SP = 20-FC-301F-4 for Thickener CV is the speed of the process pump. The minimum CV is 25% and the maximum CV is defined by 20-PDSLL-301x action. Deadband=0, Loop Update=0.5 seconds E=SP-PV PV is the permeate flow, 20-FI-301A-x SP = 20-FC-301A-x for Train SP = SP = 20-FC-301F-4 for Thickener CV is the speed of the process pump. Allows the operator to use the calculated setpoint for the trains net permeate flow. Allows the operator to use a supervisory setpoint for the trains net permeate flow. When pressed the system will use the operator entered setpoint for the trains net permeate flow until changed by the user. When the valve called to open then the PLC energizes discrete output to open valve.

20-FIC-301A-x

PID/Comm Permeate Instantaneous Flow Flow Proportional Integral Derivative Controller for Train and Thickener

Permeate

IN PRODUCTION for trains & thickener: - steps as per the OSC

35

20-FC-301A-x 35 20-HMS-201N-x 20-HMS-201P-x 35

Derived

Permeate Flow Instantaneous Flow Setpoint for Train

Flow

Permeate

20-FAL301A-x

20-FCH-301Ax

gpm

35

Button Button

Permeate Flow Auto Setpoint Button for train Permeate Flow Supervisory Setpoint Button for train

Flow Flow

Permeate Permeate

When the button is pressed. When the button is pressed.

20-FV-320-x

Valve

Instrument Isolation Valve

Quality

Permeate

AUTO: - per OSC. MANUAL: - only available with HMI Security Level equal to Supervisor. IN ALL MODES: When the transmitter is out of range by 1% of the calibrated range for 2 seconds. (i.e. calibrated range = range max. - range min.)

20-AAT-320-x 35

Alarm

Permeate Turbidity Transmitter Out of Range

Quality

Permeate

0.0

10.0

NTU

When the transmitter is in range.

20-AI-320-x 35 20-AAH-320A-x 35

Analog In

Permeate Turbidity

Quality

Permeate

0.0

10.0

NTU

Displays value with engineering units on screen. Actual instrument is 20-AE/AIT-320-x. IN ALL MODES: - all steps, for all trains, changes to Relax mode and prevents scheduled Maintenance Cleans.

Callout

Range Min

Range Max

Alarm

Permeate Turbidity High 1

Quality

Permeate

0.0

10.0

5.0

NTU

IN PRODUCTION for trains & thickener: - all steps, when the turbidity reading is at or above this setpoint for 20-KQS-320A seconds. This is a plant setpoint for all trains IN PRODUCTION for trains & thickener:: - all steps, when the turbidity reading is at or above this setpoint for 20-KQS-320B seconds. This is a plant setpoint for all trains IN PRODUCTION for trains & thickener:: - all steps, when the turbidity reading is at or above this setpoint for 20-KQS-320C seconds. This is a plant setpoint for all trains IN PRODUCTION for trains & thickener:: - all steps, when turbidity reading is at or above 20-AAH-320A-x setpoint, timer operates. IN PRODUCTION for trains & thickener:: - all steps, when turbidity reading is at or above 20-AAH-320B-x setpoint, timer operates.

When the turbidity reading is below this setpoint. Y The trains that had Backpulse selected by the operator before the alarm switch back to backpulse mode. When the turbidity reading is below this setpoint. Y

20-AAH-320B-x 35

Alarm

Permeate Turbidity High 2

Quality

Permeate

0.0

10.0

0.2

NTU

20-AAH-320C-x 35

Alarm

Permeate Turbidity High 3

Quality

Permeate

0.0

10.0

0.5

NTU

IN PRODUCTION for trains & thickener:: - all steps, proceeds to SHUTDOWN - step 1.

When the ON button is pressed.

20-KQS-320A 35 20-KQS-320B 35

Setpoint

Permeate Turbidity High 1 Timer

Quality

Permeate

0.0

60.0

10.0

sec.

Timer is used to trigger high Alarm. When timer times out, 20-AAH-320A-x is active.

When turbidity reading is below 20-AAH-320A-x setpoint.

Setpoint

Permeate Turbidity High 2 Timer

Quality

Permeate

0.0

300.0

60.0

sec.

Timer is used to trigger high Alarm. When timer times out, 20-AAH-320B-x is active.

When turbidity reading is below 20-AAH-320B-x setpoint.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 11 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-KQS-320C

Type
Setpoint

Description
Permeate Turbidity High 3 Timer

Component
Quality

Equipment
Permeate

Setpoint
120.0

Units
sec.

Set
IN PRODUCTION for trains & thickener:: - all steps, when turbidity reading is at or above 20-AAH-320C-x setpoint, timer operates. When the button is pressed.

Action or Derivation
Timer is used to trigger high alarm. When timer times out, 20-AAH-320C-x is active.

Reset
When turbidity reading is below 20-AAH-320C-x setpoint.

0.0

300.0

35 20-HMS-201Q-x 35 35 20-HMS-201R-x 20-YA-301-x Button Alarm/com m.. Demand Override Disabled Button for train Process Pump Fail Sequence Pump Permeate Permeate Button Demand Override Enabled Button for train Sequence Permeate

IN ALL MODES: - all steps, train will not be effected by the low flow demand trigger. IN ALL MODES: - all steps, train will be effected by the low flow demand trigger. IN PRODUCTION for train and thickener & BACKPULSE for train and thickener, & NEUTRALIZATION: - all steps, places pump into man off. The train/thickener proceeds to SHUTDOWN - step 1.

When the button is pressed. IN ALL MODES: - all steps requiring the pump to run, when the MCC running confirmation is missing for 5 seconds.

IN PRODUCTION for train and thickener & Y BACKPULSE for train and thickener, & NEUTRALIZATION, MAINTENANCE CLEAN and DRAIN: When the pump auto button is pressed. IN MAINTENANCE CLEAN: IN RECOVERY CLEAN: -as required in OSC steps, places pump into man off. Proceeds to last step When the pumps are put back into auto and of MAINTENANCE CLEAN. Train will be shutdown at end of Maintenance Fault Timer clears then align valves as per OSC Clean. step after a six second delay resume step, as Displays on alarm banner "Maintenance Clean Aborted." shown in the OSC. IN RECOVERY CLEAN: - holds step - all steps, places pump into man off and after a delay of six seconds closes valve 20-FV-301-x. - auto-stops chemical pumps (if necessary). - 20-KQS-301W starts Displays, "Train will be Shutdown due to active alarm" . IN DRAIN: - continues step - all steps, place process pump into fault and after a delay of six seconds close the valve 20-FV-301-4. IN RECOVERY CLEAN & DRAIN: IN RECOVERY CLEAN & DRAIN: - proceeds to SHUTDOWN - step 1. When all hold step alarms clear.

Callout

Range Min

Range Max

35

20-KQS-301W

Alarm

Fault Timer

Pump

Permeate

120

min

35

20-SMS-301A-x 35 20-SMS-301B-x 35 20-SMS-301C-x 35 20-KQI-301-x 35 20-P-301-x

Setpoint

Process Pump Permeating Start Speed

Pump

Permeate

25

100

60

Setpoint

Process Pump Backpulsing Start Speed

Pump

Permeate

25

100

50

Setpoint

Process Pump CIP & Neutralization Start Pump Speed

Permeate

25

100

50

IN RECOVERY CLEAN: - all steps, when one of the following alarms are active 20-YA-301-x, 20-FAH-301B-x, 20-FAL301B-x, 20-PDAH-301-x, 20-PAHH-601-x, 20PAH-301B-x, 20-YA-801-x, 90-PAL-002 for 120 continuous minutes. IN DRAIN: - all steps, when one of the following alarms are active 16-YA-801-4, 20-LAT-201A-4, 90-PAL-002 for 120 continuous minutes. IN PRODUCTION: IN PRODUCTION: - all steps where the pump is requested to start. - all steps, this is the pumps starting speed, held for 3 seconds, before starting PID control. IN BACKPULSE & DRAIN: IN BACKPULSE & DRAIN: - all steps where the pump is requested to start. - all steps, this is the pumps starting speed, held for 3 seconds, before starting PID control. IN MAINTENANCE CLEAN, RECOVERY CLEAN IN MAINTENANCE CLEAN, RECOVERY CLEAN & NEUTRALIZATION: & NEUTRALIZATION: - all steps, this is the pumps starting speed, held for 3 seconds, before - all steps where the pump is requested to start. starting PID control. IN ALL MODES: When the pump is operating. MANUAL: - only available with SUPER password AUTO: - according to the OSC DISABLED (in AUTO or MANUAL): - when any of the following are true: pump Fail 20-YA-301-x System Stop Activated 00-HA-005 IN ALL MODES: Displays accumulated run time for the pump on the screen. When the pump is called to run, energizes the PLC discrete output to operate motor. If VFD called to start, the speed command is set at the setpoint. Otherwise set to zero

Derived

Process Pump Accumulated Run Time Process Pump

Pump

Permeate

30000

hours

When the Reset Run Time button is pressed, run time resets to 0 hours.

Comm

Pump

Permeate

35

20-MK-301-x

Setpoint

Process Pump Speed

Pump

Permeate

IN PRODUCTION for train and thickener: - all steps, this setpoint is overwritten by the CV value from PID loop flow controller 20-FIC-301A-x to control the pump. IN BACKPULSE for train and thickener & DRAIN: - all steps, this setpoint is overwritten by the CV value from PID loop flow controller 20-FIC-301B-x to control the pump. IN MAINTENANCE CLEAN & RECOVERY CLEAN & NEUTRALIZATION: - all steps, this setpoint is overwritten by the CV value from PID loop flow controller 20-FIC-301B-x to control the pump.

35

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 12 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-PDIR-301A-x

Type
Derived

Description
Backpulse Analysis TMP Prior to Last Backpulse for train and thickener

Component
TMP

Equipment
Permeate

Setpoint

Units

Set

Action or Derivation

Reset

35

20-PDIR-301B-x 35

Derived

Backpulse Analysis TMP During Last Backpulse/Relax for train and thickener

TMP

Permeate

20-PDIR-301C-x 35

Derived

Backpulse Analysis TMP After Last Backpulse

TMP

Permeate

20-PDIR-301D-x

Derived

Backpulse Analysis TMP After Previous Backpulse for train and thickener

TMP

Permeate

35

20-PDALL-301-x 35 20-PDSLL-301-x

Alarm

TMP Low Low for train and thickener

TMP

Permeate

-8.0

0.0

-8.0

psig

IN PRODUCTION for the train and the thickener: Captures and Displays value and engineering units in Backpulse Analysis - when the Pre-Backpulse trigger, BP_TRIG_PRE, Chart: is active. - prior to last backpulse - during last backpulse - after last backpulse - after previous backpulse IN BACKPULSE for the train and the thickener & Captures and Displays value and engineering units in Backpulse Analysis RELAX: Chart: - when the During Backpulse/Relax trigger, - prior to last backpulse/relax BP_TRIG_DUR, is active. - during last backpulse/relax - after last backpulse/relax - after previous backpulse/relax IN PRODUCTION for the train and the thickener: Captures and Displays value and engineering units in Backpulse Analysis - when the Post-backpulse trigger, Chart: BP_TRIG_POST, is active. - prior to last backpulse - during last backpulse - after last backpulse - after previous backpulse IN PRODUCTION for the train and the thickener: Move value of 20-PDIR-301C-x into 20-PDIR-301D-x. - when the Post-backpulse trigger, BP_TRIG_POST, is active. Displays value and engineering units in Backpulse Analysis Chart: - prior to last backpulse - during last backpulse - after last backpulse - after previous backpulse IN PRODUCTION for the train and the thickener: IN PRODUCTION for the train and the thickener: - all steps, when the TMP is at or below this - all steps, proceeds to SHUTDOWN - step 1. setpoint for 5 seconds. IN PRODUCTION: - all steps, when the TMP is at or below this setpoint. IN PRODUCTION: - all steps, captures the initial value for the maximum of the 20-FIC-301A-x CV as: Initial value for the maximum CV = (CV value of 20-FIC-301A-x) - 0.25 Then reduces the maximum value for 20-FIC-301A-x CV by 0.25% every second until it reaches to the its minimum of 25%.

Callout

Range Min

Range Max

When the ON button is pressed.

Trigger

TMP Low-Low for train and thickener

TMP

Permeate

-8.0

0.0

-7.0

psig

35

IN ALL MODES: -all steps, when the TMP is above the setpoint, then increases the maximum value for 20-FIC301A-x CV by 0.25% every second until it reaches 100%.

20-PDILL-301-x 35 20-PDI-301-x

Indicator

TMP Low-Low Display for train and thickener

TMP

Permeate

Derived

TMP for train and thickener

TMP

Permeate

IN PRODUCTION: IN PRODUCTION: - all steps, when maximum value for 20-FIC-301A- -all steps, the maximum value for 20-FIC-301A-x CV is limited to a value x CV is below 100%. below 100% . Displays "TMP at limit!" indication on the screen. TMP = Membrane Header Pressure + Conversion Factor x (Height of the Pressure Transmitter Above the Top of the Membranes + Height from the Bottom of the Tank to the Top of the Membrane Fibers - Membrane Tank Level) Consult Control Narrative for Further Details. (For WW deep membrane tanks where bottom of cassette is 30 in.) WHEN LI-3426-x 20-LI-201-x IS ABOVE 30 in.: 20-PDI-301-x = 20-PI-301-x + C x (A+B - 20-LI-201-x) WHEN 20-LI-201-x IS AT OR BELOW 30 in. : 20-PDI-301-x = 20-PI-301-x + C x (A+B - 30) Var.A = 84 in. or mm (Top of Membranes to Pressure Transmitter) Var.B = 98 in. or mm (Bottom of Tank to top of the Membrane Fibers) C = 0.036127 psig/in.

IN PRODUCTION: - all steps, when the maximum value for 20-FIC301A-x CV is at 100%.

35

20-PAHH-301A-x 35

Alarm

Permeate Membrane Header Pressure High High for train and thickener

Pressure

Permeate

-3.0

0.0

-0.3

psig

IN PRODUCTION for the train and the thickener: IN PRODUCTION for the train and the thickener: - all steps, when the process pump is running and - all steps, proceeds to SHUTDOWN - step 1. the pressure is at or above this setpoint for 10 seconds. IN ALL MODES: IN PRODUCTION, BACKPULSE, MAINTENANCE CLEAN, RECOVERY When the transmitter is out of range by 1% of the CLEAN & NEUTRALIZATION: calibrated range for 2 seconds. - all steps, proceeds to SHUTDOWN - step 1. (i.e. calibrated range = range max. - range min.)

When the ON button is pressed.

20-PAT-301-x 35

Alarm

Permeate Membrane Header Pressure Transmitter Out of Range

Pressure

Permeate

-15.0

15.0

psig

When the ON button is pressed.

20-PI-301-x 35

Analog In

Permeate Membrane Header Pressure

Pressure

Permeate

-15.0

15.0

psig

Displays value with engineering units on screen. Actual instrument is 20-PE/PIT-301-x.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 13 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-FV-301-x

Type
Valve

Description
Permeate Header to Pump Valve

Component
Valve

Equipment
Permeate

Setpoint

Units
AUTO: - per OSC.

Set

Action or Derivation
When the valve called to open then the PLC energizes discrete output to open valve.

Reset

35

MANUAL: - only available with HMI Security Level equal to Supervisor.

35 35 35

Permeate System for the Thickener


INI_SUS_SOLIDS FIN_SUS_SOLIDS Setpoint Setpoint Influent Mixed Liquor Suspended Solids Concentration Mixed Liquor Suspended Solids Concentration to Drain the thickener Setpoint Calculated MLSS Concentration in the Thickener Thickener Thickener Concentration Concentration 100 100 12000 30000 8000 30000 mg/L mg/L Operator entered value for the influent Mixed Liquor Suspended Solids concentration. Operator entered value for the Mixed Liquor Suspended Solids final concentration in Thickener Approximate MLSS in the Thickener = MASS of the solids in the Thickener Thickener Tank Volume CAL_SUS_SOLIDS =( 20-FQIY-301F-4 * INI_SUS_SOLIDS) (Area of membrane tank * 20-LI-201A-4) The area of the membrane tank is 595 ft2 Operator entered value for the Mixed Liquor Suspended Solids concentration at which the process pump ramps down. When the Calculated MLSS Concentration in the IN PRODUCTION, STANDBY, BACKPULSE: IN DRAIN Thickener is equal to or greater than the Mixed - the thickener proceeds to STANDBY -when Mem. Tk Empty Tank 20-LS-201S-x is Liquor Suspended Solids Concentration to drain HMI displays a banner Drain the thickener" active the thickener Setpoint. IN PRODUCTION: IN PRODUCTION: When the ON button is pressed. - all steps when the flow is at or above the - all steps, proceeds to SHUTDOWN - step 1. setpoint for 10 seconds. This is the upper limit for 20-FC-301F-4 When the Calculated MLSS Concentration in the Thickener is less than Ramp Down Suspended Solids Concentration This value is used in the PID loop 20-FIC-301A-4 to control the speed of the process pump. Note: the flow should be 3 to 6 GFD with default This operator enter value is used in the calculation of Permeate Flow value of 5gfd. Instantaneous Flow Setpoint for Thickener after the calculated mixed liquor solids concentration is greater than the ramp down suspended concentration. Instantaneous Permeate Flow Setpoint = Target Net Permeate Flow Net Instantaneous Production Correction Factor In Auto SP: 20-FC-301F-4 = (20-FCY-301C-4) 20-FFY-301B-4 In Sup SP: 20-FC-301F-4 = (20-FCY-301D-4) 20-FFY-301B-4 The system recalculates then freezes this value in In Auto Production step 2 when 20-FIC-301A-4 is set to 20-FFY-301B-4 = (20-KQY-301 + 20-FQI-301B-x/20-FCY-301C-4)/(20-KIAuto. 301-x) In Sup 20-FFY-301B-4 = (20-KQY-301 + 20-FQI-301B-x/20-FCY-301D-4)/(20-KI301-x) Where: KI-3500-x is the time remaining to next Backpulse, and In Auto SP: 20-FC-301F-4 = (20-FCY-301C-4) 20-FFY-301B-4 In Sup SP: 20-FC-301F-4 = (20-FCY-301D-4) 20-FFY-301B-4 When auto setpoint is selected and the train 4 is This is the value used in the calculation of Permeate Flow Instantaneous operating as a thickener. Flow Setpoint for Thickener 20-FC-301F-4. When the Calculated MLSS Concentration in the Thickener is less than Ramp Down Suspended Solids Concentration Target Net Permeate Flow Calculated for Thickener equals Thickener Auto Net Permeate Starting Flow (average day flow for a train 516 gpm) 20-FCY-301C-4 = 20-FC-301E-4 When the Calculated MLSS Concentration in the Thickener is equal to or greater than Ramp Down Suspended Solids Concentration The flow setpoint equals the Ending flow plus (Starting flow minus the Ending flow) multiplied by (the Calculated S.S concentration minus the Thickener Drain S.S. concentration) divided by (Influent Mixed Liquor Suspended Solids Concentration minus Thickener Drain Setpoint concentration) 20-FC-301E-4 = 20-FC-301G-4 + (20-FC-301E-4 - 20-FC-301G-4) * (CAL_SUS_SOLIDS - FIN_SUS_SOLIDS) / (INI_SUS_SOLIDS FIN_SUS_SOLIDS) Note: if Calculated S.S concentration is greater than the Thickener Drain Setpoint concentration then Permeate Flow Instantaneous Flow Setpoint for Thickener equals the Thickener Auto Net Permeate Ending Flow Initially: 20-FCY-301C-4 = 20-FCY-301D-4 when alternating between auto and super

CAL_SUS_SOLIDS 35

Derived

Thickener

Concentration

100

40000

mg/L

35

RAMP_SUS_SOLIDS DRAIN_SUS_SOLIDS

Setpoint Trigger

Ramp Down Suspended Solids Concentration Drain the Thickener Trigger

Thickener Thickener

Concentration Concentration

5000

12000

10000

mg/L

35 20-FAH-301C-4 35 35 20-FCH-301B 20-FC-301E-4 35 20-FC-301G-4 35 20-FC-301F-4 35 20-FFY-301B-4 Setpoint Derived Setpoint Setpoint Setpoint Instantaneous Permeate Flow Maximum Flow Setpoint Thickener Auto Net Permeate Starting Flow Flow Thickener Permeate Flow 400 100 625 520 624 516 gpm gpm Alarm Instantaneous Permeate Flow, Flow High Flow Permeate 400 700 687 gpm

Callout

Range Min

Range Max

Thickener Auto Net Permeate Ending Flow

Thickener

Flow

190

380

316

gpm

Permeate Flow Instantaneous Flow Setpoint for Thickener

Flow

Permeate

20-FCL301B

624 20-FCH301B

gpm

Net Instantaneous Production Flow Correction Factor for Thickener

Flow

Permeate

1.00

1.3

35

20-FCY-301C-4

Derived

Target Net Permeate Flow Calculated for Flow Thickener

Permeate

20-FCL301B-x

20-FC-301E-4

35

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 14 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-FCY-301D-4

Type
Setpoint

Description
Target Net Permeate Flow Operator Entered for Train

Component
Flow

Equipment
Permeate

Setpoint

Units
gpm

Set
When supervisory setpoint is selected.

Action or Derivation
This is the value used in the calculation of 20-FC-301F-4. Initially: 20-FCY-301C-4 = 20-FCY-301D-4 when alternating between auto and supervisory setpoint. This is a bumpless transfer. This is the lower limit for 20-FC-301F-4

Reset

20-FCL301B-x

20-FC-301E-5 ###

35

35

20-FCL-301B 20-FAL-301C-x -4

Setpoint Alarm

35 20-HMS-201Y-4 20-HMS-201Z-4 35 Button Button

Instantaneous Permeate Flow Minimum Flow Flow Setpoint for Thickener Instantaneous Permeate Flow, Flow Low Flow for Thickener

Permeate Permeate

100 100

140 140

130 117

gpm gpm IN PRODUCTION for thickener: - all steps, when the pump is running and the flow is at or below the setpoint for 10 seconds. This is a common setpoint. When the button is pressed and train 4 is operating as a thickener. When the button is pressed and train 4 is operating as a thickener.

IN PRODUCTION for thickener: - all steps, proceeds to SHUTDOWN - step 1.

When the ON button is pressed.

Callout

Range Min

Range Max

35

Permeate Flow Auto Setpoint Button for thickener Permeate Flow Supervisory Setpoint Button for thickener

Flow Flow

Permeate Permeate

Allows the operator to use the calculated setpoint for the thickener net permeate flow. Allows the operator to use a supervisory setpoint for the thickener net permeate flow. When pressed the system will use the operator entered setpoint for the trains net permeate flow until changed by the user. Set Thickener flag IN ALL MODES: - enables train 4 as a thickener and it operates according to the thickener OSC when the On button is selected. IN ALL MODES: - enables train 4 as a train and it operates according to the train OSC immediately. Total Train Production Volume for Today = Totalized Permeate volume during Production - steps 1 through to the end of the cycle minus Total Backpulse volume from Backpulsing pump. At midnight this value is stored at 20-FQIY-301E-x. 20-FQIY-301D-4 = Totalized 20-FI-301A-4 (In Production) - Totalized 20-FI301B-4 (During Backpulse)

35 35

THICK_FLAG 20-HMS-201G

Trigger Button

Thickener Flag Thickener Enabled Button

Sequence Sequence

WAS WAS

When the Thickener Enabled Button is pressed. IN OFF When the button is pressed. The operator is required to confirm the selection. IN OFF When the button is pressed. This button is not available if the thickener flag is set. When train 4 is enabled as a thickener

In the last step of DRAIN, the thickener flag is reset. When the OFF button is pressed.

20-HMS-201H 35 20-FQIY-301D-4

Button

Train Enabled Button

Sequence

WAS

Derived

Today's Thickener Net Permeate Volume Volume

WAS

1,000,000

gal

At midnight, totalizer is reset to zero.

35

35

20-FQIY-301E-4 20-FQIY-301F-4

Derived Derived

Yesterday's Thickener Net Permeate Volume Thickener Net Permeate Volume Since Last Tank Drain

Volume Volume

WAS WAS

1,000,000

gal

Set to 20-FQIY-301D-4 at midnight. When train 4 is enabled as a thickener Total Train Production Volume for Today = Totalized Permeate volume during Production - steps 1 through to the end of the cycle minus Total Backpulse volume from Backpulsing pump. 20-FQIY-301F-4 = Totalized 20-FI-301A-4 (In Production) - Totalized 20-FI301B-4 (During Backpulse) This totalizer is reset when 20-LS-201S-4 is active.

50 50

Recirculation/RAS System
16-FAH-801-x Alarm Recirculation Flow High Flow Recirculation 0 100 110 90 % 16-FAL-801-x Alarm Recirculation Flow Low Flow Recirculation 0 100 10 % IN ALL MODES: Setpoint is a percentage of 16-FC-801A-x. - all steps when the flow is at or above the setpoint for 5 seconds. IN ALL MODES: Setpoint is a percentage of 16-FC-801A-x. - all steps, when the pump is running and the flow is at or below the setpoint for 10 seconds. Displays value with engineering units on screen. Actual instrument is 16-FE/FIT-801-x. IN ALL MODES: IN STANDBY for train, PRODUCTION for train, BACKPULSE for train, When the transmitter is out of range by 1% of the RELAX, RECOVERY CLEAN, DRAIN: calibrated range for 2 seconds. - all steps, proceeds to SHUTDOWN - step 1. (i.e. calibrated range = range max. - range min.) When the flow is below the setpoint. Y When the flow is above the setpoint. Y

50 16-FI-801-x 50 16-FAT-801-x 50 Alarm Recirculation Flow Transmitter Out of Range Flow Recirculation 0 2500 gpm Analog In Recirculation Flow Flow Recirculation 0 2500 gpm

When the transmitter is in range.

16-FIC-801-x

PID/Comm Recirculation/Drain Pump Flow Flow Proportional Integral Derivative Controller

Recirculation

PV is the recirculation flow rate, 16-FI-801-x SP = 16-FC-801A-x CV is the speed of the Recirculation/Drain Pump the minimum CV is 25% Deadband = 0, Loop Update = 0.5 seconds E=SP-PV

50

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 15 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
16-FC-801A

Type
Derived

Description
Recirculation/Drain Pump Flow Setpoint

Component
Flow

Equipment
Recirculation

Setpoint

Units
gpm

Set

Action or Derivation
When there is at least one train is in Production, Relax or Backpulse (Production Cycle): Recirculation Setpoint = Flow Factor multiplied by the plant flow demand flow divided by (# of trains in the production cycle) 16-FC-801A-x = (16-FFY-801 * 20-FCY-201A)/(NUM_TR_PROD) Flow setpoint is updated every 5 minutes. When there is at least one train in Production, Relax or Backpulse (Production Cycle) and the duration timer for standby aeration is active and the value of the iterations counter 16-KQS-801A equals the value of its setpoint. Recirculation Setpoint = Flow Factor multiplied by the plant flow demand flow divided by (# of trains in the production cycle) multiplied by (# of trains in the production cycle plus 1) divided by the # of trains in the production cycle 16-FC-801A-x = [16-FFY-801 * 20-FCY-201A /(NUM_TR_PROD)] * [(NUM_TR_PROD + 1)/NUM_TR_PROD] Flow setpoint is updated every 5 minutes. When none of the trains are in Production, Relax or Backpulse and at least one train is in Standby Step 3, operate the recirculation/drain pump at 1250 gpm flow setpoint. This operation is not based on the standby aeration timers IN RECOVERY CLEAN & DRAIN, operate the recirculation/drain pump at 12

Reset

50

50

16-FFY-801 16-YA-801-x

Setpoint Alarm/com m..

Recirculation/Drain Pumps Recirculation Factor Recirculation/Drain Pump Fail

Flow Pump

Recirculation Recirculation

2.0

4.0

3.0

N/A

Common setpoint for all trains in PRODUCTION, BACKPULSE & RELAX. IN ALL MODES: - all steps requiring the pump to run, when the MCC running confirmation is missing for 5 seconds.

Flow Factor, 16-FFY-801, is used to calculate the Recirculation/Drain Pump's flow setpoint, 20-FC-801A. IN STANDBY for train, PRODUCTION for train, BACKPULSE for train, RELAX: - all steps, proceeds to SHUTDOWN - step 1.

50

When the pump ON START OR AUTO button is Y pressed. IN RECOVERY CLEAN & DRAIN: When the pump (recirculation & process pump) is put back into auto and Fault Timer clears then IN RECOVERY CLEAN: align valves as per OSC step after a six second - holds step - all steps, places pump into man off and after a delay of six seconds closes delay resume step, as shown in the OSC. 20-FV-501-x. - 20-KQS-301W starts Displays, "Train will be Shutdown due to active alarm" .

Callout

Range Min

Range Max

16-KQI-801-x 50 16-P-801-x

Derived

Recirculation/Drain Pump Accumulated Run Time Recirculation/Drain Pump

Pump

Recirculation

30000

hours

IN ALL MODES: When the pump is operating. MANUAL: - only available with SUPER password AUTO: - according to the OSC DISABLED (in AUTO or MANUAL): - when any of the following are true: pump Fail 16-YA-801-x System Stop Activated 00-HA-005 IN ALL MODES: - all steps where the pump is requested to start.

IN DRAIN: - holds step - all steps, places pump (recirculation & process pump) into man off and after a delay of six seconds close the valves. - 20-KQS-301W starts Displays, "Train will be Shutdown due to active alarm" . IN ALL MODES: Displays accumulated run time for the pump on the screen. When the pump is called to run, energizes the PLC discrete output to operate motor. If VFD called to start, the speed command is set at the setpoint. Otherwise set to zero

When the Reset Run Time button is pressed, run time resets to 0 hours.

Comm

Pump

Recirculation

50

16-SMS-801-x 50 16-MK-801-x 50 16-KQS-801A 50

Setpoint

Recirculation/Drain Pump Start Speed

Pump

Recirculation

25

100

60

Setpoint

Recirculation/Drain Pump Speed

Pump

Recirculation

Setpoint

Standby recirculation/drain pump Operation Iterations

Pump

Recirculation

10

# of times

16-FV-820 35

Valve

RAS to Mix Tank Isolation Valve

Valve

Permeate

IN ALL MODES: - all steps, this is the pumps starting speed, held for 3 seconds, before starting PID control 16-FIC-801-x. ALL MODES: - all steps, this setpoint is overwritten by the lower CV value from PID loop flow controller 16-FIC-801-x to control the pump. When the standby frequency timer 20-KQS-201D Increase the iterations counter by one. times out. When the value of the iterations counter equals the value of the setpoint, run the recirculation drain pumps for all the trains in Standby. Note: when the iterations counter equals zero run the recirculation drain pumps each time the trains in standby are aerated. AUTO: When the valve called to open then the PLC energizes discrete output to - per OSC. open valve. MANUAL: - only available with HMI Security Level equal to Supervisor.

When the standby duration timer 20-KQS-201C times out for the LAST train in the standby aeration cycle and the value of the counter equals the setpoint value.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 16 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
16-FV-821

Type
Valve

Description
Sludge Holding Isolation Valve

Component
Valve

Equipment
Permeate

Setpoint

Units
AUTO: - per OSC.

Set

Action or Derivation
When the valve called to open then the PLC energizes discrete output to open valve.

Reset

35

MANUAL: - only available with HMI Security Level equal to Supervisor.

55

BACKPULSE
20-KQS-301G Derived Staggered Backpulse Order Sequence Backpulse Staggered Backpulsing: The time slots to do backpulse are evenly distributed throughout one production cycle. The distribution is based on the maximum number of trains installed in the plant. The production cycle is 12 minutes and there are 4 trains. A backpulse is scheduled to occur every 3 minutes. Each train is assigned a time slot to do backpulse according its train number, e.g., train 1 is backpulsed in the first time slot, and train 2 is backpulsed in the second time slot, etc. Any train that is not in a production cycle will be skipped. When train 4 is functioning as a thickener, the time slot for the backpulse/relax remains the same. IN RELAX & BACKPULSE train and thickener: When timer times out. - starts timer. Proceeds as per OSC when timer times out.

55

20-KQS-301B 55

Setpoint

Backpulse/RELAX Duration

Sequence

Backpulse

200

30

sec.

IN BACKPULSE train and thickener: - step 3. IN RELAX: - step 2. IN PRODUCTION: - end of in permeate step. IN BACKPULSE: - 10 seconds into step 3. IN RELAX: - 10 seconds into step 2. IN PRODUCTION: - 30 seconds into production steps.

55

BP_TRIG_PRE BP_TRIG_DUR

Trigger Trigger

Pre-Backpulse Snapshot Trigger Backpulse/Relax Snapshot Trigger

Info Info

Backpulse Backpulse

Callout

Range Min

Range Max

Y Y

55 BP_TRIG_POST 20-FC-301B 20-FIC-301B-x Trigger Setpoint Post-Backpulse Snapshot Trigger Backpulse Flow Setpoint Info Flow Backpulse Backpulse Backpulse 140 1590 1265 gpm

55 55

Y Operator entered flow setpoint for backpulsing the entire train. This is a plant setpoint. IN BACKPULSE & DRAIN: PV is the Backpulse flow rate measured at 20-FIT-301-x. SP = 20-FC-301B for the train and thickener. CV is the speed of the process pump. The minimum CV is 25% and the maximum CV is defined by 20-PDYH-301x action. IN RECOVERY CLEAN and NEUTRALIZATION: PV is the CIP flow rate measured at 20-FIT-301-x. SP = 20-FC-301C. CV is the speed of the process pump. The minimum CV is 25% and the maximum CV is defined by 20-PDYH-301x action. IN MAINTENANCE CLEAN: PV is the CIP flow rate measured at 20-FIT-301-x. SP = 20-FC-301D CV is the speed of the process pump. The minimum CV is 25% and the maximum CV is defined by 20-PDYH-301x action. Deadband = 0, LoopUpdate = 0.5 seconds E=SP-PV Displays value with engineering units on screen. Actual instrument is 20-FE/FIT-301. IN BACKPULSE, MAINTENANCE CLEAN & NEUTRALIZATION: - all steps, proceeds to SHUTDOWN - step 1.

PID/Comm Process Pump - Backpulse, Maintenance Flow Clean Recovery Clean and Neutralization Flow Proportional Integral Derivative Controller

IN BACKPULSE: - steps as per the OSC IN MAINTENANCE CLEAN: - steps as per the OSC IN RECOVERY CLEAN: - steps as per the OSC IN NEUTRALIZATION: - steps as per the OSC IN DRAIN: - steps as per the OSC

55

20-FI-301B-x 55 20-FAH-301B-x

Derived

Backpulse Pump Flow

Flow

Backpulse

2000

gpm

Alarm

Backpulsing Pump, Flow High

Flow

Backpulse

140

1750

1392

gpm

IN BACKPULSE, MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION & DRAIN: - all steps when the backpulse flow is at or above the setpoint for 5 seconds. This is a common setpoint with multiple Alarms.

55

When the ON or OFF button is pressed. Y IN RECOVERY CLEAN: When the pumps are put back into auto and IN RECOVERY CLEAN: Fault Timer clears then align valves as per OSC - holds step step after a six second delay resume step, as - all steps, places pump into man off and after a delay of six seconds closes shown in the OSC. 20-FV-301-x. - auto-stops chemical pumps (if necessary). - 20-KQS-301W starts Displays, "Train will be Shutdown due to active alarm" . IN DRAIN: - continues step - all steps, place process pump into man off and after a delay of six seconds close the valve 20-FV-301-4.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 17 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-FAL-301B-x

Type
Alarm

Description
Backpulse Pump, Flow Low

Component
Flow

Equipment
Backpulse

Setpoint
1000

Units
gpm

Set
IN BACKPULSE, MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION & DRAIN: - all steps where the pump is running and the backpulse flow is at or below the setpoint for 10 seconds.

Action or Derivation
IN BACKPULSE, MAINTENANCE CLEAN & NEUTRALIZATION: - all steps, proceeds to SHUTDOWN - step 1.

Reset

140

1100

55

55

20-FQI-301B-x 20-FIR-301B-x

Derived Derived

Backpulse Volume Backpulse Analysis Flow During Last Backpulse/Relax

Volume Flow

Backpulse Backpulse

10000

gal

55

55 55

20-HMS-201S-x 20-HMS-201T-x

Button Button

Enable Backpulse Button Enable Relax Button

Sequence Sequence

Backpulse Backpulse

20-PDAH-301-x

Alarm

Backpulsing Pump, TMP High

TMP

Backpulse

0.0

8.0

8.0

psig

55

20-PDYH-301-x

Trigger

TMP High

TMP

Backpulse

5.0

20-PDAH301B

7.0

psig

55

When the ON or OFF button is pressed. Y IN RECOVERY CLEAN: When the pumps are put back into auto and IN RECOVERY CLEAN: Fault Timer clears then align valves as per OSC - holds step step after a six second delay resume step, as - all steps, places pump into man off and after a delay of six seconds closes shown in the OSC. 20-FV-301-x. This is a common setpoint with multiple Alarms. - auto-stops chemical pumps (if necessary). - 20-KQS-301W starts Displays, "Train will be Shutdown due to active alarm" . IN DRAIN: - continues step - all steps, place process pump into man off and after a delay of six seconds close the valve 20-FV-301-4. IN BACKPULSE: IN BACKPULSE: IN BACKPULSE: - beginning of step 2 - all steps, totalizes backpulse flow. - step 1 IN BACKPULSE for train and thickener & RELAX: Captures and Displays value and engineering units in Backpulse Analysis - when the During Backpulse/Relax trigger, Chart: BP_TRIG_DUR, is active. - prior to last backpulse/relax - during last backpulse/relax - after last backpulse/relax - after previous backpulse/relax When the button is pressed. Train will use backpulse mode and not relax mode. When the button is pressed or with specific Train will use relax mode and not backpulse mode. alarms, as specified in the CLSC. Relax is not available for train 4 when it is enabled as a thickener IN BACKPULSE, MAINTENANCE CLEAN, IN BACKPULSE, MAINTENANCE CLEAN & NEUTRALIZATION: When the ON or OFF button is pressed. Y RECOVERY CLEAN, NEUTRALIZATION, - all steps, proceeds to SHUTDOWN - step 1. IN RECOVERY CLEAN: DRAIN: When the pumps are put back into auto and - all steps, when the TMP is at or above this IN RECOVERY CLEAN: Fault Timer clears then align valves as per OSC setpoint for 5 seconds during backpulse. - holds step step after a six second delay resume step, as - all steps, places pump into man off and after a delay of six seconds closes shown in the OSC. This is a common setpoint with multiple Alarms. 20-FV-301-x. - auto-stops chemical pumps (if necessary). - 20-KQS-301W starts Displays, "Train will be Shutdown due to active alarm" . IN DRAIN: - continues step - all steps, place process pump into man off and after a delay of six seconds close the valve 20-FV-301-4. IN BACKPULSE for train, BACKPULSE for IN BACKPULSE for train, BACKPULSE for thickener, MAINTENANCE IN ALL MODES: thickener, MAINTENANCE CLEAN, RECOVERY CLEAN, RECOVERY CLEAN, NEUTRALIZATION, DRAIN: -all steps, when the TMP is below the setpoint, CLEAN, NEUTRALIZATION, DRAIN: - all steps, captures the initial value for the maximum of the 20-FIC-301B-x then increases the maximum value for 20-FIC- all steps, when the TMP is at or above this CV as: 301B-x CV by 0.25% every second until it setpoint. reaches 100%. Initial value for the maximum CV = (CV value of 20-FIC-301B-x) - 0.25 Then reduces the maximum value for 20-FIC-301B-x CV by 0.25% every second until it reaches to the its minimum of 25%. IN BACKPULSE for train, BACKPULSE for IN BACKPULSE for train, BACKPULSE for thickener, MAINTENANCE thickener, MAINTENANCE CLEAN, RECOVERY CLEAN, RECOVERY CLEAN, NEUTRALIZATION, DRAIN: CLEAN, NEUTRALIZATION, DRAIN: -all steps, the maximum value for 20-FIC-301B-x CV is limited to a value - all steps, when maximum value for 20-FIC-301B- below 100% . x CV is below 100%. Displays "TMP at limit!" indication on the screen.

