You are on page 1of 36

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

PLANILLA DE METRADOS
OBRA

: CONSTRUCCION Y EQUIPAMIENTO PUESTO DE SALUD DE CARUMAS


ESTABLECIMIENTO PUESTO DE SALUD DE CARUMAS
PROPIETARIO : HOSPITAL REGIONAL MANUEL NUEZ BUTRON PUNO
CODIGO

DESCRIPCION

UND LARGO ANCHO ALTO N VECES PARCIAL

01

OBRAS PROVISIONALES

01,01,01

ALMACEN CASETA DE GUARDIANIA

M2

01,01,02

CARTEL DE OBRA

Glb.

02

TRABAJOS PRILIMINARES

02,01

LIMPIEZA DEL TERRENO


EJE A-G ENTRE 1-4

M2

3.00

24.50

3.00

13.00

1.00

9.00

9.00

1.00

1.00

1.00

1.00

318.50

TOTAL
02,02

318.50

TRAZO, NIVELES Y REPLANTEO PRELIMINAR


EJE 1-1 ENTRE A-G

M2

1.20

1.20

7.00

EJE 2-2 ENTRE A-G

M2

1.20

1.20

2.00

10.08
2.88

EJE 2-2 ENTRE A-G

M2

1.50

1.50

5.00

11.25

EJE 3-3 ENTRE A-G

M2

1.20

1.20

2.00

2.88

EJE 3-3 ENTRE A-G

M2

1.50

1.50

5.00

11.25

EJE 4-4 ENTRE A-G

M2

1.20

1.20

7.00

10.08

EJE A-A ENTRE 1-4

M2

7.25

0.60

1.00

4.35

EJE A-A ENTRE 1-4

M2

6.00

0.50

1.00

3.00

EJE B-B ENTRE 1-4

M2

6.80

0.50

1.00

3.40

EJE B-B ENTRE 1-4

M2

2.30

0.50

1.00

1.15

EJE C-C ENTRE 1-4

M2

7.25

0.60

1.00

4.35

EJE C-C ENTRE 1-4

M2

2.30

0.50

1.00

1.15

EJE D-D ENTRE 1-4

M2

5.50

0.50

1.00

2.75

EJE E-E ENTRE 1-4

M2

7.25

0.60

1.00

4.35

EJE F-F ENTRE 1-4

M2

12.80

0.50

1.00

6.40

EJE G-G ENTRE 1-4

M2

2.65

0.60

1.00

1.59

EJE 1-1 ENTRE A-G

M2

15.90

0.60

1.00

9.54

EJE 2-2 ENTRE A-G

M2

15.90

0.60

1.00

9.54

EJE 2-2 ENTRE A-G

M2

12.90

0.50

1.00

6.45

EJE 3-3 ENTRE A-G

M2

15.90

0.60

1.00

9.54

EJE 3-3 ENTRE A-G

M2

3.30

0.50

1.00

1.65

EJE 4-4 ENTRE A-G

M2

15.90

0.60

1.00

9.54

TOTAL
03

MOVIMIENTO DE TIERRAS

03,01

NIVELACION DE TERRENO

03,01,01

NIVELADO Y APISIONADO
EJE A-G ENTRE 1-4

M2

24.50

13.00

1.00

127.17

318.50

TOTAL
03,02,01

TOTAL

318.50

EXCAVACIONES PARA CIMIENTOS ZAPATAS TERRENO NORMAL.


EJE 1-1 ENTRE A-G

M3

1.20

1.20

1.50

7.00

EJE 2-2 ENTRE A-G

M3

1.20

1.20

1.50

2.00

15.12
4.32

EJE 2-2 ENTRE A-G

M3

1.50

1.50

1.50

5.00

16.88

EJE 3-3 ENTRE A-G

M3

1.20

1.20

1.50

2.00

4.32

EJE 3-3 ENTRE A-G

M3

1.50

1.50

1.50

5.00

16.88

EJE 4-4 ENTRE A-G

M3

1.20

1.20

1.50

7.00

15.12
72.63

03,03,01

EXCAVACIONES ZANJAS PARA CIMIENTOS CORRIDO


EJE A-A ENTRE 1-4

M3

7.25

0.60

1.00

1.00

4.35

EJE A-A ENTRE 1-4

M3

6.00

0.50

1.00

1.00

3.00

EJE B-B ENTRE 1-4

M3

6.80

0.50

1.00

1.00

3.40

EJE B-B ENTRE 1-4

M3

2.30

0.50

1.00

1.00

1.15

EJE C-C ENTRE 1-4

M3

7.25

0.60

1.00

1.00

4.35

EJE C-C ENTRE 1-4

M3

2.30

0.50

1.00

1.00

1.15

EJE D-D ENTRE 1-4

M3

5.50

0.50

1.00

1.00

2.75

EJE E-E ENTRE 1-4

M3

7.25

0.60

1.00

1.00

4.35

EJE F-F ENTRE 1-4

M3

12.80

0.50

1.00

1.00

6.40

EJE G-G ENTRE 1-4

M3

2.65

0.60

1.00

1.00

1.59

EJE 1-1 ENTRE A-G

M3

15.90

0.60

1.00

1.00

9.54

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

EJE 2-2 ENTRE A-G

M3

15.90

0.60

1.00

1.00

9.54

EJE 2-2 ENTRE A-G

M3

12.90

0.50

1.00

1.00

6.45

EJE 3-3 ENTRE A-G

M3

15.90

0.60

1.00

1.00

9.54

EJE 3-3 ENTRE A-G

M3

3.30

0.50

1.00

1.00

1.65

EJE 4-4 ENTRE A-G

M3

15.90

0.60

1.00

1.00

9.54

TOTAL
03,04,01

03,05,01

78.75

EXCAVACION MANUAL DE VEREDA


EJE 1-1 ENTRE A-G

M3

24.00

1.00

0.30

1.00

7.20

EJE 4-4 ENTRE A-G

M3

24.00

1.00

0.30

1.00

7.20

EJE A-A ENTRE 1-4

M3

11.00

1.00

0.30

1.00

3.30

EJE G-G ENTRE 1-4

M3

11.00

1.00

0.30

1.00

3.30

EJE 1-1 ENTRE A-G

M3

0.95

0.95

0.90

7.00

5.69

EJE 2-2 ENTRE A-G

M3

0.95

0.95

0.90

2.00

1.62

EJE 2-2 ENTRE A-G

M3

1.05

1.25

0.90

5.00

5.91

EJE 3-3 ENTRE A-G

M3

0.95

0.95

0.90

2.00

1.62

EJE 3-3 ENTRE A-G

M3

1.05

1.25

0.90

5.00

5.91

EJE 4-4 ENTRE A-G

M3

0.95

0.95

0.90

7.00

5.69

21.00

RELLENO COMPACTADO A MANO CON MATERIAL PROPIO


ZAPATAS

TOTAL
03,05,02

26.43

ELIMINACION DE MATERIAL EXCEDENTE 25% DE ESPONJAMIENTO


VOLUMEN EXCAVADO =

M3

72.63

VOLUMEN DE RELLENO =

M3

26.43

78.49 21.00

26.43
#####

VOLUMEN ELIMINADO =
04

OBRAS DE CONCRETO SIMPLE

04,01,01

SOLADO PARA ZAPATA fc'=100 Kg/CM2

172.12

M3

1.25

182.11

TOTAL

182.11

EJE 1-1 ENTRE A-G

M3

1.20

1.20

0.10

7.00

1.01

EJE 2-2 ENTRE A-G

M3

1.20

1.20

0.10

2.00

0.29

EJE 2-2 ENTRE A-G

M3

1.50

1.50

0.10

5.00

1.13

EJE 3-3 ENTRE A-G

M3

1.20

1.20

0.10

2.00

0.29

EJE 3-3 ENTRE A-G

M3

1.50

1.50

0.10

5.00

1.13

EJE 4-4 ENTRE A-G

M3

1.20

1.20

0.10

7.00

1.01

TOTAL
04,02,01

4.84

CIMIENTOS CORRIDOS (M3) 1:10+30% PG.


CIMIENTOS
EJE A-A ENTRE 1-4

M3

10.25

0.60

0.80

1.00

4.92

EJE A-A ENTRE 1-4

M3

6.00

0.50

0.80

1.00

2.40

EJE B-B ENTRE 1-4

M3

8.80

0.50

0.80

1.00

3.52

EJE B-B ENTRE 1-4

M3

2.30

0.50

0.80

1.00

0.92

EJE C-C ENTRE 1-4

M3

10.25

0.60

0.80

1.00

4.92

EJE C-C ENTRE 1-4

M3

3.30

0.50

0.80

1.00

1.32

EJE D-D ENTRE 1-4

M3

8.00

0.50

0.80

1.00

3.20

EJE E-E ENTRE 1-4

M3

10.25

0.60

0.80

1.00

4.92

EJE F-F ENTRE 1-4

M3

15.80

0.50

0.80

1.00

6.32

EJE G-G ENTRE 1-4

M3

15.80

0.60

0.80

1.00

7.58

EJE G-G ENTRE 1-4

M3

2.65

0.50

0.80

1.00

1.06

EJE 1-1 ENTRE A-G

M3

18.90

0.60

0.80

1.00

9.07

EJE 2-2 ENTRE A-G

M3

18.90

0.60

0.80

1.00

9.07

EJE 2-2 ENTRE A-G

M3

12.90

0.50

0.80

1.00

5.16

EJE 3-3 ENTRE A-G

M3

18.90

0.60

0.80

1.00

9.07

EJE 3-3 ENTRE A-G

M3

3.30

0.50

0.80

1.00

1.32

EJE 4-4 ENTRE A-G

M3

15.90

0.60

0.80

1.00

7.63

TOTAL

82.41

04.03.01

SOBRECIMIENTO 1:8 + 25 % P.M.

EJES

EJE A-A ENTRE 1-4

M3

9.95

0.25

0.20

1.00

0.50

EJE A-A ENTRE 1-4

M3

4.20

0.15

0.20

1.00

0.13

EJE B-B ENTRE 1-4

M3

11.55

0.15

0.20

1.00

0.35

EJE C-C ENTRE 1-4

M3

6.80

0.15

0.20

1.00

0.20

EJE C-C ENTRE 1-4

M3

3.00

0.15

0.20

1.00

0.09

EJE D-D ENTRE 1-4

M3

7.65

0.15

0.20

1.00

0.23

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

EJE E-E ENTRE 1-4

M3

4.45

0.15

0.20

1.00

0.13

EJE F-F ENTRE 1-4

M3

12.65

0.15

0.20

1.00

0.38

EJE G-G ENTRE 1-4

M3

9.95

0.25

0.20

1.00

0.50

EJE 1-1 ENTRE A-G

M3

21.25

0.25

0.20

1.00

1.06

EJE 2-2 ENTRE A-G

M3

10.80

0.15

0.20

1.00

0.32

EJE 2-2 ENTRE A-G

M3

3.95

0.15

0.20

1.00

0.12

EJE 3-3 ENTRE A-G

M3

12.75

0.15

0.20

1.00

0.38

EJE 4-4 ENTRE A-G

M3

21.25

0.25

0.20

1.00

1.06

TOTAL
04,03,02

EJE A-A ENTRE 1-4

M2

9.95

0.20

2.00

3.98

EJE A-A ENTRE 1-4

M2

4.20

0.20

2.00

1.68

EJE B-B ENTRE 1-4

M2

11.55

0.20

2.00

4.62

EJE C-C ENTRE 1-4

M2

6.80

0.20

2.00

2.72

EJE C-C ENTRE 1-4

M2

3.00

0.20

2.00

1.20

EJE D-D ENTRE 1-4

M2

7.65

0.20

2.00

3.06

EJE E-E ENTRE 1-4

M2

4.45

0.20

2.00

1.78

EJE F-F ENTRE 1-4

M2

12.65

0.20

2.00

5.06

EJE G-G ENTRE 1-4

M2

9.95

0.20

2.00

3.98

EJE 1-1 ENTRE A-G

M2

21.25

0.20

2.00

8.50

EJE 2-2 ENTRE A-G

M2

10.80

0.20

2.00

4.32

EJE 2-2 ENTRE A-G

M2

3.95

0.20

2.00

1.58

EJE 3-3 ENTRE A-G

M2

12.75

0.20

2.00

5.10

EJE 4-4 ENTRE A-G

M2

21.25

0.20

2.00

8.50

05

OBRAS DE CONCRETO ARMADO

05,01

ZAPTAS

05.01.01

5.45

ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO

TOTAL

56.08

14.02

ZAPATA CONCRETO Fc' = 175 Kg/CM2


EJE 1-1 ENTRE A-G

M3

1.20

1.20

0.40

7.00

4.03

EJE 2-2 ENTRE A-G

M3

1.20

1.20

0.40

2.00

1.15

EJE 2-2 ENTRE A-G

M3

1.50

1.50

0.40

5.00

4.50

EJE 3-3 ENTRE A-G

M3

1.20

1.20

0.40

2.00

1.15

EJE 3-3 ENTRE A-G

M3

1.50

1.50

0.40

5.00

4.50

EJE 4-4 ENTRE A-G

M3

1.20

1.20

0.40

7.00

4.03

TOTAL
05.01.02

19.37

ENCOFRADO Y DESENCOFRADO
EJE 1-1 ENTRE A-G

M2

4.80

0.50

7.00

EJE 2-2 ENTRE A-G

M2

4.80

0.50

2.00

16.80
4.80

EJE 2-2 ENTRE A-G

M2

5.20

0.50

5.00

13.00

TOTAL
05.01.03

34.60

ACERO FY=4200 KG/CM2 DE 1/2"


VER METRADO DE ACERO

05,02
05.02.01

VIGAS DE CIMENTACION
CONCRETO Fc' = 175 Kg/CM2
1-1 ENTRE A-G

M3

22.25

0.25

0.30

4.00

6.68

A-A ENTRE 1-4

M3

10.00

0.25

0.30

8.00

6.00

TOTAL
05.02.02

12.68

ENCOFRADO Y DESENCOFRADO
1-1 ENTRE A-G

M2

22.25

0.60

2.00

26.70

A-A ENTRE 1-4

M2

11.00

0.60

4.00

26.40

TOTAL
05.02.03

53.10

ACERO FY=4200 KG/CM2 DE 1/2"


VER METRADO DE ACERO

05,03

COLUMNAS (PORTANTES)

05.03.01

CONCRETO Fc =175 Kg/CM2


EJE 1-4 ENTRE A-G

M3

4.10

0.25

0.25

28.00

7.18

TOTAL
05.03.02

7.18

ENCOFRADO Y DESENCOFRADO
EJE 1-4 ENTRE A-G

M2

3.60

0.50

7.00
TOTAL

12.60
12.60

HOSPITAL REGIONAL MANUEL NUEZ BUTRON


05.03.03

ACERO FY=4200 KG/CM2


VER METRADO DE ACERO

05,04

VIGAS

05.04.01

CONCRETO Fc =175 Kg/CM2


EJE A-G ENTRE 1-4

M3

11.20

0.25

0.30

7.00

5.88

EJE 1-4 ENTRE A-G

M3

23.50

0.25

0.20

4.00

4.70

TOTAL
05.04.02

10.58

ENCOFRADO Y DESENCOFRADO
EJE A-G ENTRE 1-4

M2

11.20

0.75

2.00

16.80

EJE 1-4 ENTRE A-G

M2

23.50

0.25

2.00

11.75

TOTAL
05.04.03

28.55

ACERO FY=4200 KG/CM2


VER METRADO DE ACERO

05,05

LOSA ALIGERADO

05,06

CONCRETO Fc =175 Kg/CM2


EJE 1-4 ENTRE A-G

M3

23.50

0.10

0.15

28.00

9.87

EJE 1-4 ENTRE A-G

M3

3.50

3.50

0.05

18.00

11.03

EJE 1-4 ENTRE A-G

M3

3.50

0.60

0.05

18.00

1.89

TOTAL
05,07

22.79

ENCOFRADO Y DESENCOFRADO
EJE 1-4 ENTRE A-G

M2

3.20

3.20

18.00

184.32

EJE 1-4 ENTRE A-G

M2

18.20

0.60

2.00

21.84

EJE A-G ENTRE 1-4

M2

8.60

0.60

2.00

10.32

EJE 1-4 ENTRE A-G

M2

56.55

0.20

2.00

22.62

TOTAL
05,08

VER METRADO DE ACERO


05,09

239.10

ACERO FY=4200 KG/CM2


LADRILLO DE TECHO PASTELERO

KG
UND

3.50
207.90

06

ESTRUCTURA DE MADERA Y COBERTURAS

06.01.01

HABILITACION DE TIJERALESTIJERALES
TIJERALES DE MADERA L=MAYOR

UND

TIJERALES DE MADERA L=MENOR

UND

3.30 18.00
11.00

207.90

1.00

2286.90

7.00
6.00
TOTAL

13.00

06,01,02

COLOCACION DE TIJERALES

UND

13.00

13.00

06,01,03

CORREAS 2" X 3 " X 10 P

UND

117.00

117.00

06,02,01

FRISO DE MADERA 1" X 6"

