You are on page 1of 74

Construction of sharda type fall at R.D. 10000m of LMC gip.

1.HYDRAULIC PARTICULARS: U/S D/s


1 Full supply diascharge u/s Q 10.00 10.00 Cumec use Rectangular crest
2 Drop HL m
3 Full supply level FSL 101.50 100.50 m
4 Full supply depth D 1.50 1.50 m
5 Bed level CBL 100.00 99.00 m
6 Bed width U/S 8.00 8.00 m
7 Assume Bligh coefficient BLC
8 Water side slope 1 :1
9 Bed slope 1: 3000
10 Free board 0.50 0.50
u/s T.B.L. = 102.00 Drop
u/s F.S.L. = 101.50
Creast width=0.75
d/s T.B.L. = 101.00
Creast level= 100.74 d/s F.S.L. = 100.50 F.B.
u/s CBL= 100.00 1.50
d/s CBL= 99.00
cistern level= 98.70
0.90 0.80 0.70 0.60
1.20
2.90 1.20 R.L. = 97.50
0.30
4.10 2.00 2.00 2.00 3.10
2.30 2.00
13.20
1.20
0.50
2.00
3.00
Plan
7.00
1.00
1.50
1.30
1.50
Design of sarda fall masonry canal section
1.00
NAME OF WORK:-
section at A - A
8
.
0
0
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0
DESIGN
1.HYDRAULIC PARTICULARS: U/S D/s
Full supply diascharge u/s Q 10.00 10.00 Cumec < 15 Reactangular creast
Drop HL m C =
Full supply level FSL 101.50 100.50 m
Full supply depth D 1.50 1.50 m
Bed level CBL 100.00 99.00 m
Bed width U/S 8.00 8.00 m
Assume Bligh coefficient BLC
Water side slope 1 :1
Bed slope 1: 3000
DESIGN
1. Length of crest
In case of vertical drop falls, the length of crest should be the same as the d.s. bed width of channel.
= 8.00 m
2. Crest Level
Thus Q < 15 cumec hence Reactangular creast adopted
The discharge is given by Q = C x L x D
(3/2)
x (D/Bt)
(1/6)
Q = 1.835 x L x D
(3/2)
x (D/Bt)
(1/6)
Assuming crest width (B
t
) = 0.80 m
10 = 1.835 x 8 x D
3/2
x (D / 0.8 )
1/6
D = 0.77 m
Velocity of approach with slope 1 : 1
Va = 10 /( 8 + 1.5 x 1.5 )
Va = 0.702 m/sec
Velocity Head h
a =
Va
2
/2g
= 0.025
= u/s FSL + velocity head
= 101.5 + 0.025
= 101.53 m
= u/s TEL - D
= 101.53 - 0.77
= 100.73 m
= 100.74 m
3. Shape of Crest
(a). Width of crest
= 0.55 - \D
1
where D
1 = height of crest in meter above d.s. bed
= 100.73 - 99
= 1.73 m
Bt = 0.55 X \ 1.73
= 0.72 m
= 0.75 m
(b). Width at base
= 0.5 x D
1
+D
= 0.5 X 1.73
= 0.87 m
= 0.90 m
Its top shall be capped with 20 cm thick cement concrete
4.Approach
For non - meter falls, the side walls may be splayed straight at an angle of 45 degree from the u.s. edge
of the crest and extending b 1.0 m in the earthen bank from the line of FSL
5. Downstream expansion
Side walls shall be straight and parallel up to the end of floor and shall be kept vertical
6. Upstream Protection
1.5 m should be laid on the u.s. bed sloping down towards
the crest 1:10 ; and three drain pipes of 15 cm diameter at the bed during the closure of the channel
1
2
3
4
0
Keep width of crest
u/s TEL
RL of crest
6
7.00 7
Thickness at base
Provide thickness at base
Brick/stone pitching in length
1.835 1.00
5
Crest length (L)
8
9
Width of crest (Bt)
Adopt crest level
7. Cistern Elements
Depth of cistern = d
c
/ 3
dc = (q
2