Callout

Range Min

Range Max

20-PDIH-301-x 55

Indicator

TMP High Display

TMP

Backpulse

IN PRODUCTION: - all steps, when the maximum value for 20-FIC301A-x CV is at 100%.

20-PAH-301B-x

Alarm

Backpulsing, Pressure High

Pressure

Backpulse

0.0

11.4

9.0

psig

IN BACKPULSE, MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION, DRAIN: - all steps, when the backpulse header pressure is at or above this setpoint for 6 seconds. This is a common setpoint with multiple Alarms.

IN BACKPULSE, MAINTENANCE CLEAN & NEUTRALIZATION: - all steps, proceeds to SHUTDOWN - step 1.

55

20-PAH-601-x 55 20-PAH-602-x 55

Alarm

Backpulsing Pump, Switch 20-PSH-601 Pressure High Backpulsing Pump, Switch 20-PSH-602 Pressure High

Pressure

Backpulse

Alarm

Pressure

Backpulse

IN BACKPULSE: - all steps, when the switch is active for 5 seconds. IN BACKPULSE: - all steps, when the switch is active for 5 seconds.

When the ON or OFF button is pressed. Y IN RECOVERY CLEAN: When the pumps are put back into auto and IN RECOVERY CLEAN: Fault Timer clears then align valves as per OSC - holds step step after a six second delay resume step, as - all steps, places pump into man off and after a delay of six seconds closes shown in the OSC. 20-FV-301-x. - auto-stops chemical pumps (if necessary). - 20-KQS-301W starts Displays, "Train will be Shutdown due to active alarm" . IN DRAIN: - continues step - all steps, place process pump into man off and after a delay of six seconds close the valve 20-FV-301-4. IN PRODUCTION: Y - step 1. IN PRODUCTION: - step 1. Y

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 18 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-PAHH-601-x

Type
Alarm

Description
Backpulsing Pump, Pressure High High

Component
Pressure

Equipment
Backpulse

Setpoint

Units

Set
IN BACKPULSE, MAINTENANCE CLEAN, RECOVERY CLEAN, NEUTRALIZATION, DRAIN: - all steps, when both backpulse pressure high switches A & B are active at the same time.

Action or Derivation
IN BACKPULSE, MAINTENANCE CLEAN & NEUTRALIZATION: - all steps, proceeds to SHUTDOWN - step 1.

Reset

55

20-LSL-302 55 20-LAL-303

Trigger

Low Level in the Common Permeate Header Low Level in the Common Permeate Header

Level

Backpulse

Alarm

Level

Backpulse

When the switch is not active for 5 seconds. Note to FRS: The switch is to be installed above 20-LAL-303 When the backpulsing pump is running and the switch is active for 5 seconds.

When the ON or OFF button is pressed. Y IN RECOVERY CLEAN: When the pumps are put back into auto and IN RECOVERY CLEAN: Fault Timer clears then align valves as per OSC - holds step step after a six second delay resume step, as - all steps, places pump into man off and after a delay of six seconds closes shown in the OSC. 20-FV-301-x. - auto-stops chemical pumps (if necessary). - 20-KQS-301W starts Displays, "Train will be Shutdown due to active alarm" . IN DRAIN: - continues step - all steps, place process pump into man off and after a delay of six seconds close the valve 20-FV-301-4. Resets 20-LAL-303 When the switch is active. Y

Callout

Range Min

Range Max

55

IN BACKPULSE: - the process pump does not run if this switch is active. IN MAINTENANCE CLEAN & NEUTRALIZATION: - all steps, proceeds to SHUTDOWN - step 1. IN RECOVERY CLEAN: - all steps, proceeds to the next step. IN DRAIN: - continues step Operator entered CIP flow setpoint for Recovery Clean, and Neutralization. This is a plant setpoint. Operator entered CIP flow setpoint for Maintenance Clean. This is a plant setpoint.

When the switch 20-LSL-302 is no longer active Y for 20 seconds.

60 60 60 61

Clean In Place (CIP) System


20-FC-301C Setpoint CIP Pump Flow Setpoint - Recovery Clean CIP Pump Flow Setpoint - Maintenance Clean M. CLEAN Air to Citric Acid Pump Valve Flow CIP 0 2000 1265 gpm 20-FC-301D Setpoint Flow CIP 0 2000 760 gpm

CIP - Citric Acid Chemical Systems


23-FV-301 Valve Valve CIP AUTO: - per OSC. MANUAL: - only available with HMI Security Level equal to Supervisor. AUTO: - per OSC. MANUAL: - only available with HMI Security Level equal to Supervisor. AUTO: - per OSC. When the valve called to open then the PLC energizes discrete output to open valve.

61

23-FV-302 61

Valve

R. CLEAN Citric Acid Isolation Valve

Valve

CIP

When the valve called to open then the PLC energizes discrete output to open valve.

23-FV-331-x 61

Valve

Citric Acid Isolation Valve

Valve

CIP

When the valve called to open then the PLC energizes discrete output to open valve.

Interlock 61

Prevent Starting of Citric Acid Pumps

Pump

CIP

MANUAL: - only available with HMI Security Level equal to Supervisor. When a Sodium Hypochlorite Pump is ON. Blocks starting of any Citric Acid Pump, in auto or manual modes. OR When any train is in Maintenance Clean Chlorine Clean or Recovery Clean Chlorine Clean.

62

CIP - Sodium Hypochlorite Chemical Systems


23-FV-101 Valve M. CLEAN Air to Sodium Hypochlorite Pump Valve Valve CIP AUTO: - per OSC. MANUAL: - only available with HMI Security Level equal to Supervisor. AUTO: - per OSC. MANUAL: - only available with HMI Security Level equal to Supervisor. AUTO: - per OSC. MANUAL: - only available with HMI Security Level equal to Supervisor. When the valve called to open then the PLC energizes discrete output to open valve.

62

23-FV-102 62

Valve

R. CLEAN Air to Sodium Hypochlorite Pump Valve

Valve

CIP

When the valve called to open then the PLC energizes discrete output to open valve.

23-FV-131-x 62

Valve

Sodium Hypochlorite Isolation Valve

Valve

CIP

When the valve called to open then the PLC energizes discrete output to open valve.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 19 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT

Type
Interlock

Description
Prevent Starting of NaOCl Pumps

Component
Pump

Equipment
CIP

Setpoint

Units

Set
When a Citric Acid Pump is ON. OR When any train is in Maintenance Clean Acid Clean or Recovery Clean Acid Clean.

Action or Derivation
Blocks starting of any Sodium Hypochlorite Pump, in auto or manual modes.

Reset

62 63 63 20-KQS-201G Trigger Maintenance Clean Schedule Schedule

CIP - Maintenance Clean


20-KQS-201A Setpoint Maintenance Clean Aeration Step Timer Pump Maintenance Clean 600 3600 900 sec. IN MAINTENANCE CLEAN: - In aeration steps, as detailed in OSC. IN MAINTENANCE CLEAN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Maintenance Clean steps, for details. IN PRODUCTION: - in permeate step, proceeds to MAINTENANCE CLEAN - step 1. IN STANDBY: -proceeds to MAINTENANCE CLEAN - step 1. Only one Maintenance Clean can be scheduled per day.

Maintenance Clean

63

IN PRODUCTION & STANDBY: - all steps, when the system time is greater than or equal to the operator entered time to start/enable the Maintenance Cleans, 20-KQS201H, the train has not done a maintenance clean since midnight, and a Maintenance Clean has been selected to occur that day. Note: the maintenance clean is skipped when the train is enabled as a thickener.

IN MAINTENANCE CLEAN: - step 1.

20-HMS-201U-x

Button

Maintenance Clean to Occur on Given Day Enable Button

Schedule

Maintenance Clean

Operator can select to have a Maintenance Clean on specific days of the week. ENABLE indicates a Maintenance Clean for that train. Only one Maintenance Clean can be scheduled per day, Sunday to Saturday. Each day can have a different start/enabled and stop/disabled time.

63

20-KQS-201H 63 20-FSH-201

Setpoint

Maintenance Clean Start/Enable Time

Schedule

Maintenance Clean Maintenance Clean

2400

Determined by hr. Operator

Operator entered value to start/enable Maintenance Clean on the given day.

Trigger

Maintenance Cleans Delay or Aborted when Plant Flow Demand is high.

Schedule

63

System calculates the plant capacity as if there was one currently available train not in service. WHEN: Current plant permeate demand is at or above [Max. net flow for Train 1 x Total number of trains available less one train]. IF: 20-FCY-201A [(20-FCYH-301B) x (NUM_TR_PROD + # of tr. in Standby step 3 + # of tr. in Maintenance Clean - 1] The result of the calculation determines if one train can proceed to do a Maintenance Clean and the remaining trains can meet the current permeate demand. Prevents Maintenance Cleans from starting and aborts Maintenance Cleans When 20-FSH-201 is not active. that are in progress. WHEN IN PRODUCTION, BACKPULSE, OR RELAX: The Maintenance Clean request is blocked and remains active. Alarms and displays on the alarm banner "Maintenance Clean delayed". When alarm 20-FAH-201-x clears at lower plant demands, 20-FSH-201 is not active, trains that have a Maintenance Clean request active will proceed to Maintenance Clean step 1 when no other train is in a Maintenance Clean, as described in the OSC. WHEN IN MAINTENANCE CLEAN: - steps 1 to 8, proceeds to MAINTENANCE CLEAN step 9. - steps 12, proceeds to MAINTENANCE CLEAN step 13. Displays on the alarm banner "Maintenance Clean aborted" Allows the operator to select Sodium Hypochlorite Maintenance Clean for each scheduled Maintenance Clean. Allows the operator to select Citric Acid Maintenance Clean for each scheduled Maintenance Clean. IN MAINTENANCE CLEAN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Maintenance Clean steps, for details. IN MAINTENANCE CLEAN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Maintenance Clean steps, for details. IN MAINTENANCE CLEAN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Maintenance Clean steps, for details.

20-FAH-201-x

Alarm

Maintenance Clean Delay/Abort Alarm

Schedule

Maintenance Clean

When 20-FSH-201 is active and either the Maintenance Clean is pending for train "X" or train "X" is in a Maintenance Clean.

63

63 63

23-HMS-101A-x 23-HMS-301A-x 20-KQS-301C

Button Button Setpoint

Maintenance Clean Sodium Hypochlorite Sequence Button Maintenance Clean Citric Acid Button Sequence Maintenance Clean Repeated Pulse Duration Sequence

63 20-KQS-301D 63 20-KQS-301E 63 Setpoint Setpoint

Maintenance Clean Maintenance Clean Maintenance Clean

When the button is pressed. When the button is pressed. 5 200 30 for steel tanks use 20 120 for steel tanks use 60 270 sec. IN MAINTENANCE CLEAN: - steps as noted in the OSC.

Maintenance Clean First & Last Pulse, Pulse Duration

Sequence

Maintenance Clean

200

sec.

IN MAINTENANCE CLEAN: - steps as noted in the OSC.

Maintenance Clean Soak Duration

Sequence

Maintenance Clean

600

sec.

IN MAINTENANCE CLEAN: - steps as noted in the OSC.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 20 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

Callout

Range Min

Range Max

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-KQS-301F

Type
Setpoint

Description
Maintenance Clean Number of iterations

Component
Sequence

Equipment
Maintenance Clean

Setpoint
8

Units
N/A

Set
IN MAINTENANCE CLEAN: - steps as noted in the OSC.

Action or Derivation
Operator entered number of iterations for the chemical pulses in Maintenance Clean mode. This is the number of iterations the chemical pulses in Maintenance Clean are repeated. Consult the OSC, Maintenance Clean mode, for details.

Reset

10

63

64 64

CIP - Recovery Clean


20-KQS-201B Setpoint Recovery Clean Aeration Step Timer Sequence Recovery Clean 0 3600 300 sec. IN RECOVERY CLEAN: - steps as noted in the OSC. IN RECOVERY CLEAN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Recovery Clean steps, for details. IN RECOVERY CLEAN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Recovery Clean steps, for details. Operator entered number of iterations for the flushing the membrane tank in Recovery Clean. This is the number of iterations the flush step in Recovery Clean is repeated. Consult the OSC, Recovery Clean mode, for details. IN RECOVERY CLEAN and NEUTRALIZATION: IN RECOVERY CLEAN and NEUTRALIZATION: - steps as noted in the OSC. - steps as noted in the OSC, this is the steps duration. Consult the OSC, Recovery Clean steps, for details. IN RECOVERY CLEAN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Recovery Clean steps, for details. IN RECOVERY CLEAN: - duration of step as per OSC. IN RECOVERY CLEAN: - setpoint is mixing duration with air in extended soak step. - aerates the membrane tank for 20-KQS-301Q seconds every 20-KQS301R seconds. Starts step with no mixing. IN RECOVERY CLEAN: - setpoint is mixing duration with air in extended soak step. - aerates the membrane tank for 20-KQS-301Q seconds every 20-KQS301R seconds. Starts step with no mixing. When the button is selected there is not intermittent aeration in the soak step of Recovery Clean When the button is selected there is intermittent aeration in the soak step of Recovery Clean IN NEUTRALIZATION: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Neutralization steps, for details. IN NEUTRALIZATION: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Neutralization steps, for details. IN SHUTDOWN, NEUTRALIZATION, DRAIN: - steps as noted in the OSC, this is the steps duration.

20-KQS-301T 64 20-KQS-301V

Setpoint

Empty Tk Manual Flush Duration

Sequence

Recovery Clean 0

1800

sec.

IN RECOVERY CLEAN: - steps as noted in the OSC.

Setpoint

Number of Iterations for Recovery Clean Mem Tk Flushing

Sequence

Recovery Clean 0

N/A

IN RECOVERY CLEAN: - steps as noted in the OSC.

64

20-KQS-301M 64 20-KQS-301N 64 20-KQS-301P 20-KQS-301Q 64

Setpoint

Recovery Clean Repeated Pulse Duration Sequence

Recovery Clean 30

7200

120

sec.

Setpoint

Recovery Clean Soak Duration

Sequence

Recovery Clean 30

500

120

sec.

IN RECOVERY CLEAN: - steps as noted in the OSC.

64

Setpoint Setpoint

Recovery Clean Extended Soak Duration Sequence Recovery Clean Soak Extended Soak Mixing Duration Sequence

Recovery Clean 3 Recovery Clean 30

24 300

12 60

hr. sec.

IN RECOVERY CLEAN: - as per OSC. IN RECOVERY CLEAN: - in extended soak step and aeration is enabled, and every time 20-KQS-301R times out.

IN RECOVERY CLEAN: - as per OSC.

20-KQS-301R 64

Setpoint

Recovery Clean Soak Extended Soak Mixing Frequency

Sequence

Recovery Clean 600

7200

1200

sec.

IN RECOVERY CLEAN: - as per OSC.

IN RECOVERY CLEAN: - as per OSC.

64 64 65

20-HMS-210C-x 20-HMS-210C-x

Button Button

Extended Soak Mixing Disable Button Extended Soak Mixing Enable Button

Sequence Sequence

Recovery Clean Recovery Clean

When the button is selected When the button is selected

Neutralization System
20-KQS-201J Setpoint Neutralization Aeration Step Timer Sequence Neutralization 5 900 60 sec. IN NEUTRALIZATION: - steps as noted in the OSC.

64 20-KQS-301U 64 20-KQS-110C 64 20-KQS-110D 64 20-HMS-201V-x 64 20-HMS-201W-x 64 Button CONFIRM NEUTRALIZATION Button Sequence Neutralization Button Setpoint Inlet Gate Stop Sending the Open Signal Sequence Frequency Neutralization 5 360 100 sec. Setpoint Inlet Gate Opening Duration Sequence Neutralization 5 120 60 sec. Setpoint Neutralization Soak Duration Sequence Neutralization 5 1200 900 sec.

IN NEUTRALIZATION: - steps as noted in the OSC.

IN SHUTDOWN, NEUTRALIZATION, DRAIN: - steps as noted in the OSC.

RESUME NEUTRALIZATION Button

Sequence

Neutralization

Consult the OSC, shutdown, Neutralization, drain steps, for details. IN STANDBY, SHUTDOWN, NEUTRALIZATION, IN STANDBY, SHUTDOWN, NEUTRALIZATION, DRAIN: DRAIN: - steps as noted in the OSC, this is the steps duration. - steps as noted in the OSC. Consult the OSC, shutdown, Neutralization, drain steps, for details. IN NEUTRALIZATION: IN NEUTRALIZATION: When the button is pressed. - steps as per OSC, proceeds according to the OSC. Consult interlocks in CLSC and OSC for more information. IN NEUTRALIZATION: - steps as per OSC, proceeds to next step. Consult interlocks in CLSC and OSC for more information.

IN NEUTRALIZATION: When the button is pressed.

65

DRAIN

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 21 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

Callout

Range Min

Range Max

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
20-KQS-201N

Type
Setpoint

Description
Drain Aeration Step Timer

Component
Sequence

Equipment
Neutralization

Setpoint
900

Units
sec.

Set
IN DRAIN: - steps as noted in the OSC.

Action or Derivation
IN DRAIN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Neutralization steps, for details. IN DRAIN: - steps as noted in the OSC, this is the steps duration. Consult the OSC, Neutralization steps, for details.

Reset

900

1800

64 20-KQS-301H 64 Setpoint Frequency of Backpulse During Drain Sequence Neutralization 600 1800 900 sec.

IN DRAIN: - steps as noted in the OSC.

70

Vacuum System
20-FV-802-x Button Vacuum Ejector Compressed Air Valve Valve Vacuum AUTO: - per OSC. When the valve called to open then the PLC energizes discrete output to open valve. MANUAL: - only available with HMI Security Level equal to Supervisor. IN ALL MODES: IN ALL MODES: - when the compressed air ejector valve is - closes the ejector valves then proceeds to SHUTDOWN - step 1. requested open and the pressure, 20-PI-301-x, is at or above this setpoint with no time delay. Displays on alarm banner "Priming Aborted" Operator entered value used as a Master Ejector Cycle Timer. Setpoint sets the frequency for ejector operation for each train. Ejector for train X operates every 20-KS-802A seconds. Master Ejector Cycle Timer starts once any train is in STANDBY step 3 and continues while there is at least one train in STANDBY step 3 or in PRODUCTION step 2. When there are no trains in these steps, the cycle timer stops. Train # ejector opens at time = # x 20-KS-802B, of the Master Ejector Cycle Timer as follows: Train 1 ejector opens at start time = 1 x 20-KS-802B Train 2 ejector opens at start time = 2 x 20-KS-802B Train 3 ejector opens at start time = 3 x 20-KS-802B etc. Derived setpoint is the ejector operation interval between any two trains. This time is used to determine when to trigger an ejector to operate in the Master Ejector Cycle Timer, as described in 20-KS-802A. 20-KS-802B seconds = 60 sec. x 20-KS-802A / (# of trains installed) 20-KS-802C-x Setpoint Train Ejector Open Duration Sequence Vacuum 5 30 15 sec. IN STANDBY step 3, & PRODUCTION step 2: Operator entered value. - When ejector is required to operate according to Ejector opens for this duration. the start time calculated in 20-KS-802A This is a plant setpoint. Plant Flow Demand = Moving Average Feed Flow + Trim Factor from average Membrane Tk. Level 20-FCY-201A = 16-FXI-401 + 20-FCY-201B

70

20-PAH-301A-x 70 20-KS-802A

Alarm

Re-Priming Pressure High

Pressure

Vacuum

4.0

9.0

9.0

psig

When the ON button is pressed.

Callout

Range Min

Range Max

Setpoint

Train Ejector Operating Frequency Master Ejector Cycle Timer

Sequence

Vacuum

120

min.

70

20-KS-802B 70

Derived

Ejector Operating Interval - time between Sequence operating any two ejectors

Vacuum

sec.

70

75

Treated Water System


20-FCY-201A Derived Plant Permeate Flow Demand Flow Plant Permeate 0 3098 gpm

75

20-FIY-301 75 75 75 20-FQI-301C 20-FQI-301D 20-TAT-301

Derived

Plant Permeate Flow

Flow

Plant Permeate 0

3700

gpm

Derived Derived Alarm

Today's Plant Production Volume

Volume

Plant Permeate -10000 Plant Permeate -10000 Plant Permeate 0

1000000000 1000000000 30

gal gal deg. C At midnight. IN ALL MODES: When the transmitter is out of range by 1% of the calibrated range for 2 seconds. (i.e. calibrated range = range max. - range min.)

Yesterday's Plant Production Volume Volume Plant Permeate Temperature Transmitter Temperature Out of Range

Where: 20-FCY-201B = (Trim Factor from Membrane Tk Level ) Where the water accumulates in the plant, is the location the level trim is calculated. The peak flow equals 3098 gpm The overall plant flow demand used to calculate the net permeate flow 20FCY-301A-x. IN PRODUCTION and BACKPULSE: - all steps, totalizes permeate flows (Sum of 20-FI-301-x) minus backpulse flow (Sum of 20-FI-601-x). IN PRODUCTION: - all steps, totalizes permeate volumes from each train. Set value to 20-FQI-301C.

At midnight after current value is put into 20-FQI301D. Y When the transmitter is in range. Y Y

75

20-TI-301 75

Analog in

Plant Permeate Temperature

Temperature

Plant Permeate 0

30

deg. C

Displays value with engineering units on screen. Actual instrument is 20-TE/TIT-301

80 80 80

Utility Air System


90-YA-001-x 90-KQI-002 Alarm Derived Air Compressor Fail Air Compressor Accumulated Run Time Compressor Compressor Utility Air Utility Air 0 30000 hours IN ALL MODES: - all steps, when the failed signal is present. IN ALL MODES: When the compressor is operating. Page 22 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

IN ALL MODES: - all steps, alarm only. Continues steps. IN ALL MODES: Displays accumulated run time for the compressor on the screen.

When the failed signal is no longer present. When the Reset Run Time button is pressed, run time resets to 0 hours.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

GE Water & Process Technologies SCLA Victorville, CA Controls Logic Summary Chart
Notification

SORTING

GE W&PT
90-PAL-002

Type
Alarm

Description
Compressed Air Pressure Low Low

Component
Pressure

Equipment
Utility Air

Setpoint

Units

Set
IN ALL MODES: - all steps, when 90-PSL-002 is active for 5 seconds.

Action or Derivation
IN STANDBY: - intermittent aeration and priming is prevented. (the Master Ejector Cycle Timer is not running) IN PRIME, PRODUCTION, BACKPULSE, RELAX (both trains and thickener): - all steps, proceeds to STANDBY - step 1. IN DRAIN: - holds step - all steps, places all operating pumps into man off and after a delay of six seconds close the valves. - 20-KQS-301W starts Displays, "Thickener will be Shutdown due to active alarm" . IN MAINTENANCE CLEAN: - all steps, proceeds to STANDBY - step 1. Displays on alarm banner "Maintenance Clean Aborted." IN RECOVERY CLEAN: - holds step - all steps, places pump (process and recirculation/drain pumps) into man off and after a delay of six seconds closes 20-FV-301-x. - auto-stops chemical pumps (if necessary). IN NEUTRALIZATION: - all steps, proceeds to SHUTDOWN - step 1. Displays on alarm banner "Neutralization Aborted."

Reset

When 90-PSL-002 is no longer active. Y IN RECOVERY CLEAN & DRAIN: When the pump (recirculation & process pump) is put back into auto and Fault Timer clears then align valves as per OSC step after a six second delay resume step, as shown in the OSC.

Callout

Range Min

Range Max

80

85

System Power
20-JAL-001 Alarm Plant Power Failure Plant System Power IN ALL MODES: All trains and thickener proceed to POWER OFF mode. When power is restored. - all steps, when the system detects that power is lost for 1.5 seconds. The system blocks all fail safe inputs that are normally closed (to avoid nuisance alarms). When the system detects that power is restored. This startup sequence shows the order in which the devices in the plant are re-enabled after a power interruption or after an system stop button has been reset. All trains and thickener proceeds to POWER OFF until power is resumed and the train/thickener is enabled. ZeeWeed trains that were in STANDBY, PRODUCTION, BACKPULSE/RELAX, or MAINTENANCE CLEAN prior to the power failure, will proceed to STANDBY - step 1 for train as per the start-up sequence. ZeeWeed trains that were in RECOVERY CLEAN, prior to the power failure, will proceed to SHUTDOWN - step 1 as per the start-up sequence. Displays on alarm banner "Recovery Clean Aborted." ZeeWeed trains that were in NEUTRALIZATION, prior to the power failure, will proceed to SHUTDOWN - step 1 as per the start-up sequence. Displays on alarm banner "Neutralization Aborted." Thickener that was in STANDBY, PRODUCTION, BACKPULSE prior to the power failure, will proceed to STANDBY - step 1 for thickener as per the start-up sequence. A delay is provided in each step to allow for devices to start before advancing to the next step. Steps are skipped for those devices which are n Allows utility air compressors to run if required. Allows transmitters to warm up and complete a self diagnostics. Displays "Power-up Delay" on the screen. Interlock Interlock Startup Step 2 Startup Step 3 Startup Startup System Power System Power 60 seconds after start of step 1 and 90-PSL-002 Re-enables all common, non-sequenced valves. shows normal pressure. 30 seconds after the start of the previous step. Allows train 1 to come out of POWER OFF mode. There is no delay if the device in the previous step is not required. Train proceeds to either STANDBY - step 1 or SHUTDOWN - step 1. See start-up sequence step 1 for more details. 30 seconds after the start of previous step. Allows train 2 to come out of POWER OFF mode. Train proceeds to either STANDBY - step 1 or SHUTDOWN - step 1. See start-up sequence step 1 for more details. Allows train 3 to come out of POWER OFF mode. Train proceeds to either STANDBY - step 1 or SHUTDOWN - step 1. See start-up sequence step 1 for more details. Allows train/thickener 4 to come out of POWER OFF mode. Train/thickener proceeds to either STANDBY - step 1 or SHUTDOWN - step 1. See start-up sequence step 1 for more details. Y Y

85 Interlock Startup Step 1 Startup System Power

85

85

85 Interlock 85 Interlock 85 Interlock 85 Startup Step 6 Startup System Power Startup Step 5 Startup System Power Startup Step 4 Startup System Power

30 seconds after the start of previous step.

30 seconds after the start of previous step.

Issued: Nov. 16, 2009 Process Controls: D. Courtney

Page 23 of 23
The enclosed materials are considered proprietary property of GE Water & Process Technologies.

200326_Victorville_CLSC_R02_25May10_MdK.xls

ZenoTrac

Shutdown

This page has been intentionally left blank

SECTION 6

WARRANTY

This page has been intentionally left blank

Warranty Information Sheet


Tech Support - fill out Yellow Highlighted sections before transfer A 0 Binder to PM. Include this sheet with every A 0

mfill out Green Highlighted sections before transfer to Service.

MECHANICAL EQUIPMENT IXI Zenon Standard Proposal Terms WARRANTY TERM: PROCESS GUARANTEE - N/A Biology by Others Zenon Standard Proposal Terms GUARANTEE TERM: DETAILS OF WARRANTY:

Client Specification Terms Term Details: 12 months from Substantial Completion or 18 months from ship

Client Specification Terms Term Details:-

MEMBRANE Zenon Standard Proposal Terms WARRANTY TERM:

Client Specification Terms Term Details:Cliff Warranty Term - Length of Cliff term Prorated Warranty Term - Length of Pro-rated term

GUARANTEED MEMBRANE REPLACEMENT COST:

$NONE given IXI USD [7 CDN Other Unique calculation required for replacement price? List details MSRP MSRP Price List Effective Date

MEMBRANEREPLACEMENT 'OST (No $None given MEMBRANE COST FOR FUTURE EXPANSION NIA us, Oakville

tXI USD
,DN No

CDN Other

Other

PRICE ESCALATION CALCULATION REQUIRED:

(XI Yes

IXI US Bureau of Labour


Canada Unique terms: Maximum Fibre Repairs : over

State Specific (module/cassette/train) (montldyearllife)

SERVICE LEVEL OF ZENOTRAC SERVICE: SERVICE CONTRACT: None


# OF VISITS 0 # OF YEARS 0

ENF-042 Rev 06 16-Jan-06

This warranty applies to the Originalpurc/mser only, and is non transferable. This is a summary and requires supporting documentation for each item.

1 of 1

This page has been intentionally left blank

RECOMMENDED SPARE PARTS LIST

SECTION 7

This page has been intentionally left blank

RECOMMENDED SPARE PARTS LIST FOR PROJECT NO. 200326


Item No. Item Qty GE WATER # Tag # Item Details Check List PLEASE NOTE: THIS IS THE MOST CURRENT RECOMMENDED SPARE PARTS LIST BASED ON THE BILL OF MATERIAL AT THE TIME OF REQUEST. FOR A FULL CUSTOM PRICED LIST PLEASE ALLOW 1-2 WEEKS FOR GENERATION. PUMPS

C = CRITICAL R = RECOMMENDED M = MAINTENANCE CS = CONSUMABLES C R M CS

SPARES FOR EJECTOR

MAINTENANCE KIT

X X X

SPARES FOR AIR DIAPHRAGM PUMP

DUODOS 15 PVDF

"23-P-310 23-P-320 "

PUMP SPARE PARTS KIT

SPARES FOR PUMP HYPO PUMP SKID

HYPO PUMP SKID

23-P-110 23-P-120

PUMP SPARE PARTS KIT

SPARES FOR RAS PUMP

RAS PUMP

16-P-801-1 16-P-801-2 16-P-801-3 16-P-801-4

PUMP REPAIR KIT

SPARES FOR PROCESS PUMP

PROCESS PUMP

20-P-301-1 20-P-301-2 20-P-301-3 20-P-301-4

PUMP REPAIR KIT

VALVES 23-FV-131-1 23-FV-131-2 23-FV-131-3 23-FV-131-4 1 1/2" TYPE 233 PNEUMATICALLY ACTUATED VENTED BALL VALVE, PVC, FPM O-RINGS, FAIL SAFE TO CLOSE PART # S199 233 077 C/W V161 546 356 C/W CSA/UL APPROVED SOLENOID PILOT VALVE 120/60 VAC TYPE PV95 PT#199190555CSA "VALVE, BALL, 1"", TRUE UNION, PVC BODY, TEFLON SEATS, EPDM O-RINGS, SOCKETWELD, GEORGE FISCHER TYPE 546, C/W PA11 SPRING RETURN FAIL CLOSE PNEUMATIC RACK AND PINION ACTUATOR PT# 198 150 127, ASSEMBLY PT# S199 233 065 C/W TYPE PV95 120V AC SOLENOID VALVE PT# 199 190 555CSA WITH MANUAL OVERRIDE, CSA/UL APPROVED" VALVE, BUTTERFLY, BRAY SERIES 31-119, 10" CAST IRON LUG STYLE BODY, RATED VACUUM TO 50 PSI, UNDERCUT NYLON COATED DISC, SS SHAFT, EPDM SEAT, BRAY PNEUMATIC RACK AND PINION DOUBLE ACTING ACTUATOR SERIES 92/118, C/W NAMUR DIRECT MOUNT SOLE NOID 110VAC NEMA 4,4X 630250-21520536 WITH SPEED CONTROLS; BRAY ASSEMBLY ID 9C100LV119926C. VALVE, SOLENOID, BURKERT PT# 0290-A-12,O-FF-VA-NM84-120/60-12* PD02, 2-WAY AIR/WATER 1/2" FNPT, SS BODY, VITON SEAL, NORMALLY CLOSED, 7/16" ORIFICE, Cv-3.3GPM (WATER) OR 110 SCFM (AIR), 0 PSI PRESSURE DIFFERENTIAL REQUIRED, 0-230 PSI PRESS URE RANGE, C/W TYPE H ELECTRICAL CONNECTION, IDENTIFICATION # 137943L AND 1/2" FNPT CONDUIT RING ADAPTOR, ASSEMBLY # 454424J.

BALL VALVE 1-1/2"

1033705

BALL VALVE 1"

1040026

23-FV-331-1 23-FV-331-2 23-FV-331-3 23-FV-331-4

BUTTERFLY VALVE 10"

1041079

20-FV-301-1 20-FV-301-2 20-FV-301-3 20-FV-301-4

SOLENOID VALVE

1023781

20-FV-320-1 20-FV-320-2 20-FV-320-3 20-FV-320-4

USA / ZENON Membrane Solutions CAD / GE Water Process Technologies Canada

RSPL200326XMR1.xls 12/10/2009 AC

1 of 6

RECOMMENDED SPARE PARTS LIST FOR PROJECT NO. 200326


Item No. Item Qty GE WATER # Tag # Item Details 0.5" BURKERT ANGLE SEAT AND SOLENOID VALVE ASSEMBLY USED FOR VACCON EJECTOR SYST-2000-463250-6518-CD06041 Type 2000 Piston Valve material # 92707036. 2/2-Ways Normaly Closed Orifice: 13mm (1/2") Seal: FKM (viton) Body: Stainless Steel Port: NPT 1/2" Actautor: PA Actuator Size: 50mm FLOW ABOVE SEAT VACUUM VERSION Type 6518 Pilot Valve Power Supply: 120 Volts / 60 Hertz / 2 Watts Check List

C = CRITICAL R = RECOMMENDED M = MAINTENANCE CS = CONSUMABLES C R M CS

10

ANGLE SEAT VALVE 0.5"

1033457

11

KNIFE GATE VALVE 14"

KN GATE DA 14IN

16-FV-820 16-FV-821

14 INCH ORBINOX #20-3636R-14-PA FULL KNIFE GATE VALVE,316SS BODY AND GATE, PTFE IMPREGNATED SYNTHETIC FIBER PACKING, EPDM SEAT C/W PNEUMATIC DOUBLE ACTING CYLINDER, BASED ON 80 PSI AIR SUPPLY AND 60 PSI DIFFERENTIAL PRESSURE.DOUBLE ACTING PNEUMATIC ACTUATOR

12

KNIFE GATE VALVE 18"

KN GATE DA 18IN

20-FV-501-1 20-FV-501-2 20-FV-501-3 20-FV-501-4

18 INCH ORBINOX #20-3636R-18-PA FULL KNIFE GATE VALVE,316SS BODY AND GATE, PTFE IMPREGNATED SYNTHETIC FIBER PACKING, EPDM SEAT, C/W 10 BORE PNEUMATIC DOUBLE ACTING CYLINDER, BASED ON 80 PSI AIR SUPPLY AND 30 PSI DIFFERENTIAL PRESSURE.

13

CYCLIC VALVE 10"

1033379

20-FV-210-1 20-FV-210-2 20-FV-210-3 20-FV-210-4 20-FV-211-1 20-FV-211-2 20-FV-211-3 20-FV-211-4

BUTTERFLY VALVE, LUG, HIGH PERFORMANCE, 10", TYCO, K-LOK PT#F362-105-K-LOK, ANSI 150#, 316SS LUG STYLE BODY, 316SS DISC, 17-4pH,SS STEM, RTFE SEAT,FIBERGLASS RTFE IMPREGNATED BUSHINGS, C/W MORIN SERIES B-036 DA, DOUBLE ACTING PNEUMATIC A CTUATOR SCOTCH YOKE STYLE, DUCTILE IRON ACTUATOR BODY AND END CAPS, SS CYLINDER C/W WESTLOCK QUANTUM POSITION MONITOR PT# 765-N-BY-1A-2M06-00-A-36-0-L, 1/2" CONDUIT ENTRY, C/W WITH BUILT-IN 120VAC SOLENOID ENERGIZED TO CLOSE, MANUAL OVE RRIDE, POWER LOSS OPENS, TWO SPDT MAGNUM PROXIMITY SWITCHES 3A @ 120VAC, NEMA 4, 4,4X, C/W ASCO SERIES 112, 1/4" NPT FILTER/REGULATOR WITH PRESSURE GAUGE, PT# 34203089, 25 MICRON FILTER WITH BOWL PROTECTOR, SEMI-AUTO DRAIN, PRESSURE CONT ROL RANGE 7-145 PSI, COMES ASSEMBLED WITH TWO DELTROL 1/4" INLINE SPEED CONTROLS & TWO PARKER ES25MB MUFFLERS FOR NOISE REDUCTION.

INSTRUMENTS 16-PI-801-1 16-PI-801-2 16-PI-801-3 16-PI-801-4 16-PI-802-1 16-PI-802-2 16-PI-802-3 16-PI-802-4

14

PRESSURE GAUGE

1023426

PRESSURE GAUGE, ASHCROFT PT# 100-1008SL-04L 15PSI, SS CASE 100MM DIAL (4"), 0-15 PSI (DUAL SCALE PSI & kPa) 1/2" LOWER CONNECTION, GLYCERINE FILLED, 3-2-3% ASME GR B ACCURACY, POLYCARBONATE WINDOW.