ML

73.10

73.10

07

COBERTURAS

07,01

TEJA ANDINA

M2

320.00

320.00

07,02

CUMBRERA DE PLANCHA TEJA ANDINA

ML

47.30

47.30

08

MURO Y TABEQUERIA DE ALBAILERIA

08,01,01

MUROS DE LADRILLOS CABEZA KIN KON (6X12X24 CM)

08,01,02

EJE A-A ENTRE 1-4

M2

9.95

2.40

1.00

23.88

EJE G-G ENTRE 1-4

M2

9.95

2.40

1.00

23.88

EJE 1-1 ENTRE A-G

M2

21.25

2.40

1.00

51.00

EJE 4-4 ENTRE A-G

M2

21.25

2.40

1.00

51.00

EJE A-A ENTRE 1-4 (-)

M2

1.00

1.00

1.00

1.00

EJE G-G ENTRE 1-4 (-)

M2

3.00

1.60

1.00

4.80

EJE 1-1 ENTRE A-G (-)

M2

2.00

1.00

1.00

2.00

EJE 1-1 ENTRE A-G (-)

M2

9.80

1.60

1.00

15.68

EJE 4-4 ENTRE A-G (-)

M2

6.00

1.00

1.00

6.00

EJE 4-4 ENTRE A-G (-)

M2

8.00

1.00

1.00

8.00

TOTAL

149.76

37.48

MUROS DE LADRILLOS SOGA KIN KON (6X12X24 CM)


EJE A-A ENTRE 1-4

M2

4.20

2.60

1.00

10.92

EJE B-B ENTRE 1-4

M2

11.55

2.60

1.00

30.03

EJE C-C ENTRE 1-4

M2

6.80

2.60

1.00

17.68

EJE C-C ENTRE 1-4

M2

3.00

2.60

1.00

7.80

EJE D-D ENTRE 1-4

M2

7.65

2.60

1.00

19.89

EJE E-E ENTRE 1-4

M2

4.45

2.60

1.00

11.57

EJE F-F ENTRE 1-4

M2

12.65

2.60

1.00

32.89

EJE 2-2 ENTRE A-G

M2

10.80

2.60

1.00

28.08

112.28

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

EJE 2-2 ENTRE A-G

M2

3.95

2.60

1.00

10.27

EJE 3-3 ENTRE A-G

M2

12.75

2.60

1.00

33.15

EJE 4-4 ENTRE A-G

M2

21.25

2.60

1.00

55.25

EJE D-D ENTRE 1-4 (-)

M2

2.00

1.60

1.00

3.20

TOTAL

257.53

3.20

09

REVOQUES ENLUCIDOS Y MOLDURAS

09,01,01

TARRAJEO PRIMARIO O RAYADO


EJE 2-2 ENTRE A-B

M2

9.90

1.60

1.00

15.84

EJE A-A ENTRE 2-3

M2

7.05

1.60

1.00

11.28

EJE A-A ENTRE 3-4

M2

19.50

1.60

1.00

31.20

EJE B-B ENTRE 3-4

M2

10.20

1.60

1.00

16.32

EJE C-C ENTRE 3-4

M2

16.65

1.60

1.00

26.64

EJE F-F ENTRE 3-4

M2

6.65

1.60

1.00

10.64

EJE F-F ENTRE 3-4

M2

6.45

1.60

1.00

10.32

EJE D-D,F-F ENTRE 1-2

M2

31.88

1.60

1.00

51.01

EJE 2-2 ENTRE C-F

M2

15.51

1.60

1.00

24.82

EJE C-C ENTRE 1-2

M2

7.55

1.60

1.00

12.08

EJE C-C ENTRE 1-2

M2

11.20

1.60

1.00

17.92

EJE 1-1, 2-2 ENTRE A-B

M2

19.00

1.60

1.00

30.40

EJE A-A ENTRE 1-2

M2

6.75

1.60

1.00

10.80

TOTAL
09,02

TARRAJEO EN INTERIORES

09,02,01

TARRAJEO DE INTERIORES C-A- 1-5

09,03,01

269.26

EJE 2-2 ENTRE A-B

M2

6.35

1.00

1.00

EJE A-A ENTRE 2-3

M2

4.40

1.00

1.00

6.35
4.40

EJE A-A ENTRE 3-4

M2

13.10

1.00

1.00

13.10

EJE C-C ENTRE 3-4

M2

6.90

1.00

1.00

6.90

EJE B-B ENTRE 3-4

M2

5.95

1.00

1.00

5.95

EJE C-C ENTRE 3-4

M2

11.65

1.00

1.00

11.65

EJE D-D,E-E ENTRE 3-4

M2

11.60

2.60

1.00

30.16

EJE E-E,F-F ENTRE 3-4

M2

11.60

2.60

1.00

30.16

EJE F-F ENTRE 3-4

M2

6.65

1.00

1.00

6.65

EJE F-F,G-G ENTRE 3-4

M2

13.00

2.60

1.00

33.80

EJE F-F ENTRE 3-4

M2

6.65

1.00

1.00

6.65

EJE 2-2 ENTRE F-G

M2

5.55

2.60

1.00

14.43

EJE F-F,G-G ENTRE 1-2

M2

8.50

2.60

2.00

44.20

EJE 1-1, 2-2 ENTRE A-B

M2

18.30

1.00

1.00

18.30

EJE F-F ENTRE 3-4

M2

4.40

1.00

1.00

4.40

EJE D-D ENTRE A-B

M2

7.40

2.60

1.00

19.24

EJE C-C ENTRE 1-2

M2

7.30

1.00

1.00

7.30

EJE 1-1, 2-2 ENTRE A-B

M2

12.30

1.00

1.00

12.30

EJE A-A ENTRE 1-2

M2

5.40

1.00

1.00

5.40

EJE 1-4 ENTRE A-G

M2

2.10

1.25

12.00

31.50

EJE 1-4 ENTRE A-G

M2

0.80

0.85

12.00

8.16

EJE 1-4 ENTRE A-G

M2

1.00

1.25

5.00

6.25

EJE 1-4 ENTRE A-G

M2

1.10

1.25

3.00

4.13

TOTAL

281.34

50.04

281.34

231.30

TARRAJEO EXTERIOR
EJE 1-1 ENTRE A_G

M2

7.25

2.60

1.00

18.85

EJE 1-1 ENTRE A_G

M2

10.00

1.00

1.00

10.00

EJE 1-1 ENTRE A_G

M2

2.00

1.60

1.00

3.20

EJE 2-2 ENTRE A_G

M2

7.25

2.60

1.00

18.85

EJE 2-2 ENTRE A_G

M2

11.00

1.00

1.00

11.00

EJE 2-2 ENTRE A_G

M2

3.00

1.60

1.00

4.80

EJE A-A ENTRE 1-4

M2

10.00

2.60

1.00

26.00

EJE A-A ENTRE 1-4

M2

1.00

1.60

1.00

1.60

EJE B-B ENTRE 1-4

M2

8.00

2.60

1.00

20.80

EJE B-B ENTRE 1-4

M2

1.50

1.00

2.00

3.00

TOTAL
09,04,01

254.33

118.10

TARRAJEO DE COLUMNAS
EJE 1-4 ENTRE A-G

M2

2.60

0.50

28.00
TOTAL

36.40
36.40

HOSPITAL REGIONAL MANUEL NUEZ BUTRON


09,05,01

TARRAJEO DE VIGAS
EJE A-G ENTRE 1-4

M2

12.20

0.45

7.00

38.43

EJE 1-4 ENTRE A-G

M2

22.00

0.25

4.00

22.00

TOTAL
09,06,01

60.43

VESTIDURAS DE DERRAMES
EJE 1-1 ENTRE D-E

ML

10.40

1.00

10.40

EJE B-B- ENTRE 3-4

ML

7.00

1.00

7.00

EJE 4-4 ENTRE B-C

ML

6.40

1.00

6.40

EJE 2-2 ENTRE B-F

ML

6.20

9.00

55.80

EJE 2-2- ENTRE A-B

ML

6.00

4.00

24.00

EJE 2-2- ENTRE A-B

ML

5.90

6.00

35.40

EJE G-G ENTRE 1-4

ML

6.00

2.00

12.00

EJE 1-1, 4-4 ENTRE A-G

ML

5.00

17.00

85.00

EJE 1-1, 4-4 ENTRE A-G

ML

4.00

8.00

32.00

EJE A-A ENTE 1-4

ML

3.60

1.00

3.60

EJE G-G ENTRE 1-4

ML

3.60

1.00

3.60

EJE D-D,F-F ENTE 1-2

ML

3.00

2.00

6.00

TOTAL
09,07

CIELO RASOS

09,07,01

CIELO RASO CON YESO

281.20

EJE 2-2 ENTRE A-B

M2

3.05

1.80

1.00

EJE A-A ENTRE 2-3

M2

2.40

1.10

1.00

5.49
2.64

EJE A-A ENTRE 3-4

M2

5.00

4.15

1.00

20.75

EJE C-C ENTRE 3-4

M2

3.40

2.40

1.00

8.16

EJE B-B ENTRE 3-4

M2

3.40

1.20

1.00

4.08

EJE C-C ENTRE 3-4

M2

5.00

3.30

1.00

16.50

EJE D-D,E-E ENTRE 3-4

M2

5.00

3.35

1.00

16.75

EJE E-E,F-F ENTRE 3-4

M2

4.20

3.35

1.00

14.07

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE F-F,G-G ENTRE 3-4

M2

4.80

3.35

1.00

16.08

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE 2-2 ENTRE F-G

M2

3.00

2.20

1.00

6.60

EJE F-F,G-G ENTRE 1-2

M2

4.20

3.40

1.00

14.28

EJE 1-1, 2-2 ENTRE A-B

M2

6.80

3.50

1.00

23.80

EJE 2-2 ENTRE C-F

M2

12.40

1.80

1.00

22.32

EJE D-D ENTRE A-B

M2

3.30

2.10

1.00

6.93

EJE F-F ENTRE 3-4

M2

2.60

1.00

1.00

2.60

EJE C-C ENTRE 1-2

M2

3.40

2.10

1.00

7.14

EJE 1-1, 2-2 ENTRE A-B

M2

5.00

3.40

1.00

17.00

EJE A-A ENTRE 1-2

M2

2.20

1.10

1.00

2.42

TOTAL
10

PISOS Y PAVIMENTO

10,01

EMPEDRADO DE PISO

10,02

EMPEDRADO PARA FALSO PISO SOBRE CAMA COMPACTADO

212.23

EJE 2-2 ENTRE A-B

M2

3.05

1.80

1.00

EJE A-A ENTRE 2-3

M2

2.40

1.10

1.00

5.49
2.64

EJE A-A ENTRE 3-4

M2

5.00

4.15

1.00

20.75

EJE C-C ENTRE 3-4

M2

3.40

2.40

1.00

8.16

EJE B-B ENTRE 3-4

M2

3.40

1.20

1.00

4.08

EJE C-C ENTRE 3-4

M2

5.00

3.30

1.00

16.50

EJE D-D,E-E ENTRE 3-4

M2

5.00

3.35

1.00

16.75

EJE E-E,F-F ENTRE 3-4

M2

4.20

3.35

1.00

14.07

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE F-F,G-G ENTRE 3-4

M2

4.80

3.35

1.00

16.08

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE 2-2 ENTRE F-G

M2

3.00

2.20

1.00

6.60

EJE F-F,G-G ENTRE 1-2

M2

4.20

3.40

1.00

14.28

EJE 1-1, 2-2 ENTRE A-B

M2

6.80

3.50

1.00

23.80

EJE 2-2 ENTRE C-F

M2

12.40

1.80

1.00

22.32

EJE D-D ENTRE A-B

M2

3.30

2.10

1.00

6.93

EJE F-F ENTRE 3-4

M2

2.60

1.00

1.00

2.60

EJE C-C ENTRE 1-2

M2

3.40

2.10

1.00

7.14

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

EJE 1-1, 2-2 ENTRE A-B

M2

5.00

3.40

1.00

17.00

EJE A-A ENTRE 1-2

M2

2.20

1.10

1.00

2.42

TOTAL
10,03

PISO DE CEMENTO

10,04

FALSO PISO E=4" (MEZCLA 1:10 CEMENTO HORMIGON)