/ g )
1/3
q = 1.25 cumec/m
dc = 0.54 m
= 0.181 m But provided = 0.30 m
= d/s bed level - Depth of cistern
= 99.000 - 0.300 m
= 98.700 m
= 98.700 m
= 3.8*dc + 0.415+ HL
= 3.8 X 0.542 + 0.415 + 1
= 3.475 m
Provide 4.0 m long cistern at RL 98.700 m.
8. Length of Impervious floor
= 7
= Crest level - d/s bed level
= 100.74 - 99.00
= 1.74 m
Total floor length required = 7 X 1.74
= 12.18
Total floor lengthprovided = 12.20 m
Minimum d.s. floor length reqd. = 10.53*dc + 4.877-1.5* HL
= 10.53 X 0.54 + 4.877 - 1.5 X 1
= 9.08 m
Provide d.s. floor length reqd. = 9.10 m
Provide d.s. floor 9.10 m long and the balance 3.10 m under and upstream of the crest.
9 Floor thockness
Draw the hydrolic gradient line 1:7 for maximum static head i.e. when water headed upto the top of creast on
the u/s.and no water in down stream . The ordinate between the H.G. line and floor level would give the un balanced head .
The maximum uplift pressure in the u/s shall be counter balanced by the weight of water it self. Hence
theoretically there is no requirement of floor thickness in u.s. but minimum floor thickness of 0.30 m should be provided.
maximum unbalanced head at toe = 1.20 / 1.25 = 0.96 m
floor thickness required = say 1.00 m
2.25 m from toe 0.90 / 1.25 = 0.72 m
floor thickness required say 0.70 m
say
4.50 m from toe 0.61 / 1.25 = 0.49 m
floor thickness required say 0.50 m
6.75 m from toe 0.31 / 1.25 = 0.25 m
floor thickness required say 0.25 m
Curtain wall :-
(a) Down stream curtain wall:-
The curtain wall at d/s end of floor should be 45 cm thick and depth d/2 + 0.6 m to a minimum 1.00 m
Depth of curtain wall at the end of floor = 1.50 / 2 = 0.75 + 0.6 = 1.35 say 1.40 m
(b) Up stream curtain wall
The curtain wall at d/s end of floor should be 45 cm thick and depth d/3 + 0.6 m to a minimum 1.00 m
Depth of curtain wall at the end of floor = 1.50 / 2 = 0.5 + 0.6 = 1.10 say 1.10 m
D.S. protection :-
(a) Bed protection
Length of bed protection = 3 x d3 3 x fsd = 3.00 x 1.50 = 4.50 m
Side protection :-
Length = same as for bed protection.= 4.50 m
pk_nandwana@yahoo.co.in
12
10
11
maximum unbalanced head at
maximum unbalanced head at
maximum unbalanced head at
Maximum static head
Provide RL of cistern
Length of cistern
Bligh's coefficient
RL of cistern
Thus Depth of cistern
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0
Depth of sheet piles from scour considerations :
U/S sheet pile :
Discharge intensity 'q' = 1.25 cumec/m
Depth of scour 'R' = 1.36{q2/f}1/3 = 1.58 m
Anticipated scour = 1.25 R = 1.97 m
R.L. of the bottom of scour hole = 101.50 - 1.97
= 99.53 m
Minimum depth of u/s cutoff below bed level = yd/3+0.60 (where yd is water depth im m at u/s)
= 0.50 + 0.60
= 1.10 m
Provided u/s cut off wall depth = 1.20 m
RL of the bottom of sheet pile = 98.80 m
Provide sheet pile bottom elevation at = 98.80 m
If U/S sheet bottom El. is above Cistern level then provide El.= m
D/S sheet pile :
Discharge intensity 'q' = 1.25 cumec/m
Depth of scour 'R' = 1.36{q2/f}1/3 = 1.58 m
Anticipated scour = 1.5 R = 2.37 m
R.L. of the bottom of scour hole = 100.50 - 2.37
= 98.13 m
Minimum depth of d/s cutoff below bed level = yd/2 + 0.60 (where yd is water depth in m at d/s )
= 0.75 + 0.60
= 1.35 m
1.50 m
RL of bottom of sheet pile = d/s bed level-depth of cutoff
Sheet pile bottom elevation = 99.00 - 1.50 = 97.50 m
Provide sheet pile bottom elevation= 97.50 m
Total floor length and exit gradient
