UNIT OF COMPETENCY MODULE TITLE MODULE DESCRIPTOR

: : :

MAKE PIPING JOINTS AND CONNECTIONS MAKING PIPING JOINTS AND CONNECTIONS This module covers knowledge, skills and attitude in making pipe joints for plumbing system except copper pipes and fittings. works, mixing/tinting of paints, and re-painting and/or re-touching work; and estimating painting requirements. 32 Hrs. NC II

NOMINAL DURATION CERTIFICATE LEVEL PREREQUISITE

: : :

SUMMARY OF LEARNING OUTCOMES: Upon completion of the module the trainees/students should be able to: LO 1. LO 2. LO3. Fit-up joints and fittings for PVC pipe safe handling of Perform threaded pipe joints and connections Caulk joints

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

LO 1. Fit-up joint and fitting for PVC pipe ASSESSMENT CRITERIA: 1. All measurements are in accordance with the piping lay-out/plans and specifications. 2. Appropriate pipe joint is selected in line with job requirements. 3. Pipe ends are properly cleaned prior to fit-up according to standard procedures. 4. Trial fitting is performed prior to final fit-up/connection and before application of solvent cement or other types and jointing materials. 5. Joints are made with strict adherence to perpendicularity and levelness of alignment. 6. Joints are properly fitted-up with the required PVC/plastic solvent/cement and according to required alignments. CONTENTS: 1. Blue print reading 2. Drainage/Waste/vents fittings 3. Working on plastic pipes 4. Plumbing tools (leveling tools) 5. Joining of plastic pipes CONDITIONS: The students/ trainees must be provided with the following: 1. Tools and equipment Plumbing mock-up Hacksaw Spirit level Pipe cutter for PVC Pull-push rule 2. Supplies and Materials PVC pipes and fittings Sandpaper Solvent cement 3. PPE Gloves (leather) Safety shoes Goggles Methodology - Modular/Self learning - Demonstration - Film Viewing Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test
Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005) 2

L O 2.Perform threaded pipe joints and connections Assessment Criteria: 1. All measurements are in accordance with the piping lay-out/plans and specifications. 2. Threaded connections are done in accordance with the piping table and specifications and approved standard procedures. 3. All complete thread should penetrate the fittings so that one to two incomplete thread is visible on the joints. 4. Teflon tape or other related materials are fitted properly to ensure watertight joint. CONTENTS: 1. 2. 3. 4. Blue print reading Procedures in threading GI pipes Tables for Thread engagement Sealant materials

CONDITIONS: 1. Tools and equipment Working steel table with pipe vise Pipe threader Pipe reamer Pipe wrench Pull-push rule Oil can Steel brush 2. Supplies and materials G.I. pipes Elbow, Tee (for testing) 3. PPE Gloves (leather) Safety shoes Goggles Methodology Modular/Self learning Demonstration Film Viewing

Assessment Method Interview (oral questionnaire) Demonstration


3

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

Written Test

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

L O 3.

Caulk joints

Assessment Criteria: 1. Joints are firmly packed with oakum or hemp and fitted with molten pig lead or epoxy to a depth of not less than 25.4 mm. 2. Lead or epoxy is caulked thoroughly at the inside and outside edges of the joint. 3. Caulked joint is extended not more than 3.2 mm below the rim of the hub. 4. Couplers are used to connect pipes and fittings to hubless pipes. CONTENTS: 1. Procedure in cutting cast iron pipe 2. Procedure in caulking cast iron pipes 3. Tables for amount of lead and oakum in caulking CI pipes CONDITIONS: 1. Tools and equipment - Melting pot - Ladle - Lead runner - Caulking tool/yarning tools - Bullpen hammer - Cold chisel 2. Supplies and materials - Cast Iron 4x4 wye - Cast Iron 3x3 wye - Cast Iron pipe (single hub, 4 in. diameter) - Cast Iron pipe (single hub, 3 in. diameter) - Oakum - Lead 3. PPE - Safety shoes - Gloves Methodology Modular/Self learning Demonstration Film Viewing

Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test


Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005) 5

UNIT OF COMPETENCY : MODULE TITLE MODULE DESCRIPTOR : :

PERFORM SINGLE UNIT PLUMBING INSTALLATION AND ASSEMBLIES PERFORMING SINGLE UNIT PLUMBING INSTALLATION AND ASSEMBLIES This module covers the knowledge, skills and attitudes in the installation/assembling of single unit plumbing works including copper pipes. tools, materials & ipment, painting surfaces; performing works, mixing/tinting of paints, and re-and/or reuching work; and estimating painting uirement 80 Hrs. NC II

NOMINAL DURATION CERTIFICATE LEVEL PREREQUISITE

: : :

SUMMARY OF LEARNING OUTCOMES: Upon completion of the module the trainees/students should be able to: L O 1. Prepare for plumbing works L O 2. Install pipe and fittings L O 3. Install hot and cold water supply L O 4. Install/assemble plumbing fixtures