212.23

EJE 2-2 ENTRE A-B

M2

3.05

1.80

1.00

EJE A-A ENTRE 2-3

M2

2.40

1.10

1.00

5.49
2.64

EJE A-A ENTRE 3-4

M2

5.00

4.15

1.00

20.75

EJE C-C ENTRE 3-4

M2

3.40

2.40

1.00

8.16

EJE B-B ENTRE 3-4

M2

3.40

1.20

1.00

4.08

EJE C-C ENTRE 3-4

M2

5.00

3.30

1.00

16.50

EJE D-D,E-E ENTRE 3-4

M2

5.00

3.35

1.00

16.75

EJE E-E,F-F ENTRE 3-4

M2

4.20

3.35

1.00

14.07

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE F-F,G-G ENTRE 3-4

M2

4.80

3.35

1.00

16.08

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE 2-2 ENTRE F-G

M2

3.00

2.20

1.00

6.60

EJE 1-1, 2-2 ENTRE A-B

M2

4.20

3.40

1.00

14.28

EJE 2-2 ENTRE C-F

M2

6.80

3.50

1.00

23.80

EJE D-D ENTRE A-B

M2

12.40

1.80

1.00

22.32

EJE F-F ENTRE 3-4

M2

3.30

2.10

1.00

6.93

EJE C-C ENTRE 1-2

M2

2.60

1.00

1.00

2.60

EJE C-C ENTRE 1-2

M2

3.40

2.10

1.00

7.14

EJE 1-1, 2-2 ENTRE A-B

M2

5.00

3.40

1.00

17.00

EJE A-A ENTRE 1-2

M2

2.20

1.10

1.00

2.42

TOTAL
10,06

209.81

PISO VINILICO 2.5 MM


EJE C-C ENTRE 3-4

M2

3.40

2.40

1.00

8.16

EJE D-D,E-E ENTRE 3-4

M2

5.00

3.35

1.00

16.75

EJE E-E,F-F ENTRE 3-4

M2

4.20

3.35

1.00

14.07

EJE F-F,G-G ENTRE 3-4

M2

4.80

3.35

1.00

16.08

EJE 2-2 ENTRE F-G

M2

3.00

2.20

1.00

6.60

EJE F-F,G-G ENTRE 1-2

M2

4.20

3.40

1.00

14.28

EJE D-D ENTRE A-B

M2

3.30

2.10

1.00

6.93

TOTAL
10,08

10,09

82.87

PISO CERAMICO ANTIDESLIZANTE DE 30 X 30 CM


EJE 2-2 ENTRE A-B

M2

3.05

1.80

1.00

EJE A-A ENTRE 2-3

M2

2.40

1.10

1.00

5.49
2.64

EJE A-A ENTRE 3-4

M2

5.00

4.15

1.00

20.75

EJE B-B ENTRE 3-4

M2

3.40

1.20

1.00

4.08

EJE C-C ENTRE 3-4

M2

5.00

3.30

1.00

16.50

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE 1-1, 2-2 ENTRE A-B

M2

6.80

3.50

1.00

23.80

EJE 2-2 ENTRE C-F

M2

12.40

1.80

1.00

22.32

EJE F-F ENTRE 3-4

M2

2.60

1.00

1.00

2.60

EJE C-C ENTRE 1-2

M2

3.40

2.10

1.00

7.14

EJE 1-1, 2-2 ENTRE A-B

M2

5.00

3.40

1.00

17.00

EJE A-A ENTRE 1-2

M2

2.20

1.10

1.00

2.42

TOTAL

212.23

EJE 1-1 ENTRE A-G

M3

24.20

1.00

0.10

1.00

2.42

EJE 4-4 ENTRE A-G

M3

24.20

1.00

0.10

1.00

2.42

EJE A-A ENTRE 1-4

M3

11.00

1.00

0.10

1.00

1.10

EJE G-G ENTRE 1-4

M3

11.00

1.00

0.10

1.00

1.10

TOTAL
10,11

129.36

CONCRETO FC=175 KG/CM2 PARA VEREDA A= 1.00

7.04

ENCOFRADO DE VEREDA Y SARDINELES


EJE 1-1 ENTRE A-G

M2

24.20

0.30

1.00

7.26

EJE 4-4 ENTRE A-G

M2

24.20

0.30

1.00

7.26

EJE A-A ENTRE 1-4

M2

11.00

0.30

1.00

3.30

EJE G-G ENTRE 1-4

M2

11.00

0.30

1.00

3.30

TOTAL

21.12

HOSPITAL REGIONAL MANUEL NUEZ BUTRON


10,12

SARDINEL PARA VEREDAS FC=175 KG/CM2


EJE 1-1 ENTRE A-G

ML

24.20

1.00

24.20

EJE 4-4 ENTRE A-G

ML

24.20

1.00

24.20

EJE A-A ENTRE 1-4

ML

13.00

1.00

13.00

EJE G-G ENTRE 1-4

ML

13.00

1.00

13.00

TOTAL
10,03

74.40

EMPEDRADO PARA FALSO PISO Y VEREDA E = 0.10 CM


EJE 1-1 ENTRE A-G

M2

24.20

0.25

1.00

6.05

EJE 4-4 ENTRE A-G

M2

24.20

0.25

1.00

6.05

EJE A-A ENTRE 1-4

M2

11.00

0.25

1.00

2.75

EJE G-G ENTRE 1-4

M2

11.00

0.25

1.00

2.75

TOTAL
11

CONTRAZOCALOS

11,01

CONTRAZOCALO DE MADERA AGUANO 3/4" C/RODON

17.60

EJE C-C ENTRE 3-4

ML

11.65

1.00

11.65

EJE D-D,E-E ENTRE 3-4

ML

17.15

1.00

17.15

EJE E-E,F-F ENTRE 3-4

ML

14.15

1.00

14.15

EJE F-F,G-G ENTRE 3-4

ML

19.15

1.00

19.15

EJE 2-2 ENTRE F-G

M2

11.80

1.00

11.80

EJE F-F,G-G ENTRE 1-2

ML

15.45

1.00

15.45

EJE D-D ENTRE A-B

ML

10.85

1.00

10.85

TOTAL
12

ZOCALOS

12,01

ZOCALOS DE MAYOLICAS 20 X30 CM COLOR PRIMERA

100.20

EJE 2-2 ENTRE A-B

M2

9.90

1.60

1.00

15.84

EJE A-A ENTRE 2-3

M2

7.05

1.60

1.00

11.28

EJE A-A ENTRE 3-4

M2

19.50

1.60

1.00

31.20

EJE B-B ENTRE 3-4

M2

10.20

1.60

1.00

16.32

EJE C-C ENTRE 3-4

M2

16.65

1.60

1.00

26.64

EJE F-F ENTRE 3-4

M2

6.65

1.60

1.00

10.64

EJE F-F ENTRE 3-4

M2

6.45

1.60

1.00

10.32

EJE 1-1, 2-2 ENTRE A-B

M2

31.88

1.60

1.00

51.01

EJE 2-2 ENTRE C-F

M2

15.51

1.60

1.00

24.82

EJE F-F ENTRE 3-4

M2

7.55

1.60

1.00

12.08

EJE C-C ENTRE 1-2

M2

11.20

1.60

1.00

17.92

EJE 1-1, 2-2 ENTRE A-B

M2

19.00

1.60

1.00

30.40

EJE A-A ENTRE 1-2

M2

6.75

1.60

1.00

10.80

EJE A-G ENTRE 1-4

M2

1.00

1.00

1.00

1.00

TOTAL
12,02

270.26

ENCHAPE DE PIEDRA LAJA O SIMILAR


EJE 1-1 ENTRE A_G

M2

10.00

1.00

1.00

EJE 1-1 ENTRE A_G

M2

2.00

1.60

1.00

10.00
3.20

EJE 2-2 ENTRE A_G

M2

11.00

1.00

1.00

11.00

EJE 2-2 ENTRE A_G

M2

3.00

1.60

1.00

4.80

EJE A-A ENTRE 1-4

M2

1.00

1.60

1.00

1.60

EJE B-B ENTRE 1-4

M2

1.50

1.00

2.00

3.00

TOTAL
12,03

33.60

ZOCALO DE CEMENTO PULIDO SIN COLOREAR H=0.30 M


EJE 1-1 ENTRE A_G

M2

7.25

0.30

1.00

2.18

EJE 2-2 ENTRE A_G

M2

7.25

0.30

1.00

2.18

EJE A-A ENTRE 1-4

M2

10.00

0.30

1.00

3.00

EJE B-B ENTRE 1-4

M2

8.00

0.30

1.00

2.40

TOTAL
13

CARPINTERIA DE MADERA

13,01,01

PUERTA DE MADERA TABLERO REBAJADOS DE 4.5 MM DE CEDRO

9.75

EJE 1-1 ENTRE D-E

M2

2.60

2.00

1.00

5.20

EJE B-B- ENTRE 3-4

M2

2.60

1.80

1.00

4.68

TOTAL
13,01,02

9.88

PUERTA CONTRAPLACADA DE 35 mm CON TRIPLAY 4 MM INCLUYE MARCO CEDRO 2 X 3 "


EJE 4-4 ENTRE B-C

M2

2.60

1.20

1.00

3.12

EJE 2-2 ENTRE B-F

M2

2.60

1.00

9.00

23.40

EJE 2-2- ENTRE A-B

M2

2.60

0.80

4.00

8.32

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

EJE 2-2- ENTRE A-B

M2

2.60

0.70

6.00

10.92

TOTAL
13,01,03

45.76

MUEBLE DE MADERA
EJE D-D,F-F ENTRE A-2

M2

1.00

0.30

2.00

0.60

TOTAL
14

CARPINTERIA METALICA Y HERRERIA

14,01,01

VENTANA DE FIERRO PERFIL DE 1" X 1/8" FIJA MARCO 1" DE 1"

0.60

EJE G-G ENTRE 1-4

M2

1.50

1.50

2.00

4.50

EJE 1-1, 4-4 ENTRE A-G

M2

1.50

1.00

17.00

25.50

EJE 1-1, 4-4 ENTRE A-G

M2

1.00

1.00

8.00

8.00

EJE A-A ENTE 1-4

M2

1.00

0.80

1.00

0.80

EJE G-G ENTRE 1-4

M2

1.50

0.80

1.00

1.20

TOTAL
15

CERRAJERIA

15,01

BISADRA ALUMINZADA CAPUCHINA 3" X 3"

40.00

P1-2

UND

6.00

3.00

P-3

UND

3.00

1.00

18.00
3.00

P-4

UND

3.00

9.00

27.00

P-5

UND

3.00

4.00

12.00

P-6

UND

3.00

5.00

15.00

TOTAL
16

CERRADURAS

16,01

CERRADURA EXTER FORTE 3 GOLP PUERTA PRINCIPAL

PZA

3.00

75.00
3.00

TOTAL
16,02

3.00

CERRADURA PTA. INTERIOS PESTILLO MANIJA


P-3

UND

1.00

1.00

1.00

P-4

UND

1.00

9.00

9.00

P-5

UND

1.00

4.00

4.00

P-6

UND

1.00

5.00

5.00

TOTAL
16,03

CERROJO DE FIERRO REDONDO DE 1/2" X 0.35 M

PZA

2.00

16,04

MANIJA DE BRONCE PARA PUERTAS

PZA

2.00

17

VIDRIOS CRISTALES Y SIMILARES

17,01

VIDRIOS DOBLES NACIONALES

3.00

19.00
6.00

TOTAL
3.00

6.00
6.00

TOTAL

17,02

EJE G-G ENTRE 1-4

M2

1.50

1.50

2.00

4.50

EJE 1-1, 4-4 ENTRE A-G

M2

1.50

1.00

17.00

25.50

EJE 1-1, 4-4 ENTRE A-G

M2

1.00

1.00

8.00

8.00

EJE A-A ENTE 1-4

M2

1.00

0.80

1.00

0.80

EJE G-G ENTRE 1-4

M2

1.50

0.80

1.00

1.20

SUBTOTAL

40.00

TOTAL

430.40

4.00

10.50

P2

40.00

10.76

M2

2.10

1.25

430.40

VIDRIOS GRISES DE 7/32" BELGA


V-6

P2
17,03

6.00

10.50

10.76

SUBTOTAL

10.50

TOTAL

112.98

112.98

5.00

5.00

5.00

5.49

ESPEJO DE SOBREPONER
ESPEJO BAOS

18

PINTURAS

18,01

PINTURA VINILICA EN CIELO RASO 2 MANOS

UND

EJE 2-2 ENTRE A-B

M2

3.05

1.80

1.00

EJE A-A ENTRE 2-3

M2

2.40

1.10

1.00

2.64

EJE A-A ENTRE 3-4

M2

5.00

4.15

1.00

20.75

EJE C-C ENTRE 3-4

M2

3.40

2.40

1.00

8.16

EJE B-B ENTRE 3-4

M2

3.40

1.20

1.00

4.08

EJE C-C ENTRE 3-4

M2

5.00

3.30

1.00

16.50

EJE D-D,E-E ENTRE 3-4

M2

5.00

3.35

1.00

16.75

EJE E-E,F-F ENTRE 3-4

M2

4.20

3.35

1.00

14.07

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

EJE F-F,G-G ENTRE 3-4

M2

4.80

3.35

1.00

16.08

EJE F-F ENTRE 3-4

M2

2.10

1.10

1.00

2.31

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

10

EJE 2-2 ENTRE F-G

M2

3.00

2.20

1.00

6.60

EJE 1-1, 2-2 ENTRE A-B

M2

4.20

3.40

1.00

14.28

EJE 2-2 ENTRE C-F

M2

6.80

3.50

1.00

23.80

EJE D-D ENTRE A-B

M2

12.40

1.80

1.00

22.32

EJE F-F ENTRE 3-4

M2

3.30

2.10

1.00

6.93

EJE C-C ENTRE 1-2

M2

2.60

1.00

1.00

2.60

EJE C-C ENTRE 1-2

M2

3.40

2.10

1.00

7.14

EJE 1-1, 2-2 ENTRE A-B

M2

5.00

3.40

1.00

17.00

EJE A-A ENTRE 1-2

M2

2.20

1.10

1.00

2.42

TOTAL
18,02

PINTURA EN MUROS

18,02,01

PINTURA VINILICA EN MURO INTERIOR

18,03

212.23

EJE A-A ENTRE 2-3

M2

6.35

1.00

1.00

6.35

EJE A-A ENTRE 3-4

M2

13.10

1.00

1.00

13.10

EJE C-C ENTRE 3-4

M2

6.90

1.00

1.00

6.90

EJE B-B ENTRE 3-4

M2

5.95

1.00

1.00

5.95

EJE C-C ENTRE 3-4

M2

11.65

1.00

1.00

11.65

EJE D-D,E-E ENTRE 3-4

M2

11.60

2.70

1.00

31.32

EJE E-E,F-F ENTRE 3-4

M2

11.60

2.70

1.00

31.32

EJE F-F,G-G ENTRE 3-4

M2

13.00

2.70

1.00

35.10

EJE 2-2 ENTRE F-G

M2

5.55

2.70

1.00

14.99

EJE 1-1, 2-2 ENTRE A-B

M2

8.50

2.70

2.00

45.90

EJE 2-2 ENTRE C-F

M2

18.30

1.00

1.00

18.30

EJE C-C ENTRE 1-2

M2

4.40

1.00

1.00

4.40

EJE A-A ENTRE 1-2

M2

5.40

1.00

1.00

5.40

EJE C-C ENTRE 1-2

M2

7.30

1.00

1.00

7.30

EJE 1-1, 2-2 ENTRE A-B

M2

12.30

1.00

1.00

12.30

V-1 (-)

M2

2.10

1.25

12.00

31.50

V-2 (-)

M2

0.80

0.85

12.00

8.16

V-3 (-)

M2

1.00

1.25

5.00

6.25

V-4 (-)

M2

1.10

1.25

3.00

4.13

TOTAL

250.28

50.04

EJE 1-1 ENTRE A_G

M2

7.25

2.80

1.00

20.30

EJE 2-2 ENTRE A_G

M2

7.25

2.80

1.00

20.30

EJE A-A ENTRE 1-4

M2

10.00

2.80

1.00

28.00

EJE B-B ENTRE 1-4

M2

8.00

2.80

1.00

22.40

TOTAL
18,04

200.24

PINTURA VINILICA EN MURO EXTERIORES DOS MANOS

91.00

PINTURA EN COLUMNAS VIGAS Y DERRAMES


COLUMNAS
INTERIORES Y EXTERIORES

M2

2.60

0.50

28.00

36.40

EJE A - G VIGAS PRINCIPALES

M2

12.20

0.45

7.00

38.43

EJE 1-4 VIGAS SECUNDARIAS

M2

22.00

0.25

4.00

22.00

EJE 1-1 ENTRE D-E

ML

10.40

0.15

1.00

1.56

EJE B-B- ENTRE 3-4

ML

7.00

0.15

1.00

1.05

EJE 4-4 ENTRE B-C

ML

6.40

0.15

1.00

0.96

EJE 2-2 ENTRE B-F

ML

6.20

0.15

9.00

8.37

EJE 2-2- ENTRE A-B

ML

6.00

0.15

4.00

3.60

EJE 2-2- ENTRE A-B

ML

5.90

0.15

5.00

4.43

EJE 2-2- ENTRE A-B

ML

7.00

0.15

1.00

1.05

EJE G-G ENTRE 1-4

ML

6.00

0.15

2.00

1.80

EJE 1-1, 4-4 ENTRE A-G

ML

5.00

0.15

17.00

12.75

EJE 1-1, 4-4 ENTRE A-G

ML

4.00

0.15

8.00

4.80

EJE A-A ENTE 1-4

ML

3.60

0.15

1.00

0.54

EJE G-G ENTRE 1-4

ML

3.60

0.15

1.00

0.54

EJE G-G ENTRE 1-4

ML

3.00

0.15

2.00

0.90

VIGAS

DERRAMES

TOTAL
18,05

139.18

PINTURA BARNIZ ENCHAPE PIEDRA LAJA


EJE 1-1 ENTRE A_G

M2

10.00

1.00

1.00

10.00

EJE 1-1 ENTRE A_G

M2

2.00

1.60

1.00

3.20

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

11

EJE 2-2 ENTRE A_G

M2

11.00

1.00

1.00

11.00

EJE 2-2 ENTRE A_G

M2

3.00

1.60

1.00

4.80

EJE A-A ENTRE 1-4

M2

1.00

1.60

1.00

1.60

EJE B-B ENTRE 1-4

M2

1.50

1.00

2.00

3.00

TOTAL
18,06

33.60

PINTURAS EN PUERTAS Y OTROS CON ESMALTE


EJE 1-1 ENTRE D-E

M2

2.60

2.00

2.00

10.40

EJE B-B- ENTRE 3-4

M2

2.60

1.80

2.00

9.36

EJE 4-4 ENTRE B-C

M2

2.60

1.20

2.00

6.24

EJE 2-2 ENTRE B-F

M2

2.60

1.00

18.00

46.80

EJE 2-2- ENTRE A-B

M2

2.60

0.80

8.00

16.64

EJE 2-2- ENTRE A-B

M2

2.60

0.70

12.00

21.84

TOTAL
18,07

PINTURA EN CARPINTERIA METALICA Y HERRERIA

18,07,01

VETANA DE FIERRO PINTURA ANTICORROSIVA

91.52

EJE G-G ENTRE 1-4

M2

1.50

1.50

2.00

4.50

EJE 1-1, 4-4 ENTRE A-G

M2

1.50

1.00

17.00

25.50

EJE 1-1, 4-4 ENTRE A-G

M2

1.00

1.00

8.00

8.00

EJE A-A ENTE 1-4

M2

1.00

0.80

1.00

0.80

EJE G-G ENTRE 1-4

M2

1.50

0.80

1.00

1.20

TOTAL
19

VARIOS

19,01

JUNTA ASFALTICA E=1

ML

1.00

22.00

40.00
22.00

TOTAL
20

CANALETA DE AGUAS FLUVIALES

20,01

CANALETA CIRCULAR F G DE 6"