The exit gradient should be checked for the condition when there is no water in the stilling basin
when high flood is passing in the river; this provides the worst static condition.
Maximum static head = 100.74 - 99.00
= 1.74 m
= 1.50 m
H 1
GE = ------ X ------
d t\
1 GE*d
------------- = ----------- = 0.14
t\ H
o = 8.76
Hence requirement of total floor length b= o X d
= 8.76 X 1.50 = 13.14 m
Provided total floor length = 13.20 m
The floor length shall be provided as below:-
d.s floor length including cistern = 9.10 m
Width of the crest at base = 0.90 m
Upstream floor = 3.20 m
Total = 13.20 m
From Khosla's exit gradient curve
0
98.80
depth of d/s cut off wall d
Provided d/s cut off wall depth =
Pressure calculations
= 0.30 m
and downstream near cutoff wall = 0.30 m.
(i) Upstream sheet pile
d = 100.00 - 98.80
= 1.20 m
b = 13.20 m
1.20
13.20
From Khosla's Pressure curves
= 6.02
|C1 = 73.28 %
|D1 = 81.39 % |D
1
|C1 = 8.11 %
Correction for floor thickness = 2.03 (+ ve)
Correction for interference due to d/s sheet pile line, C = 19\D/b'.(d+D)/b
where, D = 99.00 - 97.50 = 1.50 m
d = 100.00 - 98.80 = 1.20 m
b' = 12.80 m
b = 13.20 m
Then, C = 1.33 (+ ve)
|C1 corrected = 73.28 + 2.03 + 1.33
= 76.64 %
(ii) Downstream sheet pile
d = 99.00 - 97.50
= 1.50 m
b = 13.20 m
d 8.00
b 13.20
From Khosla's Pressure curves
= 4.93
|E1 = 29.75 %
|D1 = 20.64 % |E1 |D1 = = 9.11 %
Correction for floor thickness = 1.82 (- ve)
Correction for interference due to u/s sheet pile line, C = 19D/b'.(d+D)/b
where, d = 99.00 - 97.50 = 1.50 m
D = 100.00 - 98.80 = 1.20 m
b' = 12.80 m
b = 13.20 m
than, C = 1.19 (- ve)
|E1 corrected = 29.75 - 1.82 - 1.19
= 26.74 %
Downstream Floor thickness
(i) At 0.00 m from toe of creast wall to 2.00 m
8.70
12.40
= 61.75 %
61.75 x 1.74
= 1.07 / 1.25 = 0.860 m
= 0.90 m
(ii) At 2.00 m from toe of creast wall and upto 4.00 m
Floor thickness required
0.09 '=
=
= % pressure
= Unbalanced head
Let the u/s floor thickness
= =
=
X 26.74 +
100.00
Provide floor thickness
1/ o =
76.64 26.74 -
= 0.11
1.07 m
1/o
d/b
6.70
12.40
= 53.70 %
53.70 x 1.74
= 0.93 / 1.25 = 0.748 m
= 0.80 m
(iii) At 4.00 m from toe of creast wall and upto 6.00 m
4.70
12.40
= 45.65 %
45.65 x 1.74
Floor thickness required = 0.79 / 1.25 = 0.635 m
= 0.70 m
(iv) At 6.00 m from toe of creast wall and upto 9.10
2.70
12.40
= 37.60 %
37.60 x 1.74
= 0.65 / 1.25 = 0.523 m
= 0.60 m
Downstream Protection
(a). Bed Protection
Length of bed protection = 3*d/s water depth
= 3.00 x 1.50
= 4.50 m
This shall consist of R.R.Stone dry pitching
This shall be protected by a toe wall 0.4 m wide R.R.sotne masonry and of depth equal to 0.80m.
(b). Side protection
Length of bed protection = 3*d/s water depth
= 3.00 x 1.50
= 4.50 m
Provide dry stone pitching 0.2 m thick on sides, resting on wall 0.4m wide and of the
same depth as other toe walls.
Floor thickness required
= =
% pressure
m 0.93
Floor thickness required
Provide floor thickness
26.74
Provide floor thickness
100.00
% pressure
26.74 + X 76.64 - 26.74
Provide floor thickness
100.00
76.64 26.74 -
0.65 m =
= 26.74 + X % pressure
Unbalanced head =
=
100.00
26.74 = +
=
-
m = 0.79 Unbalanced head
Unbalanced head
X 76.64
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0
A
:
1
1
A
U/S D/S
1
2
TBL 3
4
U/S FSL TBL 5
Creast level D/S FSL 6
7
8
d/sC.B.L.
cistern level=
RL
RL
R.L.
R.L. R.L.
R.L.
0.50
0.50
2.00
3
.
0
0
6.80
2.00
0.50
1
2
.
3
0
2
.
0
0
2
.
0
0
2
.
0
0
C
i
s
t
e
r
n