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

L O 1. Prepare for plumbing works Assessment Criteria: 1. Work plans and isometric are read and interpreted in accordance with the job requirements. 2. Materials, tools and equipment are selected and prepared according to job requirements. 3. Appropriate PPE are selected according to job requirements. CONTENTS: 1. Blue print reading 2. Plumbing tools and piping materials 3. PPE CONDITIONS: The students / trainees must be provided with the following: 1. Tools and equipment - Pipe threader - Pipe reamer - Pipe wrench - Pipe cutter - Hacksaw - Pull-push rule - Pipe vise - Tri square - Spirit level - Oil can 2. Supplies and materials - GI pipes and fittings - Plastic pipes and fittings - Plumbing fixtures and fittings 3. PPE - Gloves - Goggles - Safety shoes Methodology Modular/Self learning Demonstration Film Viewing

Assessment Method Interview (oral questionnaire) Demonstration Written Test


7

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

L O2. Install pipes and fittings Assessment Criteria: 1. Pipe and fittings are installed with a standard slope in accordance with Revised National Plumbing Code of the Philippines (RNP-CP) and venting requirements and procedures. 2. Drainage/sewer/vent piping systems are aligned with water supply and provided with clean-outs in the required locations prescribed in the approved work plan. 3. Approved fittings are used in installing drainage/sewer piping. 4. Correct usage of tools and equipment is observed according to manufacturers specifications. 5. Appropriate PPE are used in accordance with the job requirements. CONTENTS: 1. 2. 3. 4. 5. Plumbing codes Elements of plumbing system Installation of DWV Proper use of tools PPE

CONDITIONS: 1. Tools and equipments - Plumbing mock up - Hacksaw - Pull-push rule - Working steel table with pipe vise - Pipe cutter for PVC 2. Supplies and materials - Plastic pipes and fittings - Sandpaper - Solvent cement 3. PPE - Gloves - Goggles - Safety shoes Methodology Modular/Self learning Demonstration Film Viewing

Assessment Method - Interview (oral questionnaire) - Demonstration


Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005) 8

Written Test

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

L O 3.

Install hot and cold water supply

Assessment Criteria: 1. Correct specification of pipes and joint are used in accordance with the job requirements /specifications. 2. Hot and cold water supplies are installed according to the approved working plan and materials specifications. 3. Water supply is assembled leak free & free from contamination and aligned with drainage, vents and waste piping. 4. All assemblies are in accordance with the listed standard. CONTENTS: 1. 2. 3. 4. Blue print reading Installation hot and cold water supply Water test Safety measures

CONDITIONS: 1. Tools and equipments - Pipe threader - Pipe reamer - Pipe cutter - Plumbing mock up - Pull-push rule - Pipe wrench - Oil can - Steel working table with pipe vise - Steel brush 2. Supplies and materials - GI pipes and fittings - Teflon tape - Hot and cold telephone shower - Three-valve shower diverter 3. PPE - Gloves - Goggles - Safety shoes Methodology - Modular/Self learning - Demonstration - Film Viewing Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test
Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005) 10

L O 4. Install/assemble plumbing fixtures Assessment Criteria: 1. Correct specification of pipes and joints are used in accordance with the job requirements/specifications. 2. Bottom of the water pipes at all joints shall be at least 0.3 meter from the sewer of drain line. 3. Plumbing fixtures are installed according to specified rough-in measurements and/or manufacturers specifications and required standard in RNPCP. 4. Plumbing fixtures are rigidly secured with strict adherence to perpendicularity and levelness. 5. All assemblies are in conformity with the listed standard. 6. Correct use of tools and materials and equipment is observed in accordance with manufacturers specifications. 7. Appropriate PPE are used in accordance with the job requirements. 8. Worksite is cleaned and kept in safe condition in accordance with OHSA regulation. CONTENTS: 1. 2. 3. 4. Steps in setting-up plumbing fixtures Plumbing code provisions Plumbness of plumbing fixtures 5S

CONDITIONS: The students/ trainees must be provided with the following: 1. Tools and equipments - Plumbing mock up - Adjustable wrench - Screw driver - Pipe wrench - Claw hammer - Cold chisel - Electric drill - Spirit level - Pull-push rule 2. Supplies and materials - Water closet with accessories - Lavatory with accessories - Urinal - Slop sink - Floor drain - Three-valve shower diverter - Telephone shower - Teflon tape

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

11

3. PPE - Gloves - Goggles - Safety shoes Methodology Modular/Self learning Demonstration Film Viewing

Assessment Method Interview (oral questionnaire) Demonstration Written Test

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

12

UNIT OF COMPETENCY: MODULE TITLE MODULE DESCRIPTOR :

PERFORM PLUMBING REPAIR AND MAINTENANCE WORKS : Performing plumbing repair works

NOMINAL DURATION CERTIFICATE LEVEL PREREQUISITE

This module covers the knowledge, skills and attitudes in repairing plumbing works & eainting surfaces; performing painting works, tinting of paints, and re-painting and/or re-touching work; and mating painting requirements : 40 Hrs. : : NC II

SUMMARY OF LEARNING OUTCOMES: Upon completion of the module the trainees/students should be able to: L O 1. Repair defective pipes and fittings L O 2. Repair defective plumbing fixtures and accessories

