Republic of the Philippines
ENERGY REGULATORY COMMISSION
‘San Miguel Avenue, Pasig City
IN THE MATTER) OF THE
APPLICATION FOR THE APPROVAL
OF: 1) THE DISTRIBUTION LOAD
IMPROVEMENT AND LOAD BALANCE
IMPROVEMENT OF __ VARIOUS
SECTIONS OF THE DISTRIBUTION
SYSTEM OF THE PANGI SUBSTATION
COVERAGE AREA 2) THE
DISTRIBUTION CODE COMPLIANCE
AND REHABILITATION OF DANDA
SUBSTATION, AND DISTRIBUTION
LOAD AND LOAD AND PHASE
BALANCE IMPROVEMENT OF THE
DANDA SUBSTATION COVERAGE
AREA 3) THE REPLACEMENT OF
POWER TRANSFORMER — AND
REFURBISHING OF _ SIRAWAI
SUBSTATION, AND DISTRIBUTION
LOAD AND LOAD BALANCE
IMPROVEMENT OF —_ VARIOUS
SECTIONS OF __ DISTRIBUTION
SYSTEM OF SIRAWAI SUBSTATION
COVERAGE AREA 4) THE
UPGRADING OF 10 KM. 13.2 KV
IMELDA ALICIA _ DISTRIBUTION
LINES, AND DISTRIBUTION LOAD
IMPROVEMENT, LOAD AND PHASE
BALANCE IMPROVEMENT AND
REACTIVE VOLTAGE IMPROVEMENT
OF VARIOUS SECTIONS OF
DISTRIBUTION SYSTEM OF STA.
BARBARA S/S COVERAGE AREA 5)
THE UPGRADING OF RT. LIM
SUBSTATION, AND DISTRIBUTION
LOAD AND LOAD AND PHASE
BALANCE IMPROVEMENT OF.
VARIOUS. SECTIONS OF
DISTRIBUTION SYSTEM OF R.T. LIM
SIS COVERAGE AREA AND 6) THE
PROCUREMENT OF ENGINEERING
ANALYSIS SOFTWARE, AUTOMATED
BILLING SYSTEM, TEST EQUIPMENT
AND MAINTENANCE VEHICLE, WITH
PRAYER FOR ~—_— PROVISIONAL
AUTHORITY
ZAMBOANGA DEL SUR I! ELECTRIC
COOPERATIVE, INC. (ZAMSURECO
m,
Applicant.
SOATORP
KE “apy
Posting
were goiph
ERC CASE NO. 2007-535 MC
Espproved for) %
=ERC Case No. 2007-535 MC
DECISION/June 4, 2008
Page 2 of 12
DECISION
Before this Commission for resolution is the application filed on December
21, 2007 by Zamboanga del Sur Il Electric Cooperative, Inc. (ZAMSURECO Il)
for approval of: 1) the distribution load improvement and load balance
improvement of various sections of the distribution system of the Pangi
Substation coverage area; 2) the distribution code compliance and rehabilitation
of Danda Substation, and distribution load and load and phase balance
improvement of the Danda Substation coverage area; 3) the replacement of
power transformer and refurbishing of Sirawai Substation and distribution load
and load balance improvement of various sections of distribution system of
Sirawai Substation coverage area; 4) the upgrading of 10 km. 13.2 kV Imelda —
Alicia Distribution Lines, and distribution load improvement, load and phase
balance improvement and reactive voltage improvement of various sections of
distribution system of Sta. Barbara Substation coverage area; 5) the upgrading of
RT. Lim Substation, and distribution load and load and phase balance
improvement of various sections of distribution system of R.T. Lim Substation
coverage area; and 6) the procurement of engineering analysis software,
automated billing system, test equipment and maintenance vehicle, with prayer
for provisional authority.
Having found said application sufficient in form and in substance with the
required fees having been paid, an Order and a Notice of Public Hearing, both
dated January 8, 2008, were issued setting the case for initial hearing and pre-
trial conference on February 18, 2008.ERC Case No. 2007-535 MC
DECISION/June 4, 2008
Page 3 of 12
In the same Order, ZAMSURECO II was directed to cause the publication
i the Notice of Public Hearing, at its own expense, once (1x) in a newspaper of
general circulation in the Philippines, at least (10) days before the scheduled
date of initial hearing. It was also directed to inform the consumers, within its
franchise area, by any other means available and appropriate, of the filing of the
instant application, its reasons therefor, and of the scheduled hearing thereon.
The Office of the Solicitor General (OSG), the Commission on Audit
(COA) and the Committees on Energy of both Houses of Congress were
furnished with copies of the Order and the Notice of Public Hearing and were
requested to have their respective duly authorized representatives present at the
initial hearing.
Likewise, the Offices of the Mayors of the Municipalities within
ZAMSURECO I's franchise area were furnished copies of the Order and Notice
of Public Hearing for the appropriate posting thereof on their respective bulletin
boards.
On February 13, 2008, ZAMSURECO Il filed its “Pre-Trial Brief.
During the February 18, 2008 initial hearing of this case, only
ZAMSURECO I appeared. No intervenor/oppositor appeared nor was there any
intervention/opposition registered.
In the said hearing, ZAMSURECO 1I presented its proofs of compliance
with the Commission's posting and publication of notice requirements which were
duly marked as Exhibits “A” to “EE-1", inclusive. Thereafter, it conducted an
f
expository presentation of its may a ye