l
e
v
e
l
=
c
r
e
a
s
t

l
e
v
e
l

=
10.000
2.30
CANAL DATA
99.000
100.000
102.000
100.500
100.500
TBL
100.000
97.800
0.90
0.90
0.60
98.400
97.800
98.700
2.00 2.00 1.20
2.00
101.000
2.00
1.50
9.10
R.L.
R.L.
98.200
0.30
98.300
4.10
1
.
5
0
3.10 2.90
0.75
2.04
1.50
101.500
0.80
0.70
0
.
5
0
T
B
L
1
0
2
.
0
0
0
97.500
102.000
1.20
97.800
1.30
u/sCBL 100.000
T
B
L
1
0
2
.
0
0
0
B
.
W
.
1
.
5
0
0
0
.
5
0
0
1
0
0
.
0
0
0
C
B
L
F
.
B
.
8
.
0
0
0
.
3
0
1
.
5
0
3
.
0
0
F
S
D
0
1
.
0
0
0
.
0
0
0.70
Discharge
0.80
101.500
NSL
CBL
FSL
100.000
100.740
97.500
101.000
8.00
1.500
99.000
3
.
0
0
10.000
9
8
.
7
0
0
0.50
8
.
0
0
1
0
0
.
7
4
0
F.B.
8.00
FSD
0.500
1.500
0.500
B.W.
(Drawing not to scale)
m
m
m
m
m
m
m
cum
X
-

