Internal Only
Purpose
You are expected to master the following knowledge after this course:
Know how to make preparations for UMTS SDR commissioning Get familiar with data configuration of UMTS SDR Get familiar with UMTS SDR version management Know the standard workflow of commissioning Note: the interfaces may be different for different software versions.
2012/6/14
Internal Only
Contents
Introduction Preparations Power-on Check
Internal Only
Preparations
Online logon
End
Service verification
Internal Only
3.
Anti-static protection: please wear anti-static wrist strap when checking equipment. Please follow the instructions described in engineering specifications to perform operations on modules. For redundant modules, please pack them with anti-static bags. The engineers participating UMTS SDR commissioning must get the following documents at least
ZXSDR ****** Installation Manual.pdf ZXSDR ****** O&M Manual.pdf ZXSDR ****** Commissioning and Configuration Manual.pdf ZXSDR ****** Hardware Manual.pdf ZXSDR ****** Technical Manual.pdf
Internal Only
Contents
Introduction Preparations Power-on Check
Internal Only
Internal Only
Data configuration
Internal Only
PC configuration requirements:
CPU main frequency: PIII 800 or higher Memory > 256MB; Hard disk > 10GB; OS: Windows XP professional
Internal Only
Internal Only
Installation acceptance report (ensure the installation has been completed and passed the acceptance)
Unpacking acceptance report (ensure boards and all hardware equipment are available
Internal Only
Internal Only
Contents
Introduction Preparations Power-on Check
Internal Only
Power-on procedure
Check the internal jumper switch of other boards Check the internal jumper switch of the SA
Checking boards
Start
End
Internal Only
Internal Only
Check whether the SDR has been configured with the right quantity of boards as planned. Check whether boards have been inserted into the correct slots. Check the internal jumper DIP switch of the SA board
Mode
Uplink short cable, downlink short cable Uplink long cable, downlink long cable Uplink short cable, downlink long cable Uplink long cable, downlink short cable
Internal Only
5
6 7
Internal Only
Check whether the polarities of the power supply are correctly connected. Check whether the input power range of the DC power cabinet is within the range of - 40VDC - -57VDC. If 220V-AC power supply is adopted, B8200 must be used together with the PSU. Check whether the singlephase voltage is within the range of 200V AC 240V AC, and whether the frequency is span is within the range of 47 Hz 53 Hz.
Internal Only
If fibers are used for the Iub interface connection, check whether fibers are correctly connected from RNC and B8200 to the CC board. If E1 cables are used for the Iub interface connection, check whether the E1 cables between the DDF and B8200 are correctly connected. If FE cables are used for the Iub interface connection, check whether the FE cables between the Switch and B8200 are correctly connected. Check whether the fibers between the B8200 FS board and RRU are correctly connected Check whether the LMT port on the CC board is normal. Connect to the LMT port on the CC board and the PC debugging port with cables Check whether cables to dry contacts, the 232 serial port and the 485 serial port are correctly connected.
Internal Only
Power-on steps
Check whether the equipment is grounded Plug out all of the boards of B8200 except the PM. Set the switch connecting B8200 in the DC power cabinet to ON position. Check whether the RUN LED on the PM board flashes at the frequency of 1Hz, and whether the ALM LED is OFF. Check whether the RUN LED on the FA board flashes at the frequency of 1Hz, and whether the ALM LED is OFF. After the PM is powered on normally and the fan runs normally, insert the CC, BPC, SA and FS boards to see whether they are powered on normally, and whether every LED is in normal status.
Power-off steps
Set the switch connecting B8200 in the DC power cabinet to OFF position.
Internal Only
Power-on steps
Check whether the equipment is grounded After confirming the power cables are correctly connected, set the switch connecting R8840 in the DC power cabinet to ON position. Observe whether the LED status is normal. If there is an indoor lightning protection box, set the switch connecting R8840 in the indoor lightning protection box to ON position. Observe whether the LED status is normal. If there is a power distribution box providing multiple DC-outputs, set the switch connecting R8840 in that lightning protection box to ON position. Observe whether the LED status is normal.
Power-off steps
If there is an indoor lightning protection box, then set the corresponding switch in the indoor lightning protection box to OFF position. If there is no indoor lightning protection box, then set the corresponding switch in the DC power cabinet to OFF position.
Internal Only
Power-on step
Switch on the power supply of the RSU
Internal Only
Contents
Introduction Preparations Power-on Check
Internal Only
When EOMS is starting, select data configuration of the SDR and import them (the file is ready, *.xml)
Internal Only
Internal Only
Internal Only
Internal Only
Contents
Introduction Preparations Power-on Check
Internal Only
Speech service
Data service
Other services
Internal Only
Review
1. Commissioning procedure
2. Commissioning preparations
3. How to configure and manage
version information
4. Service test 5. Q&A
Internal Only