You are on page 1of 1

LINE OF EXISTING B

2,185 WINDO 12,4

LINE OF EX

350

35

600

2,298

350

DP
350

950 DOOR

DP 270
7 A05

3,100 4,005

110 350 3,800

2,298

950 DOOR

270
7 A05 3,345

3,100 4,005

110 350

11

DP
350

2,410

PRACTICE ROOM
CPT 6.80m2

PRACTICE ROOM
CPT 6.80m2

PRACTICE ROOM
CPT 6.80m2

RACTICE ROOM DP
CPT 6.80m2

PRACTICE ROOM
CPT 6.80m2

PRACTICE ROOM
CPT 6.80m2

2,298

DP
350

2,298

3,345

REMOVE EXISTING WALL AND DAIS

230

270 328 110 350 355

2,400 2,185 WINDOW 2,400 2,185 WINDOW

110 350 110 350

2,400 2,185 WINDOW 2,400 2,185 WINDOW

5 OW 2,400

2,185 WINDOW

950 3,022 A7 & A8: CURRENT FRENCH AND MATHEM ATICS CLASSROOMS DOOR REFURBI SH AND FIT 2,185 OUT FOR FOOD 350 2,185 350 955 TECHNOLOGY SV WINDOW OPENING 22,195 270 2,285 950 3,022 1,900 DOOR DOOR 350 2,185 955 7,985 OPENING 22,195

110

2,400

270

2,285

1,900 DOOR 7,985 2,698 270

2,698

REMOVE WET AREA FITOUT INCLUDING PARTITIONS, FITTINGS,FIXTURES AND FLOOR COVERINGS 270 REMOVE EXISTING WALL
REMOVE EXISTING DIAS

230

270

270

INTERVIEW

carste STUDIO P T Y LT D
GENERAL REFURBISHMENTS AND REPAIR TO BUILDING TO OVERCOME RISING DAMP AND EXISTING DAMAGE, TO INCLUDE THE INSTALLATIN OF SUB-FLOOR VENTILATION
INTERVIEW
CPT

ABN 16122394450

trading as

ACN 122394450

stephen
Architects

booker
and Heritage

architect
Consultants

E: CURRENT BOOK HIRE ROOM REFURBISH AND FIT OUT FOR PANTY AND LAUNDRY
SV

NEW RAMP
WAITING
CPT

1:14

p: (02) 4951 2578 m: 0427 432 720 f: ( 0 2 ) 4 9 5 0 0 5 9 1 e: b o o k e r a r c h @ t p g . c o m . a u a: P O B o x 1 4 9 Wa l l s e n d 2 2 8 7

NEW BULKHEAD OVER


NEW WALLS

NEW WALLS

CLERICAL
CPT
REMOVE EXISTING DOOR INFILL AND MAKE GOOD

RECEPTION
CPT
REMOVE EXISTING PANELS TO WALL AND REINSTATE OPENING

WC

All information, concepts and ideas contained herein are the property of Carste Studio Pty Ltd and may not be distributed and/ or reproduced without express permission from Carste Studio Pty Ltd. It is the responsibility of the builder to check and verify all dimensions on-site prior to the commencement of work and to notify Carste Studio Pty Ltd of any errors and omissions. Do not scale drawing. Do not use drawing for consrtuction purposes unless issued by Carste Studio Pty Ltd for construction.

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE
CBR

REMOVE DAIS AND STEPS

INTERVIEW
CPT

SICK BAY
A6: CURRENT PHYSICAL EDUCATION CLASSROOM GENERAL REFURBISHMENT AND FIT OUT FOR PERFORMING ARTS
CPT

SV
NEW WALL AND SHELVING

SICK BAY
SV

Project:
Client: CATHOLIC SCHOOLS OFFICE

Shelving above desk


REPLACE EXISTING WINDOW WITH DOOR. RETAIN WINDOW
NEW COVERED WALKWAY WITHIN LIGHTWELL

Shelving above desk

Diocese of Maitland - Newcastle

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE

Roof above

Project Name:
BURSAR
CPT
REPLACE EXISTING WALL AND INSTALL NEW WINDOWS

DUPLICATING ROOM
CPT
REMOVE EXISTING DIAS

Alterations & Additions: San Clemente Catholic High School 78 Havelock Street Mayfield
Project No:
OPENING OPENING
DOOR