s
e
c
t
i
o
n

a
t

A
-
A
(Drawing not to scale)
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0
SNO. ITEM QTY
1
D/S cistern 1 0.00 0.00 0.00 0.00
D/S curtain wall 1 0.00 0.00 0.00 0.00
U/S impervious floor 1 0.00 0.00 0.00 0.00
U/S curtain wall 1 0.00 0.00 0.00 0.00
Wing wall A-A 2 2.60 0.00 0.00 0.00
Side wall B-B 2 0.00 2.30 0.00 0.00
Side wallC-C 2 0.00 0.00 0.00 0.00
0.00
A. E/w in hard Dence soil 25 % qty taken = 0.00
cum
2
(A)Soft disintegreted rock. 25 % qty taken = 0.00
(B)Hard rock not rquirding blasting 25 % qty taken = 0.00
Phylites & other hard rockrequiring nominal blasting 25 % qty taken = 0.00
cum
3
(a)maximum size upto 20mm
Wing wall A-A 2 0.00 0.00 0.00 0.00
Side wall B-B 2 0.00 2.30 0.00 0.00
Side wallC-C 2 0.00 0.00 0.00 0.00
0.00
4 for 1 0.00
cum
D/S cistern 1 0.00 0.00 0.00 0.00
D/S curtain wall 1 0.00 0.00 0.00 0.00
D/S curtain wall 1 0.00 0 0.00 0.00
DETAIED ESTIMATE
0
Cement concrete M-10(1:3:6) well mixed and
laid in position complete including all leads of
all construction material including curing and
finishing having well graded broken stone
aggregate of complete as per technical
specification
Cement concrete M-20(1:1.5:3) well mixed
and laid in position complete including all
leads of all construction material including
curring and finishing having well graded
broken stone aggregate of maximum size
upto 20mm complete as per technical
specification
Earth work in excavation including loading
unloading, disposal and dressing of
excavated rock within initial lead of 50 m and
lift upto 1.50 m indry or moist including
dressing of excavated area wirh cost of
dewatering wherever required and all
applicable taxes and . levies etc. complete in
Total
nos
Earth work in excavation including loading
unloading disposal and dressing of excavated
earth within intial lead of 50m and lift upto
1.5m in dry or moist including dressing of
excavted area with cost of dewatering
wherever required and all applicable taxes
and levies etc complete in all respect
A. Hard soil mixed with kankar, boulder
morrum
Total
U/S impervious floor 1 0.00 0.00 0.00 0.00
U/S curtain wall 1 0.00 0.00 0.00 0.00
coping 2 0.00 0.00 0 0.00
creast top 1 0.00 0.00 0 0.00
0.00
5 for 1 0.00
cum
In cement sand mortar 1:5
Creast wall 1 0.00 0.00 0.00 0.00
Wing wall A-A 2 0.00 0.00 0.00 0.00
Side wall B-B 2 0.00 0.00 0.00 0.00
Side wallC-C 2 0.00 0.00 0.00 0.00
0.00
for 1 0.00
6 cum
In cement sand mortar 1:5
Wing wall A-A 2 0.00 0.00 0.00 0.00
Side wall B-B 2 0.00 0.00 0.00 0.00
D/S return 2 0.00 0.00 0.00 0.00
0.00
7 for 1 0.00
cum
Creast wall 1 0.00 0.00 0.00
Wing wall A-A 2 0.00 0.00 0.00
Side wall B-B 2 0.00 0.00 0.00
Side wallC-C 2 0.00 0.00 0.00
D/S return 2 0.00 0.00 0.00
0.00
for 1 0.00
8
Rate as BSR 2006 page 42 item 15c
Wing wall A-A out side 2 0.00 0.00 0.00
Side wall B-B out side 2 0.00 0.00 0.00
Side wallC-C out side 2 0.00 0.00 0.00
D/S return out side 2 0.00 0.00 0.00
0.00
total
nos
nos
nos
Total
Flush and ruled pointing on stone masonry
including raking of joint and curing etc.
complete including all leads of all construction
materials in mortar ratio cement sand mortar
(1:3)
Plaster in cement sand mortar 1:3 including
raking of joints smooth finishing & curing etc.
including all leads of all construction material
complete of thickness 20 mm.
Total
Random rubble stone masonry (using R,R.
stone where 75% stone to be not less than 15
cm. in any direction and weighing not less
than 23 kg. for foundation including curing
all leads of all construction material and all
taxes and with inial lift delift 5m from ground
level etc complete
Random rubble stone masonry (using R,R.
stone where 75% stone to be not less than 15
cm. in any direction and weighing not less
than 23 kg. for superstructure including curing
all leads of all construction material and all
taxes and with inial lift delift 5m from ground
level etc complete
Total
total
nos
for 0 0.00
9 sqm
as per item no 1 0.00
for 1 nos 0.00
cum
Rehandling excavated earth ( excluding rock)
in trenches, pilinth side of foundations etc. in
layers not exceeding 20cm in depth,
consolidating each deposited layer by
ramming and watering including cost of water
including loading unloading wherever required
with cost of dewatering wherever required
and all applicable taxes .
nos
29 368 60 64 45 64
0 0
Sno. ITEM Qtty Rate Unit Amount
1
Rate as per BSR 2008 page 13 item 1
A. Hard soil mixed with kankar, boulder morrum cum 47.00 cum #VALUE!
2
Rate as per BSR 2008 page 13 item 2
(A)Soft disintegreted rock. 0.00 78.00 cum 0.00
(B)Hard rock not rquirding blasting 0.00 121.00 cum 0.00
Phylites & other hard rockrequiring nominal blasting 0.00 166.00 cum 0.00
3
0.00 2105.00 cum 0.00
(a)maximum size upto 20mm
Rate as per BSR 2008 page 22 item 6d
4
0.00 2951.00 cum 0.00
Rate as per BSR 2008 page 22 item 4d
5
0.00 1618.00 cum 0.00
In cement sand mortar 1:5
Rate as per BSR 2008 page 29 item 1e
6
0.00 1660.00 cum 0.00
In cement sand mortar 1:5
Rate as per BSR 2008 page 29 item 1e+item13a
Cement concrete M-20(1:1.5:3) well mixed and laid in position
complete including all leads of all construction material including
curring and finishing having well graded broken stone aggrgate of
maximum size upto 20mm complete as per technical
specification
Random rubble stone masonry (using R,R. stone where 75%
stone to be not less than 15 cm. in any direction and weighing not
less than 23 kg. for foundation including curring all leads of all
construction material and all taxes and with inial lift delift
Cement concrete M-10(1:3:6) well mixed and laid in position
complete including all leads of all construction material including
curring and finishing having well graded broken stone aggrgate of
complete as per technical specification
Earth work in excavation including loading unloading disposal
