ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR

EQUIPO EXAMEN PARCIAL


SOLADO DE 2" MEZCLA 1:12 CEMENTO HORMIGON

100 m2 12.5000 h/m2 UNIDAD hh hh hh hh hh CANTIDAD 0.0160 0.1600 0.0800 0.6400 0.0800 COSTO 18.14 15.12 13.14 11.84 17.39 TOTAL COSTO 22.50 14.45 5.70 TOTAL COSTO 11.70 57.00 5.65 TOTAL COSTO 30.50 12.73 TOTAL TOTAL P.U. SUBTOTAL 0.29 2.42 1.05 7.58 1.39 12.73 SUBTOTAL 14.63 2.19 0.05 16.86 SUBTOTAL 0.35 0.06 0.01 0.42 SUBTOTAL 30.50 0.64 31.14 61.15

MATERIALES HORMIGON CEMENTO PORTLAND TIPO I (BLS.:42.5 KG) AGUA

UNIDAD m3 bls m3

CANTIDAD 0.6500 0.1515 0.0081

COMB. Y LUB. GASOLINA 84 OCTANOS (GRIFO LIMA) ACEITE MOTOR GASOLINA SAE 30W GRASA MULTIPLE EP

UNIDAD gal gal lb

CANTIDAD 0.0300 0.0010 0.0020

EQUIPOS MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11 - 12P3 HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.0800 0.0500

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL
CONCRETO PREMEZCLADO F'c=100 Kg/cm2 PARA CIMIENTOS

25.00 3.1250 UNIDAD hh hh hh hh hh

m3 h/m3 CANTIDAD 0.0320 0.6400 0.3200 1.2800 0.3200 COSTO 18.14 15.12 13.14 11.84 16.33 TOTAL COSTO 185.00 TOTAL COSTO 5.53 34.84 TOTAL TOTAL P.U. SUBTOTAL 0.58 9.68 4.20 15.16 5.23 34.84 SUBTOTAL 190.55 190.55 SUBTOTAL 1.77 1.05 2.81 228.21

MATERIALES CONCRETO PREMEZCLADO TIPO I FC=100Kg/cm2

UNIDAD m3

CANTIDAD 1.0300

EQUIPOS VIBRADOR DE CONCRETO 4HP 1.50 plg HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.3200 0.0300

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL EXAMEN PARCIAL
ENCOF. Y DESENCOF. PARA SOBRECIMIENTOS

16.00 2.0000 UNIDAD hh hh hh

m2 h/m2 CANTIDAD 0.0500 0.5000 0.5000 COSTO 18.14 15.12 13.14 TOTAL COSTO 2.96 3.02 5.40 TOTAL COSTO 15.04 TOTAL TOTAL P.U. SUBTOTAL 0.91 7.56 6.57 15.04 SUBTOTAL 0.77 0.48 18.09 19.34 SUBTOTAL 0.90 0.90 35.28

MATERIALES ALAMBRE NEGRO RECOCIDO BWG N 8 CLAVO C/CABEZA P/CONSTRUCCION D. PROMEDIO MADERA TORNILLO

UNIDAD KG KG p2

CANTIDAD 0.2600 0.1600 3.3500

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.0300

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON OPERADOR EQUIPO EXAMEN PARCIAL
CONCRETO EN FALSOPISO MEZCLA 1:8 E=4"

110 m2 13.7500 h/m2 UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh hh 0.0218 0.2182 0.5818 0.0727 18.14 15.12 11.84 17.39 TOTAL 0.40 3.30 6.89 1.26 11.85

MATERIALES HORMIGON REGLA DE MADERA AGUA

UNIDAD CANTIDAD COSTO SUBTOTAL m3 p2 m3 0.1450 0.0600 0.0160 22.50 5.20 5.70 TOTAL 3.26 0.31 0.09 3.67

COMB. Y LUB. GASOLINA 84 OCTANOS (GRIFO LIMA) ACEITE MOTOR GASOLINA SAE 30W GRASA MULTIPLE EP

UNIDAD CANTIDAD COSTO SUBTOTAL gal gal lb 0.0273 0.0009 0.0018 11.70 57.00 5.65 TOTAL 0.32 0.05 0.01 0.38

EQUIPOS MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11 - 12P3 HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL hm % MO 0.0727 0.0300 30.50 11.85 TOTAL 30.49 4.89 35.38 51.27

TOTAL P.U.