15

DIAPHRAGM SEAL FOR ABOVE PRESSURE GAUGES

1033613

FOR 16-PI-801-1/2/3/4 16-PI-802-1/2/3/4

DIAPHRAGM SEAL, TYPE 100, ASHCROFT PT # 15-102SSL-04T-CK-150, ALL CLAMPED, 1 FLANGE CONNECTION 150#, DIAPHRAGM AND HOUSING OF 316SS, FNPT GAUGE CONNECTION, GUAGE MOUNTED WITH SILICONE FLUID FOR PRESSURE APPLICATION.

16

PRESSURE GAUGE

1023462

20-PI-301-1 20-PI-301-2 20-PI-301-3 20-PI-301-4 20-PI-302-1 20-PI-302-2 20-PI-302-3 20-PI-302-4

PRESSURE GAUGE, ASHCROFT PT# 100-1008SL-04L 30PSI, SS CASE, 100MM DIAL (4"), 30" MERCURY-30 PSI (DUAL SCALE IN MECURY & PSI/kPa) 1/2" LOWER CONNECTION, GLYCERINE FILLED, 3-2-3% ASME GR B ACCURACY, POLYCARBONATE WINDOW.

USA / ZENON Membrane Solutions CAD / GE Water Process Technologies Canada

RSPL200326XMR1.xls 12/10/2009 AC

2 of 6

RECOMMENDED SPARE PARTS LIST FOR PROJECT NO. 200326


Item No. Item Qty GE WATER # Tag # 20-PSH-601-1 20-PSH-601-2 20-PSH-601-3 20-PSH-601-4 20-PSH-602-1 20-PSH-602-2 20-PSH-602-3 20-PSH-602-4 SETPOINT: 9 PSI INCREASING 17 PRESSURE SWITCH HIGH 1 1010914 20-PSH-301-1 20-PSH-301-2 20-PSH-301-3 20-PSH-301-4 20-PSH-302-1 20-PSH-302-2 20-PSH-302-3 20-PSH-302-4 SETP OINT: 20 PSI INCREASING Item Details Check List

C = CRITICAL R = RECOMMENDED M = MAINTENANCE CS = CONSUMABLES C R M CS

PRESSURE SWITCH,U.E. PT# J6-S134B-M201-M444,30"HG VAC-20PSI,1/2" FNPT, NO REFERENCE DIAL,316SS BELLOWS,FACTORY SET, PAPER ID TAG,ONE SPDT RELAY (15A),0.2-0.8"HG FIXED DEAD BAND,25 PSI PROOF PRESS.,NEMA 4X, ALUMINUM BODY,+-1% REPEATABLITY.

90-PSL-002 18 PRESSURE SWITCH LOW 1 1010917 SETPOINT=70 PSIG DECREASING 20-LSL-201B-1 20-LSL-201B-2 20-LSL-201B-3 20-LSL-201B-4 20-LSLL-201C-1 20-LSLL-201C-2 20-LSLL-201C-3 20-LSLL-201C-4

PRESSURE SWITCH,U.E. PT# H100-270-M201-M444,4-200 PSI,1/4"FNPT,WITH REFERENCE SCALE,PHOSPHOR BRONZE BELLOWS,FACTORY SET,PAPER ID TAG,ONE SPDT RELAY (15A),1-4 PSI FIXED DEAD BRAND,250 PSI PROOF PRESS.,NEMA 4X ALUMINUM BODY,+-1% REPEATABLITY.

19

LEVEL SWITCH LOW

1032157

SWITCH, LEVEL, MJK PT# 202810, MODEL 7030, CABLE SUSPENDED 4" FLOAT, POLYPROPYLENE HOUSING, 39 FT LONG OIL RESISTANT PVC CABLE, 120VAC OR 220VAC, 1PH/60Hz, -20oC to 60oC OPERATING TEMPERATURE

20

FLOW SWITCH LOW

1022883

20-FSL-201-1 20-FSL-201-2 20-FSL-201-3 20-FSL-201-4

SWITCH FLOW, KOBOLD PT# KAL-8115-C,3.3-66 FT/SEC VELOCITY RANGE, 0.5"MNPT PROC. CONNECTION, Ni-PLATED BRASS WETTED PARTS, NYLON HOUSING, 8-LED FLOW TREND, 2-COLOUR LED SWITCH STATUS, NEMA 4, 0.5"NPT CONDUIT CONNECTION, 24V DC POWER SUPPLY, 1-SPDT SWITCH, 120 PSIG MAX. OPERATING PRESSURE, -10 TO +250 DEGREE F. PROCESS TEMPERATURE, +/-1% REPRODUCIBILITY, UP TO 60 SEC. TIME DELAY START UP, CSA APPROVAL IS REQUIRED. LEVEL SWITCH FLOAT, KOBOLD PT# NCK-2554, 20' CALBE W/ PVC JACKET, 1/8" NPT TOP MOUNTED CONNECTION, 1" X 1" FLOAT. KYNAR, 204 VAC AC/DC @ 0.5 AMPS. TEMPERATURE TRANSMITTER, 0-50 DEGREE C., ENDRESS & HAUSER PT# TR11-A2ACESY43000 WITH TMT180 TRANSMITTER, PT100 CLASS B RTD, 75MM INSERTION LENGTH, 316SS STRAIGHT TIP THERMOWELL WITH 3/4" MNPT PROCESS CONNECTION, 4-20mA 2-WIRE ANALOG FIXE D RANGE OUTPUT, 10-36 VDC LOOP POWERED,COATED ALUMINUM IP55 HOUSING, 1/2" NPT CONDUIT ENTRY, GREATER OF 0.1% MEASURING RANGE OR 0.1 DEGREE C. ACCURACY. TRANSMITTER, PRESSURE, E&H PT# CERABAR-S PMC71-UAC1KBRAAAA, ALUMINUM HOUSING W/ 1/2" NPT PROCESS CONNECTION, CAPACITIVE WETTED SENSOR W/ CERAMIC DIAPHRAGM: 2 BAR G, 200 KPA, 30 PSIG10X OVERLOAD PROOF. LINEARITY = +/- 0.1%, TURNDOWN= 100 :1, HIGH RELIABILITY, 4-20 mA HART OUTPUT W/ LINEARISATION & LCD DISPLAY, CSA CL. I II III, DIV 1, GROUP A-G. RANGE TO BE SPECIFIED IN THE BOM TEXT.

21

LEVEL FLOAT SWITCH

1028356

23-LSL-101 23-LSL-301

22

TEMPERATURE TRANSMITTER

1022657

20-TW/TIT-301

23

PRESSURE TANSMITTER

1026612

20-PIT-301-1 20-PIT-301-2 20-PIT-301-3 20-PIT-301-4 RANGE: -15 TO 15 PSIG

24

FLOW TRANSMITTER 10"

1029518

20-FIT-301-1 20-FIT-301-2 20-FIT-301-3 20-FIT-301-4 RANGE 4-20 mA 0-2000 GPM

"FLOW TRANSMITTER AND SENSOR,MAGMETER,ENDRESS & HAUSER PROMAG 10P2F-EL0A1RA0B4AA,TEFLON LINER, 10"",150# ANSI FLANGE CONNECTIONS,ACCURACY 0.5% ,MICROPROCESSOR CONTROLLED,SELF-MONITORING, PULSED DC FILED,316SS MEASURING/GROUNDING/EMPTY-PIP E DETECTION ELECTRODES,DISPLAY WITH PUSH BUTTON CONTROL,85-260 VAC 50/60Hz POWER,NEMA 4X, ,FREQUENCY AND CURRENT (4-20mA)/HART OUTPUTS,CSA CLASS 1 DIV 2 GROUPS ABCD APPROVAL."

USA / ZENON Membrane Solutions CAD / GE Water Process Technologies Canada

RSPL200326XMR1.xls 12/10/2009 AC

3 of 6

RECOMMENDED SPARE PARTS LIST FOR PROJECT NO. 200326


Item No. Item Qty GE WATER # Tag # Item Details "FLOW TRANSMITTER AND SENSOR,MAGMETER,ENDRESS & HAUSER PROMAG 10P3F-EL0A1RA0B4AA,TEFLON LINER, 14"",150# ANSI FLANGE CONNECTIONS,ACCURACY 0.5% ,MICROPROCESSOR CONTROLLED,SELF-MONITORING, PULSED DC FILED,316SS MEASURING/GROUNDING/EMPTY-PIP E DETECTION ELECTRODES,DISPLAY WITH PUSH BUTTON CONTROL,85-260 VAC 50/60Hz POWER,NEMA 4X, ,FREQUENCY AND CURRENT (4-20mA)/HART OUTPUTS,CSA CLASS 1 DIV 2 GROUPS ABCD APPROVAL." E&H VIBRATION LEVEL SWITCH, COMPACT, PT# FTL20-3314, CSA GENERAL PURPOSE, 3/4" NPT, 316SS, HOUSING 316SS, 1/2" NPT ELECTRICAL CONN, 2 WIRE OUTPUTS, 19253VAC, CABLE ENTRY IP65. TRANSMITTER, LEVEL, E&H PT# DELTAPILOT-S DB51A-TG32FC11GE3A, 316L 3" 150# ANSI FLANGE PROCESS CONNECTION, TRANSMITTER FOR HYDROSTATIC LEVEL MEASUREMENT, TUBE (ROD) VERSION FOR MOUNTING IN TANKS, FLUSH MOUNTED CONTITE-SENSOR W/ METALLIC D IAPHRAGM ALLOY C4, HERMETICALLY WELDED. CSA, CL. 1, DIV 2, GROUP A-D. MEASURING RANGE: 0-15 PSIG. CELL W/ LINEARITY < 0.2%, SILICON FILL & VITON SEAL. LOOP POWERED 4-20 mA W/ DISPLAY, HART PROT. 316l SS NEMA 4X HOUSING W/ 1/2"" CON DUIT CONNECTION. Check List

C = CRITICAL R = RECOMMENDED M = MAINTENANCE CS = CONSUMABLES C R M CS

25

FLOW TRANSMITTER 14"

1029520

16-FIT-801-1 16-FIT-801-2 16-FIT-801-3 16-FIT-801-4 RANGE 4-20mA FROM 0-2500 GPM

26

LEVEL SWITCH LOW

1030578

20-LSL-302 20-LSL-303

20-LIT-201A-1 20-LIT-201A-2 20-LIT-201A-3 20-LIT-201A-4 27 LEVEL TRANSMITTER 1 1030631 ROD LENGTH = 160 INCH RANGE 4-20mA from 0 to 160 INCH SG = 1 20-AE/AIT-320-1 20-AE/AIT-320-2 20-AE/AIT-320-3 20-AE/AIT-320-4

28

SPARE LAMP FOR ON-LINE TURBIDIMETER

1022882

SPARE LAMP FOR ON-LINE TURBIDIMETER.

29

SPARE PHOTOCELL FOR ONLINE TURBIDIMETER

1027420

20-AE/AIT-320-1 20-AE/AIT-320-2 20-AE/AIT-320-3 20-AE/AIT-320-4

SPARE PHOTOCELL FOR ON-LINE TURBIDIMETER.

X X X

30

CALIBRATION SOLUTION 1L

1028119

For Turbidimater

STABLCAL STABILIZED FORMAZIN CALIBRATION SOLUTION, HACH,PT #26601-53, INCLUDES 1L OF 20 NTU STABLCAL STANDARD (CALIBRATION CYLINDER REQUIRED). FOR SINGLE CALIBRATION ONLY.

MISCELLANEOUS STRAUB COUPLING, NON-RESTRAINT, FLEX 1L, F1L 3" IPS, E, 316L SS CASING, LP & INSERT, 3.7" LONG, 3" NOM INNER DIAMETER (88.9 MM), 5.4" OUTER DIAMETER, 1 PC, PRESSURE RATING: 232 PSI, 316L SS FULL VACUUM RATED STRIP INSERT EPDM SEALING SLE EVE, 2 X BOLTS, M8, 5.5 FT.LB, MAX PIPE GAP 1".

31

COUPLING 3"

14

1027929

32

COUPLING 6"

1027931

STRAUB COUPLING, NON-RESTRAINT, FLEX 1L, F1L 6" IPS, E, 316L SS CASING, LP & INSERT, 4.21" LONG, 6" NOM INNER DIAMETER (168.3 MM), 7.5" OUTER DIAMETER, 1 PC PRESSURE RATING: 232 PSI, 316L SS FULL VACUUM RATED STRIP INSERT EPDM SEALING SLEEVE, 2 X BOLTS, M10, 7.5 FT.LB.

33

SPARES FOR - COALESCING PREFILTER FOR COMPRESSED AIR 40 MICRON FILTER

90-F-020

FILTER ELEMENT FILTER ONLY FOR - FILTER, COMPRESSED AIR, GENERAL PURPOSE, 40 MICRON ELEMENT, 1/4" NPTF CONNECTIONS, C/W SIGHT GAUGE AND TWIST DRAIN, METAL BOWL 40 MICRON ELEMENT, 0-250 PSI RANGE, C/W GAUGE. RATED FOR

X X X X

X X X

34

F-9200-1 F-9200-2 90-PY-001

35

SPARES FOR - PRV COMP AIR

PRV COMP AIR

SETPOINT = 80 PSIG Great Lakes Model GRF-100A-116 Refrigerated Dryer Complete with: Stainless Steel Coolers, Low Ambient Head Master Control, NEMA4 Electrics, Crankcase heater, High/Low Refrigerant Pressure Cut Out with Manual Reset.

36

AIR DRYER

AIR DRYER

90-DR-001-1 90-DR-001-2

USA / ZENON Membrane Solutions CAD / GE Water Process Technologies Canada

RSPL200326XMR1.xls 12/10/2009 AC

4 of 6

RECOMMENDED SPARE PARTS LIST FOR PROJECT NO. 200326


Item No. Item Qty GE WATER # 90-F-001-1 90-AC-001-1 90-TK001-1 90-PSV-001-1 90-FV-001-1 90-HV-001-1 90-PI-001-1 37 SPARES FOR AIR COMPRESSOR 2 AIR COMPRESSOR 90-F-001-2 90-AC-001-2 90-TK001-2 90-PSV-001-2 90-FV-001-2 90-HV-001-2 90-PI-001-2 SPARE PARTS KIT Tag # Item Details Check List

C = CRITICAL R = RECOMMENDED M = MAINTENANCE CS = CONSUMABLES C R M CS

38

SPARES FOR MEMBRANE BLOWER

20-B-201-1 20-B-201-2 MEMBRANE BLOWER 20-B-201-3 20-B-201-4

AIR FILTER & BELT SET

ZEE-WEED Membrane Spares REQUIRED FOR REGULAR CASSETTE & MEMBRANE MAINTENANCE. 39 ZW500D V2.1.3 CASSETTE SPARE PARTS KIT ZW 500D Module Permeate Adapter ZW500D REMOVAL TOOL 1 1029418 KIT INCLUDES: INTERCONNECTION STRIP, O-RINGS, BOLTS, NUTS, WASHERS, MODULE RELEASE TOOL, LOCKING KEYS. SINGLE MODULE ADAPTER FOR FLUSHING/BUBBLE TESTING

X X X X X X X X X X X X X

40

1028578

41

1032836

ZW500D MDL REMOVAL TOOL(REV5-NOV2007) ZW500D, DUMMY ELEMENT, TOP AND BOTTOM FILLED WITH URETHANE

42

ZW500D Blank Header

1029083

43

Bubble/Pressure Decay Test Kit

1023613

PORTABLE INSTRUMENTS FOR TESTING THE INTEGRITY OF ZEEWEED MEMBRANES. THE UNIT INCLUDES A HIGH ACCURACY DIGITAL PRESSURE DISPLAY, A PRECISION AIR REGULATOR WITH PRESET UPPER LIMIT PRIMARY. PROTECTION AT 8 PSI, A SECONDARY AIR RELIEF PROTECTION VALVE, COALESCING AIR FILTER, STAINLESS STEEL CASING WITH HANDLE, 20 FEET OF 1/4 TUBING, 2X3" AND 2X4" CAMLOCK END CAPS EACH WITH A 1/4" FEMALE QUICK CONNECT. ( 4 ) 20cc SYRINGE, ( 10 ) NEEDLES (PURPLE), ( 5 ) 22G NEEDLES, SILICONE ( SHELF LIFE OF 6 MONTHS ), SCISSORS 4 1/2", ( 2 ) GLOVES. FOR USE WITH FIBER REPAIR KIT. Compressed Air Injection Gun (requires 10cc barrels)

44

Fiber Repair Kit

1022887

45

Silicone Dispensing Gun Pneumatic Silicone Injection Tool (LITTLE JOE) Membrane Maintenance Station - Tank Membrane Maintenance Station - Pump Kit Membrane Maintenance Station - Hose Kit Membrane Maintenance Station - Work Tray

1025796

46

1028260

*Option to above Item*

47

1027906

PLASTIC WORK TANK WITH METAL STAND

48

1027907

SKID MOUNTED - PUMP FOR FLUSHING/PRESERVING MODULES

49

1027908

3 HOSE SECTIONS FOR CONNECTION PUMP KIT TO MODULES

50

1027985

SLIDING TRAY FOR TOP OF TANK

USA / ZENON Membrane Solutions CAD / GE Water Process Technologies Canada

RSPL200326XMR1.xls 12/10/2009 AC

5 of 6

RECOMMENDED SPARE PARTS LIST FOR PROJECT NO. 200326


Item No. Item Qty GE WATER # Tag # Item Details Check List

C = CRITICAL R = RECOMMENDED M = MAINTENANCE CS = CONSUMABLES C R M CS

51

TIME TO FILTER KIT LAB EQUIPMENT

1030547

FOR WASTE WATER

TTF IS AN ANALYTICAL TEST PARAMETER THAT PROVIDES CRITICAL DATA ON THE FILTERABILITY OF MIXED LIQUOR BIOREACTOR SLUDGE LAB EQUIPMENT PACKAGE (1) CERAMIC BUCHNER FUNNEL 100 MM DIAMETER (1) ERLENMEYER SUCTION 1000ML SUCTION FLASK (1) FILTER PAPERS, GLASS MICRO-FIBRE, 9CM, BOX OF 100 (1) GRADUATED CYLINDER 100 ML PLASTIC (1) RUBBER STOPPER 1 HOLE, # 8, PACK OF 12 (1) BEAKER 250 ML, PLASTIC (1) POCKET THERMOMETER 0-120F (1) STOPWATCH

52

TIME TO FILTER KIT VACUUM PUMP

1030548

FOR WASTE WATER

VACUUM PUMP EQUIPMENT (1) VACUUM PUMP; 120 VAC/60 HZ OR 250 VAC/50 HZ (1) VACUUM REGULATOR, 0 TO 29" HG, 2.47CFM WITH GAUGE (1) MALE PIPE ADAPTER, POLYETHYLENE, 1/8" X 1/4", (1) REDUCER BUSHING, 3/8X1/8, THREAD X THREAD, NYLON (1) NIPPLE 1/8"X1" NPT(M) X NPT(M), 316SS (6) FEET OF 1/4" PLASTIC TUBE

X X X

53

TIME TO FILTER KIT FILTER PAPERS DELIVERY TIME AVERAGES

1030539

FILTER PAPERS, GLASS MICRO-FIBRE, 9CM, BOX OF 100

PLC, INSTRUMENTS - 4 - 6 WEEKS MEMBRANE SPARES - STOCK - 2 WEEKS FILTERS BELTS - STOCK - 2 WEEKS TERMS: QUOTATION # FCA OAKVILLE, ONTARIO CANADA PAYMENT TERMS: TE BE NEGOTIATED AT A LATER DATE PRICES ARE VALID 30 DAYS.

TRANSMITTERS 8 - 12 WEEKS GAUGES, VALVES, SWITCHES - 4 - 6 WEEKS PUMPS, BLOWERS, MIXERS ETC - 8 - 12 WEEKS

ONCE A SPARE IS USED. IT SHOULD BE REPLACED IN INVENTORY FREIGHT, TAXES AND DUTIES EXTRA WHERE APPLICABLE DELIVERY VARIES FROM STOCK TO 12 WEEKS LIST COMPLETED BY ALEX CAVICCHI - 24 NOV 2009 PHONE # 905-465-3030 EXT 3383 EMAIL: alex.cavicchi@ge.com

USA / ZENON Membrane Solutions CAD / GE Water Process Technologies Canada

RSPL200326XMR1.xls 12/10/2009 AC

6 of 6

SECTION 8

MATERIAL SAFETY DATA SHEETS

This page has been intentionally left blank

GLYCEROL

Page 1 of 7

MSDS Number: G4774 * * * * * Effective Date: 05/25/05 * * * * * Supercedes: 08/10/04

GLYCEROL
1. Product Identification
Synonyms: 1,2,3-propanetriol; glycerin; glycol alcohol; glycerol, anhydrous CAS No.: 56-81-5 Molecular Weight: 92.10 Chemical Formula: C3H5(OH)3 Product Codes: J.T. Baker: 2135, 2136, 2140, 2142, 2143, 2988, 4043, M778 Mallinckrodt: 0564, 5092, 5093, 5100

2. Composition/Information on Ingredients
Ingredient --------------------------------------Glycerin CAS No -----------56-81-5 Percent -----------90 - 100% Hazardous --------Yes

3. Hazards Identification
Emergency Overview --------------------------

http://www.jtbaker.com/msds/englishhtml/G4774.htm

8/26/2005

GLYCEROL

Page 2 of 7

CAUTION! MAY CAUSE IRRITATION TO SKIN, EYES, AND RESPIRATORY TRACT. MAY AFFECT KIDNEYS. SAF-T-DATA(tm) Ratings (Provided here for your convenience) ----------------------------------------------------------------------------------------------------------Health Rating: 2 - Moderate (Life) Flammability Rating: 1 - Slight Reactivity Rating: 0 - None Contact Rating: 1 - Slight Lab Protective Equip: GOGGLES; LAB COAT; VENT HOOD; PROPER GLOVES Storage Color Code: Green (General Storage) ----------------------------------------------------------------------------------------------------------Potential Health Effects ---------------------------------Inhalation: Due to the low vapor pressure, inhalation of the vapors at room temperatures is unlikely. Inhalation of mist may cause irritation of respiratory tract. Ingestion: Low toxicity. May cause nausea, headache, diarrhea. Skin Contact: May cause irritation. Eye Contact: May cause irritation. Chronic Exposure: May cause kidney injury. Aggravation of Pre-existing Conditions: Persons with pre-existing skin disorders or eye problems or impaired liver or kidney function may be more susceptible to the effects of the substance.

4. First Aid Measures


Inhalation: Remove to fresh air. Get medical attention for any breathing difficulty. Ingestion: Induce vomiting immediately as directed by medical personnel. Never give anything by mouth to an unconscious person. Get medical attention. Skin Contact: Immediately flush skin with plenty of water for at least 15 minutes. Remove contaminated clothing and shoes. Wash clothing before reuse. Thoroughly clean shoes before reuse. Get medical attention if irritation develops. Eye Contact: Immediately flush eyes with plenty of water for at least 15 minutes, lifting upper and lower eyelids occasionally. Get medical attention if irritation persists.

http://www.jtbaker.com/msds/englishhtml/G4774.htm

8/26/2005

GLYCEROL

Page 3 of 7

5. Fire Fighting Measures


Fire: Flash point: 199C (390F) CC Autoignition temperature: 370C (698F) Slight fire hazard when exposed to heat or flame. Slight fire hazard when exposed to heat or flame. Explosion: Above flash point, vapor-air mixtures may cause flash fire. Fire Extinguishing Media: Use any means suitable for extinguishing surrounding fire. Water spray may be used to extinguish surrounding fire and cool exposed containers. Water spray will also reduce fume and irritant gases. Special Information: In the event of a fire, wear full protective clothing and NIOSH-approved self-contained breathing apparatus with full facepiece operated in the pressure demand or other positive pressure mode.

6. Accidental Release Measures


Ventilate area of leak or spill. Wear appropriate personal protective equipment as specified in Section 8. Contain and recover liquid when possible. Collect liquid in an appropriate container or absorb with an inert material (e. g., vermiculite, dry sand, earth), and place in a chemical waste container. Do not use combustible materials, such as saw dust. Do not flush to sewer!

7. Handling and Storage


Keep in a tightly closed container, stored in a cool, dry, ventilated area. Protect against physical damage. Isolate from incompatible substances. Containers of this material may be hazardous when empty since they retain product residues (vapors, liquid); observe all warnings and precautions listed for the product.

8. Exposure Controls/Personal Protection


Airborne Exposure Limits: For Glycerin Mist: - OSHA Permissible Exposure Limit (PEL): Total Dust: 15 mg/m3 (TWA); Respirable Fraction: 5 mg/m3(TWA). - ACGIH Threshold Limit Value (TLV): 10 mg/m3

http://www.jtbaker.com/msds/englishhtml/G4774.htm

8/26/2005

GLYCEROL

Page 4 of 7

Ventilation System: A system of local and/or general exhaust is recommended to keep employee exposures below the Airborne Exposure Limits. Local exhaust ventilation is generally preferred because it can control the emissions of the contaminant at its source, preventing dispersion of it into the general work area. Please refer to the ACGIH document, Industrial Ventilation, A Manual of Recommended Practices, most recent edition, for details. Personal Respirators (NIOSH Approved): If the exposure limit is exceeded and engineering controls are not feasible, a half facepiece particulate respirator (NIOSH type P95 or R95 filters) may be worn for up to ten times the exposure limit or the maximum use concentration specified by the appropriate regulatory agency or respirator supplier, whichever is lowest.. A full-face piece particulate respirator (NIOSH type P100 or R100 filters) may be worn up to 50 times the exposure limit, or the maximum use concentration specified by the appropriate regulatory agency, or respirator supplier, whichever is lowest. Please note that N filters are not recommended for this material. For emergencies or instances where the exposure levels are not known, use a fullfacepiece positive-pressure, air-supplied respirator. WARNING: Air-purifying respirators do not protect workers in oxygen-deficient atmospheres. Skin Protection: Wear protective gloves and clean body-covering clothing. Eye Protection: Use chemical safety goggles. Maintain eye wash fountain and quick-drench facilities in work area.

9. Physical and Chemical Properties


Appearance: Clear oily liquid. Odor: Odorless. Solubility: Miscible in water. Specific Gravity: 1.26 @ 20C/4C pH: (neutral to litmus) % Volatiles by volume @ 21C (70F): 0 Boiling Point: 290C (554F) Melting Point: 18C (64F) Vapor Density (Air=1): 3.17 Vapor Pressure (mm Hg): 0.0025 @ 50C (122F) Evaporation Rate (BuAc=1): No information found.

http://www.jtbaker.com/msds/englishhtml/G4774.htm

8/26/2005

GLYCEROL

Page 5 of 7

10. Stability and Reactivity


Stability: Stable under ordinary conditions of use and storage. Hazardous Decomposition Products: Toxic gases and vapors may be released if involved in a fire. Glycerin decomposes upon heating above 290C, forming corrosive gas (acrolein). Hazardous Polymerization: Will not occur. Incompatibilities: Strong oxidizers. Can react violently with acetic anhydride, calcium oxychloride, chromium oxides and alkali metal hydrides. Conditions to Avoid: Heat, flames, ignition sources and incompatibles.

11. Toxicological Information


Oral rat LD50: 12,600 mg/kg. Investigated as a mutagen, reproductive effector.
--------\Cancer Lists\--------------------------------------------------------NTP Carcinogen--Ingredient Known Anticipated IARC Category -------------------------------------------------------------Glycerin (56-81-5) No No None

12. Ecological Information


Environmental Fate: When released into the soil, this material is expected to readily biodegrade. When released into the soil, this material is not expected to evaporate significantly. When released into water, this material is expected to readily biodegrade. This material is not expected to significantly bioaccumulate. When released into the air, this material may be moderately degraded by reaction with photochemically produced hydroxyl radicals. When released into the air, this material may be removed from the atmosphere to a moderate extent by wet deposition. Environmental Toxicity: This material is not expected to be toxic to aquatic life.

13. Disposal Considerations

http://www.jtbaker.com/msds/englishhtml/G4774.htm

8/26/2005

GLYCEROL

Page 6 of 7

Whatever cannot be saved for recovery or recycling should be managed in an appropriate and approved waste disposal facility. Processing, use or contamination of this product may change the waste management options. State and local disposal regulations may differ from federal disposal regulations. Dispose of container and unused contents in accordance with federal, state and local requirements.

14. Transport Information


Not regulated.

15. Regulatory Information


--------\Chemical Inventory Status - Part 1\--------------------------------Ingredient TSCA EC Japan Australia ----------------------------------------------- ---- --- ----- --------Glycerin (56-81-5) Yes Yes Yes Yes --------\Chemical Inventory Status - Part 2\----------------------------------Canada-Ingredient Korea DSL NDSL Phil. ----------------------------------------------- ----- ------ ----Glycerin (56-81-5) Yes Yes No Yes --------\Federal, State & International Regulations - Part 1\----------------SARA 302------SARA 313-----Ingredient RQ TPQ List Chemical Catg. ----------------------------------------- ---------- -------------Glycerin (56-81-5) No No No No --------\Federal, State & International Regulations - Part 2\----------------RCRA-TSCAIngredient CERCLA 261.33 8(d) ----------------------------------------- ---------------Glycerin (56-81-5) No No No

Chemical Weapons Convention: No TSCA 12(b): No SARA 311/312: Acute: Yes Chronic: Yes Fire: No Reactivity: No (Pure / Liquid)

CDTA: No Pressure: No

Australian Hazchem Code: None allocated. Poison Schedule: None allocated. WHMIS: This MSDS has been prepared according to the hazard criteria of the Controlled Products Regulations (CPR) and the MSDS contains all of the information required by the CPR.

http://www.jtbaker.com/msds/englishhtml/G4774.htm

8/26/2005

GLYCEROL

Page 7 of 7

16. Other Information


NFPA Ratings: Health: 1 Flammability: 1 Reactivity: 0 Label Hazard Warning: CAUTION! MAY CAUSE IRRITATION TO SKIN, EYES, AND RESPIRATORY TRACT. MAY AFFECT KIDNEYS. Label Precautions: Avoid breathing mist. Avoid contact with eyes, skin and clothing. Keep container closed. Use with adequate ventilation. Wash thoroughly after handling. Label First Aid: If inhaled, remove to fresh air. Get medical attention for any breathing difficulty. In case of contact, immediately flush eyes or skin with plenty of water for at least 15 minutes. Get medical attention if irritation develops or persists. Product Use: Laboratory Reagent. Revision Information: MSDS Section(s) changed since last revision of document include: 3. Disclaimer: ******************************************************************************* Mallinckrodt Baker, Inc. provides the information contained herein in good faith but makes no representation as to its comprehensiveness or accuracy. This document is intended only as a guide to the appropriate precautionary handling of the material by a properly trained person using this product. Individuals receiving the information must exercise their independent judgment in determining its appropriateness for a particular purpose. MALLINCKRODT BAKER, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION ANY WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO THE INFORMATION SET FORTH HEREIN OR THE PRODUCT TO WHICH THE INFORMATION REFERS. ACCORDINGLY, MALLINCKRODT BAKER, INC. WILL NOT BE RESPONSIBLE FOR DAMAGES RESULTING FROM USE OF OR RELIANCE UPON THIS INFORMATION. ******************************************************************************* Prepared by: Environmental Health & Safety Phone Number: (314) 654-1600 (U.S.A.)

http://www.jtbaker.com/msds/englishhtml/G4774.htm

8/26/2005

This page has been intentionally left blank

SECTION 9

SERVICE & SUPPORT

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

9.1

INTRODUCTION
This section provides information regarding the various support services offered by GE W&PT. All service bulletins associated with the SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System are to be inserted at the end of this section.

9.2

CONTACTING GE W&PT SERVICE


Upon subscribing to GE W&PTs 24/7 technical support service and activating your customer account, a 4-digit security code will be issued. Provide this code when contacting the Service Department, which can be reached at: PHONE: 1-866-439-8272 EMAIL: GEWater.TechnicalSupport@ge.com Contact your facility representative for additional information about the 24/7 technical support service and other services provided by GE W&PT.

9.3
TIP: In the event of a lost MyZENON password, contact the Service department immediately.

MYZENON
MyZENON (www.MyZENON.com) provides an information exchange location between GE W&PT and your facility. It is strongly recommended that the contact information for all facility supervisors be posted and regularly updated in order to allow for better support.

Rev. 0 June, 2010

Service & Support 9-1

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

9.4

AVAILABLE SERVICES
GE W&PT delivers a comprehensive range of services beyond system design and installation. Contact the Service Department to enquire about the following services: ZenoTrac* automated process data monitoring and analysis. Site visits and equipment audits. Training programs. 24/7 technical support. Emergency call-out support. OEM components and consumable products inventory. O&M agreements. Plant commissioning, optimization, and upgrades. System controls support. Equipment calibration and preventive maintenance planning.

9.4.1

ZENOTRAC
ZenoTrac is a powerful plant support tool available to those system owners who choose to subscribe. It provides fully automated process data monitoring and trend analysis, and stores information in a centralized database. This information is then presented as a series of charts and provided to system operators through email, a secure web site, or as printed reports. With ZenoTrac, system operators can view trends, solve process problems quickly, improve plant productivity, reduce the impact of operator turnover, and manage continuous software enhancements.

Service & Support 9-2

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

9.4.2

SITE VISITS
GE W&PT service professionals are on-hand for both emergency service calls (call-outs) and planned service visits. Areas of plant operation that they can assist with include instrument calibration, preventive maintenance planning, process monitoring, and DCS code modifications. Contact the Service Department and ask them to develop a service plan tailored to your system. Emergency call-outs are invoiced based on the Field Services Labor Rate Sheet, which can be found on MyZENON or obtained by contacting the Service Department.

9.4.3

TRAINING
Training for all system operators is provided at the time of plant commissioning. Customized training packages are available. Contact the Service department for more information.

Rev. 0 June, 2010

Service & Support 9-3

This page has been intentionally left blank

SECTION 10

GLOSSARY

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

10.1

INTRODUCTION
The following sections define acronyms, abbreviations, and terms used within this manual and the water treatment industry in general. This glossary is intended to address all aspects of the products and services offered by GE Water & Process Technologies (GE W&PT), and may include some information that does not apply to your system.

10.2

ACRONYMS & ABBREVIATIONS


Table 10.1.1 - Acronyms & Abbreviations Acronym
BBD BMU BOD c/w CaCO3 CBD CEB CIP CLC COD CPU CMU

Definition
Brine Blowdown Brine Make-up Biological Oxygen Demand complete with Calcium Carbonate Concentrate Blowdown Chemically Enhanced Backwash Clean In Place Control Logic Chart Chemical Oxygen Demand Central Process Unit Concentrate Make-Up

Acronym
MLVSS MMF MMI MOV NaOCl NaOH NH3 NO2 NO3 NTU O2 OI OIT

Definition
Mixed Liquor Volatile Suspended Solids Multi-Media Filtration Man Machine Interface (see HMI) Motor Operated Valve Sodium Hypochlorite Sodium Hydroxide Ammonia Nitrite Nitrate Nephelometric Turbidity Unit Molecular Oxygen Operator Interface Operator Interface Terminal Operations Sequence Chart Off-Spec Product oxygen uptake rate Powdered Activated Carbon Piping & Instrumentation Diagram Pressure Decay Test

CR DCS DF DO ECIP ED

Concentrate Recycle Distributed Control System Dilute Feed Dissolved Oxygen Electrode Clean In Place Electrodialysis

OSC OSP OUR PAC P&ID PDT

Rev. 0 June, 2010

Glossary 10-1

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Table 10.1.1 - Acronyms & Abbreviations Acronym


EDI EDR EF EW ESD E2PROM

Definition
Electrodeionization Electrodialysis Reversal Electrode Feed Electrode Waste Emergency Shutdown Electronically Erasable Programmable Read Only Memory Ferric Chloride Gallons per ft2 per Day gallons per minute Bicarbonate Sulfuric Acid Phosphoric Acid Human Machine Interface kilograms per litre kilo pascals Litre Litres/m2 of Membrane Area per Hour Log Removal Value Ferric Chloride Gallons per ft2 per Day Langelier Saturation Index Motor Control Center milligrams per liter Membrane Integrity Test Mixed Liquor Suspended Solids

Acronym
PC PFD PID PLC POV ppb

Definition
Personal Computer Process Flow Diagram Proportional Integral Derivative Programmable Logic Controller Pneumatically Operated Valve parts per billion

FeCl3 GFD gpm HCO3 H2SO4 H3PO4 HMI kg/L kPa L LMH LRV FeCl3 GFD LSI MCC mg/L MIT MLSS

ppm

parts per million

psi psid psig RAS RO SCADA scfm SDI TDS TKN TMP USgpm UV VFD VS VSS ZW

pounds per square inch pounds per square inch differential pounds per square inch gauge Return Activated Sludge Reverse Osmosis Supervisory Control & Data Acquisition System standard cubic feet per minute Silt Density Index Total Dissolved Solids Total Kjeldahl Nitrogen Transmembrane Pressure US gallons per minute Ultraviolet Variable Frequency Drive Volatile Solids Volatile Suspended Solids ZeeWeed

Glossary 10-2

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

10.3
AC MOTOR

DEFINITIONS
Consists of two basic parts: A rotating cylinder called a Rotor and a stationary part called a Stator. The Stator surrounds the Rotor. It has coil windings, which produce an alternating magnetic field. This magnetic field causes current to flow through the Rotor conductors, resulting in a rotational force. The Rotor spins at a speed proportional to the frequency of the applied alternating current. The motor rotates at a set rotation depending on the frequency of the winding configuration. A solution having an excess of hydrogen (H+) ions (with a pH of less than 7.0). The floc produced in raw or settled wastewater due to the growth of bacteria and other organisms in the presence of dissolved oxygen (DO). Any valve with an actuator that is controlled by an external command. Non-permanent attachment of a particular molecule to a solid substrate. A process alarm, which alerts the operator, that action is needed to prevent an impending shutdown, or to restore the equipment to a normal state. Any bacteria requiring free oxygen for the metabolic breakdown of material. An environment where there is dissolved air or free oxygen. Air compressors provide oil-free, pressurized air for the operation of the actuated valves and for Membrane Integrity Tests (MITs). Air diaphragm metering pumps provide chemical dosing at measured rates. This dosing is set manually and it is regulated either by the amount of compressed air driving the pump or by setting the backpressure of the pumps.