22.00

EJE 1-6

ML

23.25

2.00

46.50

EJE A-C

ML

13.00

2.00

26.00

TOTAL
20,02

72.50

TUBERIA DE BAJADA Y DISTRIB PVC 3"


EJE 1- 6 ENTRE A - B

ML

5.40

4.00

21.60

TOTAL
20,03

21.60

PROTECCION DE C/A P/MONTANTE H=1.80 M


EJE 1- 6 ENTRE A - B

ML

1.80

4.00

7.20

TOTAL
21

APARATOS SANITARIOS Y ACCESORIOS

21,01

INODORO TANQUE BAJO DE COLOR


INCLUYE COLOCACION Y ACCESORIO

21,02

7.20

UND

5.00

5.00

5.00

LAVATORI DE PARED COLOR 2 LLAVES


INCLUYE LLAVES

UND

8.00

8.00

8.00

21,03

URINARIO DE LOSA PICO COLORADO PORCELANA

UND

1.00

1.00

1.00

21,04

LAVADERO DE ACERO INOXIDABLE

21,04,01

ACERO INOXIDABLE 01 POZA/ ACCESORIOS

UND

1.00

1.00

1.00

21,05,01

ACERO INOXIDABLE 02 POZA ACCESORIOS

UND

1.00

1.00

1.00

21,06

DUCHAS

21,06,01

DUCHA CROMADO DE CABEZA GIRATORIO I/LLAVE

UND

2.00

2.00

2.00

21,06,02

PAPELERA DE LOZA A COLOR 15 X 15 CM

UND

5.00

5.00

5.00

21,06,03

JABONERA DE LOSA BLANCO

UND

2.00

2.00

2.00

21,06,04

TOHALLERA COBARRA

UND

8.00

8.00

8.00

21,06,05

GANCHO DOBLE COLOR

UND

8.00

8.00

8.00

21,06,06

COLOCACION DE APARATOS CORRIENTES

UND

18.00

18.00

18.00

21,06,07

COLOCACION DE ACCESORIOS SANITARIOS

UND

18.00

18.00

18.00

22

INSTALACIONES SANITARIAS

22,01,01

PUNTO DE SALIDA DE DESAGUE

PTO

23.00

23.00

23.00

22,01,02

SALIDA DE VENTILACION PVC 2"

PTO

4.00

4.00

4.00

22,02

REDES DE DISTRIBUCION

22,02,01

TUBERIA PVC A=7.5 DE DESAGUE 6"

ML

47.00

1.00

47.00

47.00

22,02,02

TUBERIA PVC DE DESAGUE 4"

ML

20.70

1.00

20.70

20.70

22.02.03

TUBERIA PVC DE DESAGUE 2"

ML

20.60

1.00

20.60

20.60

22,03

ADITAMENTOS VARIOS

22,03,01

SUMEDEROS DE 2"

7.00

7.00

7.00

UND

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

12

22,03,02

REGISTROS DE BRONCE DE 4"

UND

4.00

4.00

4.00

22,03,03

SOMBRERO DE VENTILACION PVC 2"

UND

4.00

4.00

4.00

22,04

REDES COLECTORAS

22,04,01

EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE

M3

88.30

0.30

0.40

1.00

10.60

10.60

22,04,02

RELLENO DE ZANJA CON MATERIAL SELECCIONADO

M3

88.30

0.30

0.20

1.00

5.30

5.30

22,04,03

RELLENO DE ZANJA CON MATERIAL PROPIO

M3

88.30

0.30

0.20

1.00

5.30

5.30

22,05

CAMARAS DE INSPECCION

22.05.01

CAJA DE REGISTRO DESAGUE 12X24"

UND

3.00

3.00

3.00

23

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

23,01,01

SALIDA AGUA FRIA PVC 1/2"

PTO

18.00

18.00

18.00

23,02

REDES DISTRIBUCION

23,02,01

TUBERIA PVC CLASE 10 3/4" SAP

ML

46.50

1.00

46.50

46.50

23,02,02

TUBERIA PVC CLASE 10 1/2" SAP

ML

25.00

1.00

25.00

25.00

23,03

LLAVES VALVULAS

23,03,01

VALVULA COMPUERTA DE BRONCE 3/4"

UND

1.00

1.00

1.00

23,03,02

VALVULA COMPUERTA DE BRONCE 1/2"

UND

7.00

7.00

7.00

23,04

SISTEMA DE AGUA CALIENTE

23,04,01

SALIDA DE AGUA CALIENTE

PTO

2.00

2.00

2.00

23,04,02

DUCHA ELECTRICA

UND

2.00

2.00

2.00

24

INSTALACIONES ELECTRICAS

24,01

CENTRO DE LUZ

24,01,01

SALIDA DE TECHO

PTO

30.00

30.00

30.00

24,01,02

SALIDA DE PARED BRAQUETES CON PVC

PTO

4.00

4.00

4.00

24,01,03

SALIDA PARA SPOT LIGHT CON PVC

PTO

4.00

4.00

4.00

24,02

TOMACORRIENTE

24,02,01

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

PTO

57.00

57.00

57.00

24,02,02

SALIDA PARA TOMACORRIENTE BIPOLAR SIMPLE CON PVC

PTO

7.00

7.00

7.00

24,02,03

SALIDA PARA CENTRO DE LUZ CON INTERRUPTOR CONMUTACION


PTO

2.00

2.00

2.00

24,02,04

INTERRUPTORES DOBLES

PTO

9.00

9.00

9.00

25

TABLERO Y CUCHILLA

25,01

TABLERO GENERAL 2 X 15A, 1X20A,2X50 A

UND.

1.00

1.00

1.00

25,02

INTERRUPTOR TERMOMAGNETICO 2 X 50A

UND.

1.00

1.00

1.00

25,03

INTERRUPTOR TERMOMAGNETICO 2 X 20A

UND.

4.00

4.00

4.00

25,04

INTERRUPTOR TERMOMAGNETICO 2 X 15A

UND.

4.00

4.00

4.00

26

ARTEFACTOS DE ILUMINACION

26,01

ARTEFACTO 2 FLUORECENTES INC LAMPARA

UND

14.00

14.00

14.00

26,02

FLUORESENTE CIRCULAR 1X 40 W INC /EQUIPO

UND

16.00

16.00

16.00

26,03

ARTEFACTO TIPO WALLSOCKET /LAMPARA

UND

4.00

4.00

4.00

26,04

INTERRUPTOR SIMPLE

UND

10.00

10.00

10.00

26,05

INTERRUPTOR DOBLE

UND

9.00

9.00

9.00

26,06

TOMACORRIENTE DOBLE

UND

67.00

67.00

67.00

26,07

INTERUPTOR CONMUTATIVO

UND

2.00

2.00

2.00

27

SISTEMA DE PROTECCION

27,01

POZO PUESTA A TIERRA H=2.8M D=0.8M

PTO

1.00

1.00

1.00

28

CONEXIN A RED EXTERNA Y MEDIDOR

28,01

ALIMENTADOR TW N 10

1.00

50.00

50.00

29

PRUEBA DE LABORATORIO CONCRETO

29,01

ROPTURA DE BRIQUETA

12.00

12.00

12.00

LL

CONSTRUCCION DEL POZO SEPTICO

30

TRABAJOS PRELIMINARES

30,01,01

LIMPIEZA DE TERRENO

ML

50.00

UND

POZO DE PERCOLACION

M2

2.50

2.50

1.00

6.25

TANQUE SEPTICO

M2

3.40

2.40

1.00

8.16

CAJA DE DISTRIBUCION

M2

1.20

1.20

1.00

1.44

TUBERIA ENTREDA

M2

8.00

0.60

1.00

4.80

TUBERIA DE DISTRIBUCION

M2

16.00

0.60

1.00

9.60

TOTAL

30.25

30,02,01

TRAZO, NIVELES Y REPLANTEO PRELIMINAR

1.2.1

POZO DE PERCOLACION

M2

2.50

2.50

1.00

6.25

1.2.2

TANQUE SEPTICO

M2

3.40

2.40

1.00

8.16

1.2.3

CAJA DE DISTRIBUCION

M2

1.20

1.20

1.00

1.44

1.2.4

TUBERIA ENTREDA

M2

8.00

0.60

1.00

4.80

HOSPITAL REGIONAL MANUEL NUEZ BUTRON


1.2.5

TUBERIA DE DISTRIBUCION

13
M2

16.00

0.60

1.00

9.60

TOTAL
31

MOVIMIENTO DE TIERRAS

31,01

NIVELACION DE TERRENO

30.25

POZO DE PERCOLACION

M2

2.60

2.60

1.00

6.76

TANQUE SEPTICO

M2

3.80

2.80

1.00

10.64

CAJA DE DISTRIBUCION

M2

1.20

1.20

1.00

1.44

TUBERIA ENTREDA

M2

8.00

0.60

1.00

4.80

TUBERIA DE DISTRIBUCION

M2

16.00

0.60

1.00

9.60

TOTAL
31,02,01

33.24

EXCAVACION DE ZANJAS:
POZO DE PERCOLACION

M3

2.60

2.60

2.45

1.00

16.56

TANQUE SEPTICO

M3

3.80

2.80

1.95

1.00

20.75

CAJA DE DISTRIBUCION

M3

1.60

1.60

1.00

1.00

2.56

TUBERIA ENTREDA

M3

8.00

0.60

0.80

1.00

3.84

TUBERIA DE DISTRIBUCION

M3

16.00

0.60

0.80

1.00

7.68

TOTAL
31,03,01

51.39

RELLENO DE ZANJA CON MATERIAL PROPIO


POZO DE PERCOLACION

M3

0.20

0.20

2.45

1.00

0.10

TANQUE SEPTICO

M3

0.20

0.20

1.95

1.00

0.08

CAJA DE DISTRIBUCION

M3

0.20

0.20

1.00

1.00

0.04

TUBERIA ENTREDA

M3

8.00

0.50

0.50

1.00

2.00

TUBERIA DE DISTRIBUCION

M3

16.00

0.50

0.50

1.00

4.00

TOTAL
31,03,02

6.22

RELLENO Y COMPACTACION FONDO


TUBERIA DE DISTRIBUCION

ML

10.00

10.00

POZO DE PERCOLACION

ML

2.20

2.20

TANQUE SEPTICO

ML

3.40

3.40

CAJA DE DISTRIBUCION

ML

1.20

1.20
TOTAL

31,03,03

16.80

PREPARACION DE CAMA DE APOYO DE TUBO PVC DE 4"


TUBERIA DE DISTRIBUCION

ML

24.00

24.00
TOTAL

24.00

RELLENO CON CANTO RODADO


POZO PERCOLACION

M3

1.40

1.40

2.00

1.00

3.92

TOTAL
31,03,04

VOLUMEN EXCAVADO =

M3

44.67

VOLUMEN DE RELLENO =

M3

6.46

44.67
6.46
38.21

VOLUMEN ELIMINADO =
32
32,01

3.92

ELIMINACION DE MATERIAL EXCEDENTE

M3

1.25

47.76

TOTAL

47.76

OBRAS DE CONCRETO SIMPLE 175 Kg/cm2


CONCRETO SIMPLE 175 Kg/cm2
POZO DE PERCOLACION

M3

2.20

0.50

0.50

4.00

2.20

POZO DE PERCOLACION

M3

2.20

0.50

0.40

4.00

1.76

TANQUE SEPTICO

M3

3.60

2.60

0.10

1.00

0.94

CAJA DE DISTRIBUCION

M3

1.40

1.40

0.10

1.00

0.20

TOTAL
32,02

5.09

ENCOFRADO Y DESENCOFRADO
POZO DE PERCOLACION

M2

2.20

0.50

4.00

4.40

TANQUE SEPTICO

M2

3.60

2.60

1.00

9.36

CAJA DE DISTRIBUCION

M2

1.40

1.40

1.00

1.96

TOTAL
33
33,01

15.72

OBRAS DE CONCRETO ARMADO


CONCRETO SIMPLE 210 Kg/cm2
POZO DE PERCOLACION

M3

2.20

2.20

0.10

1.00

0.48

TANQUE SEPTICO

M3

3.40

2.40

0.10

2.00

1.63

CAJA DE DISTRIBUCION

M3

1.20

1.20

0.10

2.00

0.29

TOTAL
33,02

2.40

ENCOFRADO Y DESENCOFRADO
POZO DE PERCOLACION

M3

2.20

0.10

4.00

0.88

TANQUE SEPTICO

M3

3.40

0.10

4.00

1.36

HOSPITAL REGIONAL MANUEL NUEZ BUTRON


CAJA DE DISTRIBUCION

14
M3

1.20

0.10

4.00

0.48

TOTAL
33,03

2.72

ACERO FY= 4200 KG7CM2


VER METRADO DE ACEROS

34

MURO Y TABIQUERIA DE ALBANILERIA

34,02

MURO DE CABEZA
POZO DE PERCOLACION
LARGO

M2

1.90

1.40

2.00

ANCHO

M2

1.10

1.40

2.00

5.32
3.08

TANQUE SEPTICO

M2

3.40

1.50

2.00

10.20

TANQUE SEPTICO

M2

2.00

1.50

2.00

6.00

TOTAL
34,03

24.60

MURO DE SOGA
CAJA DE DISTRIBUCION

M2

1.20

0.50

2.00

1.20

CAJA DE DISTRIBUCION

M2

0.90

0.50

2.00

0.90

TOTAL
35

REVOQUES Y ENLUCIDOS Y MOLDURAS

35,01

TARRAJEO INTERIOR:

2.10

POZO DE PERCOLACION
LARGO

M2

1.20

0.90

2.00

2.16

ANCHO

M2

1.20

0.90

2.00

2.16

FONDO

M2

1.50

1.50

1.00

2.25

LARGO

M2

3.00

1.75

2.00

10.50

ANCHO

M2

2.00

1.75

2.00

7.00

FONDO

M2

3.00

2.00

1.00

6.00

LARGO

M2

0.90

0.50

2.00

0.90

ANCHO

M2

0.90

0.50

2.00

0.90

FONDO

M2

0.90

0.90

1.00

0.81

TANQUE SEPTICO

CAJA DE DISTRIBUCION

TOTAL
35,03

32.68

TARRAJEO EXTERIOR
POZO DE PERCOLACION
LARGO

M2

2.20

0.90

2.00

3.96

ANCHO

M2

1.20

0.90

2.00

2.16

LARGO

M2

3.40

1.95

2.00

13.26

ANCHO

M2

2.40

1.95

2.00

9.36

LARGO

M2

1.20

0.50

2.00

1.20

ANCHO

M2

1.20

0.50

2.00

1.20

TANQUE SEPTICO

CAJA DE DISTRIBUCION

TOTAL
36

INSTALACIONES SANITARIAS

36,01

TUBO PVC DE 4" DE DIAMETRO

ML

24

1.00

31.14
24

TOTAL
36,02

CODO 90 X 4

UND

36,03

TEE 90 X 4

UND

1.00

24.00
1.00

TOTAL
0.01

1.00
1.00

TOTAL
37

EQUIPAMIENTO

37,01,01

ESTERILIZACION

37,01,02

1.00

ESTERILIZADOR DE CALOR SECO MEDIANO DE 15 LITROS MARCA


UNDARMS1.00

1.00

1.00

1.00

CUBETA DE ACERO DE 30 X 20 X 5 CM

UND

5.00

5.00

5.00

5.00

TAMBOR METALICO 24 X 20

UND

3.00

3.00

3.00

3.00

TAMBOR METALICO 50 X 30

UND

3.00

3.00

3.00

3.00

ARMARIO METALICO DE INSTRUMENTO

UND

3.00

3.00

3.00

3.00

0.00

0.00

SALA DE PREPARACION DILATACION Y PARTO


CATRE METALICO CONCHON

UND

2.00

2.00

2.00

2.00

FRAZADA DE LANA

UND

4.00

4.00

4.00

4.00

ESCALINATA DE UN PELDAO

UND

2.00

2.00

2.00

2.00

INFANTOMETRO METAL PARA BEBES

UND

1.00

1.00

1.00

1.00

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

37,01,03

37,02,01

37,02,02

37,02,03

37,04,01

37,04,02

37,04,03

37,04,04

15

ESTETOSCOPIO ADULTO LITMAN

UND

1.00

1.00

1.00

1.00

TENSIOMETRO MERCURIAL CON BASE RODABLE RIESTER

UND

1.00

1.00

1.00

1.00

BALANZA DE PIE CON TALIMETRO ADULTO MARCA SECA ALEMAN


UND

1.00

1.00

1.00

1.00

CHATA DE FIERRO ENLOZADA

UND

1.00

1.00

1.00

1.00

SOPORTE DE VENOCLISIS

UND

1.00

1.00

1.00

1.00

BIOMBO METALICA DE 02 CUERPOS

UND

3.00

3.00

3.00

3.00

0.00

0.00

1.00

1.00

0.00

0.00

VESTIDOR
BANCA DE MADERA

UND

1.00

1.00

ARMARIO METALICO DE INSTRUMENTO

UND

1.00

1.00

SALA DE PARTOS
MESA DE ATENCION DE PARTO GINECOLOGICO

UND

1.00
1.00

1.00

1.00

UND

1.00
1.00

CAMILLA GINECOLOGICA RODABLE

1.00

1.00

ASPIRADOE DE SECRECIONES SOBRE MESA MARCA THOMASUND

1.00

1.00

1.00

1.00

CILINDRO DE OXIGENO MEDICINAL CON ACCESORIOS 6 M3

UND

1.00

1.00

1.00

1.00

ESTETOSCOPIO ADULTO LITMAN

UND

1.00

1.00

ESTETOSCOPIO PEDIATRICO LITMAN

UND

1.00

1.00

1.00

1.00

NEBULIZADOR ELECTRICO PORTATIL MARCA THOMAS

UND

1.00

1.00

1.00

1.00

RESPIRADOR MANUAL TIPO AMBU ADULTO

UND

1.00

1.00

1.00

1.00

RESPIRADOR MANUAL TIPO AMBU NEONATAL CILICONADO

UND

1.00

1.00

1.00

1.00

SET DE CURACIONES X 9 PIEZAS ALEMAN

UND

1.00

1.00

1.00

1.00

SET ATENCIN DEL PARTO X 8 PIEZAS BOB ALEMAN

UND

1.00

1.00

SET PARA PEQUEAS INTERVENSIONES QUIRURGICAS 9 PIEZA


UND

1.00

1.00

1.00

1.00

TENSIOMETRO MERCURIAL CON BASE RODABLE RIESTER

UND

1.00

1.00

1.00

1.00

CUBETA DE ACERO DE 30 X 20 X 5 CM

UND

3.00

3.00

3.00

3.00

TAMBOR METALICO 24 X 20

UND

3.00

3.00

3.00

3.00

ESTUFA DE AMBIENTE

UND

1.00

1.00

1.00

1.00

INCUVADORA RODABLE

UND

1.00

1.00

1.00

1.00

AMPLIFICADOR DE LATIDOS FETALES

UND

1.00

1.00

1.00

1.00

REFRIGERADORA ELECTRICA

UND

1.00

1.00

1.00

1.00

ESTETOSCOPIO PEDIATRICO LITMAN

UND

1.00

1.00

1.00

1.00

BALANZA DIGITAL PEDIATRICA DE SOBRE MESA M SOFHNLE UND

1.00

1.00

1.00

1.00

RECIEN NACIDO

SALA DE RECUPERACION
CATRE METALICO CONCHON

UND

2.00

2.00

2.00

2.00

FRAZADA DE LANA

UND

4.00

4.00

4.00

4.00

ESCALINATA DE UN PELDAO

UND

2.00

2.00

2.00

2.00

CHATA DE FIERRO ENLOZADA

UND

1.00

1.00

1.00

1.00

BIOMBO METALICA DE 02 CUERPOS

UND

1.00

1.00

1.00

1.00

ESCRITORIO METALICO

UND

1.00

1.00

1.00

1.00

SILLA GIRATORIO

UND

1.00

1.00

1.00

1.00

CAMILLA DE EXAMEN

UND

1.00

1.00

1.00

1.00

MESA O COCHE DE CURACIN

UND

1.00

1.00

1.00

1.00

BALANZA DE PIE CON TALIMETRO ADULTO MARCA SECA ALEMAN


UND

1.00

1.00

1.00

1.00

BALANZA DIGITAL PEDIATRICA DE SOBRE MESA M SOFHNLE UND

1.00

1.00

1.00

1.00

OTOSCOPIO PORTATIL MARCA RIESTER ALEMAN

UND

1.00

1.00

1.00

1.00

TENSIOMETRO ANEROIDE PORTATIL RIESTER ALEMAN

UND

1.00

1.00

1.00

1.00

LARINGOSCOPIO HOJAS INTERCAMBIABLES RIESTRE ALEMAN


UND

1.00

1.00

1.00

1.00

CONSULTORIOS MEDICO

CONSULTORIO GINECOLOGICO
MESA DE EXAMEN GINECOLOGICO

UND

1.00

1.00

1.00

1.00

ESCALINATA DE UN PELDAO

UND

1.00

1.00

1.00

1.00

ESCRITORIO METALICO

UND

1.00

1.00

1.00

1.00

SILLA GIRATORIO

UND

1.00

1.00

1.00

1.00

DETECTOR DE LATIDOS FETALES PORTATIL MARCA HUNTLESUND


USA

1.00

1.00

1.00

1.00

ESTETOSCOPIO ADULTO LITMAN

UND

1.00

1.00

1.00

1.00

TENSIOMETRO ANEROIDE PORTATIL RIESTER ALEMAN

UND

1.00

1.00

1.00

1.00

ESCRITORIO METALICO

UND

1.00

1.00

1.00

1.00

SILLA GIRATORIO

UND

1.00

1.00

1.00

1.00

ESCRITORIO METALICO

UND

1.00

1.00

1.00

1.00

SILLA GIRATORIO

UND

1.00

1.00

1.00

1.00

ADMINISTRACION

SECRETARIA

HOSPITAL REGIONAL MANUEL NUEZ BUTRON

37,04,05

37,04,06

37,04,07

37,04,08

16

COMPUTADORA PENTUN IV

UND

1.00

1.00

1.00

1.00

IMPRESORA LASER JET HP 1320

UND

1.00

1.00

1.00

1.00

ARMARIO METALICO DE INSTRUMENTO

UND

1.00

1.00

1.00

1.00

ESCRITORIO METALICO

UND

1.00

1.00

1.00

1.00

SILLA GIRATORIO

UND

1.00

1.00

1.00

1.00

ARMARIO METALICO DE INSTRUMENTO

UND

1.00

1.00

1.00

1.00

ESCRITORIO METALICO

UND

1.00

1.00

1.00

1.00

SILLA GIRATORIO

UND

1.00

1.00

1.00

1.00

ARMARIO METALICO DE INSTRUMENTO

UND

1.00

1.00

1.00

1.00

SILLAS

UND

6.00

6.00

6.00

6.00

TELEVISOR DE 24"

UND

1.00

1.00

1.00

1.00

EQUIPO DE RADIOS CON PANEL SOLAR

UND

1.00

1.00

1.00

1.00

TANQUE Y SISTERNA DE AGUA

UND

1.00

1.00

1.00

1.00

GLOB

1.00

1.00

1.00

GLOB

1.00

1.00

1.00

ADMISION

FARMACIA

SALUD COMUNITARIA Y AMBIENTAL(SALA DE ESPERA)

TRANSPORTES Y COMUNICACIONES

38

FLETE

38,01

FLETE TERRESTRE

39

PLACA RECORDATORIO

39,01

PLACA RECORDATORIO DE METAL


PUNO ABRIL 2007

HOJA DE METRADOS DE ACERO


Proyecto : CONSTRUCCION Y REEQUIPAMIENTO PUESTO DE SALUD DE CARUMAS
Descricpc
ion

Diseo de Fierro

Diametro

1.10

Z-1

1.40

Z-2

N Elem N Pza x Long x


Iguales
Elem
Pza
ZAPATAS

VC
AMARR
E
LATERA

23.10

0.25

11.00

0.25

3/8

Longitudes x Diametro
1/2

1/2

18

12

1.10

237.6

1/2

10

16

1.40

224

ml
Peso
Total
VIGAS DE CIMENTACION
VC
PRINCIP
AL

1/4

461.60
456.98
456.98

1/2

23.60

377.6

1/2

11.50

184

1/4

94

1.08

406.08

1/4

33

1.08

142.56

ml
Peso
Total

548.64
137.16

0.26
ESTRIB
OS VP

0.2

0.07

0.26
ESTRIB
OS VA

0.2

0.07

561.60
555.98
693.14

COLUMNAS
C-1

C-1

4.18

0.2

4.18

0.2

5/8

28

4.58

1/2

28

4.58

256.48

1/4

28

22

0.98

603.68

0.21
Estribos
C

Estribos
C

0.2

1/4

0.07

28

22

0.98

603.68

ml
Peso
Total

603.68
150.92

256.48
254.94
1,201.98

VIGAS
VP- 101
SUPERI
OR
VP-1 01
INFERIO
R
VP-1 01
REF.
SUP.

0.20

12.20

0.20

1.95
0

VP-1 01
REF.
SUP.
VS-101
REF. INF

12.20
#

2.50

1.35
0

VS-101
REF. INF

2.60

1/2

12.6

176.4

1/2

12.6

176.4

5/8

2.11

1/2

2.5

70

1/2

1.51

63.42

1/2

2.6

163.8

1/4

77

1.08

582.12

1/2

23.5

188

1/2

23.5

188

1/4

130

0.98

509.6

ml
Peso

######
272.93

0.26
ESTRIB
OS VP101
VA- 102
SUPERI
OR
VA-102
INFERIO
R

0.2

0.07

23.10

0.20

23.10

0.20

#
0.21

ESTRIB
OS VA102

0.2

0.07

#####
#####

Total
LOSA ALIGERADAS
VIGUET
A
SUPERI
OR

2.20

VP-1
SUPERI
OR
VP-1
SUPERI
OR
TEMPER
ATURA

2.45

24.3
0

12.50

0.1

1/2

28

2.3

128.8

1/2

28

2.45

343

1/2

28

24.5

686

1/4

98

12.5

1225

ml
Peso
Total
POZO SEPTICO
POZO
PERCOL
ACION
TANQUE
SEPTIC
O
TANQUE
SEPTIC
O
TANQUE
SEPTIC
O

2.16

2.36

1.09

1.16

1,384.49

######
306.25

#####
#####
1,457.10

3/8

30

2.16

130

3/8

2.36

49.6

3/8

12

1.09

39.2

3/8

1.16

18.6

###
###

ml
Peso
Total

132.70

Longitudes x Diametro
5/8

3/4

1
237.6

224

456.98
377.6
-

184

406.08

142.56
-

693.14
512.96
512.96

256.48

603.68

512.96
796.11
1,201.98

176.4
-

176.4

59.08

59.08

70

63.42

163.8

582.12

188
-

188

509.6

59.08
91.69

1,384.49
128.8
-

343

686

1225

1,457.10
129.6
-

49.56

39.24

18.56

132.70

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 23

PLANILLA DE METRADOS
OBRA : CONSTRUCCION DEL CENTRO MATERNO INFANTIL DEL PUESTO DE SALUD CHECA
ESTABLECIMIENTO PUESTO DE SALUD DE CHECA
PROPIETARIO : HOSPITAL DE APOYO ILAVE
CODIGO

DESCRIPCION

UND

LARGO

ANCHO

ALTO

N VECES PARCIAL

TOTAL

01.00.00 OBRAS PROVISIONALES


01.01.00 ALMACEN CASETA DE GUARDIANIA

M2

01.02.00 CARTEL DE OBRA

Glb.