and dressing of excavated earth within intial lead of 50m and lift
upto 1.5m in dry or moist including dressing of excavted area
with cost of dewatering
ABSTRACT OF COST
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D.
Earth work in excavation including loading unloading, disposal
and dressing of excavated rock within initial lead of 50 m and lift
upto 1.50 m indry or moist including dressing of excavated area
wirh cost of dewatering wherever required and all applicable
taxes and . levies etc. complete in all respect.
Random rubble stone masonry (using R,R. stone where 75%
stone to be not less than 15 cm. in any direction and weighing not
less than 23 kg. for superstructure including curring all leads of
all construction material and all taxes and with inial lift delift
7
0.00 94.00 sqm 0.00
Rate as per BSR 2008 page 34 item 4b
8
#REF! 52.00 sqm #REF!
sqm
Rate as BSR 2008 page 35 item 15c
9
0.00 52.00 cum 0.00
Rate as BSR 2008 page 14 item 8c Total #VALUE!
3 % contengcy #VALUE!
G total #VALUE!
Say Rs. ##### lacs
Rehandling excavatedearth ( excluding rock) in trenches, pilinth
side of foundation etc. in layers not exceeding 20cm in depth,
consolidation each ldeposited layer by ramming and watering
including cost of water including loading unloading wherever
required with cost of dewatering wherever required and all
applicable taxes .
Flush and ruled pointing on stone masonry including raking of
joint and curing etc. complete including all leads of all
construction materials in mortar ratio cement sand mortar (1:3)
Plaster in cement sand mortar 1:3 including raking of joint
smooth finishing & curing etc. including all leads of all
construction material complete of thickness 20 mm.
29 320 60 64 45 64
0 0
1 NIT No. 7/2008-09 S.No.32
2 NIT Amount Rs. #VALUE! lacs
3 Earnest money 1.Regd. Contractor @1/2%Rs. #VALUE!
2.Other Contractor @ 2%Rs. #VALUE!
4 Tender cost Rs. 200
5 Date of Selling Tender 15.09.08 to 22.09.08
6 Date of Receiving Tender 24.09.08 upto 3.00 PM
7 Date of Opening Tender 24.09.08 At 4.00 PM
8 Time of completion 4 Month
9 B.S.R. Irrigation BSR 2008
Sno. ITEM Qtty Rate Unit Amount
1
Rate as per BSR 2008 page 13 item 1
A. Hard soil mixed with kankar, boulder morrum cum 47.00 cum #VALUE!
2
Rate as per BSR 2008 page 13 item 2
(A)Soft disintegreted rock. 0.00 78.00 cum 0.00
(B)Hard rock not rquirding blasting 0.00 121.00 cum 0.00
Phylites & other hard rockrequiring nominal blasting 0.00 166.00 cum 0.00
3
0.00 2105.00 cum 0.00
(a)maximum size upto 20mm
Rate as per BSR 2008 page 22 item 6d
4
0.00 2951.00 cum 0.00
Rate as per BSR 2008 page 22 item 4d
5
0.00 1618.00 cum 0.00
Cement concrete M-10(1:3:6) well mixed and laid in
position complete including all leads of all construction
material including curring and finishing having well
graded broken stone aggrgate of complete as per
Cement concrete M-20(1:1.5:3) well mixed and laid in
position complete including all leads of all construction
material including curring and finishing having well
graded broken stone aggrgate of maximum size upto
20mm complete as per technical specification
Random rubble stone masonry (using R,R. stone where
75% stone to be not less than 15 cm. in any direction
and weighing not less than 23 kg. for foundation
including curring all leads of all construction material
SCHEDULE - G
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D.
Earth work in excavation including loading unloading
disposal and dressing of excavated earth within intial
lead of 50m and lift upto 1.5m in dry or moist including
dressing of excavted area with cost of dewatering
Earth work in excavation including loading unloading,
disposal and dressing of excavated rock within initial
lead of 50 m and lift upto 1.50 m indry or moist including
dressing of excavated area wirh cost of dewatering
wherever required and all applicable taxes and . levies
In cement sand mortar 1:5
Rate as per BSR 2008 page 29 item 1e
6
0.00 1660.00 cum 0.00
In cement sand mortar 1:5
Rate as per BSR 2008 page 29 item 1e+item13a
7
0.00 94.00 sqm 0.00
Rate as per BSR 2008 page 34 item 4b
8
#REF! 52.00 sqm #REF!
sqm
Rate as BSR 2008 page 35 item 15c
9
0.00 52.00 cum 0.00
Rate as BSR 2008 page 14 item 8c Total #VALUE!
Say Rs. #VALUE! lacs
Rehandling excavatedearth ( excluding rock) in
trenches, pilinth side of foundation etc. in layers not
exceeding 20cm in depth, consolidation each ldeposited
layer by ramming and watering including cost of water
including loading unloading wherever required with cost
of dewatering wherever required and all applicable taxes
Random rubble stone masonry (using R,R. stone where
75% stone to be not less than 15 cm. in any direction
and weighing not less than 23 kg. for superstructure
including curring all leads of all construction material
and all taxes and with inial lift delift
Plaster in cement sand mortar 1:3 including raking of
joint smooth finishing & curing etc. including all leads of
all construction material complete of thickness 20 mm.
Flush and ruled pointing on stone masonry including
raking of joint and curing etc. complete including all
leads of all construction materials in mortar ratio cement
DETERMINATION OF CONJUGATE DEPTH
(Refer IS 4997-1968)
H
L
/D
C
= 0.231 0.235 0.240 0.244 0.249 0.254 0.259 0.264
D
1
/D
C
= 0.6 0.598 0.596 0.594 0.592 0.59 0.588 0.586
H
L
= 1.00
q = 1.25
D
C
= 0.54
H
L
/D
C
= 1.84
D
1
/D
C
= 0.37
D
1
= 0.20
D
2
= 1.17
E
f1
= 2.22
E
f2
= 1.23
COEFFICIENT OF DISCHARGE
0.000 0.000
0.460 0.050
0.680 0.100
0.800 0.150
0.860 0.200
0.905 0.250
0.930 0.300
0.950 0.350
0.965 0.400
0.975 0.450
0.980 0.500
0.985 0.550
0.990 0.600
Y-AXIS X-AXIS
VALUES OF COEFFICIENT VALUES OF h d / H
d
Cs / C h d / H
d
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0 10 20 30 40
D
1
/
D
C