ACID

ACTIVATED SLUDGE

ACTUATED VALVE ADSORPTION

ADVISORY ALARM

AEROBIC BACTERIA

AEROBIC ZONE AIR COMPRESSOR

AIR DIAPHRAGM METERING PUMPS

Rev. 0 June, 2010

Glossary 10-3

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

AIR DRYER

Air dryers protect pneumatic devices, like valves and air diaphragm pumps, from damage due to condensation in the compressed air. The controls on the air dryer allow for adjustment of dew point and temperature setpoints. Air flow switches, located in the membrane aeration piping or the supplemental aeration piping, are used to indicate when a specific flow rate has been reached for a blower. This flow rate identifies low aeration to the membranes or bioreactor, triggering an alarm or alert.

AIR FLOW SWITCH

AIR RELEASE VALVES Air release valves allow the air to separate from the permeate to prevent air locks in the permeate piping. ALARM A visible or audible indication that an operator is expected to take action to rectify or prevent an abnormal situation. An alarm may be an operator interface screen message, a pilot light, a buzzer, or another form of communication to the operator. A visible device for alerting an operator when a new alarm occurs, such as a flashing or rotating light. A warning to the operator that a process or piece of equipment is operating outside normally accepted limits and requires attention to prevent the occurrence of an alarm. A control scheme for 2 or more pumps or process units in parallel, where the unit that has been running for the longest time is stopped first, and the unit that has been in readiness to start for the longest time is started first. A solution having an excess of hydroxyl (OH) ions (with pH greater than 7.0). A measure of the capacity of water or wastewater to neutralize an acid. Alkalinity in wastewater results from the presence of carbonate, bicarbonate, and hydroxide. Alkalinity in water helps to resist changes in pH caused by the addition of acids. A measure of the amount of HCO3 present in water, generally expressed as an amount of CaCO3 equivalent. Any bacteria that can survive in partial or complete absence of oxygen by using molecular oxygen found in nitrates and sulfates.

ALARM BEACON

ALERT

ALTERNATION

ALKALINE

ALKALINITY

ANAEROBIC BACTERIA

Glossary 10-4

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

ANAEROBIC ZONE

An environment where there is an absence of any electron receptor (nitrate, sulfate or oxygen). An electrical signal that is proportional to the size of the variable being monitored or controlled. Analog signals in our systems are exclusively 4-20 mA, but an analog signal can be 0-20 mA or 0-10 VDC. An ion that is negatively charged resulting from the dissociation of salts, minerals, or acids in water. In membrane systems, a compound added to feed water to increase concentrations at which scalants will precipitate, thereby increasing efficiency. An environment where there is an absence or deficiency of free oxygen. Automatic flow valves are used when regular changes are required in the state of the valve (fully open or fully closed only). They are controlled by the PLC.

ANALOG

ANION

ANTISCALANT

ANOXIC ZONE

AUTOMATIC FLOW VALVE

AVERAGE OPERATING Average of the module inlet and outlet pressures. Expressed in psi or PRESSURE FOR RO kPa. BACK DIFFUSION A phenomenon in which ions will transfer to the demineralized stream from the concentrate stream against the DC current. This transfer is due to high concentrations of ions in the concentrate. (EDR) A mode of operation in which the flow of permeate is reversed through the ZeeWeed membrane and directed from the inside of the fibers to the outside. During backpulse, there is a net flow of solids away from the membrane surface due to the combined effects of the membrane aeration and the backpulse of permeate. The process of cleaning a filter or membrane by reversing flow of clean water through it. An event that takes place regularly throughout the day, consisting of backpulse, tank drain, and aeration. The channel running along the length of the membrane tank. The channel collects water from the troughs in the membrane tank and discharges it to the drain.
Glossary 10-5

BACKPULSE

BACKWASH (FOR EDI, EDR) BACKWASH (FOR ZEEWEED 1000) BACKWASH CHANNEL (FOR ZEEWEED 1000)
Rev. 0 June, 2010

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

BACKWASH TMP TRIGGER

The change in TMP over a permeation cycle that overrides the permeation time in order to trigger a backwash.

BACKWASH TROUGH The trough on the side of the membrane tank that collects the water during a backwash and discharges it to the backwash channel. BIOCHEMICAL OXYGEN DEMAND (BOD) The measurement of the amount of oxygen required by microorganisms to oxidize (eat) the organic matter (food) in the water. This test is used to estimate the amount of organic matter in a sample. The units of BOD5 are mg/L. The 5 refers to the duration of the test (5 days). Due to the long period of time required to perform the test, Chemical Oxygen Demand (COD) is becoming a more common test to measure the amount of food. A chemical for preventing biological growth.

BIOCIDE

BIOLOGICAL OXYGEN See Biochemical Oxygen Demand. DEMAND (BOD) BIOMASS The mixture of biodegradable material, bacteria, and biosolids present in a biological wastewater treatment system. The by-product from the biodegradation of organics by bacteria. Blowers provide aeration to recirculate influent in the ZeeWeed membrane tank and for scouring the membranes to prevent membrane fouling. In a bioreactor, blowers are used to introduce air in order to create an aerobic environment for BOD removal. The stream (usually Concentrate) into which ions or solids are concentrated. The portion of the concentrate stream displaced by concentrate makeup and sent to waste. The portion of the feed stream added to the brine recycle stream to maintain ionic concentrations in the brine stream. (EDI) A group of interlocked ZeeWeed modules, fastened together to act as a single unit. A cassette is the smallest functional part of a ZeeWeed system that can be removed or isolated for removal or bubble testing.

BIOSOLIDS BLOWER

BRINE

BRINE BLOWDOWN (BBM) BRINE MAKEUP (BMU) CASSETTE FOR A ZEEWEED 500

Glossary 10-6

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

CATHODE

Electrode with negative electrode potential that attracts cations. (EDI, EDR) A negatively charged ion, resulting from dissociation of molecules in solution. (EDI, EDR) Basic element of an EDI or EDR stack consisting of a cation membrane, a demineralized water flow spacer, an anion membrane, and a concentrate water flow spacer. (EDI, EDR) Flexible sheet of cloth-reinforced membrane permeable to cations and impermeable to anions. (EDI, EDR) A test used to estimate the amount of organic matter within a sample. A strong chemical oxidizing agent is used to measure the amount of organic matter that can be oxidized. The COD of wastewater is generally higher than the BOD because more compounds can be chemically oxidized than can be biologically oxidized. The units of COD are mg/L. Generally the BOD/COD ratio varies from 0.4 to 0.8. The required concentration (example: design dosage) of anti-scalant and/or acid and/or sodium bisulfite specific to each RO or other membrane system. Backwash and soaking of ultrafiltration (UF) membranes with a chemical solution in order to remove scale and fouling from the membrane surfaces.

CATION

CELL PAIR

CATION MEMBRANE

CHEMICAL OXYGEN DEMAND (COD)

CHEMICAL FEED REQUIREMENTS

CHEMICALLY ENHANCED BACKWASH (CEB)

CHLORINE CONTACT The part of a water treatment plant where effluent is disinfected by CHAMBER chlorine. CIP MODE The system operating mode in which the unit is undergoing the CIP procedure. A system or procedure for cleaning a membrane system without removing or disassembling the system. CIP involves the circulation of chemicals through the membrane system to remove scale and biological fouling from the piping and membranes. An agent that causes dissolved or fine impurities to group together (coagulate). Coagulants are typically inorganic compounds, such as ferric chloride or alum.

CLEAN-IN-PLACE (CIP)

COAGULANT

Rev. 0 June, 2010

Glossary 10-7

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

COAGULATION

The addition of inorganic coagulants into raw water prior to filtration. This promotes clumping (aggregation) of dissolved or fine impurities. Flow across and through a membrane where the feed/reject and permeate flow in the same direction and parallel to the membrane surface. Color can occur as the result of decaying or organic debris in the water. A membrane with two or more distinct layers.

CO-CURRENT FLOW

COLOR COMPOSITE MEMBRANE CONCENTRATE

The portion of the feed solution that does not pass through the membrane, in which solids or ions are at an increased concentration. Also known as Reject or Retentate. A method in which overall recovery is increased by reusing a fraction of the concentrate stream. Also refers to the portion of the concentrate stream that exits the membrane stack, and is repressurized by the concentrate recycle pump and returned to the stack concentrating stream. The process stream flowing through the concentrate compartments of a membrane stack. Portion of the concentrate stream displaced by concentrate makeup and sent to waste. Portion of the feed stream added to the concentrate recycle stream to control ionic concentrations in the concentrate stream. The amount of a given compound in the reject as a multiple of the amount in the feed stream. A device for measuring conductivity in aqueous solutions, primarily to obtain information on total ionic concentrations (example: dissolved compounds).

CONCENTRATE RECYCLE (CR)

CONCENTRATE STREAM CONCENTRATE BLOWDOWN (CBD) CONCENTRATE MAKEUP (CMU) CONCENTRATION FACTOR CONDUCTIVITY SENSOR

Glossary 10-8

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

CONTACTOR

The electrical switch component of the motor starter. The contactor protects the PLC by isolating it from the high currents and voltages necessary to run most motors. A contactor operates as follows: an output of 120 V or less from the PLC energizes a magnetic coil and/or coils in the contactor. The magnetic field causes the contact(s) to pull in, completing the motors circuit. A control system development document in spreadsheet form that lists the control logic elements of a system, such as process variables, motors, valves, PID controls, alarms, and operator selections. For each control element, the chart defines attributes such as tag number, description, unit of measure, range, setpoint, and control actions.

CONTROL LOGIC CHART (CLC)

CONTROL NARRATIVE A control system development document, in narrative text form, that (CN) describes high level functions of the programmable controllers and operator interfaces. This document also defines any control system details that are not included in the associated Control Logic Chart (CLC) and Operations Sequence Chart (OSC). CONTROL STRATEGY The document, or set of documents, that defines the function of the programmable controllers and operator interfaces that will be used to control a process system. Generally, a GE W&PT control strategy includes a Control Narrative (CN), a Control Logic Chart (CLC), and an Operations Sequence Chart (OSC). CONTROL VALVE A valve with a positioning actuator (not an open/closed actuator) for manipulating a process flow, or a self-actuated valve. Typically tagged FCV, LCV, PCV, or TCV on a P&ID. The attack upon metals by chemical agents, converting them to nonmetallic products. Stainless steel has a passive film created by the presence of chromium (and often other alloying elements) that resists this process. An alarm condition that requires the operators immediate attention to allow the system to run at the necessary level of production, or to investigate a potentially unsafe condition. A condition that triggers a process alarm that causes the unit to shut down immediately, because continued operation could present an immediate hazard or cause damage to the equipment.

CORROSION

CRITICAL ALARM

CRITICAL FAILURE

Rev. 0 June, 2010

Glossary 10-9

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

CROSS-FLOW FILTRATION

Flow across and through a membrane where the feed/reject stream flows parallel to the membrane while the permeate stream flows perpendicular. The flow pattern reduces fouling on the media surface. Cross flow filtration necessitates a certain amount of the feed being lost to maintain flow. Hydraulic transfer of water between manifolds in the stack (from the demineralizing stream to the concentrate stream). The hard shell in which the parasite cryptosporidium resides. This hard shell protects the cryptosporidium from chlorine disinfection treatment. A parasite that contaminates water and can cause severe illness in humans. Since chlorine does not kill cryptosporidium, the most effective treatment for water supplies is through filtration. The movement of electrons through a conductor (such as wire). Electrical current is analogous to the flow of water through a pipe. Current is measured in Amperes (A) or milliAmperes (mA). The current direction can be either direct (DC) or alternating (AC). The current draw of a motor is stamped on the factory nameplate of the motor. This is the tested maximum ampere draw of the motor under full load conditions (FLA).

CROSS LEAK

CRYPTO OOCYST

CRYPTOSPORIDIUM

CURRENT

CURRENT DAY TOTAL A totalized value that is reset to zero at midnight. CYCLIC AERATION VALVES Cyclic aeration valves control the air flow to the ZeeWeed membrane cassettes, typically in 10 second intervals. The PLC controls the operation of cyclic aeration valves. The process of removing residual chlorine from water. Also, GE W&PT typically uses specially formulated, thin film composite RO membranes, which have a limited tolerance for the free chlorine found in most municipal water supplies. Hence, dechlorination is typically required upstream of the RO membranes. Activated carbon filters or sodium bisulfite are used to remove the free chlorine. With ZeeWeed membrane systems, dechlorination with the use of sodium bisulfite, is required after a chlorine Recovery Clean procedure. An operation to periodically drain water from a membrane tank to reduce the average solids concentration when permeation is stopped.

DECHLORINATION

DECONCENTRATION

Glossary 10-10

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

DEIONIZATION DEMAND

The removal of ions by ion exchange processes. A dynamic setpoint that is typically used for controlling a system with multiple process trains or units in parallel (example: an integer setpoint for the number of trains or pumps that should be running or a flow setpoint for the desired system production rate). The process of reducing the quantity of minerals or salts in an aqueous solution. Process stream flowing through and out of the demineralizing compartments of the membrane stack. The biological process by which nitrate is converted to nitrogen gas. This process occurs in the absence of free oxygen (example: anoxic zone of a bioreactor). The amount of free oxygen dissolved in water or wastewater. Dissolved oxygen levels are measured to ensure that sufficient oxygen is available for the biological population to degrade the wastewater during aerobic digestion. DO is normally expressed in mg/L, ppm, or percent of saturation. Oxygen dissolves into the mixed liquor by diffusion across the water surface and aeration.

DEMINERALIZATION

DEMINERALIZING STREAM DENITRIFICATION

DISSOLVED OXYGEN (DO)

DIGITAL VS. ANALOG A digital (discrete) electrical signal is either on or off. This signal is used SIGNALS for simple on/off control of devices or alarm/alert setpoints. DILUTE FEED DILUTE IN DILUTE OUT DISTRIBUTED CONTROL SYSTEM (DCS) DRY CONTACT The stream that serves as the feed water source for demineralization. The dilute (feed) stream entering the EDI stack(s). The dilute (product) stream leaving the EDI stack(s). A centralized electronic monitoring and control system for unit operations.

An electrically isolated relay contact that is not directly connected to a power source. Typically used for sending a contact closure to a remote control circuit where the circuit power comes from a remotely located controller.

Rev. 0 June, 2010

Glossary 10-11

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

E-CELL

The trade name for GE W&PTs Electrodeionization (EDI) process, which uses electrical impulse or stimulus to remove ions from water. An Electrodialysis Regeneration (EDR) stack is comprised of sets of cell pairs stacked one on top of the other. Each cell pair consists of an anion transfer and a cation transfer membrane, separated by a spacer, with another spacer on one side of the cell pair. The stack has an anode electrode on one side, and a cation electrode on the other. Applied direct current induces ion migration in feed water. When current is applied to the stacks, alternating channels of demineralized product water and concentrate are created. A jet pump for withdrawing a fluid or powdery substance from a space. The flow of a liquid out of a system or process. A device for removing air from the system. The rate of consumption of electrical energy. Power is calculated by multiplying the current by the voltage. Power is usually expressed in watts (W), kilowatts (kW), or horsepower (Hp). Cell pairs bounded by two electrodes. A thin metal plate (usually platinum plated titanium) used to apply electrical potential to an electrical stage of an ED/EDI/EDR membrane stack. An automatic procedure for cleaning the electrode compartments in an EDR system without removing or disassembling the system. ECIP is a preventive procedure, not a repair procedure, to help prevent the build up of scale and foulants. If the electrode compartments are blocked to the point where no flow can get through, this procedure will not work, and the stacks will require disassembly. Independent flow path formed by the electrode, electrode spacer, and heavy cation membrane. It prevents gases and pH changes resulting from electrode reactions from entering the main process flow. Feed water that is diverted to the electrode compartments.

EDR STACK

EDUCTOR EFFLUENT EJECTOR ELECTRICAL POWER

ELECTRICAL STAGE ELECTRODE

ELECTRODE CLEAN IN PLACE (ECIP)

ELECTRODE COMPARTMENT

ELECTRODE FEED (EF)

Glossary 10-12

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

ELECTRODE SPACER

An extra thick spacer used with a heavy cation membrane to form the electrode compartment. Wastewater from the electrode stream.

ELECTRODE WASTE (EW) ELECTRODEIONIZATI


ON

Removal of ions using electrical impulse or stimulus.

ELECTRODIALYSIS

A process in which ions are transferred through membranes from a less concentrated to a more concentrated solution under the impulse or stimulus of an electric current. A continuous self-cleaning electrodialysis process involving periodic reversal of the DC polarity, switching concentrating and diluting flow streams.

ELECTRODIALYSIS REVERSAL

ELECTROMAGNETIC Electromagnetic flow meters (mag meters) measure liquid flow rate. FLOW METERS (MAG The PLC uses this information to regulate pump speed and to totalize METERS) flow. ELEMENT The smallest membrane entity replaceable in a ZeeWeed cassette. (See also Module). The manual stopping of operation as quickly and reliably as possible, using a circuit that meets the requirements of NFPA 79, Chapters 9 and 10. A numerical data value that is correct for its unit of measure, so it does not need to be scaled for use or display. An occurrence that is not an alarm condition. An abnormal condition that affects the ability of a device to perform its normal function. Fault should generally be used instead of failure, failed, or faulted, and should not be used where alarm would be applicable. A water stream entering a unit treatment process. The channel running along the length of the membrane tank that distributes the feed to the cassettes.

EMERGENCY STOP

ENGINEERED UNITS

EVENT FAULT

FEED FEED CHANNEL FOR ZEEWEED 1000

Rev. 0 June, 2010

Glossary 10-13

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

FEED FLUSH FOR ZEEWEED 1000 FILTRATE

The flow of feed from the bottom to the top of the tank during a backwash, to assist in the discharge of water to the backwash channel. Liquid exiting a filtration process with reduced content of solids or contaminants. (See also Permeate). A repeated sequence of permeate production and backpulse. A mass of clumped solids or precipitates formed in sewage by biological or chemical activity. Materials that can precipitate into aggregates or flocs from finely suspended particles. The suspended materials can then be separated from the water. The process of creating aggregates or flocs from finely suspended particles that can later be separated from the water. Flocculation is often aided by a coagulant addition. A measure of the rate at which permeate passes through the filtration membrane per unit surface area of membrane. Usually measured in GFD (gallons per ft2 per day) or LMH (liters per m2 per hour). Flux = permeate flow rate / membrane surface area. The mass (kg) of organic matter fed to the bioreactor each day per unit mass of microorganism. Expressed as (kg BOD (or COD) / kg VSS - d).

FILTRATION CYCLE FLOC

FLOCCULANTS

FLOCCULATION

FLUX

FOOD-TOMICROORGANISM RATIO (F:M) FOULANTS FOULING

The unwanted materials that deposit on the surface of a membrane. The buildup of unwanted materials on the surface or within the pores of the filtration membrane. Fouling reduces the active surface area of the membrane and results in a reduction in permeability. The space above the resin that accommodates the resin expansion during the backwash procedure. The accumulation of electrode reaction gases on the surface of the electrode. A parasite that contaminates water and can cause illness (giardiasis) in humans. The most effective treatment for water supplies is through filtration.
Rev. 0 June, 2010

FREEBOARD (FOR SOFTENERS) GAS BLANKETING

GIARDIA LAMBLIA

Glossary 10-14

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

GLYCERIN (GLYCEROL)

Glycerin is the impure commercial form of glycerol. Glycerin is used to preserve and prevent ZeeWeed membranes from drying out or freezing. See Glycerin. Hand valves are used to control flow in situations where regular changes in flow are not required. The valve is in the fully open or fully closed position. Hand valves for isolation are used in situations where regular changes in the valves state are not required. The valve is in the fully open or fully closed position. Types of hand valves used for isolation include ball valves, butterfly valves, and gate valves. A measure of the amount of calcium and magnesium present in water. A property of water that can produce scale as a result of the presence of calcium and magnesium salts in solution. The drop in pressure of water flow through a resin bed. A cation membrane formed more thickly to withstand higher differential pressures. The heavy cation membrane is used as an electrode compartment border. A condition in which a process variable is greater than its normal value or range of values. This condition is typically used for control and/or for an advisory alarm. A condition in which a process variable is greater than a High setpoint. This condition typically causes an equipment shutdown. A typical panel-mounted operator interface, which allows the operator access and control of the various equipment functions of a system. An HMI may be an operator interface with proprietary software or a Windows-based industrial computer running SCADA software. The time required to displace the working volume of a bioreactor, by the feed flow into the bioreactor, in a continuous flow system. HRT (d) = anoxic and aerobic bioreactor volume (L) / feed flow rate (L/d) Measures the specific gravity of fluids.

GLYCEROL HAND VALVES FOR FLOW CONTROL

HAND VALVES FOR ISOLATION

HARDNESS

HEADLOSS HEAVY CATION MEMBRANE

HIGH

HIGH-HIGH

HUMAN MACHINE INTERFACE (HMI)

HYDRAULIC RETENTION TIME (HRT) HYDROMETER

Rev. 0 June, 2010

Glossary 10-15

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

HYDROXYL IMMEDIATE SHUTDOWN ALARM

The anion of water. The chemical formula is OH-. A shutdown alarm condition that causes the process unit to stop immediately (because continued operation could damage the equipment) instead of using the normal shutdown sequence that might include flushing or cleaning. A liquid flow into a tank or system. Inputs/outputs refer to the direction of the electronic signal in reference to the PLC. Inputs are signals that come into the PLC via an external device. Outputs are signals that are sent from the PLC to an external device. Inputs/outputs can be either digital or analog signals. A control scheme for preventing a mechanism or action from being set in motion when another mechanism or action is in operation, because the two operating simultaneously might produce undesirable results. An electrically charged particle with a positive or negative charge, formed by the dissociation of a salt, mineral, or acid in water. The process by which salts (cations and anions) are removed from water by using electricity to replace undesirable ions with a certain charge with desirable ions of the same charge. The process of restoring the ion exchange resin to its fully charged state. A measure of the tendency of water to dissolve or deposit calcium carbonate (scaling). LSI is calculated based on the total alkalinity, hardness, total dissolved solids (TDS), pH, and temperature of the water, and scaling. An LSI of 3.0 is indicative of a potential for severe scaling. The LSI is a calculated, dimensionless number that is used to determine the tendency of a water supply to foul RO membranes with calcium carbonate scale. It is dependent upon the following: the calcium content of the water supply. the bicarbonate alkalinity of the water supply. the pH of the water. the temperature of the water.
Rev. 0 June, 2010

INFLUENT INPUTS/OUTPUTS

INTERLOCK

ION

ION EXCHANGE

ION EXCHANGE REGENERATION LANGELIER SATURATION INDEX (LSI)

Glossary 10-16

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

If the LSI is negative, there is no potential for calcium carbonate scale as CaCO3 dissolves in water. If the LSI is zero, there is no potential for scaling or CaCO3 dissolving. If the LSI is positive, there is a potential for CaCO3 scale, the magnitude of the potential being dependent upon the magnitude of the LSI number. An LSI of 3.0 would be considered to be a water with severe scaling tendencies. As the concentrate stream moving through a reverse osmosis unit becomes more and more concentrated in dissolved minerals, the LSI of the water changes from the inlet of the system to the final concentrate outlet. As all RO membrane processes are staged (except for single element systems) with the concentrate out of one membrane feeding into the next, the worst LSI (example: most positive) is seen in the water coming out of the last membrane from the last housing. If it is predicted that this LSI will in fact be positive, it is common practice to either: polish the raw water, reducing the calcium and magnesium contents. feed antiscalant chemical, which 'negates' the effects of the calcium. feed an acid to lower the pH and move the LSI in a negative direction.

LEVEL SWITCH

Level switches are placed in tanks to indicate very high or very low tank levels.

LEVEL TRANSMITTERS Level transmitters measure the liquid level in membrane tanks. The PLC uses these levels to calculate the permeate rate or the feed flow rate to maintain appropriate tank levels. LOG REMOVAL VALUE (LRV) Log removal is the degree of removal or inactivation of pathogenic organisms through physical-chemical treatment of water. For the ZeeWeed system, the calculation is for removal. The log scale is used. Each increase in whole number is a 10 fold improvement in removal. The calculation is expressed in whole numbers, which are dimensionless.

Rev. 0 June, 2010

Glossary 10-17

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

For example, if the feed concentration is 100:


Table 10.1.2 - Log Removal Permeate Concentration
10 1 0.1 0.01 0.001

Removal
90% 99% 99.9% 99.99% 99.999%

Log Removal
1 2 3 4 5

Given: Feed Concentration: 800,000 particle counts 1,238 colonies Permeate Concentration: 50 particle counts 2 colonies

Calculation: Log removal = -Log10 (50 counts / 800,000 counts) = 4.2 Or Log removal = -Log10 (25,238 colonies / 2 colonies) = 4.1 LOW A condition in which a process variable is less than its normal value or range of values. This condition is typically used for control and/or for an advisory alarm. A condition in which a process variable is lower than the Low setpoint. This condition typically causes an equipment shutdown. The internal cavity within the hollow fiber of a ZeeWeed membrane through which air and permeate flow. A cleaning procedure consisting of aeration, backpulsing, and soaking the ZeeWeed membranes. The operator selects either citric acid or sodium hypochlorite as the cleaning solution. A flow path that feeds several other flow paths. See Human Machine Interface (HMI).

LOW-LOW

LUMEN

MAINTENANCE CLEAN

MANIFOLD MAN MACHINE INTERFACE (MMI)

Glossary 10-18

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

MC-1 (CITRIC ACID) A proprietary cleaning chemical available from GE W&PT and designed to remove inorganic foulants from membranes. MEMBRANE Thin barriers or films of material with many small pores of a predetermined size. These pores allow solvent and other smaller molecules, ions, or particles to pass through while preventing the passage of other materials. Membranes are designed to allow the separation of permeate streams from feed streams. The process of using blowers to provide turbulence at the membrane surface to reduce accumulation of foulants on the membranes. A biological wastewater treatment system that uses a membrane to separate water from biomass.

MEMBRANE AERATION MEMBRANE BIOREACTOR

MEMBRANE BLOWER Membrane blowers provide aeration to recirculate influent and provide turbulence to membrane surfaces to reduce membrane fouling. MEMBRANE INTEGRITY TEST (MIT) A test procedure that introduces air under pressure into the lumen side of the ZeeWeed membrane. This test detects the condition of the membranes and any broken fibers, while the membranes remain in the tank. Membrane Integrity Test (MIT) and Pressure Decay Test (PDT) are two terms that are often used interchangeably when referring to protocols for integrity monitoring. However, there are subtle but important differences between the two terms. MIT refers to any method, both direct and indirect, used to monitor the integrity of the ZeeWeed membranes. Two currently used methods of indirect monitoring are particle counting and turbidity tracking. The PDT is GE W&PTs standard method for direct membrane integrity monitoring. The PDT consists of pressurizing the inside of the membrane fibers with clean air between 3.0 and 10.0 psig, depending on which ZeeWeed membrane product and version is being used. This pressure is allowed to stabilize in order to ensure that all of the water inside the membrane fibers has been displaced by air. The flow of air to the membranes is then turned off and the decay in pressure is measured in regular intervals over a specified duration. The rate of pressure decay is a function of the rate of air loss through the membranes due to diffusion, dry pores, and leaks. Other than leaks, air can only pass through a wetted pore by diffusion since the air pressure required to displace the water out of a pore is much higher than the air pressure used for the PDT.

Rev. 0 June, 2010

Glossary 10-19

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A PDT at 3 and 5 psig can detect broken fibers, tears, and delamination. These are the types of membrane leaks expected to develop as the membranes age. However, to be compliant with future regulations, GE W&PT has increased the test pressure to 9.0 psig for ZW500D membranes and 10.0 psig for ZW1000 membranes. This measures the air loss from defects larger than 3 microns, which will be a requirement of the USEPA Long-term 2 Enhanced Surface Water Treatment Rule (LT2ESWTR). MEMBRANE PERMEABILITY The ratio of the flux and the transmembrane pressure at that flux. Usually expressed in L/m2/h/kPa or GFD/psi.

MEMBRANE SURFACE A measurement of the effective surface area of each element. AREA METERING PUMP A chemical metering pump is an electronically-controlled, solenoid or motor-driven diaphragm pump used for metering fluids, such as acid, base, and hypochlorite. The stroke length and rate of the pump can be manually set from the control panel on the pump face. Electronic metering pumps dose chemicals into the ZeeWeed system at measured rates. Changing the stroke frequency and stroke length can control the dosing rate, allowing it to be fixed or paced to achieve the correct dosing rate. A measure of conductance. It represents the ratio of the current flowing through a conductor, measured in amperes, to the potential difference between the end to the conductor, measured in volts. A mho is a unit of conductance equal to the reciprocal of the ohm, expressed as amperes/volt. One millionth of a mho. A measure of conductance equivalent to a micromho. An ion exchange tank consisting of both cation and anion resin. Provides the most complete deionization of water, up to 18.3 megohm/ cm resistivity. Mixed bed resins or mixed bed ion exchange resins are mainly used in water purification for polishing process water to achieve demineralized water quality (example: after a reverse osmosis system).

MHO

MICROMHO (MHO) MICROSIEMENS (S) MIXED BED

Glossary 10-20

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

MIXED LIQUOR

The liquid mixture present in the aeration tank of an activated sludge system. The liquid is a mixture of activated sludge and water containing organic matter undergoing activated sludge treatment. The mixed liquor is a living soup of microorganisms that requires food, oxygen, nutrients, proper pH, and correct solids retention time. A measure of the quantity of suspended solids in the aeration tank of an activated sludge treatment system. Mixed Liquor Suspended Solids (MLSS) is usually measured in milligrams per liter (mg/L). The portion of the Mixed Liquor Suspended Solids (MLSS) that vaporizes when heated to 550C 50C (1022F 122F). This volatile portion is mainly organic material and thus indicates the biomass present in the aeration tank. The portion of solids that does not vaporize is mostly inorganic substances. A filtration device consisting of membrane fibers, top and bottom headers, and connecting air and permeate pipes. A module is the smallest distinct portion into which a cassette can be divided. A filtration device consisting of membrane tubes, entrance and return headers, and connecting feed and concentrate pipes. A module is the smallest distinct portion that a system can be divided into. The module houses and contains the tubular membrane. The modules consist of two endcaps, one capped and the other with two hosebarb connections for the feed inlet and reject outlet. The permeate collects inside the module and exits via an elbow near the closed end.

MIXED LIQUOR SUSPENDED SOLIDS (MLSS) MIXED LIQUOR VOLATILE SUSPENDED SOLIDS (MLVSS)

MODULE (MEMBRANE) FOR ZEEWEED 500A/B MODULE (TUBULAR MEMBRANE)

MODULE FLOW RATE The fluid flow rate through the module, which is normally equal to the sum of the permeate and concentrate flow rates. Measured in US gpm or liters/minute. MODULE FLOW RATE The fluid flow rate through the RO module, which is normally equal to FOR RO the sum of the permeate and the concentrate flow rates. Measured in US gpm or liters/minute. MOLECULAR WEIGHT The size of the molecule that determines whether or not the molecule CUT-OFF is small enough to pass through the membranes pore. MOTOR CONTROL CENTER (MCC) The control panel that holds the motor starters and breakers for the system equipment.

Rev. 0 June, 2010

Glossary 10-21

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

MOTOR FUNDAMENTALS

A number of important motor components consist of a motor starter, contactor, overload, A.C. motors, variable frequency drive, and pump rotation verification. A pump may be severely damaged if started in reverse rotation. Threephase motors can run either clockwise or counter-clockwise depending on how they are wired. It is essential to verify motor rotation before operating a pump. Rotation should be checked each time the motors three-phase power is disconnected. A coupled pump should always be uncoupled before checking the rotation. A starter allows the PLC to operate a motor while remaining electrically isolated from the motor circuit. A motor starter consists of a contactor and an overload. The process of getting from one graphic or pop-up screen on an operator interface to another. A measurement of the turbidity (opacity) of water.

MOTOR ROTATION CHECK

MOTOR STARTER

NAVIGATION

NEPHELOMETRIC TURBIDITY UNIT (NTU) NITRATE

Nitrate is the most highly oxidized form of nitrogen found in wastewater. Total Kjedahl Nitrate (TKN) is converted to nitrate during nitrification. Nitrate is converted to nitrogen gas during denitrification. Nitrate is chemically written as NO3-. The biological process by which ammonia is converted to nitrite and then to nitrate. Nitrite is the middle step of nitrification where ammonia is converted to nitrite and then to nitrate. Nitrite is relatively unstable and easily oxidized to the nitrate form. Nitrite is chemically written as NO2-. A circuit is either open (off) or closed (on). A circuit is closed if current flows through it; a circuit is open if there is no current. An alarm condition that needs to be addressed but that does not require immediate operator attention. A process alarm condition which starts an orderly shutdown of the unit.

NITRIFICATION

NITRITE

NO VS. NC SWITCHES NON-CRITICAL ALARM NON-CRITICAL FAILURE

Glossary 10-22

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

NORMALLY OPEN SWITCH (NO) NORMALLY CLOSED SWITCH (NC)

The circuit is open when no forces are acting on the switch.

The circuit is closed when no forces are acting on the switch.

OFF-SPEC PRODUCT Portion of product stream sent to the feed tank or waste tank for not (OSP) meeting product quality standards. OPERATOR INTERFACE (OI) Also called Human Machine Interface (HMI) or Man Machine Interface (MMI). A display screen through which system conditions can be monitored and controlled.

OPERATOR Also called Human Machine Interface (HMI) or Man Machine Interface INTERFACE TERMINAL (MMI). (OIT) ORGANIC LOADING RATE The mass of organic matter feed to the anoxic and aerobic reactors each day per unit volume. Expressed as kg of COD/m3 of nitrification reactor/d or kg of BOD5/m3 of nitrification reactor/d. The organic loading rate can be reported using the units of mg/L/min. A control system development document in spreadsheet form that shows the required sequences for process operations. For each process sequence step, the chart defines attributes such as pump states, valve actuations, step times, interlocks, and control actions. Provides thermal overload protection to the motor. This occurs when the motor is drawing a higher current than its full load amperage (FLA) for an extended period. Common thermal overloads use bimetallic strip switches or heater coils. Common features on an overload are as follows: A reset button/dial that allows the motor circuit to reset manually after it has been tripped, or the overload to reset itself automatically after a few minutes. A trip current dial (for bimetallic strip overloads) sets the current (usually at or slightly above the FLA) at which the circuit will trip. A test button trips the circuit manually.

OPERATIONS SEQUENCE CHART (OSC)

OVERLOAD

Rev. 0 June, 2010

Glossary 10-23

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A trip indicator window displays a colored indicator when the circuit is tripped.

OXYGEN UPTAKE RATE (OUR)

The rate of oxygen at which microorganisms consume food in the bioreactor. The rate at which the microorganisms use oxygen (OUR) can be a direct indicator of their biological activity. OUR is measured in mg of O2 consumed/L of biomass/minute. Provides an interface between the operator and the PLC. The PanelView screen enables the operator to monitor the systems operation. The touch-screen controls and/or push buttons allow the operator to control the system. The number of particles per 100 ml of filtrate water. Water can be microscopically examined using a particle counter, which classifies suspended particles by number and size. Particle counters are placed in piping to measure the particle count, verify membrane integrity, and ensure the quality of the permeate. Very small suspended solids in water. They vary in size, shape, density, and electrical charge, and can be gathered together by coagulation and flocculation. A chemical treatment used to expedite the natural passive quality of stainless steels. When exposed to air, stainless steels passivate naturally due to the presence of chromium. The rate of natural passivation varies. To ensure that a passive layer forms rapidly after pickling, a solution of nitric acid and water is applied to the metal surface. Passivation does not remove embedded surface contamination. Thorough water rinsing must follow all passivating treatments. A characteristic condition of stainless steels, which impedes normal corrosion tendencies, and renders the steel passive to its environment.

PANELVIEW HMI (HUMAN MACHINE INTERFACE)

PARTICLE COUNTS

PARTICLE COUNTER

PARTICULATES

PASSIVATION

PASSIVE

Glossary 10-24

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

PERCENT REJECTION Percent (%) rejection is defined as the percentage of Total Dissolved FOR RO Solids (TDS) that are rejected by the membranes into the concentrate stream. It is calculated using the following formula:
Permeate TDS x 100 Feed TDS

Percent Rejection

100

For example, if the feed water has a TDS level of 359 mg/L (or ppm) and the permeate water has a TDS level of 9 mg/L, the percent rejection of the system would be calculated as follows:
9 x 100 359

Percent Rejection

100

= 97.5%

The Total Dissolved Solids level is typically measured with a conductivity probe and instrument. The rejection typically increases with decreasing recovery levels and higher transmembrane pressures. PERMAFLOW PERMEATE PERMEATE FLOW RATE (FLUX) The trade name for GE W&PTs tubular membranes. The portion of the feed solution that passes through the membrane. The permeate flow rate per unit of membrane area. This is used for a specific system with a fixed number of membranes. The term can be used interchangeably with permeate flow rate. The most common usage is in GFD (gallons of permeate per square foot of membrane area per day) or in LMH (liters of permeate per square meter per day).

PERMEATE FLOW Permeate flux is defined as the permeate flow rate per square foot of RATE (FLUX) FOR RO membrane area. It is used interchangeably with permeate flow rate. The rate at which permeate is produced is dependent upon the following: the membrane operating pressure. the feed water analysis. the system recovery ratio.

Rev. 0 June, 2010

Glossary 10-25

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

PERMEATE HEADER

the feed water temperature.

The piping running along the length of the membrane tank that collects permeate from each of the permeate manifolds. The piping running across the top of the cassette (parallel to the main axis of the cassette) that collects the permeate from the individual stacks. The permeate is discharged to the permeate header. When stainless steels have been heated to elevated temperatures (such as during welding), an oxide scale will form on the surface unless the material is surrounded by a protective atmosphere. Any such oxides must be removed to restore the stainless steel to its optimum corrosion resistance. The part is immersed in a pickling solution to remove oxides and loosely embedded iron. Pickling paste can be used to clean larger affected areas in accordance with the manufacturers directions.