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL EXCAVACION DE ZANJAS 4.00 m3 0.5000 h/m3 UNIDAD hh hh CANTIDAD 0.2000 2.0000 COSTO 18.14 15.12 TOTAL COSTO 33.87 TOTAL TOTAL P.U. SUBTOTAL 3.63 30.24 33.87 SUBTOTAL 1.69 1.69 35.56

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.0500

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL CORTE MANUAL DE TERRENO 40.00 m2 5.0000 h/m2 UNIDAD hh hh CANTIDAD 0.2000 0.2000 COSTO 18.14 15.12 TOTAL COSTO 6.65 TOTAL TOTAL P.U. SUBTOTAL 3.63 3.02 6.65 SUBTOTAL 0.33 0.33 6.98

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.0500

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ PEON EXAMEN PARCIAL ELIMINACION DESMONTE CON EQUIPO 345.00 m3 43.1250 h/m3 UNIDAD hh hh CANTIDAD 0.0023 0.0464 COSTO 18.14 11.84 TOTAL COSTO 195.15 153.62 TOTAL TOTAL P.U. SUBTOTAL 0.04 0.55 0.59 SUBTOTAL 18.11 3.56 21.67 22.27

EQUIPOS CAMION VOLQUETE 4 X 2 140-210 HP 6 M3 CARGADOR S/LLANTA 125 HP, 2.5 Y3

UNIDAD hm hm

CANTIDAD 0.0928 0.0232

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL RELLENO CON MATERIAL PROPIO 7.00 m3 0.8750 h/m3 UNIDAD hh hh CANTIDAD 0.1143 1.1429 COSTO 18.14 11.84 TOTAL COSTO 15.61 TOTAL TOTAL P.U. SUBTOTAL 2.07 13.53 15.61 SUBTOTAL 0.78 0.78 16.39

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.0500

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL TRAZO Y REPLANTEO 300.00 m2 37.5000 h/m2 UNIDAD hh hh hh CANTIDAD 0.0027 0.0267 0.0533 COSTO 18.14 15.12 11.84 TOTAL COSTO 30.52 3.02 5.40 TOTAL COSTO 13.5 44.80 1.08 TOTAL TOTAL P.U. SUBTOTAL 0.05 0.40 0.63 1.08 SUBTOTAL 0.76 0.02 0.14 0.92 SUBTOTAL 0.00 0.02 0.03 0.06 2.06

MATERIALES YESO EN BOLSA DE 20 KG CLAVO C/CABEZA P/CONSTRUCCION D. PROMEDIO MADERA TORNILLO

UNIDAD bls KG P2

CANTIDAD 0.0250 0.0050 0.0264

EQUIPOS CORDEL ROLLO DE 50m WINCHA DE 30m HERRAMIENTA MANUAL

UNIDAD pza pza % MO

CANTIDAD 0.0001 0.0005 0.0300

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL
TRAZO DE NIVELES Y REPLANTEO DURANTE EL PROCESO

300.00 37.5000 UNIDAD hh hh hh

m2 h/m2 CANTIDAD 0.0027 0.0267 0.0533 COSTO 18.14 15.12 11.84 TOTAL COSTO 30.52 3.02 TOTAL COSTO 13.5 44.80 1.08 TOTAL TOTAL P.U. SUBTOTAL 0.05 0.40 0.63 1.08 SUBTOTAL 0.76 0.02 0.78 SUBTOTAL 0.00 0.02 0.03 0.06 1.92

MATERIALES YESO EN BOLSA DE 20 KG CLAVO C/CABEZA P/CONSTRUCCION D. PROMEDIO

UNIDAD bls KG

CANTIDAD 0.0250 0.0050

EQUIPOS CORDEL ROLLO DE 50m WINCHA DE 30m HERRAMIENTA MANUAL

UNIDAD pza pza % MO

CANTIDAD 0.0001 0.0005 0.0300

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ZOCALO DE CERAMICO 20X20 4.00 m2 0.5000 h/m2 UNIDAD hh hh hh CANTIDAD 0.200000 2.000000 0.660000 COSTO 18.14 15.12 11.84 TOTAL COSTO 35.00 8.00 19.95 TOTAL COSTO 41.68 TOTAL TOTAL P.U. SUBTOTAL 3.63 30.24 7.81 41.68 SUBTOTAL 0.88 1.60 20.95 23.42 SUBTOTAL 2.08 2.08 67.19