H
L
/D
C
Sequent depth determination
y = -118.86x
6
+ 334.56x
5
- 376.1x
11.827x + 0.0038
R = 0.9996
0.4
0.6
0.8
1
R
A
T
I
O

O
F

M
O
D
I
F
I
E
D

C
O
E
F
F
I
C
I
E
N
T

T
O

F
R
E
E

D
I
S
C
H
A
R
G
E

C
O
E
F
F
I
C
I
E
N
T



C
s

/

C

RATIO OF DISCHARGE COEFFICIENTS DUE TO
TAILWATER EFFECT
0.998 0.650
0.999 0.700
1.000 0.750
1.000 0.800
h d / H
e
= 0.000
Cs / C = 0.004
Cs = 0.007
0 0 0 0
0.1 14 19 29
0.2 19 27 40
0.3 21 31 47
0.4 23 34 53
0.5 25 37 57.5
0.6 26.5 40 62
0.7 27 42 65
0.8 28.5 43.5 68.5
0.9 29.5 44 71
1 30 44.5 74
Depressed floor
w.s. w.s.
H b
d b
|E = 1/[cos-1(-2)
|D = 1/[cos-1(-1)
|c' = 100|E
|D; = 100|D
|D' = 100|D; (Depressed floor)
|D' = |D-2/3(|E-|D)+3/o^2 (Depressed floor)
Sheet pile at end
KHOSLA CURVE
Value of
1/o =d/b
|D' |D |E
0
0.2
0 0.1 0.2 0.3
R
A
T
I
O

O
F

M
O
D
I
F
I
E
D

C
O
E
F
F
I
C
I
E
N
T

T
O

F
R
E
E

D
I
S
C
H
A
R
G
E

C
O
E
F
F
I
C
I
E
N
T



C
s

/

C
DEGREE OF SUBMERGENCE hd / He
0
10
20
30
40
50
60
70
80
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7
S
c
a
l
e

f
o
r

|

=

P
/
H
x
1
0
0

Value of 1/o =d/b
Khosla curve
0.269 0.274 0.279 0.284 0.290 0.295 0.301 0.306 0.312
0.584 0.582 0.58 0.578 0.576 0.574 0.572 0.57 0.568
40 50 60
Sequent depth determination
D1/Dc
376.1x
4
+ 216.52x
3
- 68.36x
2
+
11.827x + 0.0038
R = 0.9996
RATIO OF DISCHARGE COEFFICIENTS DUE TO
TAILWATER EFFECT