PERMEATE MANIFOLD

PICKLING

PH

The measure of the acidity or alkalinity of a solution, based on the concentration of hydrogen ions. pH values are expressed as numbers on a scale of 0 to 14. With values less than 7 being acidic, and greater than 7 being basic. pH analyzers measure the pH levels in the recirculation line during Recovery Cleans. The PLC uses the analyzer to monitor the pH of the cleaning chemicals and to control the dosing of neutralizing chemicals. The point at which the amount of current per unit area of membrane is high enough to dissociate water molecules, resulting in the formation of OH- and H+ ions. A screen design that is displayed by selecting buttons on a graphical screen of the operator interface. The popup screen overlays a portion of the graphical screen. Popup screens are typically used for controlling a motor or entering setpoints. A device that converts an AC input to a DC output. The size of the holes in the membranes. Parts per million. 1 ppm = 1 mg/L (assuming specific gravity = 1.0).

PH ANALYZER

POLARIZATION

POPUP SCREEN

POWER SUPPLY PORE SIZE


PPM

Glossary 10-26

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

PRESSURE DROP PRESSURE DECAY TEST PRESSURE GAUGE PRESSURE TRANSMITTER

A loss of pressure due to friction or flow restriction. See Membrane Integrity Test.

A device used for measuring the pressure of a gas or liquid. Pressure transmitters, located on the permeate header, are used to control pump speed during production, backpulse, and membrane integrity tests of the conventional membrane systems. The transmitters inform the PLC of high or low pressures, triggering an alarm. A cylindrical vessel (usually made of FRP) that contains membrane elements. The strategy for carrying out a process. It may refer to a process that does not result in the production of a product, for example a Clean-InPlace (CIP) procedure. A treated water stream exiting a unit treatment process. A microprocessor-based controller that uses programmable memory to store instructions in order to control a process. The main components of a PLC are the power supply, processor, memory, input interface, and output interface. A control scheme in which the controller output is varied to maintain a process variable to a certain ratio of another variable. As an example, proportional control is used to vary a chemical dosing pump speed in proportion to the water flow at the chemical dosing location. This control method ensures that the chemical concentration in the water will not change when the water flow changes. Feedback control with proportional, integral, and derivative control action. This control method allows the PLC to manipulate a physical device (control variable) to achieve a setpoint by constantly observing the response (process variable). A PID controller attempts to correct the error between a measured process variable and a desired setpoint by calculating and then outputting a corrective action that can adjust the process accordingly and rapidly in order to keep the error minimal. The PID loop contains the following three parameters:

PRESSURE VESSEL

PROCEDURE

PRODUCT WATER PROGRAMMABLE LOGIC CONTROLLER (PLC)

PROPORTIONAL CONTROL

PROPORTIONAL INTEGRAL DERIVATIVE (PID) CONTROL LOOP

Rev. 0 June, 2010

Glossary 10-27

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Gain (Kc) - Proportional control. Reset (Ti) - Integral control. Rate (Td) - Derivative control. The proportional control term Kc changes the control variable by an amount proportional to the setpoint deviation. The magnitude of Kc determines the sensitivity of the PID control loop to process changes. The larger the Kc value, the larger the proportional change in the control variable. The integral control term Ti is the time during which the actuating variable is changed for an existing deviation. The magnitude of Ti determines the amount of memory that the PID control loop exhibits. A large Ti value has a low effect on the setpoint deviation and vice versa. Controllers that use 1/Ti have opposite effects on the deviation. The derivative control term Td changes the control variable by an amount proportional to the rate of change (slope) of the setpoint deviation. The larger the Td value, the more effect the rate of change of the deviation has on the control variable and vice versa. Systems that use 1/Td have the opposite effect. RATE The tuning parameter for the derivative control action of a PID controller. The amount of water recovered as permeate divided by the amount of feed water supplied to the system. High recovery ratios mean that a large percentage of the water is collected as permeate, whereas a low recovery results in most of the feed water going to the reject stream. As the recovery ratio increases, the suspended solids concentration of the reject stream increases. Higher solids in the reject stream represent higher solids concentrations in the membrane tank. This may result in higher transmembrane pressure (TMP) readings.

RECOVERY

While membrane systems can be forced to run at a higher recovery than designed, premature membrane fouling may result. DO NOT run the system at a higher recovery than designed.

Glossary 10-28

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

The formula for determining percent recovery is as follows:


Permeate Flow Rate x 100 Feed Flow Rate

Percent Recovery

RECOVERY CLEAN

A chemical cleaning procedure used to restore ZeeWeed membrane permeability. An electrical device that changes AC power to DC power. The redox analyzer measures the ability of a solution to act as an oxidizing agent or reducing agent. Redox potential/ORP (oxidationreduction potential) is measured in the range specified in the vendor data. Positive readings indicate an oxidizing agent, while negative readings indicate a reducing agent. Chemicals used in the regeneration of resin beds in an ion exchange unit. A process for restoring the resin in an ion exchange unit to its fully charged state. GE W&PT-patented hollow fiber used in the ZeeWeed 500 series modules, consisting of a polymeric membrane on a strong support. The process of using a manual reset button to clear an alarm condition after it has been resolved. The tuning parameter for the integral control action of a PID controller. Layers of resin in an ion exchange unit. See also Mixed Bed.

RECTIFIER REDOX/ORP ANALYZER

REGENERANT CHEMICALS REGENERATION

REINFORCED FIBER

RESET

RESIN BEDS

RESIDUAL CHLORINE Residual chlorine analyzers are placed in the recirculation piping to ANALYZER electronically measure the level of chlorine present during Recovery Cleans. The PLC uses this online chlorine measurement to control the neutralizing chemical dosing pumps. RESISTIVITY FOR RO The property of a substance (in this case, water) to resist the flow of electricity. Resistivity is the measurement of that resistance. Resistivity is the inverse of conductivity. Measured by a resistivity monitor. See Reject.

RETENTATE

Rev. 0 June, 2010

Glossary 10-29

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

REJECT

Also known as Concentrate or Retentate. The portion of the feed solution that does not pass through the membrane. A water purification process that utilizes high-pressure pumps to drive process water through semi-permeable reverse osmosis (RO) membranes in order to remove dissolved ions and unwanted matter. The feed solution is the stream that enters the reverse osmosis (RO) membrane unit. Following reverse osmosis, the feed stream is divided into concentrate and permeate streams. A run time counter for a motor or process unit, usually with units of hours. Precipitate of calcium carbonate or calcium sulfate. The formation of a precipitate on a surface in contact with water as the result of scale deposit. The process of converting a raw numerical value to a value in engineering units. A control function intended to set the states of the pumps, valves, and other control devices of a process unit for a series of operation steps. An adjustable value for a process variable, which is used for controlling a process. A controller will vary the process to keep the process variable at the setpoint, or a process alarm and/or control action will occur when the process variable reaches the setpoint. An alarm that alerts the operator that action is needed to recover from a situation where either a piece of equipment is unable to operate, or the control system has determined that operation is unsafe or undesirable. The plastic covering that protects the ZeeWeed 1000 element. A device for measuring silica concentrations in liquid. The silt density index represents the quantity of silt (colloidal material) present in a water source. It is a measure of the potential of suspended solids to foul RO membranes. The excess volume of biological sludge wasted daily from the bioreactor. Usually measured in L/d or g/d.
Rev. 0 June, 2010

REVERSE OSMOSIS (RO)

RO FEED

RUN TIME METER

SCALE SCALING

SEQUENTIAL CONTROL SETPOINT

SHUTDOWN ALARM

SHROUD SILICA ANALYZER SILT DENSITY INDEX (SDI)

SLUDGE WASTING RATE


Glossary 10-30

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

SODIUM HYPOCHLORITE (NAOCL) SOLENOID VALVE

A membrane cleaning and conditioning agent that removes organic foulants and sanitizes the system permeate/treated water piping. This substance is a strong oxidant and disinfectant. Solenoid valves provide on/off control for low flow volume locations, including air diaphragm chemical pumps and pneumatic valves. The PLC controls the solenoid valves. The time required to remove the working volume of the bioreactors mixed liquor by the average flow rate of waste sludge from the system.
Anoxic and Aerobic Reactor Volume (L) Sludge Wasting Rate (L/d)

SOLIDS RETENTION TIME (SRT)

SRT (d)

SOLUTE SOLVENT

Material (such as salts) dissolved by a solvent (such as water). Any material that acts to dissolve another. The solvent constitutes the dissolving medium, or liquid portion, of a solution. Water is frequently referred to as the universal solvent. Polyethylene sheets with die cut water flow paths and manifolds to allow water in the membrane stack to be channeled into demineralizing and concentrating streams. A group of two or three elements arranged in a vertical stack with a common permeate collection pipe.

SPACERS

STACK

STACK DIFFERENTIAL The hydraulic pressure between the demineralizing and concentrating PRESSURE streams in the membrane stack. STACK SHORTING Damage to stack membranes due to excessive voltage travelling through the membranes and generating heat. In reverse osmosis (RO), a process configuration where rejected water is fed through additional sets of membrane in order to increase recovery (without changing final product water quality). A slotted or screen sieve for screening flowing liquid.

STAGING

STRAINER

Rev. 0 June, 2010

Glossary 10-31

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)

A computer system that collects and records process data and alarms, and provides a graphical user interface for a process system. It is typically a Windows-based desktop computer that runs a SCADA software package. The SCADA, which is the center of the control system, acts as a link between the PLC and the operator. It allows the control of valves, pumps, and blowers. All electronic parameters are displayed and setpoint values are stored. A device that produces a binary signal in response to an operator action or the comparison of a process variable to a setpoint. For example a High level switch converts a tank level into a binary signal for high level. The device may be a mechanical float switch, a relay in an electronic instrument, or a software comparator. The system recovery ratio is the ratio of water recovered as permeate versus the amount of feed water supplied to the system. A high recovery ratio means that a large percentage of the water is collected as permeate; a low recovery ratio results in most of the feed water going to the reject stream. As the recovery ratio increases, the concentration of the reject stream increases and the permeate quality decreases. As the recovery ratio is lowered, the proportion of feed water that is rejected increases.

SWITCH

SYSTEM RECOVERY

Operating the RO subsystem at a higher rate of recovery than recommended will result in premature membrane fouling. The formula for determining percent recovery is as follows:
Permeate Flow Rate x 100 Feed Flow Rate

Percent Recovery

SUPPORT MEDIA

A high-density material with a graded particle size for supporting resin (example: gravel, anthrafil, and quartz). An event that takes place once per day, consisting of draining the tank while backpulsing and air scouring.

TANK DRAIN FOR ZEEWEED 1000

Glossary 10-32

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

TANK HEATER

During a Recovery Clean, a CIP tank heater increases the temperature of the cleaning solution. The feed water temperature has a pronounced effect on the permeability through the membranes. As the operating temperature increases, the permeability also increases. Temperature transmitters monitor temperatures.

TEMPERATURE EFFECTS

TEMPERATURE TRANSMITTER TOTAL DISSOLVED SOLIDS (TDS) TOTAL KJELDAHL NITROGEN (TKN)

The concentration of all solids dissolved in a solution (normally expressed in ppm). The total concentration of nitrogen in a sample present as ammonia or bound in organic compounds. Total Kjeldahl Nitrogen (TKN) is usually measured in mg/L. A measure of the amount of organic materials suspended or dissolved in water. Total Organic Carbon (TOC) is a quicker sampling method than measuring Chemical Oxygen Demand (COD) or Biological Oxygen Demand (BOD) for determining the quality of the effluent. A measure of the amount of material that is dissolved or suspended in a water sample, by weight. Total Solids is determined by allowing a known volume to evaporate and then weighing the remaining residue.
Total Solids = Total Dissolved Solids + Total Suspended Solids

TOTAL ORGANIC CARBON (TOC)

TOTAL SOLIDS (TS)

TOTAL SUSPENDED SOLIDS (TSS)

A measure of the solids (normally expressed in ppm) found in water, which can be removed by filtration.

TRAIN FOR ZEEWEED A group of cassettes immersed in a tank and connected to a common MEMBRANES header through which the permeate is drawn. Suction is created with either a permeate/process pump or a siphon. TRAIN FOR SOFTENERS A single filtration or ion exchange system capable of producing the desired treated water.

Rev. 0 June, 2010

Glossary 10-33

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

TRANSMEMBRANE PRESSURE (TMP)

The difference in pressure across the membranes, between the outer and inner surface of membrane. TMP is the driving force that causes filtration through the membranes to occur. This pressure difference is created by applying a partial vacuum inside the membrane fibers with the suction of the permeate/process pump. TMP can be varied by changing the speed of this pump. A trigger allows a change in operation. It is a normal event that can clear an alarm or be one of several points in a sequence of events.

TRIGGER

TUBULAR MEMBRANE A pressure driven cross flow filtration membrane used for separating and concentrating suspended solids and high molecular weight particles from a variety of waste and process streams. The filtration surface is a strong polymeric membrane cast on the inside surface of a porous support tube. The membrane is constructed of materials that can withstand harsh chemical environments. TURBIDITY A measure (via light penetration) of the cloudiness of an otherwise clear liquid. Measured in Nephelometric Turbidity Units (NTU). Sediment or foreign particles stirred up or suspended in water. Turbidity meters are placed in the permeate piping or the feed piping to measure turbidity. When registering high turbidity, the PLC will trigger an alarm and shut down the ZeeWeed system. Water treatment methods used to remove suspended solids, bacteria, and viruses from water. This method operates using low pressures and typically using hollow-fiber or rolled membrane elements. A light wave, at a specific wavelength, used to disinfect water. UV will kill any viable bacteria, viruses, and parasites. Conventional hollow fiber, which is based on a simple polymeric structure, used in the ZeeWeed 1000 module.

TURBIDITY METER (TURBIDIMETER)

ULTRAFILTRATION

ULTRAVIOLET (UV)

UNREINFORCED FIBER

VACUUM DEGASIFIER A tower to which a vacuum is applied and through which water droplets descend to remove dissolved gas. VACUUM PUMP Vacuum pumps remove air from the system and ensure that the permeate/process pump remains primed. The process in which the operation of motor-operated valves may be manually tested.
Rev. 0 June, 2010

VALVE TEST

Glossary 10-34

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

VARIABLE FREQUENCY DRIVE (VFD)

An electrical device attached to a pump motor used to automatically adjust motor speed in response to process conditions. A VFD controls the speed of a pump by changing the frequency of the alternating current to power the motor. For example, a pump motor operating at 1800 rpm at 60 Hz would run at 900 rpm if the frequency is reduced to 30 Hz. The space between media particles in a settled bed. The total content of suspended and dissolved solids in water, which are volatile at 550C (1022F). The suspended solids that can be filtered from a sample of water and are volatile at 550C (1022F).

VOID VOLUME VOLATILE SOLIDS (VS) VOLATILE SUSPENDED SOLIDS (VSS) VOLTAGE

The difference in electrical potential across two points. This is analogous to gauge pressure in water applications. Voltage is measured in volts (V). Instantaneous surges of water pressure caused by a sudden interruption in water flow. Cation resin in sodium form that removes cations such as calcium and magnesium from the water, and releases sodium ions. The exchange of sodium by ion exchange. A die-cut sheet of plastic which forms direct flow paths for demineralized and concentrate streams. (EDI) Water that is electrically (but not hydraulically) transferred through the membranes along with ions. The trade name for GE W&PTs process of using a ZeeWeed membrane system to clarify effluent from a bioreactor. The trade name for GE W&PTs powerful plant process support tool which provides fully automated process data monitoring and trend analysis. The trade name for GE W&PTs immersible hollow fiber filtration module.
Glossary 10-35

WATER HAMMER

WATER SOFTENER

WATER SOFTENING WATER FLOW SPACER WATER TRANSFER

ZENOGEM

ZENOTRAC

ZEEWEED

Rev. 0 June, 2010

This page has been intentionally left blank

GE Water & Process Technologies

APPENDIX A

ZEEWEED 500D
IMMERSED HOLLOW-FIBER ULTRAFILTRATION TECHNOLOGY

NOTICE The enclosed materials are considered proprietary property of GE Water & Process Technologies. No assignments, either implied or expressed, of intellectual property rights, data, know-how, trade secrets or licenses of use thereof are given. All information is provided exclusively for the addressee for the purposes of evaluation and is not to be reproduced or divulged to other parties, nor used for manufacture or other means, or to authorize any of the above, without the express written consent of GE Water & Process Technologies. The acceptance of this document will be construed as an acceptance of the foregoing conditions. * Trademark of General Electric Company; may be registered in one or more countries.

This page has been intentionally left blank

A.1

CAUTIONS

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.1.1

CAUTIONS SPECIFIC TO THIS SUBSYSTEM


The following precautions must be read and adhered to by all system operators. 1. This appendix must be read and understood in its entirety before operating the subsystem. 2. Membranes must be kept moist at all times. Store in a temperature between 5 - 35C (41 - 95F). Do not allow membranes to freeze or dry out. 3. If the system has been preserved (example: for shipment or shutdown), any shipping preservatives should be flushed from the system before startup. See Section 3.7.1: Flushing for more information. 4. Membranes must be immersed in a biocidal solution prior to storage, shipping or system shutdowns longer than 72 hours. Flushing the system at least once per day while off-line is also sufficient for short term shutdowns. See the section on cleaning for procedures. 5. The customer is fully responsible for the effects of unapproved chemicals when used with ZeeWeed filtration systems. Their use will render the membrane warranty null and void. Contact GE Water & Process Technologies if there is a concern about chemical use. 6. To avoid damaging the membranes, all prescreening measures must be in operation at all times. Do not bypass prescreening processes under any circumstances. 7. During construction, maintenance, or any other work performed directly above the membrane tank, ensure that foreign debris (example: pipe turnings) does not fall into the tank.

Rev. 0 June, 2010

ZeeWeed 500D - Cautions A-1

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

8. During membrane integrity tests (MIT) or bubble tests, the compressed air must be clean, dry, and free of oil. Do not exceed the maximum recommended pressure. 9. Do not allow membrane fibers to come in contact with sharp objects, become entangled with equipment or tools, be pulled tightly, or to freeze or dry out. 10. Do not clean the membranes with a high-pressure water stream (example: pressure washer or fire hose), and do not use water that exceeds maximum temperatures for membranes 11. Membranes that are to be returned to GE W&PT must be cleaned, sanitized, and preserved before shipment. Contact GE W&PT for instructions before returning membranes.

ZeeWeed 500D - Cautions A-2

Rev. 0 June, 2010

A.2

SUBSYSTEM OVERVIEW

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.2.1

OVERVIEW
The ZeeWeed 500D is a supported hollow-fiber ultrafiltration membrane technology introduced in 1997. The ZeeWeed 500D product line consists of both modules and cassettes. A module is the basic building block and smallest replaceable unit of a ZeeWeed 500D membrane treatment system as shown in Figure A.2.1 ZeeWeed 500D Cassettes in a Treatment System. Modules are joined together to form a cassette, which is the smallest operable unit of a treatment system. Cassettes are integrated into a treatment system by suspension in a membrane tank and connection to permeate collection and air distribution piping. They are designed to be lifted by overhead devices and special tools exist to facilitate cassette access.

Figure A.2.1 - ZeeWeed 500D Cassettes in a Treatment System

Rev. 0 June, 2010

ZeeWeed 500D - Subsystem Overview A-5

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.2.2

MEMBRANE FIBER
The ZeeWeed 500D membrane is an outside-in supported polyvinylidene fluoride (PVDF) hollow-fiber. The term supported refers to the fact that the membrane polymer coats a braided material that reinforces the fiber. The ultrafiltration membrane fiber has a nominal pore size of 0.04 m and is capable of removing suspended solids, protozoa, bacteria, and most viruses. As a result, high quality water can be produced with minimum chemical addition and treatment.

A.2.3

MODULES
Membrane fibers are arranged vertically between two headers. Water is drawn through the fibers into the permeate header and then exits the module via the permeate spigot or saddle. The module has a key, which is used to lock the module in place when it is installed in the cassette.

Figure A.2.2 - ZeeWeed 500D Module

ZeeWeed 500D - Subsystem Overview A-6

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

The following table provides general specifications for the ZeeWeed 500D module.
Table A.2.1 - Module Specifications Module Dimensions
Height Width Depth 2,198 mm (86.4) 844 mm (33.2) 49 mm (1.9)

Module Weight
Max. Shipping Weight (crated) Lifting Weight (varies with solids
accumulation)

26 kg (58 lb) (wastewater) 28 kg (62 lb) (drinking water) 26-75 kg (58-163 lb) (wastewater) 30-74 kg (66-163 lb) (drinking water)

Membrane Properties
Nominal Surface Area 31.6 m2 (340 ft2) (wastewater) 31.6 m2 (340 ft2); 40.9 m2 (440 ft2) (drinking water) PVDF 0.04 microns Non-Ionic & Hydrophilic 1.9 mm OD/0.8 mm ID Outside-In

Material Nominal Pore Size Surface Properties Fiber Diameter Flow Path

Operating Specifications
TMP Range Max. Operating Temperature Operating pH Range -55 to 55 kPa (-8 to 8 psi) (wastwater), -90 to 90 kPa (-13 to 13 psi) (drinking water) 40C (104F) 5.0-9.5

Cleaning Specifications
Max. Cleaning Temperature Cleaning pH Range Max. Cl2 Concentration 40C (104F) 2.0-10.5 1000 ppm

Rev. 0 June, 2010

ZeeWeed 500D - Subsystem Overview A-7

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.2.4

CASSETTES
The cassette is comprised of a welded stainless steel frame. The ZeeWeed 500D module can be slid into and out of the cassette. Four modules are connected in parallel into top and bottom common saddles, which are linked by a 2 PVC permeate downcomer pipe. The top saddle connects into the stainless steel 8 permeate manifold. The cassette is then linked to an external permeate header on the train using hard pipe or hose connections. The cassette uses 3 aeration CPVC downcomer pipes to feed tube diffusers assembled into a grid at the bottom of the cassette. For membrane bioreactor applications, the 1.5 PVC diffuser tubes are clear; for other applications, the tubes are white.

Figure A.2.3 - ZeeWeed 500D Cassette

ZeeWeed 500D - Subsystem Overview A-8

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

The following table provides general specifications for the ZeeWeed 500D cassette.
Table A.2.2 - Cassette Specifications Cassette Size
Max. No. of ZeeWeed Modules

48M
48

64M
64

Dimensions
Length Width Height 2,112 mm (83.1) 743 mm (29.3) 2,085 mm (82.1)

Tie-Points
Permeate Connection Air Connection 6 316 L SS vert. pipe 8 316 L SS horz. pipe two 3 PVC vert. spigot

Weights
Max. Shipping Weight
(crated)

1,730 kg (3,815 lb) 1,335-4,260 kg (2,945-9,385 lb)

2,040 kg (4,500 lb) 1,425-4,535 kg (3,140-10,000 lb)

Lifting Weight (varies with solids accumulation)

Rev. 0 June, 2010

ZeeWeed 500D - Subsystem Overview A-9

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.2.5
A.2.5.1

THEORY OF OPERATIONS
FILTRATION
Filtration is defined as the separation of one or more components from a fluid stream. In conventional usage, it usually refers to the separation of solid or insoluble particles from liquid or gaseous streams. The most commonly employed membrane processes and the filtration ranges in which they operate are presented in Figure A.2.4 - Filtration Spectrum.

Figure A.2.4 - Filtration Spectrum

Membrane separation processes can be categorized in various ways; three of which are pore size, molecular weight cutoff (MWCO), and operation pressure. As the pore size gets smaller (and the molecular weight cutoff decreases), the pressure applied to the membrane for separation generally increases. The water treatment objectives of each system decide the basis on which a process is selected and operated.

ZeeWeed 500D - Subsystem Overview A-10

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.2.5.2

ULTRAFILTRATION: AN INTRODUCTION
Ultrafiltration (UF) is a process that filters particles on the basis of size. In membrane separations, UF is typically used to separate or remove relatively large particles, such as microbes, bacteria, and macromolecules with molecular weights greater than about 300,000 molecular weight. UF uses loose membranes, which refers to membranes that have relatively large pores.

A.2.5.3

ZEEWEED ULTRAFILTRATION
ZeeWeed 500D is an immersed ultrafiltration membrane system for low suspended solids water feeds. The membrane and process have been developed with the goal of reducing costs while maintaining the high level of treated water quality. The filtrate (permeate) is pushed through the membrane from the bulk fluid by atmospheric pressure due to a partial vacuum applied within the membrane fibers. The physical barrier of the ZeeWeed membrane prevents the passage of bacterial organisms and solids into the water supply.

Rev. 0 June, 2010

ZeeWeed 500D - Subsystem Overview A-11

This page has been intentionally left blank

A.3

INSTALLATION & TESTING

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.1

INTRODUCTION
This section provides information regarding subsystem installation, initial testing, and maintenance procedures. This information must be read and internalized in its entirety by system operators prior to installing or operating the subsystem.

A.3.2

INSTALLATION REQUIREMENTS
The following must be available before the subsystem can be installed: APPLICABLE DRAWINGS: The Process and Instrumentation Diagram (P&ID), General Arrangement (GA), Plot Plan, and Electrical drawings for the system are provided in this manual. These drawings will be needed during installation. WATER: Water introduced into the system during installation must be free of particulates, and any debris that falls into the tanks must be removed immediately. ELECTRICITY: GE W&PT is not responsible for supplying power to the subsystem. During installation, a qualified electrician must verify the following: That all electrical connections meet local government and industry standards. That all electrical cables have been properly fitted. That all 3-phase motors have been wired for proper rotation.

QUALIFIED PERSONNEL: A qualified electrician, pipefitter, and millwright are required on site when commissioning the system.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-15

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.3.3

PERSONAL SAFETY
It is crucial that fall arrest equipment be worn when working overtop the membrane tank. A fall arrest harness must be worn and appropriate tieoff lanyards must be used while installing and/or working on a cassette.

Figure A.3.1 - Harness and Lanyard

A.3.4

HANDLING OF FACTORY SHIPPED ZEEWEED CASSETTES


ZeeWeed 500D cassettes are always shipped with modules installed. The cassette itself is sealed in a plastic bag to retain moisture to prevent damage to the membranes due to drying. The cassette is shipped on its side in a plywood crate.

ZeeWeed 500D - Installation & Testing A-16

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.4.1

UNLOADING SHIPPED CASSETTES


The Installer is responsible for the prompt and proper unloading of all membrane equipment and materials received into his custody. During unloading, ensure the following: Dock level, off-loading facilities are recommended. The wooden shipping crates have been designed to be lifted from the bottom using a forklift. Damage incurred or observed during equipment off-loading needs to be immediately reported to your GE representative.

It is recommended that an experienced/qualified forklift truck driver unloads the membranes from the carrier. ZeeWeed 500D cassettes are shipped on their sides and will require uprighting. Follow all procedures carefully to prevent injury. Shipping crates are not to be stacked!

A.3.4.2

CONFIRMING EQUIPMENT AND MATERIALS


A cross-check should be performed on the shipment using the packing slip to confirm the delivery of membrane equipment.

Do not open membrane crates. Verification is limited to external examination of crates. The equipment delivery will be checked for content and any damage that may have occurred during shipping or the unloading process. Any non-conformance shall be immediately reported to your GE representative (in writing). Digital pictures of damage should be provided.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-17

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Refer to A.3.4.3 Confirming Handling Indicators to confirm the condition of the handling indicators. When the equipment shipment has been checked, the Equipment Acceptance Certificate and Checklist must be completed and signed by the Site Organization's representatives. The Installer shall expeditiously replace all materials and equipment that are lost or damaged while in the custody of the Installer. Replacement materials and equipment will be of a type and quality equal to the original materials and equipment, and will be acceptable to GE W&PT and to the Owner.

A.3.4.3

CONFIRMING HANDLING INDICATORS


GE W&PT includes a series of shipping indicators to protect the integrity of the membrane cassettes while they are being shipped. Indicators may include freeze and/or heat (see Figure A.3.2 - Shipping Indicators). The Installer's representative should document the indicator condition on the indicator check label located on the membrane crate.

Table A.3.1 - Handling Indicators Freeze Indicator


Indicator Location When to check External At time of receipt

Heat Indicator
External At time of receipt

At the time of discovery, the Installer must inform the GE representative of any triggered indicators.

ZeeWeed 500D - Installation & Testing A-18

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

TIP: A triggered indicator indicates ideal shipping conditions were not maintained. The GE representative will evaluate membranes prior to installation.

During membrane installation, the GE representative on site will also inspect and record the status of all indicators.

Figure A.3.2 - Shipping Indicators

Duplicate indicators used by the GE representative are located inside the crate.

A.3.5

STORING MEMBRANES
The Installer must provide all facilities and services required for the storage, maintenance, protection, and security of the equipment and materials delivered by GE W&PT. The following conditions should be followed: Equipment and materials must be stored in assigned lay-down areas. Stored equipment and materials must be adequately supported and protected to prevent damage. Equipment must be moved into the permanent building or onto its permanent foundation as soon as construction will permit.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-19

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Stored materials and equipment must not be allowed to contact the ground. In warehouses that do not have dry concrete or suspended floors, materials and equipment must be stored on platforms or shoring. Indoor storage furnished by the Installer must consist of suitable construction trailers or portable enclosures and must be weather-tight, well ventilated, and secure against theft and vandalism. Access doors must be adequate to accommodate the movement and handling of materials and equipment to be stored and must be equipped with secure locks. Membrane cassettes will be stored upright on a level surface. The membrane cassette crates must remain closed until the Installer begins membrane installation, to prevent permanent membrane damage due to drying out. The membrane crates should never be exposed to excessive vibration or large bumps.

Membranes should be stored in a dark dry area with a storage temperature between 5 - 35C (41 - 95F) and a setpoint of 20C (68F).

A.3.5.1

STORING CRATED CASSETTES


The following conditions should be ensured when storing crated cassettes: Sheltered area protected from freezing, direct sunlight, or extreme heat. Vacuum sealed bag should remain sealed until membrane installation is being performed.

ZeeWeed 500D - Installation & Testing A-20

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

The cassettes have been manufactured and preserved to comply with the contractually specified membrane/cassette delivery and installation schedule. Should the installation of the membranes/cassettes be delayed more than one month, contact your GE representative for instructions.

A.3.5.2

STORING BAGGED MODULES


New modules preserved with glycerin solution, bagged and factory sealed, may be stored for up to 12 months from manufacturing. For the exact expiry date, contact GE W&PT technical support. The following conditions should be ensured when storing bagged modules: Stored in a sheltered area protected from freezing, direct sunlight, extreme heat, and winds that could accelerate drying. The module should be kept bagged and sealed at all times.

Disassembly of cassettes to replace modules requires attention and care. Contact GE W&PT technical services for reassembly procedures, which include step-by-step instructions, bolt torques, and identification of non-reusable hardware.

A.3.5.3

STORING WETTED MEMBRANES

ZeeWeed membranes should not be allowed to dry out as membrane properties will be adversely affected. Drying may result in irreversible damage to the membranes. If the preservative is flushed out or if the module has been in contact with water, the membrane must not be allowed to dry out under any circumstances. The membranes may be left in air for a maximum of 45 minutes out of direct sunlight and wind. After 45 minutes, membranes should be immersed in water. Spraying the membranes after this period is not sufficient to prevent drying-out and will not allow a longer period of contact with air.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-21

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

If membranes are frequently lightly misted (not sprayed with fire hoses or pressure washers) from the time they have been taken out of the water, they may be left in air for a maximum of 6 hours between 5C 35C (41F - 95F). Since the membranes are maintained wet, there is no need for specific rewetting procedures. However, if necessary for other reasons (for example, drinking water compliance and residual of preservatives) the standard procedures for rinsing and disinfection may be used before starting the operation. If it is impractical to immerse or repeatedly spray the membrane, the membrane should be cleaned, preserved in glycerin solution, and rebagged according to membrane preservation procedures (see A.3.12 System Shutdown and Membrane Preservation). Discuss longer storage durations with GE W&PT technical services.

A.3.5.4

STORING WETTED CASSETTES


For storage periods of up to approximately 15 days, simple immersion of the cassettes in water containing sodium hypochlorite (NaOCl) with a residual concentration of 3 mg/L is suitable. Perform weekly testing of the water and add chlorine if the residual chlorine concentration drops to less than 0.2 mg/L. A Recovery Clean of the membrane prior to storage is strongly recommended. Periodic aeration may also be necessary to prevent anoxic or anaerobic conditions from developing in the tank. Perform weekly testing of the water to ensure that the residual chlorine concentration is within acceptable limits. A log must be maintained recording daily sodium hypochlorite concentration and water temperature. Longer storage durations are to be discussed with GE W&PT technical services.

Four (4) - 3/8 - 16 NC

ZeeWeed 500D - Installation & Testing A-22

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.6

UNCRATING AND INSTALLING CASSETTES


The purpose of this document is to outline the steps required to properly install modules into a 500D 48E WW cassette installed with MARS.

Follow proper safety procedures to prevent injury when carrying out this procedure. These instructions are specific to this model of cassette.

Proper crane training is required along with a certified and inspected crane.

Prior to installation of the membranes, all piping and tanks must be installed, tested, and readied to accept membrane cassettes.

A.3.6.1

PREPARING THE SITE


The Membrane Pre-Installation Checklist must be completed before cassettes can be uncrated and installed. The GE representative will provide the Membrane Pre-Installation Checklist, the Membrane Map, and Repair Log. All loose shipped parts required for cassette installation must be located. All guide brackets, permeate piping and air piping are to be installed as per installation documentation supplied by GE W&PT. Membrane tanks must be thoroughly cleaned and free of debris. There must be enough water in the membrane tank to ensure that the fibers are completely submerged within water. Locate and reserve an area for proper cassette assembly and unloading.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-23

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

The following parts should be available: Forklift with extended forks rated for cassette weight to move crate Crane/hoist, slings, and lifting bracket to upright cassette and install cassette in tank. Lifting hoist requirements: 64 element cassette: 3000-4500 kg (6614-9921 lbs) 48 element cassette: 2800-3800 kg (6172-8377 lbs)

2 sheets of 1 in. thick foam (90 in. x 90 in.) Four (4) 3/4 in. lifting safety hoist rings rated for 2268 kg (5000 lbs), material: 4140 aircraft quality carbon steel (recommended manufacturer ACTEK, part #46018) c/w 8 3/4 in. diameter SS flat washers and 4 3/4 in. diameter SS hex nuts (included with shipment) Four (4) slings Four (4) point spreader bar Two (2) point spreader bar Module Removal Tool NEFAB tool/flat head screwdriver to uncrate the cassette Camera for documenting the condition of the cassette and indic in. socket to attach cassette arms 1 1/8 in. socket - to attach cassette arms PVC glue and primer to install necessary PVC elbows to cassette Anti-Seize - use NSF grade only for drinking water applications (for example, White Knight)

Always use trained operators and inspected equipment.


ZeeWeed 500D - Installation & Testing A-24 Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Four (4) - 3 in. x 3/4 in. 316 SS bolts Eight (8) - 3/4 in. 316 SS nuts Four (4) - 3/4 in. 316 SS flat washers Four (4) - 3/4 in. 316 SS nord-lock washers

A.3.6.2

INSTALLING LEVELING PINS


The purpose of these pins is to allow for proper leveling of each membrane cassette during the final stages of the plant construction. The cassette must be individually leveled to a tolerance of +/-1/8 in. per cassette within a train. All cassettes across adjoining process must be +/ - 1/4 in. level tolerance of one another. The cassette support design in the membrane tank includes adjustable pins to fine tune the cassette levels. Use a laser level prior to cassette installation to ensure the required tolerances are achieved. Cassettes that are not properly leveled may exhibit more rapid fouling as air distribution may be affected. Ensure that the following parts are available: Item #1 - Hitch Pin or Double Split Shaft Collar - please refer to project specifics Item #3 - Qty 8 - 1in. UNC 316L SS Hex Nut Item #5 - Qty 8 - 1 in. NL SS Nord-Lock locking washer 1 in. Nom Torque = 104 ft-lbs

A.3.6.3

MANEUVERING THE CASSETTE


It is important that before any work begins, the necessary planning and precautions are done in order to ensure that the membrane installation procedure is safely carried out. It is the responsibility of those installing the membranes to properly prepare.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-25

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Before the crates or cassettes can be moved, ensure that the lifting mechanism (fork lift and crane) are in good operating conditions and are rated for the load. While maneuvering the crate or cassette, ensure that no one is in its path or out of sight of the crane/forklift operator.

Do not stand under the cassette or crate.

The forklift and crane operators must be qualified and certified forklift and crane operators and must have the proper documentation on the person while operating the equipment.

A.3.6.4

UNCRATING CASSETTES
ZeeWeed 500D cassettes are always shipped with modules installed. The cassette is shipped on its side in a plywood crate. The cassette itself is sealed in plastic to retain moisture and prevent membrane damage.

500D crates are not designed to be stacked on top of one another. Damage, such as punctures, water damage, and tripped indicators incurred during equipment off-loading needs to be reported to the site superintendent and GE W&PT immediately. Uncrate the membranes with a GE W&PT representative present to monitor the process and verify the receiving tanks and piping have been satisfactorily prepared. Failure to do so may affect the membrane warranty. The cassette will need to be transported to a designated uncrating area using a forklift. Uncrating the cassettes is to be completed on a dry level surface, out of direct sunlight.

ZeeWeed 500D - Installation & Testing A-26

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

The cassette should not be allowed to freeze. Refer to Membrane Care. Membranes are not to be uncrated if any of the following activities are taking place in the immediate vicinity: painting wiring and terminations roofing grinding tinwork welding pipe flushing sandblasting drilling all power tools that discharge debris (including carpentry) or any other activity that could pose harm to the membranes

The cassettes should be uncrated by removing the top first followed by the sides. Please note that at least two people are required to uncrate the cassette. The following pictures illustrate the order of cassette uncrating.

Use two workers to remove the box sides.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-27

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

The top of the crate is to be removed first followed by one of the sides.

Figure A.3.3 - Top of Crate Removed

The ends will remain supported by the other side of the cassette. When removing the other side, care must be taken to ensure the remaining ends of the cassette are supported. See Figure A.3.3 - Top of Crate Removed. TIP:
Crate dimensions (LxWxH) are: 111 in. x 83 in. x 89 in. (2.82 m x 2.10 m x 2.26 m).

Figure A.3.4 - Cassette Sealed in Plastic

ZeeWeed 500D - Installation & Testing A-28

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.6.4.1

REMOVING THE CASSETTE BAG


The cassette comes packaged in a vacuum sealed bag. After the cassette is uncrated, and immediately prior to installing the cassette into the membrane tank with water, carefully remove the bag. See Figure A.3.4 - Cassette Sealed in Plastic. Cut open the bag sealing at the top, then carefully roll it down to the base of the crate. See Figure A.3.5 - Bag Sealing the Cassette.