3.00

3.00

1.00

9.00

9.00

1.00

1.00

1.00

02.00.00 TRABAJOS PRILIMINARES


02.01.00 LIMPIEZA DEL TERRENO

M2

29.30

13.00

1.00

380.90

380.90

02.02.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR

M2

29.30

13.00

1.00

380.90

380.90

M2

29.30

13.00

1.00

380.90

380.90

03.00.00 MOVIMIENTO DE TIERRAS


03.01.00 NIVELACION DE TERRENO
03.01.01 NIVELADO Y APISIONADO

03.02.00 EXCAVACIONES PARA ZAPATAS HASTA H= 1.70 Prof.


03.02.01 ZAPATAS Z = 1 H= 1.50

M3

1.20

1.20

1.50

20.00

43.20

03.02.02 ZAPATAS Z = 2 H= 1.50

M3

1.50

1.50

1.50

12.00

40.50

TOTAL

83.70

03.03.00 EXCAVACIONES ZANJAS PARA CIMIENTOS CORRIDO


EJE A-A ENTRE 1-4

M3

7.25

0.60

1.00

1.00

4.35

EJE A-A ENTRE 1-4

M3

6.00

0.50

1.00

1.00

3.00

EJE B-B ENTRE 1-4

M3

6.80

0.50

1.00

1.00

3.40

EJE B-B ENTRE 1-4

M3

2.30

0.50

1.00

1.00

1.15

EJE C-C ENTRE 1-4

M3

7.25

0.60

1.00

1.00

4.35

EJE C-C ENTRE 1-4

M3

2.30

0.50

1.00

1.00

1.15

EJE D-D ENTRE 1-4

M3

5.50

0.50

1.00

1.00

2.75

EJE E-E ENTRE 1-4

M3

7.25

0.60

1.00

1.00

4.35

EJE F-F ENTRE 1-4

M3

12.80

0.50

1.00

1.00

6.40

EJE G-G ENTRE 1-4

M3

8.10

0.50

1.00

1.00

4.05

EJE H-H ENTRE 1-4

M3

5.90

0.60

1.00

1.00

3.54

EJE 1-1 ENTRE A-G

M3

19.10

0.60

1.00

1.00

11.46

EJE 2-2 ENTRE A-G

M3

19.10

0.60

1.00

1.00

11.46

EJE 2-2 ENTRE A-G

M3

12.90

0.50

1.00

1.00

6.45

EJE 3-3 ENTRE A-G

M3

19.10

0.60

1.00

1.00

11.46

EJE 3-3 ENTRE A-G

M3

3.30

0.50

1.00

1.00

1.65

EJE 4-4 ENTRE A-G

M3

19.10

0.60

1.00

1.00

11.46

TOTAL

92.43

03.04.00 EXCAVACION MANUAL DE VEREDA


VEREDA FRENTERA Y POSTERIOR

M3

28.40

1.00

0.30

2.00

17.04

VEREDAS LATERALES

M3

11.00

1.00

0.30

2.00

6.60

TOTAL

23.64

03.05.00 RELLENO COMPACTADO A MANO CON MATERIAL PROPIO


03.05.01 ZAPATAS

M3

Z-1

M3

0.95

0.95

0.90

20.00

16.25

Z-2

M3

1.05

1.25

0.90

12.00

14.18

TOTAL

30.42

03.06.00 ELIMINACION DE MATERIAL EXCEDENTE 25% DE ESPONJAMIENTO


VOLUMEN EXCAVADO =

M3

83.70

VOLUMEN DE RELLENO =

M3

30.42

92.43

23.64

30.42
169.35

VOLUMEN ELIMINADO =

199.77

M3

1.25

211.69

TOTAL

211.69

04.00.00 OBRAS DE CONCRETO SIMPLE


04.01.00 SOLADO PARA ZAPATA fc'=140 Kg/CM2
Z-1

M3

1.20

1.20

0.10

20.00

2.88

Z-2

M3

1.50

1.50

0.10

12.00

2.70

TOTAL

5.58

04.02.00 CIMIENTOS CORRIDOS (M3) 1:10+30% PG.


EJES CIMIENTOS
EJE A-A ENTRE 1-4

M3

10.25

0.60

0.80

1.00

4.92

EJE A-A ENTRE 1-4

M3

6.00

0.50

0.80

1.00

2.40

EJE B-B ENTRE 1-4

M3

8.80

0.50

0.80

1.00

3.52

EJE B-B ENTRE 1-4

M3

2.30

0.50

0.80

1.00

0.92

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 24

EJE C-C ENTRE 1-4

M3

10.25

0.60

0.80

1.00

4.92

EJE C-C ENTRE 1-4

M3

3.30

0.50

0.80

1.00

1.32

EJE D-D ENTRE 1-4

M3

8.00

0.50

0.80

1.00

3.20

EJE E-E ENTRE 1-4

M3

10.25

0.60

0.80

1.00

4.92

EJE E-E ENTRE 1-4

M3

2.30

0.50

0.80

1.00

0.92

EJE F-F ENTRE 1-4

M3

15.80

0.50

0.80

1.00

6.32

EJE G-G ENTRE 1-4

M3

8.20

0.60

0.80

1.00

3.94

EJE G-G ENTRE 1-4

M3

2.65

0.50

0.80

1.00

1.06

EJE H-H ENTRE 1-4

M3

5.90

0.60

0.80

1.00

2.83

EJE 1-1 ENTRE A-G

M3

24.10

0.60

0.80

1.00

11.57

EJE 2-2 ENTRE A-G

M3

24.10

0.60

0.80

1.00

11.57

EJE 2-2 ENTRE A-G

M3

12.90

0.50

0.80

1.00

5.16

EJE 3-3 ENTRE A-G

M3

2.30

0.50

0.80

1.00

0.92

EJE 3-3 ENTRE A-G

M3

7.51

0.50

0.80

1.00

3.00

EJE 4-4 ENTRE A-G

M3

21.10

0.60

0.80

1.00

10.13

TOTAL

83.54

04.03.00 SOBRECIMIENTO 1:8 + 25 % P.M.


EJES EJE A-A ENTRE 1-4

M3

9.95

0.25

0.20

1.00

0.50

EJE A-A ENTRE 1-4

M3

4.20

0.15

0.20

1.00

0.13

EJE B-B ENTRE 1-4

M3

11.55

0.15

0.20

1.00

0.35

EJE C-C ENTRE 1-4

M3

6.80

0.15

0.20

1.00

0.20

EJE C-C ENTRE 1-4

M3

3.00

0.15

0.20

1.00

0.09

EJE D-D ENTRE 1-4

M3

7.65

0.15

0.20

1.00

0.23

EJE E-E ENTRE 1-4

M3

4.45

0.15

0.20

1.00

0.13

EJE F-F ENTRE 1-4

M3

12.65

0.15

0.20

1.00

0.38

EJE G-G ENTRE 1-4

M3

11.50

0.15

0.20

1.00

0.35

EJE H-H ENTRE 1-4

M3

8.10

0.25

0.20

1.00

0.41

EJE 1-1 ENTRE A-G

M3

25.32

0.25

0.20

1.00

1.27

EJE 2-2 ENTRE A-G

M3

13.75

0.15

0.20

1.00

0.41

EJE 2-2 ENTRE A-G

M3

3.95

0.15

0.20

1.00

0.12

EJE 3-3 ENTRE A-G

M3

15.65

0.15

0.20

1.00

0.47

EJE 4-4 ENTRE A-G

M3

25.32

0.25

0.20

1.00

1.27

TOTAL

6.29

04.04.00 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO


EJES EJE A-A ENTRE 1-4

M3

9.95

0.20

2.00

3.98

EJE A-A ENTRE 1-4

M3

4.20

0.20

2.00

1.68

EJE B-B ENTRE 1-4

M3

11.55

0.20

2.00

4.62

EJE C-C ENTRE 1-4

M3

6.80

0.20

2.00

2.72

EJE C-C ENTRE 1-4

M3

3.00

0.20

2.00

1.20

EJE D-D ENTRE 1-4

M3

7.65

0.20

2.00

3.06

EJE E-E ENTRE 1-4

M3

4.45

0.20

2.00

1.78

EJE F-F ENTRE 1-4

M3

12.65

0.20

2.00

5.06

EJE G-G ENTRE 1-4

M3

11.50

0.20

2.00

4.60

EJE H-H ENTRE 1-4

M3

8.10

0.20

2.00

3.24

EJE 1-1 ENTRE A-G

M3

8.10

0.20

2.00

3.24

EJE 2-2 ENTRE A-G

M3

8.10

0.20

2.00

3.24

EJE 2-2 ENTRE A-G

M3

8.10

0.20

2.00

3.24

EJE 3-3 ENTRE A-G

M3

8.10

0.20

2.00

3.24

EJE 4-4 ENTRE A-G

M3

8.10

0.20

2.00

3.24

TOTAL

48.14
TOTAL

24.70

05.00.00 OBRAS DE CONCRETO ARMADO


05.01.00 ZAPTAS
05.01.01 ZAPATA CONCRETO Fc' = 175 Kg/CM2
Z-1

M3

1.20

1.20

0.40

20.00

11.52

Z-2

M3

1.50

1.50

0.40

12.00

10.80

TOTAL

22.32

05.01.02 ENCOFRADO Y DESENCOFRADO


Z-1

M2

4.80

0.50

3.00

7.20

Z-2

M2

6.00

0.50

4.00

12.00

TOTAL

19.80

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 25

05.01.03 ACERO FY=4200 KG/CM2 DE 1/2"


Z-1

KG

1.10

12.00

0.99

20.00

261.36

Z-2

KG

1.40

16.00

0.99

12.00

266.11

TOTAL

527.47

05.02.00 VIGAS DE CIMENTACION


05.02.01 CONCRETO Fc' = 175 Kg/CM2
EJE 1-1 ENTRE A-H

M3

27.30

0.25

0.30

4.00

8.19

A-A ENTRE 1-4

M3

10.00

0.25

0.30

4.00

3.00

TOTAL

11.19

05.02.02 ENCOFRADO Y DESENCOFRADO


1-1 ENTRE A-H

M2

27.30

0.60

4.00

65.52

A-A ENTRE 1-4

M2

10.00

0.60

4.00

24.00

TOTAL

89.52

44.76

05.02.03 ACERO FY=4200 KG/CM2 DE 1/2"


VC 1-4 ENTRE A-H , 1/2"

KG

27.80

4.00

4.00

0.99

440.35

VC A-H ENTRE 1-4 , 1/2"

KG

11.50

4.00

4.00

0.99

182.16

ESTRIBO VC 1-4 ENTRE A-H , 1/4"

KG

1.17

110.00

4.00

0.25

128.70

VC A-H ENTRE 1-4 , 1/4"

KG

1.17

33.00

4.00

0.25

38.61

TOTAL

789.82

05.03.00 COLUMNAS (PORTANTES)


05.03.01 CONCRETO Fc =210 Kg/CM2
C-1

M3

4.10

0.25

0.25

32.00

8.20

TOTAL

8.20

05.03.02 ENCOFRADO Y DESENCOFRADO


C-1

M2

3.60

1.00

16.00
TOTAL

57.60

57.60
28.80

05.03.03 ACERO FY=4200 KG/CM2


C-1 4 5/8"

KG

4.58

4.00

32.00

1.55

908.67

C-1 2 1/2"

KG

4.58

2.00

32.00

0.99

290.19

KG

0.95

22.00

32.00

0.25

167.20

ESTRIBOS C-1 1/4"

TOTAL

1366.06

05.04.00 VIGAS
05.04.01 CONCRETO Fc =175 Kg/CM2
VIGA PRINCIPAL

M3

12.20

0.25

0.30

8.00

7.32

VIGA SECUNDARIA

M3

26.60

0.25

0.20

4.00

5.32

TOTAL

12.64

05.04.02 ENCOFRADO Y DESENCOFRADO


EJES VIGA PRINCIPAL
VIGA SECUNDARIA

M2

12.20

0.25

4.00

12.20

M2

25.49

0.25

2.00

12.75

TOTAL

24.95

05.04.03 ACERO FY=4200 KG/CM2


EJES VIGAS PRINCIPALES
VP A-H ENTRE 1-4 , 1/2"

KG

12.70

4.00

8.00

0.99

402.34

VP A-H ENTRE 1-4 , 5/8"

KG

12.70

5.00

8.00

1.55

787.40

ESTRIBOS 1/4"

KG

0.95

64.30

8.00

0.25

122.17

VS 1-4 ENTRE A-H , 1/2"

KG

28.90

4.00

4.00

0.99

457.78

ESTRIBOS 1/4"

KG

0.75

150.00

4.00

0.25

112.50

VIGA SECUNDARIA

TOTAL

1882.18

05.05.00 LOSA ALIGERADO


05.05.01 CONCRETO Fc =210 Kg/CM2
1-4 ENTRE A-H

M3

28.60

0.10

0.15

28.00

12.01

1-4 ENTRE A-H

M3

3.50

3.50

0.05

21.00

12.86

1-4 ENTRE A-H

M3

3.50

0.60

0.05

27.00

2.84

TOTAL

27.71

05.05.02 ENCOFRADO Y DESENCOFRADO


LOSA

M2

3.00

2.80

28.00

235.20

VOLADO

M2

3.00

0.60

14.00

25.20

VOLADO

M2

3.20

0.60

2.00

3.84

TAPAS

M2

64.40

0.20

2.00

25.76

TOTAL

290.00

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 26

05.05.03 ACERO FY=4200 KG/CM2


ACERO 1/2" (-)

KG

28.90

28.00

0.99

801.11

ACERO 1/2" (+)

KG

28.90

28.00

0.99

801.11

A. TEMPERATURA 1/4"

KG

12.50

113.00

0.25

353.13

TOTAL
05.06.00 LADRILLO DE TECHO PASTELERO

UND

3.50

3.30

21.00

242.55

11.00

1.00

1955.34
242.55
2668.05

06.00.00 ESTRUCTURA DE MADERA Y COBERTURAS


06.01.01 HABILITACION DE TIJERALESTIJERALES
TIJERALES DE MADERA L=MAYOR

UND

TIJERALES DE MADERA L=MENOR

UND

9.00
5.00
TOTAL

06.02.01 COLOCACION DE TIJERALES

14.00

UND

14.00

14.00

06.03.01 CORREAS 2" X 3 "

ML

139.00

167.20

06.04.01 FRISO DE MADERA 1" X 6"

ML

82.50

76.00

06.05.01 TEJA ANDINA

M2

412.00

412.00

06.05.02 CUMBRERA DE PLANCHA TEJA ANDINA

ML

52.40

52.40

06.05.00 COBERTURAS

07.00.00 MURO Y TABEQUERIA DE ALBAILERIA


07.01.00 MUROS DE LADRILLOS CABEZA KIN KON (6X12X24 CM)
EJE A-A ENTRE 1-4

M2

9.95

2.30

1.00

22.89

EJE H-H ENTRE 1-4

M2

8.10

2.30

1.00

18.63

EJE 1-1 ENTRE A-H

M2

22.90

2.40

1.00

54.96

EJE 4-4 ENTRE A-H

M2

24.90

2.40

1.00

59.76

EJE A-A ENTRE 1-4 (-)

M2

1.00

1.00

1.00

1.00

EJE 1-1 ENTRE A-H (-)

M2

2.00

1.00

1.00

2.00

EJE 1-1 ENTRE A-H (-)

M2

1.00

1.60

12.00

19.20

EJE 4-4 ENTRE A-H (-)

M2

1.00

1.00

7.00

7.00

EJE 4-4 ENTRE A-H (-)

M2

1.00

1.00

10.00

10.00

39.20

TOTAL

156.24

39.20

117.04

156.24

07.02.00 MUROS DE LADRILLOS SOGA KIN KON (6X12X24 CM)


EJE A-A ENTRE 1-4

M2

4.20

2.60

1.00

10.92

EJE B-B ENTRE 1-4

M2

11.55

2.60

1.00

30.03

EJE C-C ENTRE 1-4

M2

6.80

2.60

1.00

17.68

EJE C-C ENTRE 1-4

M2

3.00

2.60

1.00

7.80

EJE D-D ENTRE 1-4

M2

7.65

2.60

1.00

19.89

EJE E-E ENTRE 1-4

M2

4.45

2.60

1.00

11.57

EJE F-F ENTRE 1-4

M2

15.65

2.60

1.00

40.69

EJE G-G ENTRE 1-4

M2

9.30

2.60

1.00

24.18

EJE 2-2 ENTRE A-H

M2

13.70

2.60

1.00

35.62

EJE 2-2 ENTRE A-G

M2

3.95

2.60

1.00

10.27

EJE 3-3 ENTRE A-G

M2

15.65

2.60

1.00

40.69

EJE 4-4 ENTRE A-G

M2

21.25

2.60

1.00

55.25

EJE D-D ENTRE 1-4 (-)

M2

2.00

1.60

1.00

3.20

TOTAL

304.59

3.20

304.59
301.39

08.00.00 REVOQUES ENLUCIDOS Y MOLDURAS


08.01.00 TARRAJEO PRIMARIO O RAYADO
VESTIDOR

M2

9.90

1.60

1.00

15.84

SS.HH

M2

7.05

1.60

1.00

11.28

SALA DE PARTOS

M2

19.50

1.60

1.00

31.20

CUARTO SEPTICO

M2

10.20

1.60

1.00

16.32

SALA DE RECUPERACION

M2

16.65

1.60

1.00

26.64

SS.HH

M2

6.65

1.60

1.00

10.64

SS.HH

M2

6.45

1.60

1.00

10.32

SALA DE ESPERA

M2

31.88

1.60

1.00

51.01

CORREDOR

M2

15.51

1.60

1.00

24.82

SS.HH PUBLICO

M2

7.55

1.60

1.00

12.08

ESTERILIZACION

M2

11.20

1.60

1.00

17.92

SALA DE PREPARACION Y DILATACION

M2

19.00

1.60

1.00

30.40

SS.HH

M2

6.75

1.60

1.00

10.80

TOTAL
08.02.00 TARRAJEO EN INTERIORES
TARRAJEO DE INTERIORES C-A- 1-5

269.26

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 27

VESTIDOR

M2

6.35

1.00

1.00

6.35

SALA DE PARTOS

M2

13.10

1.00

1.00

13.10

ATENCION RECIEN NACIDO

M2

6.90

1.00

1.00

6.90

CUARTO SEPTICO

M2

5.95

1.00

1.00

5.95

SALA DE RECUPERACION

M2

11.65

1.00

1.00

11.65

CONSULTORIO MEDICO

M2

11.60

2.70

1.00

31.32

CONSULTORIO OBSTETRICO

M2

11.60

2.60

1.00

30.16

HOSPITALIZACION VARONES

M2

14.30

2.60

1.00

37.18

HOSPITALIZACION VARONES

M2

2.00

1.00

1.00

2.00

SS.HH PUBLICO

M2

4.40

1.00

1.00

4.40

HOSPITALIZACION DAMAS

M2

14.50

2.60

1.00

37.70

HOSPITALIZACION DAMAS

M2

2.00

1.00

1.00

2.00

HOSPITALIZACION PEDIATRIA

M2

11.80

2.60

1.00

30.68

HOSPITALIZACION PEDIATRIA

M2

2.00

1.00

1.00

2.00

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

13.90

2.60

1.00

36.14

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

2.00

1.00

1.00

2.00

FARMACIA

M2

9.40

2.60

1.00

24.44

FARMACIA

M2

1.00

1.00

1.00

1.00

SALA DE ESPERA

M2

12.50

2.60

1.00

32.50

SALA DE ESPERA

M2

1.80

1.00

1.00

1.80

CORREDOR

M2

22.45

2.60

1.00

58.37

SS.HH

M2

4.40

1.00

1.00

4.40

SS.HH PUBLICO

M2

5.40

1.00

1.00

5.40

ESTERILIZACION

M2

7.30

1.00

1.00

7.30

SALA DE PREPARACION Y DILATACION

M2

12.30

1.00

1.00

12.30

V-1 (-)

