Professional Documents
Culture Documents
LINE OF EX
350
35
600
2,298
350
DP
350
950 DOOR
DP 270
7 A05
3,100 4,005
2,298
950 DOOR
270
7 A05 3,345
3,100 4,005
110 350
11
DP
350
2,410
PRACTICE ROOM
CPT 6.80m2
PRACTICE ROOM
CPT 6.80m2
PRACTICE ROOM
CPT 6.80m2
RACTICE ROOM DP
CPT 6.80m2
PRACTICE ROOM
CPT 6.80m2
PRACTICE ROOM
CPT 6.80m2
2,298
DP
350
2,298
3,345
230
5 OW 2,400
2,185 WINDOW
950 3,022 A7 & A8: CURRENT FRENCH AND MATHEM ATICS CLASSROOMS DOOR REFURBI SH AND FIT 2,185 OUT FOR FOOD 350 2,185 350 955 TECHNOLOGY SV WINDOW OPENING 22,195 270 2,285 950 3,022 1,900 DOOR DOOR 350 2,185 955 7,985 OPENING 22,195
110
2,400
270
2,285
2,698
REMOVE WET AREA FITOUT INCLUDING PARTITIONS, FITTINGS,FIXTURES AND FLOOR COVERINGS 270 REMOVE EXISTING WALL
REMOVE EXISTING DIAS
230
270
270
INTERVIEW
carste STUDIO P T Y LT D
GENERAL REFURBISHMENTS AND REPAIR TO BUILDING TO OVERCOME RISING DAMP AND EXISTING DAMAGE, TO INCLUDE THE INSTALLATIN OF SUB-FLOOR VENTILATION
INTERVIEW
CPT
ABN 16122394450
trading as
ACN 122394450
stephen
Architects
booker
and Heritage
architect
Consultants
E: CURRENT BOOK HIRE ROOM REFURBISH AND FIT OUT FOR PANTY AND LAUNDRY
SV
NEW RAMP
WAITING
CPT
1:14
NEW WALLS
CLERICAL
CPT
REMOVE EXISTING DOOR INFILL AND MAKE GOOD
RECEPTION
CPT
REMOVE EXISTING PANELS TO WALL AND REINSTATE OPENING
WC
All information, concepts and ideas contained herein are the property of Carste Studio Pty Ltd and may not be distributed and/ or reproduced without express permission from Carste Studio Pty Ltd. It is the responsibility of the builder to check and verify all dimensions on-site prior to the commencement of work and to notify Carste Studio Pty Ltd of any errors and omissions. Do not scale drawing. Do not use drawing for consrtuction purposes unless issued by Carste Studio Pty Ltd for construction.
RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE
CBR
INTERVIEW
CPT
SICK BAY
A6: CURRENT PHYSICAL EDUCATION CLASSROOM GENERAL REFURBISHMENT AND FIT OUT FOR PERFORMING ARTS
CPT
SV
NEW WALL AND SHELVING
SICK BAY
SV
Project:
Client: CATHOLIC SCHOOLS OFFICE
RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE
Roof above
Project Name:
BURSAR
CPT
REPLACE EXISTING WALL AND INSTALL NEW WINDOWS
DUPLICATING ROOM
CPT
REMOVE EXISTING DIAS
Alterations & Additions: San Clemente Catholic High School 78 Havelock Street Mayfield
Project No:
OPENING OPENING
DOOR
SECURE STORE
B3: CURRENT FOOD TECHNOLOGY CLASSROOM REFURBISH AND INSTALL NEW FIT-OUT
REFURBISHMENTS TO INCLUDE THE INSTALLATION OF CEILING AND SUBFLOOR VENTILATION SV
NEW WALL
06:01
North Point:
CBR
CPT
N
EXISTING STAIR
NEW STAIR 01
B3: CURRENT PANTRY AND LAUNDRY REFURBISH AND INSTALL NEW FIT-OUT FOR PANTRY
REFURBISHMENTS TO INCLUDE THE INSTALLATION OF CEILING AND SUBFLOOR VENTILATION SV
A5: CURRENT MUSIC CLASSROOM GENERAL REFURBISHMENT AND FIT OUT FOR PERFORMING ARTS
CPT
CT
WINDOW
REMOVE INTERNAL PARTITIONS, WALLS, FITTINGS AND FIXTURES AND MAKE GOOD. REPLACE ENTRY DOOR WITH NEW UNIT COMPLIANT WITH AS AND BCA.
Bar Scale:
DP
0 1 2 3 4 5
WINDOW
Legend:
RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE
RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE
CBR
ART C AL ALUMINIUM LOUVRES CBR CONCRETE - BROOM FINISH CC OFFORM CONCRETE COLUMN - CLASS 2 FINISH CPT CARPET FLOOR FINISH ALUMINIUM LOUVRES DP COLORBOND DOWNPIPE - SHALE GREY CONCRETE BROOM FINISH FB1 FACE BRICK - TO MATCH EXISTING OFFORMFB2 CONCRETE COLUMN - LIGHT CLASSCONTRAST 2 FINISH TO EXISTING FACE BRICK CARPET MC FLOOR FINISH COLOROBOND METAL ROOF CAPPING COLORBOND DOWNPIPE - SHALE GREY SHALE GREY FACE BRICK EXISTING MR - TO MATCH COLORBOND METAL ROOF SHEETING - SHALE GR FACE BRICK CONTRAST TO SC - LIGHT STEEL COLUMN - EXISTING GALVANISED COLOROBOND METAL ROOF CAPPING DP SV SHEET VINYL FLOOR-FINISH SHALE GREY COLORBOND METAL ROOF SHEETING - SHALE GREY AR STEEL COLUMN - GALVANISED SHEET VINYL FLOOR FINISH
DOOR
CBR
Amendments:
DOOR
Rev:
Detail:
Date:
DP
WINDOW
DP
DP
WINDOW
OPENING
DP
DOOR
RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE
CBR
BOOK HIRE
CPT 28.55m2 WINDOW
ENTRY
SV 10.60m2
Computers
DOORS
WINDOW
WINDOW
D r a w i n g WINDOW :
Title:
WINDOW
TORE
1:100
LIBRARY
Date: Status:
Catalogues
07.05.07 DA CDJ
CPT 243.65m2
Compactus
DOOR
WALKWAY
06:01-DA-A06
7/5/07
Sta
1:100
AV STORE
CPT 9.00m2
Plot Date:
ING