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

13

L O 1. Repair defective pipes and fittings Assessment Criteria: 1. Defective pipes and fittings are located, identified and repaired as is where is. 2. Replacement pipes and/or fittings are checked to ensure they are free from defects and in accordance with standard specifications or as required. 3. Joints are tightly secured and leak-free in accordance with the job requirements. 4. Damage areas are restored or repaired in line with standard operating procedures. 5. Correct usage of tools and equipments is observed in accordance with job requirements. 6. Appropriate PPE are used in accordance with job requirements. Contents: Condition: Mensuration Materials use and specification Knowledge of plumbing work Proper use of drawing tools/equipment Safety precautions and 5 S implementation Students/trainees must be provided with the following:

1. Tools and equipment - Pipe threader - Pipe wrench - Pipe cutter - Adjustable wrench - Screw driver 2. Supplies and Materials - PVC /PE GI pipes and fittings CI pipes and fittings 3. PPE - Gloves Goggles Safety shoes Methodology Modular/Self learning Demonstration Film Viewing Assessment Method Interview (oral questionnaire) Demonstration Written Test
Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005) 14

L O 2. Repair defective plumbing fixtures and accessories Assessment Criteria: 1. 2. 3. 4. 5. 6. Defective plumbing fixtures repaired and/or replaced Replacement plumbing fixtures are checked to ensure they are free from defects and in accordance with standard specification or as required. Joints are tightly secured and leak free in accordance with the job requirements Damage areas are restored or repaired in line with standard operating procedures. Correct usage of tools and equipment is observed in accordance with job requirements. Appropriate PPE are used in accordance with job requirements.

CONTENTS: 1. 2. 3. 4. Repair and replace plumbing fixtures Replacement of fittings for plumbing fixtures PPE 5S

CONDITIONS: The students/ trainees must be provided with the following: 1. Tools and equipments - Plumbing mock up - Adjustable wrench - Screw driver - Pipe wrench - Claw hammer - Cold chisel - Electric drill - Spirit level - Pull-push rule 2. Supplies and materials - Water closet with accessories - Lavatory with accessories - Urinal - Slop sink - Floor drain - Three-valve shower diverter - Telephone shower - Teflon tape 3. PPE - Gloves - Goggles - Safety shoes

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

15

Methodology Modular/Self learning Demonstration Film Viewing

Assessment Method Interview (oral questionnaire) Demonstration Written Test

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

16

UNIT OF COMPETENCY : MODULE TITLE :

PERFORM PLUMBING REPAIR AND MAINTENANCE WORKS Performing plumbing maintenance This module covers the knowledge, skills and attitudes in maintaining plumbing works.; performing painting works, mixing/tinting of paints, and repainting and/or re-touching work; and estimating painting requirements. : 20 Hrs. : : NC II

MODULE DESCRIPTOR :

NOMINAL DURATION CERTIFICATE LEVEL PREREQUISITE

SUMMARY OF LEARNING OUTCOMES: Upon completion of the module the trainees/students should be able to: L O 1. Clear clogged pipes L O 2. Clear clogged fixtures

Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005)

17

L O 1. Clear clogged pipes Assessment Criteria: 1. Clogged pipes are correctly located in line with approved working plan. 2. Clogged pipes are cleared using appropriate method. 3. Pipes are cleared and provided with screen in line with standard operating procedures. 4. Appropriate PPE are used in accordance with the job requirements. CONTENTS: 1. procedure in cleaning clog pipes 2. PPE 3. 5S CONDITIONS: The students/ trainees must be provided with the following: 4. Tools and equipments - Plumbing mock up - Adjustable wrench - Screw driver - Pipe wrench - Claw hammer - Cold chisel - Electric drill - Spirit level - Pull-push rule - Plugging equipment 5. Supplies and materials - Water closet with accessories - Lavatory with accessories - Urinal - Slop sink - Floor drain - Three-valve shower diverter - Telephone shower - Teflon tape 6. PPE - Gloves - Goggles - Safety shoes Methodology - Modular/Self learning - Demonstration - Film Viewing Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test
Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005) 18

L O 2. Clear clogged fixtures Assessment Criteria: 1. 3. Clogged fixture drains are correctly located in line with approved working plan. 2. Clogged fixture drains are cleared using appropriate method. Fixture drains are cleared and provided with screen in line with standard operating procedures. 4. Appropriate PPE are used in accordance with the job requirements.

CONTENTS: 1. Procedure in cleaning fixtures drains 2. PPE 3. 5S CONDITIONS: The students/ trainees must be provided with the following: 7. Tools and equipments - Plumbing mock up - Adjustable wrench - Screw driver - Pipe wrench - Claw hammer - Cold chisel - Electric drill - Spirit level - Pull-push rule - Plugging equipment 8. Supplies and materials - Water closet with accessories - Lavatory with accessories - Urinal - Slop sink - Floor drain - Three-valve shower diverter - Telephone shower - Teflon tape 9. PPE - Gloves - Goggles - Safety shoes Methodology - Modular/Self learning - Demonstration - Film Viewing Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test
Workshop/04/20-29/05/dory/jo/--(Revised April 29,2005) 19