M2

2.10

1.25

12.00

31.50

V-2 (-)

M2

0.80

0.85

12.00

8.16

V-3 (-)

M2

1.00

1.25

5.00

6.25

V-4 (-)

M2

1.10

1.25

3.00

4.13

50.04

TOTAL

407.04

50.04

357.00

407.04

08.03.00 TARRAJEO EXTERIOR


EJE 1-1 ENTRE A_G

M2

7.25

2.80

1.00

20.30

EJE 1-1 ENTRE A_G

M2

12.00

1.00

1.00

12.00

EJE 1-1 ENTRE A_G

M2

2.00

1.60

1.00

3.20

EJE 2-2 ENTRE A_G

M2

10.30

2.80

1.00

28.84

EJE 2-2 ENTRE A_G

M2

13.00

1.00

1.00

13.00

EJE 2-2 ENTRE A_G

M2

4.00

1.60

1.00

6.40

EJE A-A ENTRE 1-4

M2

10.00

2.80

1.00

28.00

EJE A-A ENTRE 1-4

M2

1.00

1.60

1.00

1.60

EJE B-B ENTRE 1-4

M2

9.20

2.80

1.00

25.76

TOTAL

139.10

08.04.00 TARRAJEO DE COLUMNAS


INTERIORES Y EXTERIORES

M2

2.60

0.50

32.00

41.60

TOTAL

41.60

08.05.00 TARRAJEO DE VIGAS


VIGAS PRINCIPALES A-H

M2

12.20

0.45

8.00

43.92

VIGAS SECUNDARIAS 1-4

M2

26.60

0.25

4.00

26.60

TOTAL

70.52

08.06.00 VESTIDURAS DE DERRAMES


P-1

ML

10.40

1.00

10.40

P-2

ML

7.00

2.00

14.00

P-3

ML

6.40

3.00

19.20

P-4

ML

6.20

6.00

37.20

P-5

ML

6.00

6.00

36.00

P-6

ML

5.90

5.00

29.50

P-7

ML

7.00

1.00

7.00

V-1

ML

5.00

21.00

105.00

V-2

ML

4.00

8.00

32.00

V-3

ML

3.60

1.00

3.60

V-4

ML

3.60

1.00

3.60

V-5

ML

3.00

2.00

6.00

TOTAL

303.50

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 28

09.00.00 CIELO RASOS


CIELO RASO CON YESO
VESTIDOR

M2

3.05

1.80

1.00

SS.HH

M2

2.40

1.10

1.00

2.64

SALA DE PARTOS

M2

5.00

4.15

1.00

20.75

ATENCION RECIEN NACIDO

M2

3.40

2.40

1.00

8.16

CUARTO SEPTICO

M2

3.40

1.20

1.00

4.08

CORREDOR SEPTICO

M2

3.70

3.50

1.00

12.95

SALA DE RECUPERACION

M2

5.00

3.30

1.00

16.50

CONSULTORIO MEDICO

M2

5.00

3.35

1.00

16.75

CONSULTORIO OBSTETRICO

M2

4.20

3.35

1.00

14.07

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION VARONES

M2

5.00

4.00

1.00

20.00

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION DAMAS

M2

5.00

4.00

1.00

20.00

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION PEDIATRIA

M2

4.10

3.30

1.00

13.53

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

4.20

3.40

1.00

14.28

3.40

2.00

1.00

6.80

FARMACIA

5.49

SALA DE ESPERA

M2

3.70

4.60

1.00

17.02

CORREDOR

M2

19.00

1.80

1.00

34.20

ECOGRAFIA

M2

3.30

2.10

1.00

6.93

SS.HH PUBLICO

M2

2.60

1.00

1.00

2.60

ESTERILIZACION

M2

3.40

2.10

1.00

7.14

SALA DE PREPARACION Y DILATACION

M2

5.00

3.40

1.00

17.00

SS.HH

M2

2.20

1.10

1.00

2.42

TOTAL

270.24

10.00.00 PISOS Y PAVIMENTO


10.01.00 EMPEDRADO DE PISO E = 6"
VESTIDOR

M2

3.05

1.80

1.00

SS.HH

M2

2.40

1.10

1.00

2.64

SALA DE PARTOS

M2

5.00

4.15

1.00

20.75

ATENCION RECIEN NACIDO

M2

3.40

2.40

1.00

8.16

CUARTO SEPTICO

M2

3.40

1.20

1.00

4.08

CORREDOR SEPTICO

M2

3.70

3.50

1.00

12.95

SALA DE RECUPERACION

M2

5.00

3.30

1.00

16.50

CONSULTORIO MEDICO

M2

5.00

3.35

1.00

16.75

CONSULTORIO OBSTETRICO

M2

4.20

3.35

1.00

14.07

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION VARONES

M2

5.00

4.00

1.00

20.00

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION DAMAS

M2

5.00

4.00

1.00

20.00

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION PEDIATRIA

M2

4.10

3.30

1.00

13.53

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

4.20

3.40

1.00

14.28

3.40

2.00

1.00

6.80

FARMACIA

5.49

SALA DE ESPERA

M2

3.70

4.60

1.00

17.02

CORREDOR

M2

19.00

1.80

1.00

34.20

ECOGRAFIA

M2

3.30

2.10

1.00

6.93

SS.HH PUBLICO

M2

2.60

1.00

1.00

2.60

ESTERILIZACION

M2

3.40

2.10

1.00

7.14

SALA DE PREPARACION Y DILATACION

M2

5.00

3.40

1.00

17.00

SS.HH

M2

2.20

1.10

1.00

2.42

TOTAL

270.24

10.02.00 FALSO PISO E=4" (MEZCLA 1:10 CEMENTO HORMIGON)


VESTIDOR

M2

3.05

1.80

1.00

SS.HH

M2

2.40

1.10

1.00

5.49
2.64

SALA DE PARTOS

M2

5.00

4.15

1.00

20.75

ATENCION RECIEN NACIDO

M2

3.40

2.40

1.00

8.16

CUARTO SEPTICO

M2

3.40

1.20

1.00

4.08

CORREDOR SEPTICO

M2

3.70

3.50

1.00

12.95

SALA DE RECUPERACION

M2

5.00

3.30

1.00

16.50

CONSULTORIO MEDICO

M2

5.00

3.35

1.00

16.75

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 29

CONSULTORIO OBSTETRICO

M2

4.20

3.35

1.00

SS.HH

M2

2.10

1.10

1.00

14.07
2.31

HOSPITALIZACION VARONES

M2

5.00

4.00

1.00

20.00

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION DAMAS

M2

5.00

4.00

1.00

20.00

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION PEDIATRIA

M2

4.10

3.30

1.00

13.53

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

4.20

3.40

1.00

14.28

FARMACIA

M2

3.40

2.00

1.00

6.80

SALA DE ESPERA

M2

3.70

4.60

1.00

17.02

CORREDOR

M2

19.00

1.80

1.00

34.20

ECOGRAFIA

M2

3.30

2.10

1.00

6.93

SS.HH PUBLICO

M2

2.60

1.00

1.00

2.60

ESTERILIZACION

M2

3.40

2.10

1.00

7.14

SALA DE PREPARACION Y DILATACION

M2

5.00

3.40

1.00

17.00

SS.HH

M2

2.20

1.10

1.00

2.42

TOTAL

270.24

10.03.00 PISO VINILICO 2.5 MM


ATENCION RECIEN NACIDO

M2

3.40

2.40

1.00

8.16

CONSULTORIO MEDICO

M2

5.00

3.35

1.00

16.75

CONSULTORIO OBSTETRICO

M2

4.20

3.35

1.00

14.07

HOSPITALIZACION VARONES

M2

5.00

4.00

1.00

20.00

HOSPITALIZACION DAMAS

M2

5.00

4.00

1.00

20.00

HOSPITALIZACION PEDIATRIA

M2

4.10

3.30

1.00

13.53

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

4.20

3.40

1.00

14.28

TOTAL

106.79

10.04.00 PISO CERAMICO ANTIDESLIZANTE DE 30 X 30 CM


VESTIDOR

M2

3.05

1.80

1.00

SS.HH

M2

2.40

1.10

1.00

5.49
2.64

SALA DE PARTOS

M2

5.00

4.15

1.00

20.75

CUARTO SEPTICO

M2

3.40

1.20

1.00

4.08

CORREDOR SEPTICO

M2

3.70

3.50

1.00

12.95

SALA DE RECUPERACION

M2

5.00

3.30

1.00

16.50

SS.HH

M2

2.10

1.10

1.00

2.31

SS.HH

M2

2.10

1.10

1.00

2.31

SS.HH

M2

2.10

1.10

1.00

2.31

FARMACIA

M2

3.40

2.00

1.00

6.80

SALA DE ESPERA

M2

3.70

4.60

1.00

17.02

CORREDOR

M2

19.00

1.80

1.00

34.20

ECOGRAFIA

M2

3.30

2.10

1.00

6.93

SS.HH PUBLICO

M2

2.60

1.00

1.00

2.60

ESTERILIZACION

M2

3.40

2.10

1.00

7.14

SALA DE PREPARACION Y DILATACION

M2

5.00

3.40

1.00

17.00

SS.HH

M2

2.20

1.10

1.00

2.42

TOTAL

163.45

10.05.00 CONCRETO FC=175 KG/CM2 PARA VEREDA A= 1.20


VEREDA FRENTERA Y POSTERIOR

M3

29.30

1.00

0.10

2.00

5.86

VEREDAS LATERALES

M3

11.00

1.00

0.10

2.00

2.20

TOTAL

8.06

10.06.00 ENCOFRADO DE VEREDA Y SARDINELES


VEREDA FRENTERA Y POSTERIOR

M2

29.30

0.30

2.00

17.58

VEREDAS LATERALES

M2

11.00

0.30

2.00

6.60

TOTAL

24.18

10.07.00 SARDINEL PARA VEREDAS FC=175 KG/CM2


FRENTE Y POSTERIOR

ML

29.30

2.00

58.60

LATERALES

ML

13.00

2.00

26.00

TOTAL

84.60

10.08.00 EMPEDRADO PARA FALSO PISO Y VEREDA E = 0.10 CM


VEREDA FRENTERA Y POSTERIOR

M2

29.30

0.25

2.00

14.65

VEREDAS LATERALES

M2

11.00

0.25

2.00

5.50

TOTAL

20.15

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 30

11.00.00 CONTRAZOCALOS
11.01.00 CONTRAZOCALO DE MADERA AGUANO 3/4" C/RODON
ATENCION RECIEN NACIDO

ML

11.65

1.00

11.65

CONSULTORIO MEDICO

ML

17.15

1.00

17.15

CONSULTORIO OBSTETRICO

ML

14.15

1.00

14.15

HOSPITALIZACION VARONES

ML

16.50

1.00

16.50

HOSPITALIZACION DAMAS

ML

14.50

1.00

14.50

HOSPITALIZACION PEDIATRICO

ML

13.70

1.00

13.70

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

ML

13.90

1.00

13.90

TOTAL

101.55

12.00.00 ZOCALOS
12.01.00 ZOCALOS DE MAYOLICAS 20 X30 CM COLOR PRIMERA
VESTIDOR

M2

9.90

1.60

1.00

15.84

SS.HH

M2

7.05

1.60

1.00

11.28

SALA DE PARTOS

M2

19.50

1.60

1.00

31.20

CUARTO SEPTICO

M2

10.20

1.60

1.00

16.32

SALA DE RECUPERACION

M2

16.65

1.60

1.00

26.64

SS.HH

M2

6.65

1.60

1.00

10.64

SS.HH

M2

6.45

1.60

1.00

10.32

CORREDOR

M2

15.51

1.60

1.00

24.82

SALA DE ESPERA

M2

31.88

1.60

1.00

51.01

SS.HH PUBLICO

M2

7.55

1.60

1.00

12.08

ESTERILIZACION

M2

11.20

1.60

1.00

17.92

SALA DE PREPARACION Y DILATACION

M2

19.00

1.60

1.00

30.40

SS.HH

M2

6.75

1.60

1.00

10.80

SS.HH

M2

6.75

1.60

1.00

10.80

LAVATORIOS

M2

1.00

1.00

2.00

2.00

TOTAL

234.64

12.02.00 ENCHAPE DE PIEDRA LAJA


EJE 1-1 ENTRE A_G

M2

12.00

1.00

1.00

EJE 1-1 ENTRE A_G

M2

2.00

1.60

1.00

12.00
3.20

EJE 2-2 ENTRE A_G

M2

13.00

1.00

1.00

13.00

EJE 2-2 ENTRE A_G

M2

4.00

1.60

1.00

6.40

EJE A-A ENTRE 1-4

M2

1.00

1.60

1.00

1.60

TOTAL

36.20

12.03.00 ZOCALO DE CEMENTO PULIDO SIN COLOREAR H=0.30 M


EJE 1-1 ENTRE A_G

M2

7.25

0.30

1.00

2.18

EJE 2-2 ENTRE A_G

M2

10.30

0.30

1.00

3.09

EJE A-A ENTRE 1-4

M2

10.00

0.30

1.00

3.00

EJE B-B ENTRE 1-4

M2

9.20

0.30

1.00

2.76

TOTAL

11.03

13.00.00 CARPINTERIA DE MADERA


13.01.00 PUERTAS APANELADAS, MADERA AGUANO E= 1 1/2"
P-1 PUERTA PRINCIPAL

M2

2.60

2.00

1.00

5.20

P-2

M2

2.60

1.80

2.00

9.36

TOTAL

14.56

13.02.00 PUERTA CONTRAPLACADA DE MADERA AGUANO DE 35 mm ESPESOR


P-3

M2

2.60

1.20

5.00

15.60

P-4

M2

2.60

1.00

6.00

15.60

P-5

M2

2.60

0.80

3.00

6.24

P-6

M2

2.60

0.70

7.00

12.74

P-7

M2

2.60

1.80

1.00

4.68

TOTAL

54.86

13.03.00 MUEBLE DE MADERA


ADMISION Y FARMACIA

M2

1.00

0.30

3.00

0.90

TOTAL

0.90

14.00.00 CARPINTERIA METALICA Y HERRERIA


14.01.00 VENTANA CON SOPORTE METALICO
V-2

M2

1.50

1.00

21.00

31.50

V-3

M2

1.00

1.00

9.00

9.00

V-4

M2

1.00

0.80

1.00

0.80

V-5

M2

1.50

0.80

1.00

1.20

TOTAL

42.50

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 31

15.00.00 CERRAJERIA
15.01.00 BISAGRAS FIJAS AL MARCO (VAIVEN)

UND

6.00

3.00

18.00

TOTAL

18.00

15.02.00 BISADRA ALUMINZADA CAPUCHINA 4"


P-3

UND

3.00

5.00

15.00

P-4

UND

3.00

6.00

18.00

P-5

UND

3.00

3.00

9.00

P-6

UND

3.00

7.00

21.00

TOTAL

63.00

16.00.00 CERRADURAS
16.01.00 CERRADURA EXTER FORTE 3 GOLP PUERTA PRINCIPAL
PZA

3.00

3.00

TOTAL

3.00

16.02.00 CERRADURA PTA. INTERIOS CON MANIJA


P-3

UND

1.00

5.00

5.00

P-4

UND

1.00

6.00

6.00

P-5

UND

1.00

3.00

3.00

P-6

UND

1.00

7.00

7.00

TOTAL
16.03.00 CERROJO DE ALUMINIO DE 4"