Do NOT cut along the center of the cassette. Fibers can be damaged.

Figure A.3.5 - Bag Sealing the Cassette

Once rolled down to the base of the cassette, cut the bag at the base and discard.

There is a plastic wrap underneath the bag. The plastic wrap must stay intact for the uprighting of the cassette.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-29

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Depending upon the version of the cassette, it may come equipped with yellow shipping braces. If these braces are present, they need to be removed prior to uprighting the cassette.

Figure A.3.6 - Removing the Cassette Bag

If the membranes have been in storage, check for any signs of mold on the fibers. If mold is present, immediately rebag and contact GE W&PT.

A.3.6.5

MOVING UNCRATED CASSETTES


When the cassette has been removed from the shipping crate, care must be taken to ensure that contact with the membrane fibers is avoided. Lift the cassette by the factory-supplied lifting points on the top of the cassette using the lifting module. If a lifting module is not available, a spreader bar is required.

Do not attach ropes to the four hanger brackets and lift the hanger brackets. The hanger brackets will not withstand the horizontal (inward) loads produced by the ropes.

ZeeWeed 500D - Installation & Testing A-30

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Cassettes are designed to be lifted vertically and lowered slowly. Do not swing or drop cassettes. Never tilt or drag an uncrated cassette. Treat the product with care. If necessary, the uncrated and uprighted cassette can be moved on the wooden skid on which it was shipped, using a forklift. Extreme caution must be taken to avoid wind, environmental, and safety risks that may be present while moving the cassette in this manner.

If there is contact with the fibers, the integrity of the membranes may be compromised. Advise GE W&PT staff on site immediately so the fibers can be inspected and repairs can be initiated before cassette is installed. If fiber damage is not reported to GE W&PT staff, extra time and effort will be required later to remove the cassette and make the repairs.

A.3.6.6

INSPECTING THE ZEEWEED 500D CASSETTE INSPECTION 1


With the cassette uncrated but still on its side, perform the following inspections of the aeration piping and connections: Ensure that aerators are properly in place. See Figure A.3.7 Cassette Inspections and Figure A.3.8 - Aerators. Ensure that the large holes on the aerators are facing down relative to the cassette. Ensure that all saddles are securely clipped to the cassette frame. Ensure that the correct number of non permeating (dummy) headers are installed and in the correct location. Ensure that the correct type of aerators are used under the nonpermeating (dummy) headers (some aerators are left aerators and some are right aerators depending on which side the small side holes are on).

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-31

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Ensure that the two main aeration pipes are installed and secure.

Figure A.3.7 - Cassette Inspections

Figure A.3.8 - Aerators

ZeeWeed 500D - Installation & Testing A-32

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.6.7

INSTALLING UNION TO CASSETTES MAIN AERATION PIPES


All cassettes require that either a PVC union or hose barb fitting be glued to the PVC pipes on the cassette. In order to minimize the amount of time and work required on the cassette after it is installed and to reduce the risk of damage to the membranes, these parts should be installed prior to the cassette being installed in the tank. The ideal time is when the cassette is still on its side.

Figure A.3.9 - Union Installation

A.3.6.8

UPRIGHTING A CASSETTE
The cassettes are shipped on their sides and need to be lifted, then rotated to the upright position.

Read this procedure completely before proceeding with the uprighting operation.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-33

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

To promote safety, uprighting a cassette must be done in a dedicated staging area. The staging area shall be cordoned-off to people who are not directly involved in this activity. Bring shipping crates into the staging area one at a time. Clear the area of any material and provide the safe space required for both removing the cassette from the wooden skid and uprighting it. The area for the uprighting operation shall be at least 7.5 meters X 3 meters (25 ft X 10 ft). Clearly mark the area and isolate it, so that access of unauthorized personnel is prevented. The use of a perimeter fence, rope/chain barriers, pylons, or other signalling and blocking means is highly recommended.

Be alert! Cassettes have sharp edges. Follow these two steps: 1. A.3.6.8.1 Removing the Cassette from the Wooden Skid. 2. A.3.6.8.2 Uprighting Cassette. Remove all uncrating material from the staging area before commencing the uprighting activity. The use of an overhead hoist is recommended; however, if an appropriate overhead hoist is not available, then a mobile telescopic boom crane or equivalent lifting device should be used. The hoist/crane must be rated for at least a 5 ton (10,000 lb) lifting capacity at both the jib extension and the angle required for the lift. The operation of the hoist/crane shall be performed by a qualified operator, according to the local and international safety codes and regulations for lifting operations. If a crane is being used, it shall be located at an appropriate distance to prevent collision with the cassette during the lifting and uprighting.

ZeeWeed 500D - Installation & Testing A-34

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Follow proper safety procedures to prevent injury.

A.3.6.8.1

REMOVING THE CASSETTE FROM THE WOODEN SKID


One set of four hoist rings is included with every 10 cassettes (or less) in the shipment. Attach the four lifting hoist rings to the four upper corners of the cassette.

Figure A.3.10 - Hoist Ring Location

Hoist rings are made of carbon steel. To prevent cassette frame stainless steel contamination, it is important to install 3/4 in. stainless steel flat washers on the top plate along with a stainless steel nut. Tighten the bolt to the recommended torque of 100 ft/lbs. Ensure that the bushing of the hoist ring is sitting flush against the frame. Verify that the hoist is free to swivel and pivot in every direction.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-35

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Confirm bolt, shoulder pins, or bail do not show any cracks or signs of wear. Secure shoulder pins.

Figure A.3.11 - Hoist Ring Assembly

Ensure that the following steps are taken before performing the uprighting procedure: 1. Place a 1 in. thick foam sheet on the clear and flat ground where the cassette will be placed for uprighting. 2. Use a four point lift frame and spreader bar to uncrate and upright a cassette. This lifting configuration is highly recommended in conditions where overhead space is limited. 3. Ensure that the hoist rings do not touch or pry against any surface of the cassette frame, in particular the vertical corner post, except at the location of attachment. If a lift frame or spreader bar is not available, an arrangement similar to what is shown in Figure A.3.12 - Lifting a Cassette Without a Four-Point Lift Frame and Spreader Bar is recommended. Follow these recommendations:

ZeeWeed 500D - Installation & Testing A-36

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Use two slings on each lifting bracket. The sling closest to the cassette should be a short nylon strap about 4 feet long. This arrangement will prevent damage from the crane hooks. The longer cables should be at least 20 feet long. Use flexible synthetic material (such as reinforced man-made fibers) instead of metal chains to avoid damage to the cassette body material. Minimum angles between the horizontal plane and the cables should be: i. 60 where the spreader bar (lifting frame) is used

ii. 75 for one point lift

Figure A.3.12 - Lifting a Cassette Without a Four-Point Lift Frame and Spreader Bar

Ensure that the surrounding area is clear of people. 4. Slowly lift the hoist until the cassette is at the minimum height (not more than 2 in. or 5 cm) required to move the cassette off the wooden skid.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-37

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

5. Slowly and gently transfer the cassette to above the 1 in. foam sheet, and gently lower the cassette to the ground. 6. Remove the skid and the remains of the vacuum-sealed bag. 7. Clean the area of any spills, using rags or other absorbent material. Clean and dry the floor to prevent slip hazards. 8. Disengage the hoist and slings. Remove the two hoist rings attached to the bottom side of cassette (the side that will be placed on the ground).

A.3.6.8.2

UPRIGHTING CASSETTE

If a crane is being used, it must be located at an appropriate distance to prevent collision with the cassette during the uprighting, in case a kicking out occurs. Follow these steps: 1. Locate the crane on the side of the cassette where the cassette moves horizontally during the uprighting. 2. Place another 1 in. foam sheet to the side of the cassette where it will be placed on the ground. 3. Attach a two-point spreader bar to the lifting hoist. Attach the spreader bar to the two hoist rings on the upper side of the cassette using two slings.

Ensure that the surrounding area is clear of people. 4. Slowly lifting the cassette off the ground. The cassette will tilt as it is lifted. The lifting device must be free to move laterally to remain over the cassettes center of gravity.

ZeeWeed 500D - Installation & Testing A-38

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

5. At all times, keep the hoist in vertical alignment with the lifting points on the cassette. Failure to do so could result in the cassette kicking out. Do not attempt to stop the cassette if it kicks out. 6. If a crane is being used, a signaling person, standing at a safe distance, should signal the crane operator. Appropriate signaling/communication means are required. 7. Lift the cassette until it pivots onto its side, then lower it until it rests fully on the foam in its vertical position. 8. After lowering the cassette to the vertical position, remove the slings and lifting hoist rings.

Figure A.3.13 - Uprighting a Cassette

A.3.6.9

INSTALLING CASSETTE ARMS


The cassette arms, which allow the cassette to be moved using the lifting frame, are installed after the uprighting procedure. Refer to the applicable fabrication drawings that are provided for details on this assembly.

A torque of 104 ft-lb for 3/4 in. Nord-Locks is needed.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-39

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Figure A.3.14 - Cassette Arms

There are regular and mirror image versions of the arms. Ensure that the correct arm is installed on the correct side of the cassette. Note the position of the open end of the hanger arms and the position of the small tab at the bottom. Also note that the hanger arms on the diagonal from each other are identical and hanger arms adjacent to each other are opposite in orientation (top slots are on different sides of center).

Figure A.3.15 - Installed Cassette Arms with Lifting Bracket

ZeeWeed 500D - Installation & Testing A-40

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.6.10

REMOVING THE PLASTIC WRAPPING


Cassettes are shipped with plastic wrap around the fibers. It must be removed carefully so that the membrane fibers are not cut. To remove the plastic, cut the wrapping close to the corner beam. To avoid contamination of the stainless steel frame (leading to corrosion), do not come in contact with the cassette frame while cutting. Discard the wrapping following its removal.

Be sure to cut along the corner beam to prevent fibers from being damaged. Do not cut plastic wrapper along the membrane area.

Figure A.3.16 - Cutting the Wrapper

A.3.6.11

REMOVING THE PROTECTIVE FOAM


Cassettes are shipped with protective foam placed against the 2 in. vertical permeate down pipes, on the back side of the cassette. This foam is used to prevent fibers from rubbing on the pipes during shipping.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-41

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Before removing the foam, visually inspect the cassette for any tangled fibers or fibers stuck to the foam. Pull the foam out from within the cassette carefully and slowly.

Figure A.3.17 - Removing the Protective Foam

To prevent damage to the membranes, use extreme caution when pulling the protective foam out of the cassette.

A.3.6.12

INSPECTING THE ZEEWEED 500D CASSETTE INSPECTION 2


The second inspection consists of the following: Before installing the cassette into the membrane tank, inspect the cassette for loose or missing nuts and bolts. Refer to 500D Torque Specifications found on the General Arrangement Drawings. Inspect the cassette frame welds for rust spots. Verify that the module keys are in the locked position (vertical).

ZeeWeed 500D - Installation & Testing A-42

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Record the serial numbers of each membrane module on the membrane map. When placed into the membrane tank, record the location in the tank where the membrane is placed. Ensure that the top and bottom expander blocks are tight and fully engaged and flush with the bottom surface of the key side outer assembly.

Figure A.3.18 - Tighten Expander Blocks

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-43

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.3.6.13

ASSEMBLING AERATION PIPING


Some parts of the cassette aeration spool may be assembled together before the cassette is installed. These sub-assemblies are then assembled together after the cassette is installed in the tank. For the specific parts that can be assembled together, look in the spool drawings for the specific project. Preassembling reduces the cassette installation time and reduces the amount of work that will have to be done on the cassettes after they are installed.

Figure A.3.19 - Aeration Piping

A.3.7

PREVENTING DEBRIS CONTAMINATION


It is critical to ensure that no debris capable of damaging the membranes enters the membrane tank at any time. Damaged incurred by debris is not covered by the membrane warranty. Possible contamination pathways include: Feed water laden with debris. Debris being blown or falling into the tank during construction, maintenance, or repairs over the membranes. Residue from piping or process equipment.
Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-44

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A clean membrane tank needs to be protected from contamination by debris, especially debris larger than 1.6 mm (1/16 in.). If debris is allowed to enter the tank, irreversible damage to the membranes can occur. Examples of common materials that cause damage include (but are not limited to): Cable ties Plastic turnings from drilling Pieces of wire Broken measuring tapes Weld slag and metal debris from grinding Twigs Leaves Shells Fish Sand

To prevent construction debris from entering the tank after membrane installation, cover cleaned tanks with a continuous plastic barrier protected by plywood sheets. General good housekeeping practices are recommended.

A.3.8

INSTALLING CASSETTES IN THE MEMBRANE TANK


After the cassette has been fully inspected, the cassette can be installed in the membrane tank.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-45

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

There must be enough potable water in the membrane tank such that no fibers will be exposed to air once the cassette is installed. The lifting arm is moved using the crane to the overtop of the cassette. The pins at its four corners slide into the hanger arm slotted hole facing the inside of the cassette. Once the pins are through the slotted holes, a hitch pin must be passed through the lifting bracket pins to secure the lifting bracket to the cassette.

Figure A.3.20 - Lifting Bracket

Using the hoist and lifting bracket, carefully lift the cassette and install it onto the leveling pins inside the membrane tank. The outside slotted holes on the hanger arms slide onto the leveling pins in the tank.

During lifting, the cassette is to be guided by the cassette stainless steel supports only. Never touch the membranes.

ZeeWeed 500D - Installation & Testing A-46

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.8.1

INSTALLING PERMEATE AND AIR CONNECTIONS


With the membranes in the tank, the permeate and aeration connections must be completed.

Figure A.3.21 - Permeate and Air Connections

Do not allow any glue or solvent to fall onto the fibers or cassette as irreversible damage may result. Protect fibers and PVC piping from spills.

A.3.8.2

CONNECTING PERMEATE PIPING


The permeate piping is connected by installing a coupling that will join the cassette to the rest of the permeate header. The coupling is either 4 in. or 8 in. depending on the application. Also depending on the application, the permeate header may come through the tank wall and straight to the cassette header (Figure A.3.21 - Permeate and Air Connections) or it may be located above the cassettes and have to be piped down from the top of the tank to the cassette header (Figure A.3.22 - Cassette Header). Either way, the following steps should be taken in order to minimize the installation time and reduce the amount of work done after membranes are installed in the tank:

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-47

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

1. Just before dropping the cassette onto the leveling pins, mount the coupling to the cassette header and the pipe spool that connects to the other side of the coupling. 2. Tighten the coupling so that it can support the weight of the spool piece. 3. Lower cassette onto the leveling pins. 4. Install remaining spool pieces and couplings to connect to main permeate header. Remove the lifting bracket if it gets in the way of the work.

While installing the remaining couplings and spool pieces after the cassette is in the tank, make sure that the membrane modules are not stepped on. Only step on the cassette header and frame.

Figure A.3.22 - Cassette Header

For systems where the permeate header is installed through the wall of the tank and is aligned with the cassette header, place the coupling on the section of the permeate header sticking through the tank wall. Lower the cassette onto the leveling pins, slide the coupling so that it catches both pipes, and tighten.

ZeeWeed 500D - Installation & Testing A-48

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.8.3

CONNECTING AIR PIPING


Each cassette is provided with two 3 in. air connections. Each of these air connections provides air to half of the aerators at the bottom of the cassette. Depending on the design of the system, these two air connections can either: connect together with a 4 in. tee at the cassette and then a 4 in. connection is made to the header, or; run independently as two 3 in. spools; each spool connecting to separate aeration headers.

The single 4 in. tee version is for installations with cyclic aeration (whole cassette on-off air cycling). The twin 3 in. connection version is for installations with sequential aeration (air is cycled first to half the aerators on a cassette - and then the other half). If there is any uncertainty as to which design is to be used, refer to the P&IDs. Follow these steps: 1. Lower the cassette onto the leveling pins and remove the lifting bracket, if necessary, to make room to work. 2. Install the permeate piping completely. See Figure A.3.19 Aeration Piping. 3. Install the aeration hose connection to the main aeration header. 4. Connect the other end of the hose to the already installed (see A.3.6.7 Installing Union to Cassettes Main Aeration Pipes) fitting on the cassette main aeration pipes.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-49

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Always connect the air hose to the main aeration header first and then connect the other end to the cassette PVC aeration pipes. This avoids stressing the PVC parts on the cassette.

Figure A.3.23 - Air Connections

A.3.9

AFTER CASSETTE INSTALLATION


The following procedures must be completed after all cassettes have been installed in the membrane tanks.

ZeeWeed 500D - Installation & Testing A-50

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.9.1

FLUSHING
All ZeeWeed membrane modules and cassettes are shipped in a glycerin solution with a pH of 3.5 to 4.5 to prevent the membranes from drying. This glycerin solution has a high biochemical oxygen demand (BOD) and is not suitable for discharge to surface water or as drinking water. The contractor is responsible for supplying available disposal capacity for spent water, including disposal of wastewater following flushing of glycerin after membrane installation (pH range of 2 to 11).

The downstream tank for permeate must not be contaminated with glycerin.

A.3.9.1.1

PURGING GLYCERIN FROM MEMBRANES


Complete the following steps: 1. Install the membranes in the membrane tank filled with feed water. 2. Run the system so that the membranes are permeating at 40 LMH (23.6 GFD). Recycle the permeate from the permeate pump discharge to the membrane tank for 60 minutes. 3. Drain the membrane tank contents to a drain and pump to headworks of the plant. 4. Refill the membrane tank with feed water. 5. As in step 2, run the system so that the membranes are permeating at 40 LMH (23.6 GFD). Recycle the permeate from the permeate pump discharge to the membrane tank for 30 minutes. 6. Drain the tank contents to a drain or a tanker.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-51

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

7. Repeat steps 4, 5, and 6 twice. Measure the organic contents of the final tank drain to verify that TOC is less than 3 mg/L above the background level, or that the COD is less than 10 mg/L above the background level.

If there are multiple trains, the glycerin flushing water can be reused. GE W&PT will provide calculations to determine the volume of water required.

A.3.9.2

CHECKING AERATION
The cassettes must be installed before starting an aeration check. To verify proper aeration to the membranes, complete the following steps: 1. Start the blower and ensure that air is being supplied to the membrane cassettes. 2. If the installation procedure is carried out correctly, the aeration diffuser system should be totally horizontal, providing even distribution of air over the membranes. After install the cassettes, visually verify that the air distribution is even.

Air must be evenly distributed within the cassette. 3. Observe the bubble pattern on the surface of the tank. The surface should bubble evenly above the membrane cassette. If any uneven aeration is observed, the system must be stopped and the cause isolated. If the airflow is uneven, it can be corrected by adjusting the level of the cassette using the levelling bolts. This is critical and will be supervised by a GE W&PT FSR. 4. Check the air pipe connections for leakage. If any leaks are found, fix the piping immediately to ensure that the membrane cassettes are receiving sufficient aeration.

ZeeWeed 500D - Installation & Testing A-52

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

5. With the aeration on, observe the airflow pattern in the various membrane tanks. Determine if the difference in membrane tank level while backpulsing has an effect on the airflow pattern. 6. Observe the aeration pattern within the individual cassettes during the 10-second cycle to determine whether all of the modules are receiving equal airflow. 7. Turn aeration on in one membrane tank and off in another tank. Ensure there is no aeration in the membrane tank that is off.

A.3.9.3

TESTING PERFORMANCE
The customer is responsible for ensuring a supply of raw water and a receiving body for the treated water for commissioning and performance testing of the equipment. The customer is responsible for the provision of necessary analytical tests for treated water quality, as per project specifications.

A.3.9.4

BUBBLE TEST
A bubble test is used to locate leaks in the membranes and should be completed for each cassette in the subsystem. To complete a bubble test, perform the following steps:

TIP: If possible, remove the cassette from the membrane tank and test in a separate tank.

1. Reduce the water level in the membrane tank to a point below the permeate connection, so that no water can get into the cassette after the connection is removed. The membranes must be completely submerged.

Before making any connections, ensure that the membrane safety hand valve and the pressure regulating valve are closed. 2. Connect the PDT kit adapters to the permeate connection(s) on the cassette.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-53

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

3. Connect the 1/4 in. tubing from the adapter to the permeate air connection, and then connect the 1/4 in. tubing from the compressed air source. 4. Slowly open the pressure regulating valve to empty liquid from the permeate side of the membrane into the membrane tank. 5. Set the applied air pressure to just over half of the required pressure. 6. Wait 5 minutes to ensure the air has purged the water, and then increase the air pressure to just under the required pressure. 7. Examine the membranes for escaping bubbles (indicating a leak). 8. If a leak is found, analyze the bubble stream as described in A.3.9.4.1 Bubble Types. Based on the type of bubble stream found, the module can be repaired using the procedures outlined later in this manual. In cases where few leaks are present in a given module, and none of the leaks are serious, the repairs should be made on site. If a module requires difficult or numerous repairs, contact GE W&PT for further information.

A.3.9.4.1

BUBBLE TYPES
The size and type of bubbles released by a leak during a bubble test indicate the type of leak. Bubbles are classified according to four types, as shown in Figure A.3.24 - Bubble Sizes. TYPE 1: A Type 1 bubble stream appears as a steady flow of large bubbles, typically 10 mm (3/8 in.) in diameter or greater. Type 1 streams are usually released by a broken membrane fiber. However, if the stream appears to come from one of the permeate headers, it may also be caused by an improperly installed O-ring.

ZeeWeed 500D - Installation & Testing A-54

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

TYPE 2: A Type 2 bubble stream is characterized by a steady flow of moderate sized bubbles (between 1 - 10 mm (1/32 - 3/8 in.)). This form of leak is typically minor and often caused by damaged fibers or pin holes in the membrane. Type 2 leaks may not always require repair. Any larger leaks found during the bubble test should be repaired first, after which a second test will determine whether Additional repairs for Type 2 leaks are necessary to bring performance up to specified levels. TYPE 3: A Type 3 bubble stream appears as an intermittent stream of small bubbles (less than 1 mm (1/32 in.)). This type of stream is typically due to air passing through unwetted pores. Unwetted pores allow passage of air but not water, and do not need to be repaired. TYPE 4: Type 4 bubbles gather at the top of the cassette and release when the bubble is sufficiently large. This type of bubble is usually formed by accumulated Type 2 or Type 3 bubbles.

Figure A.3.24 - Bubble Sizes

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-55

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.3.10

MEMBRANE INSPECTION/REPLACEMENT
This procedure is required if the membranes are being replaced, inspected as part of routine maintenance, or being removed from the tank. GE W&PT recommends that direct supervision of GE personnel be arranged whenever the membranes are removed from the tanks. If there is a build up of solids on the membranes, read A.3.10.1 Heavy Cassette Lifting before lifting the cassette from the membrane tank.

Once membrane inspection or replacement has begun, it must be completed promptly. It is vital that the membranes DO NOT DRY OUT OR FREEZE before completing this procedure. To remove a cassette from the membrane tank: 1. Lower the liquid level in the membrane tank to just below the connections. Carry out a general shutdown of the whole system. Isolate the cassettes using the manual valves at the permeate and air headers.

Individual membrane modules cannot be isolated from the rest of a membrane cassette. 2. Disconnect the YN couplings from the cassette: 1 coupling for permeate and 2 couplings for air per cassette. 3. Attach the lifting bracket to the cassette. 4. Attach a chain or lifting strap to the steel lifting harness on the cassette. 5. Use a manual hoist and monorail (boom truck or crane) to carefully lift the cassette until the strap is tight. Continue to lift the membrane cassette out of the frame with the crane, taking care not to trap the flexible piping or damage the membranes, especially if any sharp edges are exposed in the area.

ZeeWeed 500D - Installation & Testing A-56

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

6. Remove the cassette to a safe, preferably level, location and transplant the necessary items to the new membranes (if applicable; no transplantation is necessary when inspecting the membranes). If new membranes are being installed, the customer will ensure that the delivery is correct and will assist in checking the integrity of the supplied membranes. 7. When inspecting the membranes, check for any apparent damage to the modules or fibers, and for items that are clearly different from module to module. Look for any loose hardware or fasteners. Ensure that none of the membrane fibers are broken. Check the top and bottom permeate headers and piping for any apparent damage or cracking. 8. When replacing a membrane cassette or installing new membranes, disassemble the cassette in reverse order of assembly. Contact GE W&PT before disassembling a cassette. Contact the Service Department at (905) 465-3030 for additional technical assistance if any problems are observed. GE W&PT maintains an inventory of membranes at all times. Generally, if membrane modules are being replaced, they can be shipped on short notice.

A.3.10.1

HEAVY CASSETTE LIFTING


ZeeWeed cassettes that have been operated for extended periods of time may accumulate debris, which will add weight to the cassette. The extent of debris buildup over time will depend on the nature of the waste stream, the effectiveness of the wastewater prescreening step, and other factors. If heavily weighted cassettes are completely removed from the tank for inspection and cleaning, this could result in the cassette frame and cassette lifting mechanism being subjected to excessive loadings. In some cases, the resulting load may encroach on the design safety factor of the cassette frame and lifting mechanism, as well as the cassette support beam and grating in the location where the cassette is set down.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-57

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Improper handling of overweight cassettes may result in injury or property loss. If by direct measurement with a weigh scale or by other means, it is suspected the cassettes are overweight, or if for safety reasons, it is assumed the cassettes are overloaded every time the cassettes are removed, the following procedure will assist in removing the debris from the cassettes before they are removed from the tank: 1. Isolate the cassettes from permeation and aerate them for 12 to 24 hours. The cassettes can be isolated via the local hand valves or by disabling the train from the HMI. Aerating without permeation has proven effective in removing built up debris from the cassette and will reduce or eliminate the overweight condition. 2. Turn off the aeration and lift the cassette partially out of the tank. Flush the exposed section with clean water (process effluent is sufficient). Lift the cassette approximately 50 cm 75 cm (20 in. 30 in.) at a time and repeat the process. By lifting the cassette in steps, the submerged sections will be partially supported by the wastewater and will reduce the lifting loads. For a deep tank application, where this process is not practical, wash off the debris prior to lifting the cassette above the grating. 3. Do not complete any lift with staff directly under or in the immediate vicinity of the cassette. The normal safe operating practice of using guide ropes should always be used for controlling the lift. Any direct staff contact with the cassette should be minimized.

For optimal performance and long life of the equipment, all areas must be kept clean. Remove any chemical spills immediately and wipe down the maintenance equipment frequently.

ZeeWeed 500D - Installation & Testing A-58

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.3.11

RETURNING DAMAGED MEMBRANES


If the membrane is being returned to GE Water & Process Technologies, it is imperative that it be properly cleaned, preserved, and that a Returned Goods Authorization (RGA) number be obtained prior to shipping it. Contact GE Water & Process Technologies technical services for information on the RGA procedure.

A.3.12

SYSTEM SHUTDOWN AND MEMBRANE PRESERVATION


When membranes have been installed in a tank, they need to be kept wet at all times. When the protective glycerin solution is removed during soaking in water, the membranes become especially susceptible to drying. For storage periods of up to approximately 15 days, simple immersion of the cassettes in water containing sodium hypochlorite (NaOCl) with a maximum residual concentration of 3 mg/L. Residual chlorine levels should be monitored every week and repeat testing is required if the chlorine level drops to less than 0.2 mg/L. Recovery cleaning of the membrane prior to storage is strongly recommended.

An isolated cassette must be cleaned before it is returned to service. If a cassette is isolated for less than a week, perform a Maintenance Clean with sodium hypochlorite. If a cassette is isolated for longer than a week, perform a Recovery Clean with sodium hypochlorite. For information on Maintenance and Recovery Cleans, refer to A.5 Preventive Maintenance.

A.3.12.1

SHORT TERM SHUTDOWN


The system is always expected to operate in On, with all components in Auto. Do not leave the system unattended, if any component without an online spare is not in Auto.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-59

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

System shutdown procedures include the following steps: 1. Chemical clean the system component(s) to be shutdown. 2. Switch the train(s) to OFF. 3. Shutdown the plant. Before the system is returned to service, it must be cleaned. The period of time that the system has been shutdown will dictate the type of cleaning required; short shutdown periods (less than a week) require a less vigorous cleaning then shutdown periods lasting longer than a week. Alternatively, for long-term storage, the components can be removed from the system and preserved in glycerine.

A.3.12.2

LONG TERM MEMBRANE SHUTDOWN


Following are the steps by the operator: 1. Perform a Recovery Clean. For Recovery Clean instructions, refer to A.5 - Preventive Maintenance. 2. Ensure that the membranes are free of solids. 3. Prepare a solution of 50 wt% glycerin.

The preservative solution is extremely slippery on surfaces and extreme care should be exercised when handling the solution. To minimize the risk of staff injury from slipping, clean up spills immediately.

ZeeWeed 500D - Installation & Testing A-60

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

The following is an example calculation for preparing 1000 liters of the preservative solution. The specific gravity of 100% glycerine is 1.26. For 1000 liters of preservative solution: Add 396 liters of 100% glycerine. Fill the tank to the 1000 liter mark. (Approximately 600 liters). 4. Use one of the following procedures to impregnate the modules: Option I for ZeeWeed 500D: a. ZeeWeed 500D modules in a horizontal tank: i. Soak the module in the above solution and apply 0.34 bar vacuum (0.66 bar absolute) for 30 minutes.

ii. Take the module out of the solution and place it on the floor for 30 minutes to allow excess solution to drain off. iii. Bag and seal the module immediately as described in step 5. b. Single module vertical in stand: i. Plug the bottom permeate port and pour 3 liters (0.8 gallons) of mixture prepared in Step 3 into the top port.

ii. Bag and seal the module immediately, as described in step 5. Option II for ZeeWeed 500D: a. ZeeWeed 500D cassettes: i. With the cassette immersed in water, ensure that the lumen is full of water by operating under vacuum (permeation).

ii. Close permeate isolation valves and then remove cassette from water. Do not allow air to enter the permeate side of the module.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-61

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

iii. Connect a reservoir of preservative solution (as prepared in Step 3) to the permeate piping and keep the reservoir at least 60 cm (24) above the top of the cassette. iv. Open the permeate isolation valves; the level in the reservoir should fall as the holdup water volume reverse permeates and preservative enters the module. v. Continue reverse permeation until a volume of preservative equivalent to 3 liters (0.8 gal) is reverse permeated through each module in the cassette (a 64 module cassette requires 192 liters (51 gal) of preservative solution). 5. Bag the module using a 0.15 mm (6 mil) thick plastic bag. These bags are available from GE W&PT. Seal the membranes in the plastic bag, using either a hand held sealer or tape, so that they will remain preserved and will not dry out. For the tape seal, remove as much air as possible from the bag. Seal most of the membrane bag with tape, then remove the excess air with a shop vacuum. 6. Store in a cool, dry area, out of the direct sunlight and protected from accidental contact that could damage the module or bag. It is recommended that the membranes be double bagged or enclosed in suitable cardboard cartons. The membranes are now properly preserved, and the system can be shut down. To shut down the ZeeWeed system: 1. Set the system to Off. 2. Set all equipment to Off. 3. Close all automatic valves. The ZeeWeed train is now shut down.

ZeeWeed 500D - Installation & Testing A-62

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

4. To allow drainage, open the appropriate lines on the permeate pumps and associated piping runs. The permeate header and all dedicated pipelines to the out-of-service train should be drained, flushed, and dried. 5. Close the isolation valves on the permeate header. 6. Leave the cassette isolation valves on the air headers open, and the header outlets capped with camlock caps. 7. Remove and store the membrane tank level transmitter from the membrane tank. 8. Follow the normal maintenance schedule for all equipment, specifically all pumps and blowers. Contact the Service Department at (905) 465-3030 for any additional technical assistance with the handling and storage of the membranes.

Rev. 0 June, 2010

ZeeWeed 500D - Installation & Testing A-63

This page has been intentionally left blank

A.4

MEMBRANE CARE

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.4.1

INTRODUCTION
This section describes various aspects of membrane care that may arise during operations including: Causes and prevention of ZeeWeed fouling Fiber shrinkage and slack Module removal from a cassette Module insertion into a cassette Fiber repair

If any of the problems discussed in this section persist or other difficulties arise, the operator should contact GE Water & Process Technologies. Complete operating logsheets are necessary to determine the source of the problem.

A.4.2

MEMBRANE FOULING
The following section provides information regarding membrane fouling, types of foulants, and the processes used to remove them.

A.4.2.1

PROBLEMS ASSOCIATED WITH MEMBRANE FOULING


Membrane fouling causes increased operational TMP, increased energy costs, and reduced membrane life. Foulants create an increased resistance to permeation, requiring more vacuum (or operational TMP) to treat similar quantities of water. When TMP increases, the process pump requires more energy to draw the increased vacuum to meet the flow setpoint.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-67

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Membrane fouling reduces the life of a membrane.

A.4.2.2

FOULING AND FOULANTS


Fouling is defined as the accumulation of unwanted deposits on a membrane surface. These deposits reduce the effective membrane surface area, thus reducing the flow of purified water. Foulants are materials that accumulate on the surface of a membrane and decrease membrane performance. Foulants are divided into the following four groups: Biological Precipitative Adsorptive Solids Formation

BIOLOGICAL FOULING: Aerobic and anaerobic living materials, such as bacteria, fungus, and algae, are classified as biological foulants. These organisms colonize on the surface of the membrane, which can block the flow through the membrane surface. PRECIPITATIVE FOULING: Precipitative fouling usually occurs in the form of scale. Scale forms when the compounds in the feed water are concentrated beyond their solubility. Common precipitative foulants include calcium carbonate and magnesium sulfate. Inorganic foulants form a hard scale on the membrane surface, hindering membrane performance. Scale can be caused by high pH levels and extremely hard feed water. This type of fouling is not common in ZeeWeed systems because filtration does not remove dissolved ions from the water. ADSORPTIVE FOULING: Compounds that stick to the surface of the membrane, such as oil, polymers, cationic surfactants, and hydrocarbons, are classified as adsorptive foulants.

ZeeWeed 500D - Membrane Care A-68

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

SOLIDS FORMATION: In applications with high solid levels in the feed water, it is possible to accumulate solids between the membrane fibers. The accumulation of material between the membrane fibers can create the following conditions: Increased membrane resistance to permeation (causing increased TMP), Permanent physical membrane damage.

Figure A.4.1 - Solids Accumulation Between Fibers

Adequate aeration and proper prescreening can prevent membrane solids formation.

A.4.2.3

FOULING TREATMENT
Different strategies are required to treat the four types of fouling. BIOLOGICAL FOULING TREATMENT: Experience has shown that antimicrobial agents and biocides are effective in preventing and reversing biological fouling. Since established biological growth is much more difficult and time-consuming to remove than recent biological growth, GE W&PT prescribes frequent cleanings with low doses of sodium hypochlorite (bleach) to kill biological foulants. These low-strength doses are preferable to the infrequent, high strength cleanings required when biological growth becomes established.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-69

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

PRECIPITATIVE FOULING TREATMENT: Membranes fouled with precipitative scale are cleaned using an acidic cleaner, such as citric acid. It is preferable to avoid precipitative fouling by reducing the concentration of potential fouling compounds. Feed water can be pretreated by lime softening and pH adjustment to remove scale-forming compounds in the influent stream. Concentrations of hydroxide and carbonate ions can be reduced by adding acid. ADSORPTIVE FOULING TREATMENT: Since adsorptive fouling is extremely difficult to reverse, it is critical to avoid exposure to oils, polymers, and hydrocarbons. If considering polymers or surfactants, check with GE W&PT. MEMBRANE SOLIDS FORMATION: Proper aeration is effective in preventing membrane solids formation. It is imperative to inspect the aeration pattern on a routine basis.

A.4.2.4

FOULING PREVENTION
The three most common methods of preventing fouling in a ZeeWeed subsystem are to perform a backpulse, a maintenance clean, and a recovery clean. Depending on the type of fouling, maintenance cleans and recovery cleans are performed with either a sodium hypochlorite or citric acid solution, used to remove organic and inorganic foulants, respectively. Refer to A.5 - Preventive Maintenance for more information regarding cleaning frequency and procedures.

A.4.2.4.1

PRESCREENING
Improper prescreening leads to difficulties in membrane cleaning and potential damage to the membranes. Proper prescreening helps eliminate the build-up of trash, hair, lint, and other fibrous materials, and decreases the risk of solids accumulation. When screening is required for the ZeeWeed system, a 2 mm or 1/16 punch hole traveling band screen is appropriate.

ZeeWeed 500D - Membrane Care A-70

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.4.3

FIBER SHRINKAGE AND SLACK


ZeeWeed 500D modules consist of hollow fibers supported between two headers maintained at a product specific fixed distance from each other. The fiber length on a module relative to the overall distance between the two headers is marginally larger, which results in fibers that can move to a limited degree. ZeeWeed 500D modules are manufactured with inherent fiber slack designed to optimize membrane air scouring during operation as well as accommodate typical changes. A module with taut fibers may not perform well because the random motion of the fibers during aeration is critical to the filtration efficiency of ZeeWeed membranes. If the fibers shrink during operation, the predetermined slack will disappear and the fibers will become taut affecting membrane performance. Fiber slack changes for a specific plant and application, and is a function of operating temperature, chlorine concentration, and time. Significant changes in fiber slack are generally observed when a module is operated extensively at temperatures of >25C (77F) or in the presence of certain solvents sometimes found in industrial wastewater applications. Shrinkage is a physical change that can be expected to be observed in any product composed of synthetic polymers. The slack of the fibers within respective ZeeWeed 500D products is a measurable property and adjustments can be made as required. The exact rate of fiber shrinkage is difficult to predict due to variability in site specific parameters; however, the shrinkage rate increases with temperature. For example, a plant operating at 35C (95F) will typically exhibit more fiber shrinkage than a plant operating at 30C (86F) over the same period of time. Plants operating at temperatures below 25C (77F) are not expected to exhibit significant fiber shrinkage and the need for slack adjustment is unlikely. For the reasons listed above, it is important for plant operations staff to monitor their ZeeWeed product slack, even those sites operating below 25C (77F), to ensure optimum performance from their membranes. If an insufficient fiber slack problem is observed, it is strongly recommended that it be remedied in a timely manner.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-71

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

If ZeeWeed 500D membrane modules are permitted to operate with insufficient slack for an extended period of time, irreversible damage may occur to the modules. Refer to Table A.4.1 - Recommended Inspection Intervals and inspect based on the plants operating temperature. The visual inspections should be repeated regularly on the same cassette over a period of time. The visual inspection and clear pictures of the broad side of the cassette can alert the operator. Comparative pictures for adequate fiber slack adjustment on ZeeWeed 500D products are shown in Figure A.4.2 Correct Slack for ZeeWeed 500D through Figure A.4.3 - Incorrect Slack for ZeeWeed 500D. It is recommended that plant operators, who suspect slack adjustment is required, forward the pictures and any observations to GE W&PTs Business Service Department for review and examination to determine if there is any need for further action. All ZeeWeed 500D products are able to have fiber slack adjusted in the field, either by the operators following detailed instructions or by GE W&PT Field Service staff as part of a Membrane Service Agreement (MSA), Service Audit (SA), or other arranged onsite support visit.
Table A.4.1 - Recommended Inspection Intervals Maximum Operating Temperature
0 - 24C (32 - 76F) 25 - 30C (77 - 86F) >30C (> 86F)

Recommended Monitoring Inspection Frequency


Every 2 Years Once Per Year Twice Per Year

ZeeWeed 500D - Membrane Care A-72

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

It is strongly emphasized that a plants failure to identify and promptly address concerns with insufficient fiber slack may impact the overall usable life of the installed membrane modules and cassettes. In some extreme cases, inaction may contribute to premature module failures. This is not a warrantable product failure.