SECURE STORE

B3: CURRENT FOOD TECHNOLOGY CLASSROOM REFURBISH AND INSTALL NEW FIT-OUT
REFURBISHMENTS TO INCLUDE THE INSTALLATION OF CEILING AND SUBFLOOR VENTILATION SV

NEW WALL

06:01
North Point:

CBR

CPT

REMOVE EXISTING WALL

N
EXISTING STAIR

NEW STAIR 01

REMOVE EXISTING WALL AND DOOR AND MAKE GOOD

REMOVE EXISTING STAIR AND MAKE GOOD

B3: CURRENT PANTRY AND LAUNDRY REFURBISH AND INSTALL NEW FIT-OUT FOR PANTRY
REFURBISHMENTS TO INCLUDE THE INSTALLATION OF CEILING AND SUBFLOOR VENTILATION SV

A5: CURRENT MUSIC CLASSROOM GENERAL REFURBISHMENT AND FIT OUT FOR PERFORMING ARTS
CPT

ING WITH D LEVEL

CT

WINDOW

WC: WOMEN GENERAL REFURBISHMENT AND NEW FITOUT

REMOVE INTERNAL PARTITIONS, WALLS, FITTINGS AND FIXTURES AND MAKE GOOD. REPLACE ENTRY DOOR WITH NEW UNIT COMPLIANT WITH AS AND BCA.

Bar Scale:
DP
0 1 2 3 4 5

LINE OF EXISTING DEMOUNTABLE

WINDOW

Legend:

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE

AL CBR CC CPT DP FB1 FB2 MC MR SC SV

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE
CBR

LINE OF EXISTING BUILDING

ART C AL ALUMINIUM LOUVRES CBR CONCRETE - BROOM FINISH CC OFFORM CONCRETE COLUMN - CLASS 2 FINISH CPT CARPET FLOOR FINISH ALUMINIUM LOUVRES DP COLORBOND DOWNPIPE - SHALE GREY CONCRETE BROOM FINISH FB1 FACE BRICK - TO MATCH EXISTING OFFORMFB2 CONCRETE COLUMN - LIGHT CLASSCONTRAST 2 FINISH TO EXISTING FACE BRICK CARPET MC FLOOR FINISH COLOROBOND METAL ROOF CAPPING COLORBOND DOWNPIPE - SHALE GREY SHALE GREY FACE BRICK EXISTING MR - TO MATCH COLORBOND METAL ROOF SHEETING - SHALE GR FACE BRICK CONTRAST TO SC - LIGHT STEEL COLUMN - EXISTING GALVANISED COLOROBOND METAL ROOF CAPPING DP SV SHEET VINYL FLOOR-FINISH SHALE GREY COLORBOND METAL ROOF SHEETING - SHALE GREY AR STEEL COLUMN - GALVANISED SHEET VINYL FLOOR FINISH
DOOR

CBR

Amendments:
DOOR

Rev:

Detail:

Date:

DP
WINDOW

DP

DP
WINDOW

OPENING

GROUND FLOOR WALKWAY


CBR RL 19.00m

DP

DOOR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE
CBR

BOOK HIRE
CPT 28.55m2 WINDOW

ENTRY
SV 10.60m2

Computers

DOORS

WINDOW

WINDOW

D r a w i n g WINDOW :
Title:

WINDOW

TORE

Refurbishment Plans: Ground Floor


Scale:
LINE OF EXISTING BUILDING
LIBRARIAN OFFICE/ WORKROOM
CPT 35.70m2

1:100
LIBRARY

Date: Status:
Catalogues

07.05.07 DA CDJ

CPT 243.65m2

Compactus

DOOR

Drawn: Drawing No.:

WALKWAY

Refurbishments: Ground Floor


WINDOW

06:01-DA-A06
7/5/07

Sta

1:100
AV STORE
CPT 9.00m2

Plot Date:

ING

You might also like