|E
|D
|D'
w.s.
b
d
Sheet pile at end
0.3 0.4 0.5 0.6 0.7 0.8 0.9
DEGREE OF SUBMERGENCE hd / He
0.6 0.7 0.8 0.9 1
0.318 0.324 0.330 0.336 0.342 0.348 0.355 0.361 0.368
0.566 0.564 0.562 0.56 0.558 0.556 0.554 0.552 0.55
0.375 0.382 0.389 0.396 0.403 0.410 0.417 0.425 0.433
0.548 0.546 0.544 0.542 0.54 0.538 0.536 0.534 0.532
0.441 0.448 0.456 0.465 0.473 0.481 0.490 0.499 0.508
0.53 0.528 0.526 0.524 0.522 0.52 0.518 0.516 0.514
0.517 0.526 0.535 0.545 0.554 0.564 0.574 0.584 0.594
0.512 0.51 0.508 0.506 0.504 0.502 0.5 0.498 0.496
0.605 0.616 0.626 0.637 0.648 0.660 0.671 0.683 0.695
0.494 0.492 0.49 0.488 0.486 0.484 0.482 0.48 0.478
0.707 0.719 0.732 0.745 0.758 0.771 0.784 0.798 0.812
0.476 0.474 0.472 0.47 0.468 0.466 0.464 0.462 0.46
0.826 0.840 0.855 0.870 0.885 0.900 0.916 0.932 0.948
0.458 0.456 0.454 0.452 0.45 0.448 0.446 0.444 0.442
0.964 0.981 0.998 1.015 1.033 1.051 1.069 1.087 1.106
0.44 0.438 0.436 0.434 0.432 0.43 0.428 0.426 0.424
1.125 1.145 1.165 1.185 1.206 1.227 1.248 1.270 1.292
0.422 0.42 0.418 0.416 0.414 0.412 0.41 0.408 0.406
1.314 1.337 1.360 1.384 1.408 1.433 1.458 1.484 1.510
0.404 0.402 0.4 0.398 0.396 0.394 0.392 0.39 0.388
1.536 1.563 1.591 1.618 1.647 1.676 1.706 1.736 1.767
0.386 0.384 0.382 0.38 0.378 0.376 0.374 0.372 0.37
1.798 1.830 1.862 1.895 1.929 1.964 1.999 2.035 2.071
0.368 0.366 0.364 0.362 0.36 0.358 0.356 0.354 0.352
2.108 2.146 2.185 2.225 2.265 2.306 2.348 2.391 2.435
0.35 0.348 0.346 0.344 0.342 0.34 0.338 0.336 0.334
2.479 2.525 2.571 2.619 2.667 2.716 2.767 2.818 2.871
0.332 0.33 0.328 0.326 0.324 0.322 0.32 0.318 0.316
2.925 2.980 3.036 3.093 3.151 3.211 3.272 3.335 3.399
0.314 0.312 0.31 0.308 0.306 0.304 0.302 0.3 0.298
3.464 3.531 3.599 3.669 3.741 3.814 3.889 3.965 4.044
0.296 0.294 0.292 0.29 0.288 0.286 0.284 0.282 0.28
4.124 4.206 4.290 4.376 4.464 4.554 4.647 4.742 4.839
0.278 0.276 0.274 0.272 0.27 0.268 0.266 0.264 0.262
4.939 5.041 5.145 5.253 5.363 5.476 5.591 5.710 5.832
0.26 0.258 0.256 0.254 0.252 0.25 0.248 0.246 0.244
5.958 6.086 6.218 6.354 6.493 6.636 6.784 6.935 7.090
0.242 0.24 0.238 0.236 0.234 0.232 0.23 0.228 0.226
7.250 7.415 7.584 7.759 7.938 8.123 8.313 8.509 8.711
0.224 0.222 0.22 0.218 0.216 0.214 0.212 0.21 0.208
8.919 9.133 9.355 9.583 9.818 10.061 10.312 10.572 10.839
0.206 0.204 0.202 0.2 0.198 0.196 0.194 0.192 0.19
11.116 11.402 11.698 12.004 12.320 12.648 12.987 13.339 13.703
0.188 0.186 0.184 0.182 0.18 0.178 0.176 0.174 0.172
14.080 14.472 14.878 15.300 15.738 16.193 16.666 17.158 17.669
0.17 0.168 0.166 0.164 0.162 0.16 0.158 0.156 0.154
18.201 18.756 19.334 19.936 20.564 21.219 21.904 22.619 23.366
0.152 0.15 0.148 0.146 0.144 0.142 0.14 0.138 0.136
24.148 24.967 25.824 26.723 27.666 28.656 29.695 30.788 31.939
0.134 0.132 0.13 0.128 0.126 0.124 0.122 0.12 0.118
33.150 34.426 35.773 37.195 38.698 40.288 41.972 43.757 45.652
0.116 0.114 0.112 0.11 0.108 0.106 0.104 0.102 0.1
47.666 49.808 52.091 54.526
0.098 0.096 0.094 0.092