PZA

2.00

16.04.00 MANIJA DE BRONCE PARA PUERTAS

PZA

2.00

4.00

21.00
8.00

TOTAL
3.00

8.00
6.00

TOTAL

6.00

17.00.00 VIDRIOS CRISTALES Y SIMILARES


17.01.00 VIDRIOS DOBLES TRANSPARENTE
V-2

M2

1.50

1.00

21.00

31.50

V-3

M2

1.00

1.00

9.00

9.00

V-4

M2

1.00

0.80

1.00

0.80

V-5

M2

1.50

0.80

1.00

1.20

SUB TOTAL

42.50

TOTAL

457.30

TOTAL EN PIES CUADRADOS

P2

42.50

10.76

457.30

M2

1.50

1.00

3.00

4.50

P2

4.50

10.76

TOTAL

48.42

48.42

6.00

6.00

6.00

5.49

17.02.00 VIDRIOS EN SISTEMAS 6 MM


V-1
17.03.00 ESPEJO DE SOBREPONER
ESPEJO BAOS

UND

18.00.00 PINTURAS
18.01.00 PINTURA ESMALTE EN CIELO RASO
VESTIDOR

M2

3.05

1.80

1.00

SS.HH

M2

2.40

1.10

1.00

2.64

SALA DE PARTOS

M2

5.00

4.15

1.00

20.75

ATENCION RECIEN NACIDO

M2

3.40

2.40

1.00

8.16

CUARTO SEPTICO

M2

3.40

1.20

1.00

4.08

CORREDOR SEPTICO

M2

3.70

3.50

1.00

12.95

SALA DE RECUPERACION

M2

5.00

3.30

1.00

16.50

CONSULTORIO MEDICO

M2

5.00

3.35

1.00

16.75

CONSULTORIO OBSTETRICO

M2

4.20

3.35

1.00

14.07

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION VARONES

M2

5.00

4.00

1.00

20.00

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION DAMAS

M2

5.00

4.00

1.00

20.00

SS.HH

M2

2.10

1.10

1.00

2.31

HOSPITALIZACION PEDIATRIA

M2

4.10

3.30

1.00

13.53

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

4.20

3.40

1.00

14.28

3.40

2.00

1.00

6.80

FARMACIA
SALA DE ESPERA

M2

3.70

4.60

1.00

17.02

CORREDOR

M2

19.00

1.80

1.00

34.20

ECOGRAFIA

M2

3.30

2.10

1.00

6.93

SS.HH PUBLICO

M2

2.60

1.00

1.00

2.60

ESTERILIZACION

M2

3.40

2.10

1.00

7.14

SALA DE PREPARACION Y DILATACION

M2

5.00

3.40

1.00

17.00

SS.HH

M2

2.20

1.10

1.00

2.42

TOTAL

270.24

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 32

18.02.00 PINTURA EN MUROS


19.02.01 PINTURA DE MURO INTERIOR C/LATEX
VESTIDOR

M2

6.35

1.00

1.00

6.35

SALA DE PARTOS

M2

13.10

1.00

1.00

13.10

ATENCION RECIEN NACIDO

M2

6.90

1.00

1.00

6.90

CUARTO SEPTICO

M2

5.95

1.00

1.00

5.95

SALA DE RECUPERACION

M2

11.65

1.00

1.00

11.65

CONSULTORIO MEDICO

M2

11.60

2.60

1.00

30.16

CONSULTORIO OBSTETRICO

M2

11.60

2.60

1.00

30.16

HOSPITALIZACION VARONES

M2

15.60

2.60

1.00

40.56

HOSPITALIZACION VARONES

M2

2.00

1.10

1.00

2.20

SS.HH

M2

4.40

1.00

1.00

4.40

HOSPITALIZACION DAMAS

M2

14.80

2.60

1.00

38.48

HOSPITALIZACION DAMAS

M2

2.00

1.10

1.00

2.20

SS.HH

M2

4.40

1.00

1.00

4.40

HOSPITALIZACION PEDIATRICA

M2

11.70

2.60

1.00

30.42

HOSPITALIZACION PEDIATRICA

M2

2.00

1.10

1.00

2.20

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

11.90

2.60

1.00

30.94

ADMICION -ARCHIVO DE HISTORIAS CLINICAS

M2

2.00

1.10

1.00

2.20

FARMACIA

M2

9.40

2.60

1.00

24.44

FARMACIA

M2

2.00

1.10

1.00

2.20

SALA DE ESPERA

M2

8.40

1.00

1.00

8.40

ECOGRAFIA

M2

9.40

1.00

1.00

9.40

ECOGRAFIA

M2

2.00

1.00

1.00

2.00

SS.HH PUBLICO

M2

4.40

1.00

1.00

4.40

ESTERILIZACION

M2

8.80

1.10

1.00

9.68

SALA DE PREPARACION Y DILATACION

M2

19.00

1.10

1.00

20.90

CORREDOR

M2

30.20

1.10

1.00

33.22

CORREDOR SEPTICO

M2

5.40

1.10

1.00

5.94

V-1 (-)

M2

2.10

1.25

12.00

31.50

V-2 (-)

M2

0.80

0.85

12.00

8.16

V-3 (-)

M2

1.00

1.25

5.00

6.25

V-4 (-)

M2

1.10

1.25

3.00

4.13

50.04

TOTAL

382.85

50.04

332.81

382.85

18.02.02 PINTURA DE MURO EXTERIORES C/LATEX


EJE 1-1 ENTRE A_G

M2

7.25

2.80

1.00

20.30

EJE 2-2 ENTRE A_G

M2

10.30

2.80

1.00

28.84

EJE A-A ENTRE 1-4

M2

10.00

2.80

1.00

28.00

EJE B-B ENTRE 1-4

M2

9.20

2.80

1.00

25.76

TOTAL

102.90

18.03.00 PINTURA EN COLUMNAS VIGAS Y DERRAMES


COLUMNAS
INTERIORES Y EXTERIORES

M2

2.60

0.50

32.00

41.60

VIGAS PRINCIPALES A-H

M2

12.20

0.45

8.00

43.92

VIGAS SECUNDARIAS 1-4

M2

26.60

0.25

4.00

26.60

P-1

ML

10.40

0.15

1.00

1.56

P-2

ML

7.00

0.15

2.00

2.10

P-3

ML

6.40

0.15

3.00

2.88

P-4

ML

6.20

0.15

6.00

5.58

P-5

ML

6.00

0.15

6.00

5.40

P-6

ML

5.90

0.15

5.00

4.43

P-7

ML

7.00

0.15

1.00

1.05

V-1

ML

5.00

0.15

21.00

15.75

V-2

ML

4.00

0.15

8.00

4.80

V-3

ML

3.60

0.15

1.00

0.54

V-4

ML

3.60

0.15

1.00

0.54

V-5

ML

3.00

0.15

2.00

0.90

VIGAS

DERRAMES

TOTAL

157.65

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 33

18.03.00 PINTURA BARNIZ EN PIEDRA LAJA


EJE 1-1 ENTRE A_G

M2

12.00

1.00

1.00

EJE 1-1 ENTRE A_G

M2

2.00

1.60

1.00

12.00
3.20

EJE 2-2 ENTRE A_G

M2

13.00

1.00

1.00

13.00

EJE 2-2 ENTRE A_G

M2

4.00

1.60

1.00

6.40

EJE A-A ENTRE 1-4

M2

1.00

1.60

1.00

1.60

TOTAL

36.20

18.04.00 PINTURAS EN PUERTAS Y OTROS OLEO MATE


P-1 PUERTA PRINCIPAL

M2

2.60

2.00

2.00

10.40

P-2

M2

2.60

1.80

4.00

18.72

P-3

M2

2.60

1.20

10.00

31.20

P-4

M2

2.60

1.00

12.00

31.20

P-5

M2

2.60

0.80

6.00

12.48

P-6

M2

2.60

0.70

14.00

25.48

P-7

M2

2.60

1.80

2.00

9.36

TOTAL

138.84

18.04.00 PINTURA EN CARPINTERIA METALICA Y HERRERIA


VETANA DE FIERRO PINTURA C/ ESMALTE
V-1

M2

1.50

1.50

3.00

6.75

V-2

M2

1.50

1.00

21.00

31.50

V-3

M2

1.00

1.00

9.00

9.00

V-4

M2

1.00

0.80

1.00

0.80

V-5

M2

1.50

0.80

1.00

1.20

TOTAL

49.25

19.00.00 VARIOS
19.01.00 JUNTA ASFALTICA E=1

ML

1.00

24.00

24.00

TOTAL

24.00

20.00.00 EVACUACION DE AGUAS DE LLUVIA


20.01.00 CANALETA CIRCULAR F G DE 6"
EJE 1-6

ML

29.30

2.00

58.60

EJE A-C

ML

13.00

2.00

26.00

TOTAL

84.60

20.02.00 TUBERIA DE BAJADA Y DISTRIB PVC 3"


EJE 1- 6 ENTRE A - B

ML

5.40

4.00

21.60

TOTAL

21.60

20.03.00 PROTECCION DE C/A P/MONTANTE H=1.80 M


EJE 1- 6 ENTRE A - B

ML

1.80

4.00

7.20

TOTAL

7.20

21.00.00 APARATOS SANITARIOS Y ACCESORIOS


21.01.00 INODORO TANQUE BAJO DE COLOR
INCLUYE COLOCACION Y ACCESORIO

UND

6.00

6.00

6.00

UND

10.00

10.00

10.00

UND

1.00

1.00

1.00

21.05.00 ACERO INOXIDABLE 01 POZA/ ACCESORIOS

UND

1.00

1.00

1.00

ACERO INOXIDABLE 02 POZA ACCESORIOS

UND

1.00

1.00

1.00

21.02.00 LAVAMANOS DE PARED DE COLOR


INCLUYE LLAVES
21.03.00 URINARIO PORCELANA
21.04.00 LAVATORIO DE ACERO

21.06.00 DUCHAS
UND

2.00

2.00

2.00

21.07.00 PAPELERA DE LOZA A COLOR

DUCHA CROMADO GIRATORIO I/LLAVE

UND

6.00

6.00

6.00

21.08.00 JABONERA DE LOSA COLOR

UND

2.00

2.00

2.00

21.09.00 TOHALLERA PLASTICO 24"

UND

9.00

9.00

9.00

21.10.00 GANCHO COLOR SIMPLE

UND

9.00

9.00

9.00

21.11.00 COLOCACION DE APARATOS SANITARIOS

UND

21.00

21.00

21.00

21.12.00 COLOCACION DE ACCESORIOS SANITARIOS

UND

21.00

21.00

21.00

22.01.00 PUNTO DE SALIDA DE DESAGUE

PTO

26.00

26.00

26.00

22.02.00 SALIDA DE VENTILACION PVC 2"

PTO

5.00

5.00

5.00

22.00.00 INSTALACIONES SANITARIAS

22.03.00 REDES DE DISTRIBUCION


22.03.01 TUBERIA DE DESAGUE 6"

ML

52.00

1.00

52.00

52.00

22.03.02 TUBERIA DE DESAGUE 4"

ML

24.70

1.00

24.70

24.70

22.03.03 TUBERIA DE DESAGUE 2"

ML

25.60

1.00

25.60

25.60

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

N 34

22.04.00 ADITAMENTOS VARIOS


22.04.01 SUMEDEROS DE 2"

UND

8.00

8.00

8.00

22.04.02 REGISTROS DE BRONCE DE 4"

UND

5.00

5.00

5.00

22.04.03 SOMBRERO DE VENTILACION

UND

6.00

6.00

6.00

UND

3.00

3.00

3.00

22.05.00 CAMARAS DE INSPECCION


22.05.01 CAJA DE REGISTRO DESAGUE 12X24"
23.00.00 REDES COLECTORAS
23.01.00 EXCAVACION DE ZANJAS

M3

95.30

0.30

0.40

1.00

11.44

11.44

23.02.00 RELLENO DE ZANJA CON MATERIAL SELECCIONADO


M3

95.30

0.30

0.20

1.00

5.72

5.72

23.03.00 RELLENO DE ZANJA

95.30

0.30

0.20

1.00

5.72

5.72

20.00

20.00

20.00

M3

24.00.00 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO


24.01.00 SALIDA AGUA FRIA PVC 1/2"

PTO

24.02.00 REDES DISTRIBUCION


24.02.01 TUBERIA PVC CLASE 10 3/4" SAP

ML

56.50

1.00

56.50

56.50

24.02.02 TUBERIA PVC CLASE 10 1/2" SAP

ML

30.50

1.00

30.50

30.50

24.03.00 LLAVES VALVULAS


24.03.01 VALVULA COMPUERTA DE BRONCE 3/4"

UND

1.00

1.00

1.00

24.03.02 VALVULA COMPUERTA DE BRONCE 1/2"

UND

8.00

8.00

8.00

25.01.00 SALIDA DE AGUA CALIENTE

PTO

2.00

2.00

2.00

25.02.00 DUCHA ELECTRICA

UND

2.00

2.00

2.00

25.00.00 SISTEMA DE AGUA CALIENTE

26.00.00 INSTALACIONES ELECTRICAS


26.01.00 CENTRO DE LUZ
26.01.01 SALIDA DE TECHO

PTO

35.00

35.00

35.00

26.01.02 SALIDA PARA ELECTRICIDAD BRAQUETE CON PVCPTO

4.00

4.00

4.00

26.01.03 SALIDA PARA SPOT LIJHT

PTO

4.00

4.00

4.00

PTO

67.00

67.00

67.00

26,03,01 COLOCACION DE INTERRUPTOR SIMPLES

PTO

8.00

8.00

8.00

26,03,02 COLOCACION DE INTERRUPTOR DOBLES

PTO

9.00

9.00

9.00

26,03,03 INTERUPTOR CONMUTATIVO

PTO

2.00

2.00

2.00

27.01.00 TABLERO GENERAL 2 X 15A, 1X20A,2X50 A

UND.

1.00

1.00

1.00

27.02.00 INTERRUPTOR TERMOMAGNETICO 2 X 50A

UND.

1.00

1.00

1.00

27.03.00 INTERRUPTOR TERMOMAGNETICO 2 X 20A

UND.

4.00

4.00

4.00

27.04.00 INTERRUPTOR TERMOMAGNETICO 2 X 15A

UND.

4.00

4.00

4.00

UND

18.00

18.00

18.00

28.02.00 FLUORESENTE CIRCULAR 1X 40 W INC /EQUIPO UND

17.00

17.00

17.00

26.02.00 TOMACORRIENTE
26.02.01 SALIDA PARA TOMACORRIENTE DOBLE
26.03.00 INTERRUPTORES

27.00.00 TABLERO Y CUCHILLA

28.00.00 ARTEFACTOS DE ILUMINACION


28.01.00 ARTEFACTO 2 FLUORECENTES INC LAMPARA
28.03.00 ARTEFACTO TIPO WALLSOCKET /LAMPARA

UND

4.00

4.00

4.00

28.04.00 INTERRUPTOR SIMPLE

UND

12.00

12.00

12.00

28.05.00 INTERRUPTOR DOBLE

UND

9.00

9.00

9.00

28.06.00 INTERUPTOR CONMUTATIVO

UND

2.00

2.00

2.00

28.07.00 TOMACORRIENTE DOBLE

UND

67.00

67.00

67.00

28.08.00 MEDIDOR MONOFASICO

UND

1.00

1.00

1.00

PTO

1.00

1.00

1.00

1.00

20.00

20.00

29.00.00 SISTEMA DE PROTECCION


29.01.00 POZO PUESTA A TIERRA H=2.8M D=0.8M
30.00.00 CONEXIN A RED EXTERNA Y MEDIDOR
30.01.00 ALIMENTADOR TW N 10

ML

20.00

31.00.00 PRUEBA DE LABORATORIO CONCRETO


31.01.00 ROPTURA DE BRIQUETA

UND

12.00

12.00

12.00

31.02.00 DISEO DE MEZCLA

UND

1.00

1.00

1.00

31.03.00 ENSAYO DE DENSIDAD DE CAMPO

UND

6.00

6.00

6.00

32.01.00 FLETE TERRESTRE

GLOB

1.00

1.00

1.00

32.02.00 FLETE EN ZONAL RURAL

GLOB

1.00

1.00

1.00

32.00.00 FLETE

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

M3

N 35

REDESS EL COLLAO-U PLANEAMIENTO ESTRATEGICO

M3

N 36

You might also like