Figure A.4.2 - Correct Slack for ZeeWeed 500D

Figure A.4.3 - Incorrect Slack for ZeeWeed 500D

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-73

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4.3.1

SLACK ADJUSTMENT
Every effort has been made by GE Water and Process Technologies to provide current information while preparing this procedure. GE maintains that depictions of methods and/or techniques and use of specific tools and/or apparatus shown within the situations portrayed are accurate at the time of printing. GE accepts no liability for any reliance placed on the information contained herein.

A.4.3.1.1

MANPOWER REQUIREMENT
The slack adjustment procedure requires the use of 2 people at all times to prevent damage to the modules and cassette. Prior to removing the cassette from the tank, don protective clothing, face mask, gloves and boots. Using a high flow, low pressure water supply, hose down the cassette thoroughly during its removal to remove solids. This procedure will require the cassette to be out of the process tank for an extended period of time. The membranes must be sprayed with water every 30 minutes in order for them to stay moist. Local weather condition may demand more frequent spraying.

Be careful when removing a cassette caked with solids as the cassette will be heavier. When removing cassettes, ensure that they are level and inspect the aerator plates/tubes. Before beginning work, verify the rated capacity of lifting brackets, cranes, and the cassette lifting frame. As the cassette is removed from the water, use a weight scale to ensure that components under load are within their design capacity. To reduce the amount of solids on the cassette before lifting, aerate the cassette without permeation. Use a garden hose to dislodge the solids from the cassettes as they are being removed from the tank. Remember to spray the garden hose as gently as possible to avoid permanent damage to the fibers.

ZeeWeed 500D - Membrane Care A-74

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

To ensure that the water pressure in the hose is not excessive, test that the stream does not extend more than 3 ft when the hose is held at a height of 3 ft (as demonstrated in Figure A.4.4 - Water Pressure Test). If the stream contacts the ground within 3 ft of the hose, the pressure is suitable for spraying the membranes.

Figure A.4.4 - Water Pressure Test

A thorough clean and soak of the cassettes may be required prior to lifting them from the membrane tank.

A.4.3.1.2

TOOLS/PARTS REQUIRED
Large Flat Head Screw Driver (SS or Plated) Small Flat Head Screw Driver (SS or Plated) Torque Wrench: 25-250 Inch lbs. or 3.6-29 Nm 3/8 in. or 1/2 in. Ratchet (same size as torque wrench) 17mm socket 17mm open wrench Rubber Mallet Pry Bar (Stainless Steel or Plated) Coarse File Qty 28 Nordlocks M10 (Replacement)

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-75

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

White Knight Food Grade Anti-Seize Module Removal Tool Full Face Mask Protective clothing including boots and gloves 5mm Allen Key Socket 13/32 in. drill bit Drill Qty 6 - M10 x 250 mm Jack Bolts

A.4.3.1.3

DEFINITIONS AND NOTES


During a slack adjustment procedure, remember the following information: The front of the cassette is defined as follows: when facing the front of the cassette, the 3 in. Aeration pipes are located on the left side of the cassette Apply food grade anti-seize to all bolts (for example: White Knight Anti-Seize) Replace all Nordlocks with new Ensure the use of stainless steel or plated tools only Review the latest ZeeWeed 500D Module Inspection Checklist for items to be inspected while cassette/modules are out of the water.

The ZeeWeed 500D Cassette has four adjustable positions: 1. Position #1: Standard from the Manufacturing Assembly Plant 2. Position #2 Adjustment raises the modules 8mm from position #1

ZeeWeed 500D - Membrane Care A-76

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3. Position #3 Adjustment raises the modules 16mm from position #1 4. Position #4 Adjustment raises the modules 24mm from position #1 (See Figure A.4.5 - Center Beam)

Figure A.4.5 - Center Beam

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-77

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4.3.1.4

SLACK ADJUSTMENT PROCEDURE - PRELIMINARY STEPS


1. With a 5 mm allen key or a hex wrench, loosen all top and bottom key side outer support expanders (see Figure A.4.6 - Loosen Support Expanders). Use care not to gall hardware. Use caution that no contact is made with the fibers

Figure A.4.6 - Loosen Support Expanders

2. Unlock the module key (top and bottom) prior to continuing with this procedure. The module is in the unlocked position when the lock is horizontal (see Figure A.4.7 - Locked and Unlocked Module). Do not force the lock into position.

Figure A.4.7 - Locked and Unlocked Module

ZeeWeed 500D - Membrane Care A-78

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3. Remove the aeration tubes by carefully sliding them out of the bottom front of the cassette (see Figure A.4.8 - Remove the Aeration Tubes).

Be aware that tubes must be placed back into their original position in the cassette.

Figure A.4.8 - Remove the Aeration Tubes

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-79

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4.3.1.5

ADJUSTMENT FOR THE FRONT/BACK BEAMS


1. On the front side only (top and bottom), slide all of the modules out of the cassette, approximately 2-3 in. from the permeate manifolds (see Figure A.4.9 - Module Slid Out of Cassette).

Figure A.4.9 - Module Slid Out of Cassette

ZeeWeed 500D - Membrane Care A-80

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

2. To gain access to the front bottom beam bolts, remove modules from the following positions within the cassette - # 2, # 9, # 16, # 23, (left to right) (see Figure A.4.10 - Modules Removed From These Positions).

Figure A.4.10 - Modules Removed From These Positions

3. Remove the bolts from positions # 9, # 16, and # 23. Loosen but do not remove the bolt in position # 2. This bolt will keep the Front Bottom Adjustable Beam aligned with the holes (see Figure A.4.11 - Removing the Bolts).

Figure A.4.11 - Removing the Bolts

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-81

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

4. Pry the end of the Front Adjustable Bottom Beam where the bolts have been removed (see Figure A.4.12 - Front Adjustable Bottom Beam).

Use stainless steel or plated tools only.

Figure A.4.12 - Front Adjustable Bottom Beam

5. To achieve acceptable slack, adjust the Front Adjustable Bottom Beam to the desired height (see Figure A.4.13 - Adjusting the Front Adjustable Bottom Beam). 6. Install one bolt in position # 23 (loose). Ensure bolts are installed properly; bolt threads towards the outside of the cassette.

ZeeWeed 500D - Membrane Care A-82

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

7. Remove bolt from position #2 and repeat steps 4 to 6.

Figure A.4.13 - Adjusting the Front Adjustable Bottom Beam

8. Install bolts in positions # 9 and # 16. If required, use a screwdriver to align the holes (see Figure A.4.14 - Align the Holes).

Figure A.4.14 - Align the Holes

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-83

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4.3.1.6

ADJUSTMENT FOR THE CENTER BEAM


1. Slide all the modules to the STOP position of the top Header (see Figure A.4.15 - Slide the Modules to the Stop Position).

Figure A.4.15 - Slide the Modules to the Stop Position

2. Tighten all 4 bolts as per drawing specification (247 inch pounds). Re-install the modules that had been removed (see Figure A.4.16 - Tighten the Bolts).

Do not slide any of the modules back into the permeate saddles. 3. Repeat the procedure for the back beam of the cassette.

ZeeWeed 500D - Membrane Care A-84

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Number the modules left to right.

Figure A.4.16 - Tighten the Bolts

4. Referencing Figure A.4.5 - Center Beam, remove one of the Slack Adjustment Clips from the bottom per position change (see Figure A.4.17 - Remove the Slack Adjustment Clip).

Figure A.4.17 - Remove the Slack Adjustment Clip

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-85

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

5. Install Qty 6 - M10 x 250 mm bolts into the existing threaded jacking bolt holes found on either end and center of the centre beam (see Figure A.4.18 - Insert Jacking Bolts). a. If required, file the adjacent saddle to allow insertion of the bolt at either end of the beam.

Figure A.4.18 - Insert Jacking Bolts

ZeeWeed 500D - Membrane Care A-86

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

b. If required, drill out in between the saddles to allow enough space for the centre jack bolt to be inserted (see Figure A.4.19 - Drill Out Saddle).

Figure A.4.19 - Drill Out Saddle

6. Before proceeding, use a low pressure hose to flush away any debris left from the filing or drilling of the saddles (see Figure A.4.20 - Flush Away Debris).

Figure A.4.20 - Flush Away Debris

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-87

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

7. Remove the bolts located at the middle of the centre beam. Note there is one bolt on either side of the beam (see Figure A.4.21 Remove Center Beam Bolts).
.

Figure A.4.21 - Remove Center Beam Bolts

8. Adjust the center beam by removing the bolts from each side of the centre beam at both ends of the beam - four bolts in total. Retain all hardware for replacement (see Figure A.4.22 - Adjust the Center Beam).
.

Figure A.4.22 - Adjust the Center Beam

ZeeWeed 500D - Membrane Care A-88

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

9. Use the jacking bolts to lift the centre beam to the desired height, referencing Figure A.4.5 - Center Beam. 10. Once all four bolts have been installed at the ends, align the appropriate middle bolt hole on each side of the middle of the centre beam (see Figure A.4.23 - Align the Middle Bolt Hole).

Figure A.4.23 - Align the Middle Bolt Hole

11. Install and tighten the six center beam bolts as per torque specification 247 inch lbs (see Figure A.4.24 - Torque the Bolts). 12. Reinstall modules and lock into position. Reinstall aeration tubes in their original positions.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-89

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

The installation of a 500D module must be completed with two people. The bottom module header must not swing freely when the top header is slid into place. If the bottom header is not controlled during installation, it can swing into the centre of the cassette and impact the bottom permeate collectors. Damage from this impact will result in the need for module replacement.

Figure A.4.24 - Torque the Bolts

ZeeWeed 500D - Membrane Care A-90

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

13. Tighten all top and bottom key side outer support expanders using a 5 mm Allen Key or a hex wrench. The expander is fully engaged when flush with the bottom surface of the key side outer assembly. Max tightening torque not to exceed 5.0 Nm (3.6 FT-LBS, 44 IN-LBS) (see Figure A.4.25 - Tighten Support Expanders).
.

Figure A.4.25 - Tighten Support Expanders

14. Indicate on the membrane map the date of the slack adjustment and the amount of slack adjusted. List the bolt positions used.

A.4.4

MODULE REMOVAL FROM A CASSETTE


Follow proper safety procedures to prevent injury when carrying out this procedure.

Completely read and understand this procedure before attempting to remove modules.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-91

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4.4.1

MANPOWER AND TIME REQUIREMENT


The removal of a single module should take a few minutes once the cassette is removed from the tank. Always use two people when extracting a cassette or module.

Figure A.4.26 - Module Removal Tool

A.4.4.1.1

TOOL PREPARATION - REMOVAL

The removal tool is orientated differently when removing from the top and bottom of the module. To adjust the pin location, remove the cotter pin, change the face position and reinsert the cotter pin.
Table A.4.2 - Pin Location and Function Pin Location
1 2 3 4

Function
Installation assistance - top header Future use Future use Removal, installation assistance - bottom header

ZeeWeed 500D - Membrane Care A-92

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

The module removal tool is supplied with a standard faceplate. Use a repair adaptor faceplate (optional) when removing/installing modules that have been repaired using the repair adapter (see Figure A.4.29 Faceplate).

Figure A.4.27 - Pin Removal From The Top

Figure A.4.28 - Pin Removal From The Bottom

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-93

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Figure A.4.29 - Faceplate

Figure A.4.30 - Standard and Repaired Header (Repair Adapter)

A.4.4.2

TOOL PREPARATION INSTALLATION

This tool should not be used on Drinking Water (DW) or Tertiary Treatment (TT) designated cassettes.

ZeeWeed 500D - Membrane Care A-94

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

In all instances, attempt to install the module by hand. Only use the tool for assistance, if required.

Figure A.4.31 - Installation Assistance From The Top

Figure A.4.32 - Installation Assistance From The Bottom

A.4.4.2.1

TOOLS REQUIRED
500D module removal tool

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-95

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Gloves

Figure A.4.33 - Prohibited Removal Tools

Do not use any other tools to remove or install the 500D module. Part # 1032836 replaces all previous versions of the 500D Removal Tool.

A.4.4.2.2

MODULE REMOVAL
1. Check that all retaining components of the cassette have been removed or slacked so the module is no longer restrained in the cassette. 2. Clamp the teeth of the Insert/Removal tool to the cavities on the membrane fiber side of the module header face.

ZeeWeed 500D - Membrane Care A-96

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3. If the cavities are filled with material clean them out so the Insert/ Removal tool will mate properly.

Figure A.4.34 - Attach the Removal Tool

4. Mate the Insert/Removal tool to the face of the module (see Figure A.4.35 - Module Removal).

Be sure to keep tool flush against module face while locking into position.

Turn the circular rotating ring counter clockwise to lock the insert/removal tool to the module by engaging the locking tabs. A light spray lubricant can be used on the locating ring if operation becomes difficult (see Figure A.1.54 - Turn Rotating Ring).

Figure A.4.35 - Module Removal

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-97

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Hand manipulate the rotating ring. Do not use tools to gain leverage. Breaking of the locking tabs could result if tools are applied to the rotating ring.

Figure A.4.36 - Turn Rotating Ring

ZeeWeed 500D - Membrane Care A-98

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

5. When the Insert/Removal tool is securely locked onto the module face plate, pull the handle away from the module fibers. Do not pinch any fibers. This will disengage the module spigot from the permeate collector.

Figure A.4.37 - Module Removal Handle

6. Move the handle in a long single stroke. Do not use a short vigorous pumping action to remove modules. Do not to apply excessive force to remove a module. 7. Pull out the module approximately 10 in. (25.4 cm). Repeat the procedures for the opposite header.

The removal tool is not designed to fully remove the module from the cassette. Remove the tool prior to hand removing the module.

Use a gentle hand do not use force on module.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-99

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4.5

INSTALLATION OF MODULES INTO THE CASSETTE FRAME


Follow proper safety procedures to prevent injury when carrying out this procedure. The membrane cassettes are shipped with the modules installed. This procedure is provided for membrane repair. See A.4.6 Fiber Repair for the fiber repair procedure. To remove modules from a cassette see A.4.4 Module Removal from a Cassette.

A.4.5.1

MANPOWER REQUIREMENT
The typical installation of a 500D module requires the use of 2 people at all times to prevent damage to the module.

Figure A.4.38 - ZeeWeed 500D Cassette

A.4.5.2

TOOLS REQUIRED
Flash Light (Optional)

ZeeWeed 500D - Membrane Care A-100

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

500D Module MARS Removal Tool O-Ring lubricant (i.e. Lubri-gel) Step Ladder

A.4.5.3

CHECKING FOR SLACK ADJUSTMENT


Prior to installing the new module, visually inspect the cassette and refer to A.4.3 Fiber Shrinkage and Slack to determine if the cassette should be adjusted for slack.

A.4.5.4

UNPACKING THE MODULE


Each module is packaged in a sealed bag in a box. Using 2 people, remove the module from the box, and lay it out flat on a clean table or work surface larger than the fully extended module. Through the clear bag, inspect the module to ensure that no damage was incurred during shipping. Check that all O-rings are present. If an O-ring is missing, do not open bag until a spare O-ring is located. Carefully cut completely across the one end of the bag. Do not cut towards yourself or the fibers. With one person holding the header, the second person should pull on the bottom of the bag sliding the bag off of the module.

Be mindful of the module and membrane at all times when working around the cassettes. Do not allow clothing, body parts, tools, materials, jewelry etc. to scrape or touch the membrane. Do not allow the module headers to bump up against the cassette frame or other modules. Ensure the module is not allowed to dry out.

A.4.5.5
A.4.5.5.1

INSTALLING THE MODULE


PRELIMINARY INSPECTION AND SET UP
Once the module is unpacked, the permeate spigots will be exposed.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-101

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

1. Inspect the spigot for any cracks or damage. 2. Confirm the black EPDM #118 s are present, intact and in proper placement on the permeate spigot. O-rings must not be twisted, cracked, or worn. Apply a water-soluble lubricant (such as Lubrigel or KY Jelly) to the O-rings (see Figure A.4.39 - Correct Position of the O-rings on the Permeate Spigot). 3. When reinstalling a used module that was removed for inspection, hose down the module to remove any obvious solids and debris. Pay particular attention to the rail support guide on the top of the header.

Figure A.4.39 - Correct Position of the O-rings on the Permeate Spigot

A.4.5.5.2

INSTALLING THE TOP HEADER

Quality testing has shown that the majority of module failures can be attributed to incorrect module installation. It is very important that the following instructions are followed to prevent damage. Under no circumstances should excessive force be used on the module to aid in insertion or removal from the cassette.

ZeeWeed 500D - Membrane Care A-102

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Each module has one square-end header and one round-end header. Modules are installed alternating square and round ends up.

Figure A.4.40 - Module Header

For a wastewater application with ZeeWeed 500D-48 cassettes, the module at the extreme right hand side (when viewed with the 3 aeration pipes on the left) will have the square-end header at the top and round end at the bottom. The second module will have the round-end at the top and square end at the bottom. Subsequent modules will alternate square and round ends. Install the modules according to the pattern above.

Figure A.4.41 - Cassette

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-103

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Support the headers at all times. Do not allow the module headers to bump up against the cassette frame or other modules.

Figure A.4.42 - Handling the Module

Check that the desired end (round or square) is at the top. Use 2 people to lift the module. Be careful not to let the fibers or the bottom header contact the ground. While one person climbs the ladder to install the top header, the second person must support the bottom header at all times.

The installation of a 500D module must be completed with two people. The bottom module header must not swing freely when the top header is slid into place. If the bottom header is not controlled during installation, it can swing into the centre of the cassette and impact the bottom permeate collectors. Damage from this impact will result in module replacement.

ZeeWeed 500D - Membrane Care A-104

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

1. To insert the module into the cassette, align the rail on the top of the module with the cassette.

Figure A.4.43 - Aligning the Rail on the Module with the Cassette Frame

2. If space allows, wipe any visible debris from the rail and apply lubri-gel to both the rail and rail support guides on the top of the header to allow a smooth insertion.

Under no circumstances should excessive force be used to insert the module. Avoid the use of a hammer or any blunt force object. 3. With one person supporting the top and another person supporting the bottom header of the module, slide the top header in until it is about 10 in. (250 mm) from being completely installed.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-105

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4.5.5.3

INSTALLING THE BOTTOM HEADER


If necessary, use a flash light to illuminate the bottom permeate port. If space allows, turn the bottom header sideways to reduce some of the slack.

Figure A.4.44 - Turning the Bottom Header Sideways During Installation

1. Line up the bottom header spigot with the permeate connection on the cassette. Use care that the spigot does not impact the permeate collector. 2. Once alignment is confirmed, use gentle but firm pressure to push the bottom header towards the centre of the cassette.

ZeeWeed 500D - Membrane Care A-106

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

3. Confirm the O-ring seal on the module is correctly made with the bottom permeate collector.

Figure A.4.45 - Inserting the Bottom Header

4. With the spigot properly seated, slightly and gently lift the header - do not put stress on the spigot connection and slip the locating nipples on the front of the header into the holes on the cassette frame.

Figure A.4.46 - Locating Nipples

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-107

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.4.5.5.4

COMPLETING THE MODULE INSTALLATION


1. After the bottom header is successfully connected, connect the top header. 2. If space allows, wipe any visible debris from the rail and apply lubri-gel to both the rail and rail support guides on the top of the header to allow a smooth insertion.

Under no circumstances should excessive force be used to insert the module. Avoid hammering or using a blunt force object. Avoid using force in the area above the GE Water logo. 3. Once the module is in place, it must be locked in position at the top and bottom. The module is in the locked position when the locking key is vertical. A click will be felt when the locking key is in proper position. Do not force the locking key into position.

Figure A.4.47 - Lock Position

If a module does not easily slide into the cassette, visually check for the following: Permeate adaptor inserts seated properly. If not, reseat the inserts.

ZeeWeed 500D - Membrane Care A-108

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Extra plastic on the module header or urethane potting material over flowing header. To remove extra plastic, use a coarse file, and then a fine file. Carefully file off any extra material which may be interfering with the insertion of the module into the saddle.

A.4.5.5.5

TIGHTENING THE EXPANDERS


1. Tighten all top and bottom key side outer support expanders using a 5 mm Allen Key or a hex wrench.

Figure A.4.48 - Tightening Expanders

Use caution that no contact is made with the fibres. Expander is fully engaged when flush with the bottom surface of the key side outer assembly. Max tightening torque not to exceed 5.0 Nm (3.6 FTLBS, 44 IN-LBS).

A.4.5.6

FINAL CHECKS
Perform a final check on the cassette and confirm: All spigots are seated properly All modules keys are in the locked positions All hardware is secure and torqued to the proper specifications (see General Arrangement Drawings).

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-109

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Once the module(s) have been installed and final check has been completed, it may be necessary to carry out a glycerin flush and sanitization procedure.

A.4.5.7

RETURNING DAMAGED MEMBRANES


Before returning membranes to GE W&PT, it is imperative that they be properly cleaned, preserved, and that a Returned Goods Authorization (RGA) number be obtained prior to shipping it. Contact GE W&PT Technical Support for information on the RGA procedure.

A.4.6

FIBER REPAIR
A delaminated fiber needs to be cut and sealed. This section describes the procedure for the necessary repair.

Do not separate strands that are glued together at the header as this will cause damage to the membranes.

A.4.6.1

CUT FIBERS
For leaks detected at either end of the membrane fiber, or for fibers that have been cut badly, apply the steps outlined below:

ZeeWeed 500D - Membrane Care A-110

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

1. Remove the membrane module from the membrane tank and cut off the damaged portion 20 mm (3/4 in.) from the potting material on the ZeeWeed header. See Figure A.4.49 - Membrane Cut Position for the correct cut position.

Figure A.4.49 - Membrane Cut Position

2. Using a hypodermic syringe filled with silicone sealant (available from GE W&PT as a membrane repair kit, Baan # 1022887), insert the tip of the needle 10 mm (7/16 in.) into the centre of the membrane lumen. See Figure A.4.50 - Axial Silicone Injection for insertion positions. 3. Apply light pressure to inject the silicone. Fill the lumen back to the header, as indicated by the darkened zone in Figure A.4.50 Axial Silicone Injection (this typically takes about 15-45 seconds). Slowly withdraw the needle while still injecting silicone to assure the lumen is completely filled. While still applying pressure to the syringe, use the tip of the needle to spread silicone over the cut end of the lumen.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-111

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

4. Once the repair is complete, place the cassette back into the membrane tank. Allow a ten minute curing time before performing further membrane testing.

Figure A.4.50 - Axial Silicone Injection

ZeeWeed 500D - Membrane Care A-112

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.4.6.2

LEAKING FIBERS
If the leak is in the middle of the lumen, follow the steps outlined below: 1. Remove the membrane module from the membrane tank. 2. Using a hypodermic syringe filled with silicone sealant (available from GE W&PT as a membrane repair kit, Baan # 1022887), push the tip of the needle through the lumen. Ensure that the needle does not go through the lumen completely, but only into the hollow centre. See Figure A.4.51 - Subjacent Silicone Injection for insertion instruction. The correct positioning of the needle is 5 to 10 mm (3/16 in. to 7/16 in.) away from the leak zone, at an angle of 5 to 10 degrees.

A metal shield should be used to protect the hand holding the fiber. 3. Apply light pressure to fill the lumen so that it is filled 5 to 10 mm (3/16 in. to 7/16 in.) past the leak zone on either end. Continue applying pressure while withdrawing the needle from the lumen, ensuring the puncture is sealed. 4. Once the repair is complete, place the cassette back into the membrane tank. Allow a ten minute curing time before performing further membrane testing.

Rev. 0 June, 2010

ZeeWeed 500D - Membrane Care A-113

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

The optional DispensGun, an ergonomic, pistol-grip style silicon delivery tool (Pt. No. 1025796), can be used to simplify and shorten the time required to perform ZeeWeed fiber repairs.

Figure A.4.51 - Subjacent Silicone Injection

ZeeWeed 500D - Membrane Care A-114

Rev. 0 June, 2010

A.5

PREVENTIVE MAINTENANCE

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.5.1

INTRODUCTION
This section describes various preventive maintenance measures that may be done to enhance and maintain the operation of the system. The section includes discussions on: The Vendor Data The preventive maintenance equipment schedule The Zeeweed 500D inspection procedure The module interconnection strip inspection procedure Methods to prevent stainless steel corrosion

All routine maintenance must be carried out according to the safety regulations and instructions specified by the supplier of the equipment.

Read all relevant safety information in the Vendor Data and in Safety Information before doing any maintenance work.

Handle the cleaning chemicals with care (refer to Material Safety Data Sheets). Wear a face mask, rubber apron, and rubber gloves when handling these chemicals.

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-117

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.5.2

VENDOR DATA AND MAINTENANCE PROCEDURES


Technical specifications of the mechanical and electrical items in the system, as well as detailed maintenance guidelines and procedures, have been provided in the Vendor Data. All routine maintenance must be carried out according to the technical specifications of each system component, as described in the Vendor Data. A summary of major preventive maintenance items in the system can be found in Table A.5.1 - Preventive Maintenance Schedule. The Vendor Data is prepared and provided to the client at the time of delivery of the ZeeWeed Filtration System and is a compilation of installation, operation, maintenance, and safety information supplied to GE Water & Process Technologies (GE W&PT) by manufacturers of various component parts incorporated into your system. GE W&PT has not independently verified the information contained in the Vendor Data and no representations or warranties of any kind, express or implied, are made by GE W&PT as to the quality, suitability, accuracy, timeliness, or completeness of any material, information, or data contained therein. GE W&PT does not accept liability for the consequences of any action taken on the basis of information contained in the Vendor Data. If updated or additional information beyond what has been provided in the Vendor Data is required, contact GE W&PT Technical Support Department for assistance. Selection of the correct lubricant is subject to seasonal conditions, ambient temperatures, air movement, and air quality. The selection of lubricants should be made carefully with due reference to the Vendor Data and with consideration for the operating conditions of the equipment. If any of the problems discussed in this section persist or other difficulties arise, the operator should contact GE W&PT. Complete operating logsheets are necessary to determine the source of the problem.

ZeeWeed 500D - Preventive Maintenance A-118

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.5.3

PREVENTIVE MAINTENANCE EQUIPMENT SCHEDULE


The purpose of the operators preventive maintenance schedule is to keep the equipment ready and to detect any signs of equipment malfunction during operation and scheduled maintenance checks.

All analog and digital instruments should be checked/calibrated as per Vendor Data. Tasks are presented in Table A.5.1 - Preventive Maintenance Schedule. The following codes are used at the top of the columns: D - Daily Maintenance Checklist W - Weekly Maintenance Checklist M - Monthly Maintenance Checklist Q - Quarterly Maintenance Checklist S - Semi-Annually Maintenance Checklist A - Annually Maintenance Checklist
Table A.5.1 - Preventive Maintenance Schedule D
X

Task
Fill out system logsheet

Logsheet Analytical Testing


X X X pH: feed, membrane tank, permeate Feed water: Color, TOC/DOC, TSS/VSS Treated water: Color, TOC/DOC, Total Coliform

All Motors
X X Cleanliness (wipe up any spills or debris). Remove any corrosion from piping or instruments. Security of components

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-119

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Table A.5.1 - Preventive Maintenance Schedule


X Check for leaks anywhere in the system Replace the PLC battery every two to four years Every 5 years, replace the UPS X Inspect the piping for corrosion and repair as required. See A.5.6 Preventing Stainless Steel Corrosion. Inspect the inside of the membrane tank for damage. Repair as required. X Inspect membrane tanks

TW: For wastewater systems, drain the tank.


X Have the ground checked every year if possible. Note: Copper-clad ground rods last longer than galvanized rods. Also check the clamp or weld connections for corrosion.

All Motors
X Where possible, remove fan cover and clean off dust from fan and airway. Use low-pressure compressed air and/or dry cloth.

ZeeWeed Modules
X X X X X Check the module interconnecting strip. See A.5.6 Preventing Stainless Steel Corrosion. Check the cyclic/sequential aeration is functioning correctly by observing the membrane tank Clean with sodium hypochlorite and/or citric acida Check cassettes for level Inspect one cassette per train per year for any signs of wear. Take pictures of membranes in the cassette and send the pictures to GE W&PT. See A.4.3 Fiber Shrinkage and Slack, and A.5.5 Module Interconnecting Strip Inspection.

a. Monthly initially until optimum interval established for system.

ZeeWeed 500D - Preventive Maintenance A-120

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.5.4

ZEEWEED 500D INSPECTION PROCEDURE


This procedure will serve as a guide for the field inspection of the ZeeWeed 500D membrane module/cassette. Contact GE W&PT Technical Support if there are any concerns or questions about the following topics.

A.5.4.1

TOOLS AND EQUIPMENT NEEDED


Only common maintenance type tools (wrenches et al) are required to remove ZeeWeed 500D cassettes for inspection. The particular tools required are site specific. Below is a list of tools and equipment you should have available during the inspection: ZeeWeed 500D Membrane Interconnecting Strip (MIS) Removal Tool Associated tools to remove the ZeeWeed 500D cassette safely from the membrane tank ZeeWeed 500D Header Removal Tool. Older versions will not provide suitable removal effectiveness and should not be used.

A.5.4.2

INFORMATION GATHERING AND RECORDING


It is recommended that the following information be recorded for every cassette inspected on the "ZW500D Inspection Template": Site Name Inspector Inspection Date Train Number

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-121

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Cassette Position Cassette Serial Number

Photos should be taken at each step and filed with the completed Inspection Forms.

A.5.4.3

INSPECTION FREQUENCY
A typical new ZeeWeed 500 series plant should initially execute the inspection procedure quarterly (every three months) on at least one cassette from each train - this is typically called the 'indicator cassette' and should be the same cassette for each subsequent inspection. For plants with operating temperatures greater than 30C (86F) or with a potential that suspended solids can accumulate within the membrane tanks (enhanced coagulation/MBR applications) it is recommended to initially execute the inspection procedure monthly. Since the processes at each plant are unique, and considering the variations in feed water quality, temperature changes and resultant accumulation of solids, the effects on ZeeWeed modules will vary. An initial quarterly or monthly inspection frequency should be adjusted by experienced operating staff either up or down dynamically based on observed and recorded trends and site specific operating conditions. It is important for operating staff to monitor potential issues, adjust inspection frequency in response to trends, and correct detected issues promptly to ensure optimum performance of the membranes and to prevent irreversible damage. At a minimum, it is recommended that each cassette within a plant be inspected annually. For assistance in determining the optimum frequency of membrane module inspection, call Technical Support.

ZeeWeed 500D - Preventive Maintenance A-122

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.5.4.4

AERATION PATTERNS AND HITCH PINS


Before the cassette is removed from the water, a visual inspection of the aeration patterns should be performed with the liquid level a few inches above the permeate pipe. A rectangular air pattern of equal intensity (Figure A.5.1 - Correct Aeration Pattern) should be seen. Note any inconsistencies in the Additional Notes section on the inspection template. Inconsistencies could consist of poor air distribution on one side of the cassette or less air to the cassette due to poor valve operation or loose cassette leveling pins. Ensure that the cyclic valves are operating correctly. Note the cyclic time (if applicable) in the notes section on the inspection template (i.e.-10 seconds on and 10 seconds off or other cycle time). Also check hitch pins are all in place and in good condition. Hitch pins should fit snugly on the pin and not show signs of wear. There should be 4 hitch pins per cassette.

Figure A.5.1 - Correct Aeration Pattern

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-123

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.5.4.5

HOSES, CAMLOCKS, AND STRAUB CONNECTIONS


Check that the hoses, camlocks, and straub connections are in good condition. Note any cracks and discolouration on hoses and check all hose clamps are tight. Check all Straub connections for tightness per factory torque specifications, and ensure connections are properly aligned to the pipe.

A.5.4.6

REMOVING THE CASSETTE

A cassette that has been in service will weigh more than it did when it was first installed. To avoid severe personal injury caused by a collapse, confirm that the load limits of all lifting equipment and of the surface that the cassette will be set on are sufficient. Refer to A.3.10 Membrane Inspection/Replacement for instructions on removing cassettes from membrane tanks. When removing a cassette with accumulated solids, verify the rated capacity of lifting brackets, cranes, and the cassette lifting frame before attempting a lift. As the cassette is removed from the tank, use a weight scale to ensure that components under load are within their design capacity. Ensure that the cassette remains level throughout the lift and inspect the aerator plates and tubes for solids accumulation.

Never spray membranes with a high-pressure water stream. To reduce the amount of solids on the cassette before lifting, aerate the cassette without permeation and use a garden hose with a lowpressure stream to dislodge solids from the cassette.

ZeeWeed 500D - Preventive Maintenance A-124

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

To ensure that the water pressure in the hose is not excessive, with the hose held 3 ft above the ground, confirm that the stream does not extend more than 3 ft from the hose before reaching the ground (refer to Figure A.5.2 - Water Pressure Test). A stream that extends any further with the hose held at this height is too strong to be used on the membranes.

Figure A.5.2 - Water Pressure Test

A.5.4.7

LEVELING PINS
Once the cassette is removed from the water, a visual inspection of the leveling pins should be performed (Figure A.5.3 - Typical Levelling Pin Diagram). Check for loose or damaged pins. Check that all fasteners (nuts, bolts, etc.) are not loose, missing, or damaged. Leveling pins that are loose may result in cassettes that are not level, which will contribute to uneven aeration and solids accumulation.

Figure A.5.3 - Typical Levelling Pin Diagram

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-125

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.5.4.8

SOLIDS ACCUMULATION PATTERNS


Once the cassette has been removed from the membrane tank or the water level has been lowered to where membrane tank entry is feasible (abiding by all health and safety regulations), the following steps must be performed: Full length pictures should be taken from all four sides of the cassette Note any solids accumulation patterns on the inspection template. See Figure A.5.4 - Solids Accumulation (OK). Figure A.5.5 - High Solids Accumulation shows a high level of solids accumulation, which would cause concern.

Debris, such as sticks and leaves, are a concern. This type of material should not be in contact with the membranes. Scaling on the membrane is also a concern. Scaling may cause undesirable effects on the membrane. If excessive solids, debris or any scaling is noticed, check all screens prior to the membrane tank and then contact GE W&PT Technical Support.

Figure A.5.4 - Solids Accumulation (OK)

ZeeWeed 500D - Preventive Maintenance A-126

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Figure A.5.5 - High Solids Accumulation

A.5.4.9

SHELLS
Check the cassette and membranes closely for signs of aquatic life, particularly in the form of shell life. Shells can be as small as 1mm in length. Figure A.5.6 - Shells shows an example of shells.

Figure A.5.6 - Shells

A.5.4.10

CASSETTE FRAME AND HARDWARE


Check the stainless steel (SS) cassette frame welds. Welds should all be in good condition.

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-127

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Check all fasteners, for example, nuts and bolts are not loose or missing. Refer to General Assembly drawings for specifics on locations. Contact GE W&PT Regional Accounts Manager for drawing details. Contact GE W&PT Technical Support if there are any questions.

A.5.4.11

PERMEATE COLLECTION AND SADDLE INSPECTION


An inspection of both the bottom end position permeate collection ports (Figure A.5.7 - Bottom Permeate Collection Port) and the top permeate end saddles should be conducted (Figure A.5.8 - Top Permeate Saddle). Note any issues on the inspection template. Figure A.5.9 - Location of Collection Port and Saddle shows the locations of the permeate collector and saddle.

Figure A.5.7 - Bottom Permeate Collection Port

Figure A.5.8 - Top Permeate Saddle

ZeeWeed 500D - Preventive Maintenance A-128

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Figure A.5.9 - Location of Collection Port and Saddle

A.5.4.12

AERATION TUBE INSPECTION


The aeration tubes should be inspected to ensure they are not plugged or clogged. Clean any aeration tube that is plugged or clogged. Note the location of plugged or clogged aeration tubes on the inspection template. If plugged or clogged aeration tubes are found, the SS aeration channel must be cleaned by removing end caps. PVC end caps are located on the back side of the cassette at the bottom. To review site specific operating conditions, contact Technical Support. Recheck the aeration pattern after cleaning.

Figure A.5.10 - Aerator Caps

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-129

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.5.4.12.1

REPORTING
Submit all your findings (inspection template and photos) along with any updated membrane maps to your GE W&PTs Technical Support contact.

A.5.5

MODULE INTERCONNECTING STRIP INSPECTION


The Module Interconnecting Strip (MIS) holds groups of membrane modules together in the cassette. It requires monthly inspection to ensure proper operation and identifies worn parts that require replacement. 1. Visually inspect all of the Module Interconnecting Strips (MIS) and verify they are attached (see Figure A.5.11 - MIS Location).

Figure A.5.11 - MIS Location

ZeeWeed 500D - Preventive Maintenance A-130

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

2. Verify that all locking keys are tightly locked in the vertical position (see Figure A.5.12 - Locking Key Locked Position (Vertical) and Figure A.5.13 - Locking Key Unlocked Position (Horizontal).

Figure A.5.12 - Locking Key Locked Position (Vertical)

Figure A.5.13 - Locking Key Unlocked Position (Horizontal)

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-131

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

3. Inspect the MIS locking pins. The locking pins should be in the upright position.

Figure A.5.14 - Locking Pin Locked Position (Vertical)

Figure A.5.15 - Locking Pin Unlocked Position (Diagonal)

ZeeWeed 500D - Preventive Maintenance A-132

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

4. Check for wear on the MIS. Each locking pin should lock into position tightly and securely. If the locking pins move freely, the MIS is worn. Figure A.5.16 - Module Header, Showing Wear Location shows typical wear location on a module header.

Figure A.5.16 - Module Header, Showing Wear Location

5. Check for independent movement between the module and the locking key mechanism. 6. Look for wear on the locking key mechanism.

A.5.6

PREVENTING STAINLESS STEEL CORROSION


A water treatment system may comprise stainless steel components. System operators must follow the preventive maintenance steps provided below in order to prevent corrosion from forming on stainless steel piping and components.

Rev. 0 June, 2010

ZeeWeed 500D - Preventive Maintenance A-133

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.5.6.1

CAUSES OF CORROSION
Stainless steel corrosion is primarily caused by surface contamination and/or chlorine attack. Surface contamination can cause serious corrosion if it is not removed quickly. SURFACE CONTAMINATION. When the piping is installed with carbon steel tools or not protected from nearby welding or grinding work, carbon steel particles may embed in stainless steel surfaces. Exposure to rusty water or iron-laden dust and dirt can also cause surface corrosion. CHLORINE ATTACK. Chlorine-induced corrosion can occur when chlorinated water splashes on piping or when chlorine vapors condense on the piping due to inadequate ventilation or high humidity.

A.5.6.2

PREVENTING CORROSION
Minimize corrosion as follows: CLEAN REGULARLY. Piping and equipment should be kept clean and dry. Keep potential contaminants (for example, solvents, tools, and equipment), away from stainless steel components. MINIMIZE CHLORINE CONTACT. Control splashing or condensation of chlorinated water streams. Remove contamination as soon as it is observed. Minimize work near stainless steel components. Avoid welding or grinding work. If local work is necessary, ensure that the stainless steel components are fully protected. FABRICATION, HANDLING, AND INSTALLATION OF COMPONENTS. Use the correct tools and fabrication techniques for any new work. Properly weld and passivate new or repaired piping. Avoid the use of dissimilar metal fasteners and joining components. Ensure that any new components are thoroughly cleaned, inside and outside, before installation. If excessive condensation is evident on piping surfaces, adjust the ventilation system or add dehumidification.

ZeeWeed 500D - Preventive Maintenance A-134

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.5.6.3

DETECTING, CLEANING, & REPAIRING CORROSION


The following sections include recommendations on detecting, cleaning, and repairing corroded or contaminated components.

A.5.6.3.1

DETECTING EMBEDDED IRON


The simplest test for free, embedded iron is to wash down the stainless steel part with clean water, allow it to dry (or drain), and wait 24 hours. If there are rust streaks on the surface of the stainless steel, iron is present. The ferroxyl test is a more sensitive indication of embedded iron. The system operator applies the solution with a spray bottle and checks for a blue stain within 15 seconds of the application. If a blue stain appears, there is iron contamination.
Table A.5.2 - Ingredients to the Ferroxyl Test Ingredient
Distilled Water Nitric Acid, 60-67% Potassium Ferricyanide

Volume/Weight
1000 mL 20 mL 30 g

When handling this test solution, wear rubber gloves, protective clothing, and face shields. Avoid inhalation of the atomized spray! Prepare the solution (specified in Table A.5.2 - Ingredients to the Ferroxyl Test) as follows: 1. Add the nitric acid to the distilled water. 2. Add the potassium ferricyanide to the nitric acid/distilled water combination.

A.5.6.3.2

CLEANING & REPAIRING SURFACE CORROSION

Do not allow cleaning compounds to fall in the membrane tanks.


Rev. 0 June, 2010 ZeeWeed 500D - Preventive Maintenance A-135

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

If corrosion occurs on a stainless steel part, clean and treat the oxidized areas in order to restore the surface to its original corrosion resistance. Remove the oxidized material with the appropriate wire brush. After the oxidized areas have been brushed clean, apply a pickling paste to the affected area to chemically clean the surface and remove any embedded contaminants.
Table A.5.3 - Effective Cleaning Methods Job
Routine cleaning Smears and fingerprints

Cleaning Agents
Warm water, soap, ammonia, and detergent 3M Stainless Steel Cleaner and Polish, Arcal 20, Lac-ONu, Lumin Wash, Stainless Shine 3M Stainless Steel Cleaner and Polish, Twinkle, Liquid Nu Steel, Household Cleaners Any good commercial detergent or caustic cleaner

Comments
Apply with a sponge or soft cloth. Provides a barrier film to minimize fingerprints.

Stubborn stains and discoloration

Using a dry or damp cloth, rub lightly in the direction of the polish lines of the stainless steel. Apply with a sponge or soft cloth in the direction of the polish lines of the stainless steel.

Grease and oil

As an added precaution, there are various protective coatings that can be used to help prevent stainless steel contamination and corrosion. Clear lacquers are preferred over the colored lacquers and paints, so that the operator can check the condition of the stainless steel surface below the coating.

ZeeWeed 500D - Preventive Maintenance A-136

Rev. 0 June, 2010

ZW500D Inspection Template


Site Name: Inspection Performed by: Date Inspected: Train Number: Cassette Position:
L-Module 10 L-Module 11 L-Module 12 L-Module 13 L-Module 14 L-Module 15 L-Module 16 L-Module 17 L-Module 18 L-Module 19 L-Module 1 L-Module 2 L-Module 3 L-Module 4 L-Module 5 L-Module 6 L-Module 7 L-Module 8 L-Module 9 Cassette S/N

MLSS & pH: Water Level: Above/Below


Permeate Pipe

Aeration Type: Aeration Sequence (ie. 10/10 or 10/30):

Module Inspection
L-Module 20 L-Module 21 L-Module 22 L-Module 23 L-Module 24 R-Module 1 R-Module 2 R-Module 3 R-Module 4 R-Module 5 R-Module 6 R-Module 7 R-Module 8 R-Module 9 R-Module 10 R-Module 11 R-Module 12 R-Module 13 R-Module 14 R-Module 15 R-Module 16 R-Module 17 R-Module 18 R-Module 19 R-Module 20 R-Module 21 R-Module 22 R-Module 23 R-Module 24

Inspection Point
Solids Accumulation - OK, Concern (C), Issue (I)
Top Bot Top Bot Top Bot Top Bot Top Bot Top Bot

Fibre Slack - Loose (L) / Tight (T) Clips and Inserts all Present (Y/N) Locking Key In Locked Position (Y/N)

INSERT CASSETTE NUMBER HERE

V-wedge Snug (Y/N) Header In Good Condition (Y/N) Plugged (P) or Clogged (C ) Aerator Tubes/Channels

Inspection Point
Equal Intensity Aeration Pattern (Y/N) Hitch Pins In Good Condition (Y/N) Hoses/Hose Clamps In Good Condition (Y/N) Camlocks/Straub In Good Condition (Y/N) Cassette Lifting Load Limits ( OK / Issue (I) ) Leveling Pins In Good Condition (Y/N) Fasteners or Nuts Loose (L) / Missing (M)
Bottom Permeate Collector in Good Condition (Y/N)

Cassette Inspection

Top Permeate Saddle In Good Condition (Y/N) *Note Comments can be written on next page

QRF-020

REV 04

Page 1 of 2

Aug 24, 2007

ZW500D Inspection Template


Site Name: Inspection Performed by: Date Inspected: Train Number: Cassette Position:
L-Module 25 L-Module 26 L-Module 27 L-Module 28 L-Module 29 L-Module 30 L-Module 31 L-Module 32 R-Module 26 R-Module 28 R-Module 30 Cassette S/N

Module Inspection
R-Module 32 R-Module 25 R-Module 27 R-Module 29 R-Module 31

Inspection Point
Solids Accumulation - OK, Concern (C), Issue (I)
Top Bot Top Bot Top Bot Top Bot Top Bot Top Bot

INSERT CASSETTE NUMBER HERE

Fibre Slack - Loose (L) / Tight (T) Clips and Inserts all Present (Y/N) Locking Key In Locked Position (Y/N) V-wedge Snug (Y/N) Header In Good Condition (Y/N) Plugged (P) or Clogged (C ) Aerator Tubes/Channels

ADDITIONAL NOTES

QRF-020

REV 04

Page 2 of 2

Aug 24, 2007

This page has been intentionally left blank

A.6

CLEANING & VENTILATION

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.6.1

CLEANING CHEMICALS
Depending on the type of cleaning required and the fouling on the membranes, use either a sodium hypochlorite (NaOCl) solution or a citric acid (MC-1) solution. Sodium hypochlorite is used to remove organic/ biological fouling on the membranes. Citric acid is used to remove fouling due to mineral scales, iron, or other metals. For more severe fouling, GE Water & Process Technologies (GE W&PT) offers specially designed and formulated cleaning chemicals for ZeeWeed membranes. These approved cleaning chemicals should be used along with the Maintenance Clean and Recovery Clean procedures provided in this section. Safety and handling instructions for these cleaning chemicals are located in Material Safety Data Sheets. GE W&PT will advise on chemicals that are suitable.
Table A.6.1 - Chemicals Required for ZeeWeed Cleaning Chemical Purpose Design Frequency Design pH Concentration of Cleaning
200 mg/La 2 per week Maximum 10.5

Sodium Hypochlorite Maintenance Clean


Sodium hypochlorite 12% and specific gravity 1.168 Organic Cleaner

Citric Acid Maintenance Clean


Citric acid 50% Scale Removal 2000 mg/Lb 1 per week 2.5-3.5

Sodium Hypochlorite Recovery Clean


Sodium hypochlorite 12% and specific gravity 1.168 Organic Cleaner 1000 mg/Lb 2 per year Maximum 10.5 at T<30C. Maximum pH 10 at 30C <T< 40C.

Citric Acid Recovery Clean


Citric acid 50% Scale Removal 2000 mg/Lb 2 per year 2.5-3.5

a. b. c.

Backpulse concentration Membrane tank concentration If required

Rev. 0 June, 2010

ZeeWeed 500D - Cleaning & Ventilation A-139

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Other cleaning chemicals may contain materials incompatible with the membranes and should NOT be used. Use of non-approved cleaning chemicals voids any membrane warranties.

Wear a face mask, rubber apron, and rubber gloves when handling chemicals. For more information, see Material Safety Data Sheets.

A.6.2

FREQUENCY OF CLEANINGS
The frequency of cleanings depends on specific operating conditions (operating time, feed flow rates, and permeate flow rates) and on the particular chemistry of the fluid being processed. During normal operation, membranes can become fouled by mineral salts (calcium carbonate, calcium sulfate, magnesium sulfate), iron (Fe), insoluble organics (such as oil), and biological matter (bacteria or products from bacterial action). Deposits that build up on the membrane surface during operation can cause a loss in permeability. It should be noted that permeability drops if the feed temperature decreases. This decrease is normal and does not necessarily indicate fouling. For frequency of cleanings, refer to Table A.6.1 - Chemicals Required for ZeeWeed Cleaning.

A.6.3

TYPES OF CLEANINGS
Never apply Backpulse pressures greater than 8 psig (22.7 psia) across the membranes. Membrane life may decrease as a result.

ZeeWeed 500D - Cleaning & Ventilation A-140

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

To maximize membrane life and operation, the system automatically undergoes a Backpulse according to a system operator-set frequency and duration. See During Relax, the membranes sit for a system operator-specified duration without permeation before resuming production. During this time, the membrane aeration disperses the solids that have concentrated around the membranes.. Relax is an alternative to Backpulse. If a Backpulse failure occurs and no pump is available, the PLC places the trains into Relax mode. See A.6.3.2 Relax. An automatic Maintenance Clean is also performed according to a system operator-set frequency. See A.6.3.4 Maintenance Clean. GE W&PT must be consulted for assistance with setting up a Maintenance Clean schedule. A Recovery Clean procedure is required to prevent fouling of the membranes and when it is no longer possible to operate the unit at the required flux without exceeding the maximum Transmembrane Pressure (TMP). See A.6.3.5 Recovery Clean.

A.6.3.1

CLEANING LOGSHEET
All cleaning data should be recorded on the cleaning logsheet located in performance monitoring. This logsheet should be faxed to GE W&PTs Process Group (or e-mailed to service@zenon.com) for verification of cleaning effectiveness.

A.6.3.2

RELAX
During Relax, the membranes sit for a system operator-specified duration without permeation before resuming production. During this time, the membrane aeration disperses the solids that have concentrated around the membranes.

Rev. 0 June, 2010

ZeeWeed 500D - Cleaning & Ventilation A-141

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.6.3.3

BACKPULSE
Backpulse cleanings occur automatically during the normal production cycle of the system, at a system operator-set frequency and duration. The Backpulse frequency and duration should be periodically optimized by the system operator for changes in operating conditions and the influent feed to the system.

A.6.3.3.1

ENTERING BACKPULSE SETPOINTS


If required, the default setpoints for Backpulse can be adjusted at the HMI as follows: 1. Select Enable to switch a train from Relax to Backpulse. (It is not possible to enable Relax).

Figure A.1 - Train Overview

ZeeWeed 500D - Cleaning & Ventilation A-142

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Figure A.2 - Train Setpoints

2. Input the Backpulse frequency and duration. 3. Record all changes to the setpoints.

A.6.3.3.2

INITIATING BACKPULSES
The system operator can also initiate an additional Backwash by selecting the Initiate Backpulse button on Figure A.3 - Mode of Operation. The Backpulse occurs for the duration already set by the system operator. The Backpulse timer will be reset so that future Backpulse will occur at the set frequency. This button is only active in On mode, and is disabled if any other train is in Backpulse.

Rev. 0 June, 2010

ZeeWeed 500D - Cleaning & Ventilation A-143

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

When a system operator initiates a Backpulse, the Backpulse begins immediately. The selected train becomes the lead train. The system adjusts the production cycle time to maintain staggered backpulsing.

Figure A.3 - Mode of Operation

A.6.3.4

MAINTENANCE CLEAN
Maintenance Clean is an automatic procedure that results in consistent performance of ZeeWeed membranes. A regular Maintenance Clean prolongs the interval between Recovery Cleans. The Maintenance Clean is performed at frequencies and chemical concentrations detailed in Table A.6.1 - Chemicals Required for ZeeWeed Cleaning. For more information, refer to the Control Documentation. There are two types of Maintenance Cleans: Chlorine Clean and Acid Clean. The Chlorine Clean removes the organic foulants; the Acid Clean removes the inorganic foulants. The system operator must ensure that there are sufficient cleaning chemicals available. The system operator must set the day and time when the Maintenance Clean needs to occur using Figure A.4 Maintenance Clean Schedule for each unit respectively. The time is normally set between 12 a.m. and 6 a.m. when system demand is lowest.

ZeeWeed 500D - Cleaning & Ventilation A-144

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

For more information about alternative Maintenance Clean procedures, contact the Service Department at (905) 465-3030 or by email at zenon.service@ge.com.

A.6.3.4.1

SCHEDULING A MAINTENANCE CLEAN


To schedule a Maintenance Clean for a train, complete the following steps: 1. On the Maintenance Clean schedule screen (see Figure A.4 Maintenance Clean Schedule), enter the day and time for the Maintenance Clean. For days when a Maintenance Clean is not required, enter a time of 24:00.

Figure A.4 - Maintenance Clean Schedule

Rev. 0 June, 2010

ZeeWeed 500D - Cleaning & Ventilation A-145

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

2. Record all setpoint changes in the Maintenance Clean Setpoints Screen.

Figure A.6.1 - Maintenance Clean Setpoints Screen

A.6.3.4.2

PERFORMING A MAINTENANCE CLEAN

The cleaning solution is pumped back through the membrane fibers, similar to a Backpulse.

Only one unit can be in Maintenance Clean or Recovery Clean at a time. Maintenance Cleans are performed as follows: Refer to the OSC for a detailed description of the steps involved.

A.6.3.4.3

ALTERNATIVE MAINTENANCE CLEAN


For details about alternative Maintenance Clean procedures, contact GE W&PT.

ZeeWeed 500D - Cleaning & Ventilation A-146

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Since a foulant can contain a variety of substances, rotating between sodium hypochlorite and citric acid (one cleaning event with sodium hypochlorite and the next one with citric acid) is recommended. Other chemical cleaners may also be used if recommended and approved by GE W&PT. It is recommended that the correct chemicals be selected for each site during the initial operating period.

A.6.3.5

RECOVERY CLEAN
A Recovery Clean should be performed if the automatic backpulsing of the system does not maintain membrane performance above the specified level. A Recovery Clean procedure is required to prevent fouling of the membranes and when it is no longer possible to operate the unit at the required flux without exceeding the maximum Transmembrane Pressure. A Recovery Clean is operator-initiated and should have the operator present during the majority of the clean. There are two types of Recovery Cleans: Chlorine Clean and Acid Clean. The Chlorine Clean removes the organic foulants; the Acid Clean removes the inorganic foulants. Normally, an Acid Clean follows a Chlorine Clean. At a reduced average operating capacity, the average interval between Recovery Cleans may be extended. A 50% by weight solution of citric acid has a density of 1.24. Therefore, a 50% citric acid solution 0.62 kg of citric acid per liter of water. 0.5 kg citric acid - 1.24 kg 50% citric soln kg of citric - = --------------------------------------------------------------------------------------- ------------------------------------------------------1 kg 50% citric soln 1 L 50% citric soln L of 50% solution

kg of citric - = -------------------------------------------------------0.62 kg citric acid -----------------------------------------L of 50% solution 1 kg 50% citric solution

Rev. 0 June, 2010

ZeeWeed 500D - Cleaning & Ventilation A-147

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

The sodium hypochlorite (NaOCl) cleaning solution should be limited to a maximum pH of 11 at a temperature less than 30C, and a maximum pH of 10 at a temperature between 30C and 35C.

Citric acid solubility is 500 g/L at 10C. GE W&PT does not recommend increasing the concentration beyond 500 g/L. A 50% by weight solution of citric acid has a density of 1.24. Therefore, a 50% citric acid solution is made up using 0.62 kg of citric acid per liter of water. An example calculation for adding citric acid to the dosing tank is as follows: Required weight of citric acid = volume of water x 620 grams. When topping up the dosing tank by 4 L: Weight of citric acid = 4x620 = 2,480 grams. Therefore, add another 2,480 g of citric acid.

A.6.3.5.1

PREPARING FOR A RECOVERY CLEAN


To prepare for a Recovery Clean, complete the following steps:

Do not clean the membranes with a cleaning solution above 38C. 1. Ensure that the chemical tanks have sufficient solution. 2. Record the current water temperature, flux, and permeability while the train is operating in Production.

A.6.3.5.2

PERFORMING A RECOVERY CLEAN

Sodium hypochlorite cleaning solution generates gas that is both a health and safety concern and corrosive. Adequate ventilation must be provided.

ZeeWeed 500D - Cleaning & Ventilation A-148

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Do not pour chemicals directly on the membranes. For the PLC-controlled Recovery Clean procedure, see the OSC. To perform a Recovery Clean, complete the following steps: Refer to the OSC for a detailed description of the steps involved in performing a recovery clean.

Toxic chlorine gas is produced if citric acid and sodium hypochlorite mix with each other. Always ensure that one chemical is completely rinsed from the tank and piping prior to cleaning with the other chemical. Clean water should be backpulsed through all contaminated piping until residual chlorine levels are less than 10 ppm. If chlorine gas is detected, the system operator should evacuate the area immediately and advise the plant safety officer and/or immediate supervisor accordingly. To minimize the chances of producing toxic chlorine vapors, the chemical feed pumps are interlocked during automatic operation so that sodium hypochlorite (NaOCl) and citric acid (MC-1) cannot be sent to the same location simultaneously. It is the system operators responsibility to ensure that sodium hypochlorite (NaOCl) and citric acid (MC-1) are not sent to the same location simultaneously if these devices are manually operated.

A.6.4

VENTILATION
Ventilation of the membrane tanks must be provided if the membrane plant is located in a building. This should include forced-air vents in the checker plate above the membrane tank, as well as standard ventilation for the building (for example, 4-6 exchanges/hour). Venting should be designed to provide only a small negative pressure above the membrane tank. Ventilation should be left on at all times.

Rev. 0 June, 2010

ZeeWeed 500D - Cleaning & Ventilation A-149

This page has been intentionally left blank

A.7

TROUBLESHOOTING

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.7.1

OVERVIEW
GE Water & Process Technologies Technical Support Desk has drawn upon many years of experience in a wide variety of plants to compose this troubleshooting section. It conveniently brings together the most common issues and frequently asked questions. GE W&PT has prepared specific training courses to develop troubleshooting skills. To discuss training options, call the Service department.

For pressurized systems, relieve the pressure before starting troubleshooting. Disconnect the air from the valves. Closing the valve will not relieve the pressure.

All routine troubleshooting must be carried out according to the safety regulations and instructions specified by the supplier of the equipment.

Read all relevant safety information in the Vendor Data and in Safety Information before doing any maintenance work.

Handle the cleaning chemicals with care (refer to the Material Safety Data Sheets). Wear a face mask, rubber apron, and rubber gloves when handling these chemicals.

Rev. 0 June, 2010

ZeeWeed 500D - Troubleshooting A-153

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

A.7.2

EQUIPMENT TROUBLESHOOTING GUIDE


The following troubleshooting guide is provided for quick reference only. For detailed troubleshooting of system components, consult the Vendor Data. If any of the problems discussed in this section persist or other difficulties arise, the operator should contact GE W&PT. Completed operating log sheets are necessary to determine the source of the problem. Be sure to consult all necessary safety information prior to troubleshooting. Ensure that only qualified personnel are troubleshooting system components. Mechanical or electrical maintenance should only be performed by qualified personnel. In the event of any differences between this manual and the supplied Vendor Data, the supplied Vendor Data should always take precedence. It is up to the operator to follow the correct safety procedures when doing any type of troubleshooting.

ZeeWeed 500D - Troubleshooting A-154

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Mechanical or electrical problems should be reported to GE W&PT.


Table A.7.1 - Troubleshooting Guide Problem General
Low flow shutdowns Flow valve (FV) or solenoid valve downstream of the process pump discharge is closed Vacuum ejector not operating or not at sufficient vacuum Hand valves on the discharge of the pump are throttled or closed High Transmembrane Pressure (TMP) shutdown (low pressure). Hand valve on the suction to the pump is throttled or closed System recovery has wandered to higher than designed Membranes require cleaning Check valves for correct operation

Cause

Recommended Remedy

Check vacuum at pump inlet

Verify correct position of hand valve, as per P&IDs Verify correct position of hand valve, as per P&IDs Verify current vs. design system recovery Perform Recovery Clean as per A.6.3.5 Recovery Clean of this manual or contact GE W&PT Contact GE W&PT

PID tuning: overshooting the flow/pressure control setpoints after backpulse The TMP is based on two instruments: the permeate header pressure transmitter and the level transmitter in the membrane tank. If either of these instruments fail or are inaccurate, it can prevent the entire train from operating.

Check the calibration on the instruments; check the readings on the HMI.

Rev. 0 June, 2010

ZeeWeed 500D - Troubleshooting A-155

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Table A.7.1 - Troubleshooting Guide Problem


High-pressure shutdown (backpulse)

Cause
Hand valve on the suction to the pump is throttled or closed System recovery wandered to higher than designed The timers are too quick as they relate to pressure shutdowns

Recommended Remedy
Verify the correct position of hand valves, as per P&IDs Verify current vs. design system recovery Contact GE W&PT

Level problems (analog)

Failed 24 V DC power supply Problems with moisture in probe

Verify power supply outlet Check probe seals Verify operation of switch Check the continuity of the fuses Verify switch input to PLC versus program

Level problems (digital)

Switch compromised by chemicals Blown fuse to device Programing problem: switch programmed to behave improperly

ZeeWeed Membranes
Leaking/cut fiber Damaged fiber See A.4.6 Fiber Repair for fiber repair methods

A.7.3

PERMEATE QUALITY
Permeate quality may be affected by any number of factors, such as membrane damage, or a leak in the cassette seal.

A.7.3.1

MEMBRANE DAMAGE
To determine if damage has occurred to one or more of the membrane modules, examine the permeate from each membrane cassette. If the permeate is acceptable, the modules and cassette may continue service. If a damaged cassette is identified, find the damaged module either by visual fiber inspection or by a bubble test. Inspect and repair or replace any damaged modules to bring the overall system performance up to appropriate levels.

ZeeWeed 500D - Troubleshooting A-156

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

To locate a leaking element, use a bubble test. Streams of bubbles identify the location of possible leaks in the ZeeWeed system. After the cassette has been removed from the membrane tank and placed in another tank, slowly raise the module out of the water to locate the leak. In most cases, the cassette does not require disassembly to locate and repair leaking fibers. Alternately, the membranes may be inspected after removing them from the system. This option should only be accomplished under the direct supervision of GE W&PT personnel. See A.3.10 Membrane Inspection/ Replacement.

A.7.3.2

CASSETTE SEAL LEAKAGE


A leak in a cassette seal may result from improper attachment or loosening of the connections to the cassette. Check these connections periodically to see that they are properly installed.

A.7.4

PROCESS PUMP HAS LOST PRIME


A centrifugal permeate pump will not tolerate excessive air. Water in contact with air at atmospheric pressure naturally contains dissolved gases. After the water crosses the membrane boundary, the lower pressure encountered on the lumen side reduces the solubility of these gases in the water. The gases come out of solution and start to collect into bubbles. If the air is not removed for any reason, the process pump will lose prime. An alarm will be generated and the train will be shut down. PROBLEM: Process pump will not achieve prime due to air inside permeate header. POSSIBLE CAUSES: Air leaks along pipe work. Missing or pinched camlock O-rings attached to permeate pipes.
ZeeWeed 500D - Troubleshooting A-157

Rev. 0 June, 2010

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Cracks along PVC piping. Permeate header sample valves not entirely closed. Failed check valves. Air release valve rubber seat stuck at the discharge orifice. Air separator and/or associated spool fittings might have cracks, allowing in air.

RECOMMENDED REMEDIES: To determine exactly where a leak is occurring along the permeate header, use a spray bottle containing a soapy solution that can be sprayed at fittings and along piping and pipes to check for leaks. Because the system runs under a vacuum during production, wait until a backpulse occurs (positive pressure) to check for leaks on the permeate header. Physically check all permeate pipes for evidence of cracks, and replace as required. Replace any damaged or pinched O-rings inside permeate camlock fittings. Install any missing camlock O-rings. Ensure that sample valves are closed when the system is in operation. Ensure that the backpulse tank volume is well above the discharge point on the tank. Determine if the air release valve rubber seat is stuck at the top orifice. If so, it will prevent air from being vented from the permeate header. See A.7.5 Air Release Valves (Crispin Valve with ejector) for troubleshooting approaches. Ensure that the air release valve moves freely (vertically) inside the housing. Repair any leaks at or around the air separator. If the TMP is high, there is a greater probability of air being pulled across the membranes, which could hinder priming of the process pumps. Initiate a membrane cleaning to unclog membrane pores.

ZeeWeed 500D - Troubleshooting A-158

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

Replace broken or missing check valve components. Request a program change to ensure that flow valves remain open in Standby.

A.7.5

AIR RELEASE VALVES (CRISPIN VALVE WITH EJECTOR)


PROBLEM: Air cannot be removed from the permeate header, either due to the air release valve rubber seat remaining stuck to the top orifice discharge port on the air release valve housing or blockage inside the orifice port. POSSIBLE CAUSES: Rust deposits formed on the internal surface area of the air release valve may prevent the float ball from rising/falling freely inside the air release valve housing. Rubber seat is set too far away from the top side of the brass support arm. Flakes of rust from non-epoxy-coated air release valve housings may have broken free and lodged into the orifice vent, creating a blockage and preventing air from being removed from the air separator.

RECOMMENDED REMEDIES: 1. Shutdown the train. Remove the air release valve housing cover. Inspect the interior surface area of the air release valve. If a low volume leak persists with the rubber valve against the orifice, then the rubber valve should be adjusted or replaced. If rust is present, arrange to have the air release valve sandblasted to remove the rust and recoat with epoxy. 2. Ensure that the float ball moves freely up/down inside the air release valve housing. If not, remove any obstructions.

Rev. 0 June, 2010

ZeeWeed 500D - Troubleshooting A-159

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

3. Reassemble the air release valve. 4. Switch to train to On from Off mode to start the ejector. If necessary readjust the position of the rubber seat for the air release valve.

A.7.6

AERATION PROBLEM
Check all air connections and piping for damage. If damage is present, the system will have to be repaired immediately. Ensure the air filter is changed at regular intervals. Refer to the Vendor Data for the recommended maintenance schedule. Proper aeration is essential to the operation of the ZeeWeed system. See A.3.9.2 Checking Aeration for instructions on checking for proper aeration.

A.7.7

SYSTEM COMPONENT FAILURE


If a system component has failed, perform the following steps: 1. Ensure that the device is locked out. 2. Record any information found on the device; for example, part number, model number, make, and tag number. 3. Check the spare parts list for availability. 4. Check the Vendor Data for troubleshooting, spare components list, and method to repair the device. 5. Contact GE W&PT at (905) 465-3030 and speak to our Service Department to order spare parts.

ZeeWeed 500D - Troubleshooting A-160

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

In Manual mode, all interlocks are disabled. This allows for manual entry of setpoints. Equipment can be damaged in Manual mode.

Rev. 0 June, 2010

ZeeWeed 500D - Troubleshooting A-161

This page has been intentionally left blank

A.8

PERFORMANCE MONITORING

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.8.1

INTRODUCTION
This section provides information regarding the procedures, tools, and schedules associated with gathering and tracking subsystem performance data. This information is essential when assessing longstanding performance issues, establishing trends, and determining the durability of various components.

A.8.2

LOGSHEETS
Logsheets, which are provided as electronic copies, are used for manually recording operational data and analytical results. PERFORMANCE LOGSHEETS: Performance logsheets include those used for recording process data. Electronic copies of these documents will be provided by GE W&PT. Completed performance logsheets should be emailed to GE W&PT on a weekly basis in order to facilitate GE W&PT's ability to provide guidance, SETPOINT LOGSHEET: The setpoint logsheet is used to record all changes made to setpoints associated with the subsystem or its various components (example: pumps). Because a complete loss of power to the system will cause the PLC to reboot using the original setpoints stored in the E2PROM, it is essential that this logsheet be updated whenever setpoints are changed so that the most recent values can be reentered.

A.8.3

ZENOTRAC
ZenoTrac is a powerful system support tool available as an option for all GE W&PT clients. Contact GE W&PT for more information about ZenoTrac.

Rev. 0 June, 2010

ZeeWeed 500D - Performance Monitoring A-165

This page has been intentionally left blank

A.9

CALCULATIONS

This page has been intentionally left blank

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.9.1

INTRODUCTION
This section provides calculations used to determine chemical quantities required for cleaning, maintenance, and various other subsystem procedures. These calculations are intended as general examples only; additional information specific to your subsystem may be provided by GE W&PT personnel during initial startup and commissioning.

A.9.1.1
TIP: Multiply a value in US gpm by 3.785 to get the equivalent in lpm, and a value in lb/ ft3 by 0.016 to get the equivalent in kg/L.

UNIT CONVERSIONS
Convert all values to metric equivalents before performing the calculations provided in this section. To find the corresponding value in kg/L for a known solution density, look up the density in Table A.9.1 - Solution Concentrations and Densities. Concentrations are given as weight percentages. To create a solution using a dry chemical, use [x]/(1-[x]) kg of chemical for every liter of water, where [x] is the solution concentration written as a decimal. EXAMPLE: To make a 35% calcium chloride solution, 0.35/(1-0.35) = 0.538 kg of calcium chloride for every liter of water used to make the solution.

Rev. 0 June, 2010

ZeeWeed 500D - Calculations A-169

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Table A.9.1 - Solution Concentrations and Densities Chemical


Aluminum sulfate Ammonium chloride Calcium chloride (35% soln.) Calcium chloride (15% soln.) Calcium hydroxide Ferric chloride MC-1 Phosphoric acid (75% soln.) Phosphoric acid (85% soln.) Polyaluminum chloride Potash Potassium permanganate Powdered activated carbon slurry Sodium aluminate (10% soln.) Sodium aluminate (32% soln.) Sodium bicarbonate Sodium bisulfite Sodium carbonate Sodium hydroxide (25% soln.) Sodium hydroxide (50% soln.) Sodium hypochlorite (12% soln.) Sodium hypochlorite (6% soln.) Sulfuric acid (77.67% soln.) Sulfuric acid (93.19% soln.) Sulfuric acid (98% soln.) Urea ZenoTreat 150 (antiscalant) ZenoTreat 450 (antiscalant)

Solution Concentration (Weight%)


48.50 10.00 35.00 15.00 5.00 35.00 50.00 75.00 85.00 33.00 25.00 3.00 5.00 10.00 32.00 3.50 40.00 10.00 25.00 50.00 12.00 6.00 77.67 93.19 98.00 23.00 100.00 100.00

Solution Density (kg/L)


1.335 1.080 1.250 1.150 1.050 1.360 1.240 1.582 1.694 1.205 1.150 1.030 1.025 1.090 1.300 1.035 1.370 1.110 1.260 1.520 1.168 1.076 1.704 1.834 1.836 1.000 1.150 1.080

NOTES: Before mixing solution, consult the applicable MSDS for chemical purity.

ZeeWeed 500D - Calculations A-170

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

A.9.2

GENERAL DOSING CALCULATION


To determine the amount of chemical(s) required when dosing the subsystem, use the following calculation: Calculate the flow rate of 35% ferric chloride solution to dose to 60 ppm in a 100 lpm stream.

Figure A.9.1 - Dosing Calculation Diagram


Feedwater flow rate Chemical concentration in feedwater stream Stock solution concentration Stock solution density Qf = 100 lpm Cf = 60 ppm (60 mg/L) Cc = 35% by weight

c = 1.36 kg/L

The mass flow rate of ferric chloride in the feedwater stream equals the mass flow rate of ferric chloride dosed. In the equations below, Qf and Qc are in lpm, Cf is in mg/L, c is in kg/L, and Cc is weight percent written as a decimal (example: 35% as 0.35).
Qf x Cf

Qc

c x Cc x 106

Example:
100 x 60 1.36 x 0.35 x 106

0.0126 lpm

6 mg FeCl3 L FeCl3 soln. 35 kg FeCl3 = Qc 100 L feed x 60 x 1.36 kg soln. x x 10 mg minute L feed minute L soln. 100 kg soln. kg

Rev. 0 June, 2010

ZeeWeed 500D - Calculations A-171

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

If the required nutrient concentration (nitrogen or phosphorus) in the feedwater stream (Cf) is given in mg/L (or ppm), then an extra calculation step must be included. Calculate the chemical flowrate according to the general example above, and then divide this flowrate by the mass percent nitrogen or phosphorus in the chemical being used (refer to Table A.9.2 - Mass Percent Nitrogen or Phosphorus in Chemical.
Table A.9.2 - Mass Percent Nitrogen or Phosphorus in Chemical Chemical
Ammonium chloride Urea Phosphoric acid

Mass Percent Nitrogen or Phosphorus in Pure Chemical


26.1% 46.6% 31.6%

A.9.3

CALCULATING MEMBRANE PERMEABILITY


To gauge the effectiveness of a cleaning session, calculate the overall permeability of the membranes before versus after the session has been performed. Refer to the example below when calculating membrane permeability. EXAMPLE: A subsystem has a typical operating temperature of 20C (68F) (T1) and an actual (observed) operating temperature of 15C (59F) (T2). The permeate flowrate was recorded at 3,285.4 lpm (868 gpm) at a membrane pressure of 0.414 bar (6 psi), while total membrane surface area equals 4,548.53 m2 (48,960 ft2). 1. Calculate the membrane area:
Membrane area per train Number of modules per cassette Number of cassettes x per train Surface area per module

48 modules per cassette

3 cassettes per train

x 340 ft2 per module = 48,960 ft2 per train

ZeeWeed 500D - Calculations A-172

Rev. 0 June, 2010

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

GE Water & Process Technologies Operation & Maintenance Manual

2. Convert flow rate to flux at the observed temperature:


Flow Membrane surface area per train Number of minutes per day

Flux at 59F =

868 gpm 48,960 in.2 per train

x 1,440 minutes per day = 25.5 gfd

3. Correct the flux value from the observed temperature (15C (59F)) (T2) to the reference temperature (20C (68F)) (T1). Viscosity values required for this calculation can be found in Table A.9.3 - Water Viscosity.
Table A.9.3 - Water Viscosity Temperature Viscosity C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Temperature Viscosity C
23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

Temperature Viscosity C
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65

F
34 36 37 39 41 43 45 46 48 50 52 54 55 57 59 61 63 64 66 68 70 72

cP
1.7311 1.6736 1.6192 1.5677 1.5188 1.4723 1.4281 1.3860 1.3459 1.3077 1.2712 1.2362 1.2029 1.1709 1.1403 1.1109 1.0828 1.0558 1.0298 1.0049 0.9809 0.9578

F
73 75 77 79 81 82 84 86 88 90 91 93 95 97 99 100 102 104 106 108 109 111

cP
0.9356 0.9142 0.8935 0.8736 0.8544 0.8359 0.8180 0.8007 0.7840 0.7679 0.7523 0.7372 0.7225 0.7084 0.6946 0.6813 0.6685 0.6560 0.6438 0.6321 0.6207 0.6096

F
113 115 117 118 120 122 124 126 127 129 131 133 135 136 138 140 142 144 145 147 149

cP
0.5988 0.5884 0.5782 0.5683 0.5587 0.5494 0.5403 0.5315 0.5229 0.5145 0.5064 0.4984 0.4907 0.4832 0.4758 0.4687 0.4617 0.4549 0.4482 0.4418 0.4355

Rev. 0 June, 2010

ZeeWeed 500D - Calculations A-173

GE Water & Process Technologies Operation & Maintenance Manual

200326 SCLA Industrial Wastewater Treatment Facility ZeeWeed MBR-Ultrafiltration System

Flux at T1 = Flux at T2 x

viscosity at T1 viscosity at T2

25.5 gfd

1.0049 = 1.1403

22.47 gfd

4. Using the recorded membrane pressure, convert the temperature-corrected flux to membrane permeability.
Membrane permeability Corrected flux Membrane pressure

22.47 gfd 6 psi

3.7 gfd per 1 psi

In order to accurately assess the effectiveness of a cleaning procedure, measure and record the membrane permeability immediately before and after each cleaning session is performed.

ZeeWeed 500D - Calculations A-174

Rev. 0 June, 2010