MATERIALES ARENA GRUESA FRAGUA BLANCA CERAMICO 20x20

UNIDAD m3 kg m2

CANTIDAD 0.025000 0.200000 1.050000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.0500

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL
ZOCALO DE CEMENTO SIMPLE MEZCLA CEMENTOARENA

14.00 1.7500 UNIDAD hh hh hh

m2 h/m2 CANTIDAD 0.057100 0.571400 0.382900 COSTO 18.14 15.12 11.84 TOTAL COSTO 35.00 14.45 3.02 5.40 5.70 TOTAL COSTO 14.21 TOTAL TOTAL P.U. SUBTOTAL 1.04 8.64 4.53 14.21 SUBTOTAL 0.74 2.70 0.09 2.81 0.03 6.37 SUBTOTAL 0.43 0.43 21.00

MATERIALES ARENA FINA CEMENTO PORTLAND TIPO I (BLS.:42.5 KG) CLAVO C/CABEZA P/CONSTRUCCION DE PROMEDIO MADERA ANDAMIAJE AGUA

UNIDAD m3 bls kg p2 m3

CANTIDAD 0.021000 0.186900 0.030000 0.520000 0.005600

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL EXAMEN PARCIAL
PUERTA POSTERIOR CONTRAPLACADA DE 0.65 M DE ANCHO

3.00 0.3750 UNIDAD hh hh hh

m2 h/m2 CANTIDAD 0.666700 2.666700 2.666700 COSTO 18.14 15.12 13.14 TOTAL COSTO 3.02 8.60 33.00 1.00 22.70 TOTAL SUBTOTAL 12.09 40.32 35.04 87.45 SUBTOTAL 0.20 88.49 33.00 1.10 2.33 125.13

MATERIALES CLAVO C/CABEZA P/CONSTRUCCCION D. PROMEDIO MADERA CEDRO TRIPLAY LUPUNA 4X 8 X 6mm LIJA P/MADERA COLA SINTETICA

UNIDAD kg p2 pza hja gal

CANTIDAD 0.066900 10.290000 1.000000 1.100000 0.102800

EQUIPOS CEPILLADORA ELECTRICA SIERRA CIRCULAR HERRAMIENTA MANUAL

UNIDAD hm hm % MO

CANTIDAD 0.533300 0.533300 0.030000

COSTO 4.29 3.91 87.45 TOTAL TOTAL P.U.

SUBTOTAL 6.86 0.78 0.98 8.63 221.21

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL EXAMEN PARCIAL
PUERTAS CONTRAPLACADAS DE 0.65 M DE ANCHO

3.00 0.3750 UNIDAD hh hh hh

m2 h/m2 CANTIDAD 0.666700 2.666700 2.666700 COSTO 18.14 15.12 13.14 TOTAL COSTO 3.02 8.60 21.75 1.00 22.70 TOTAL COSTO 4.29 3.91 87.45 TOTAL SUBTOTAL 12.09 40.32 35.04 87.45 SUBTOTAL 0.20 88.49 21.75 1.10 2.33 113.88 SUBTOTAL 2.29 2.09 2.62 7.00 208.33

MATERIALES CLAVO C/CABEZA P/CONSTRUCCCION D. PROMEDIO MADERA CEDRO TRIPLAY LUPUNA 4X 8 X 4mm LIJA P/MADERA COLA SINTETICA

UNIDAD kg p2 pza hja gal

CANTIDAD 0.066900 10.290000 1.000000 1.100000 0.102800

EQUIPOS CEPILLADORA ELECTRICA SIERRA CIRCULAR HERRAMIENTA MANUAL

UNIDAD hm hm % MO

CANTIDAD 0.533300 0.533300 0.030000

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL EXAMEN PARCIAL RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP 25.00 pza 3.1250 h/pza UNIDAD hh hh hh CANTIDAD 0.032000 0.320000 0.320000 COSTO 18.14 15.12 13.14 TOTAL COSTO 137.10 6.19 TOTAL COSTO 9.62 TOTAL TOTAL P.U. SUBTOTAL 0.58 4.84 4.20 9.62 SUBTOTAL 1.37 1.30 2.67 SUBTOTAL 0.29 0.29 12.58

MATERIALES PEGAMENTO P/TUBO PVC TUBO PVC AGUA S.P CLASE 10 " X 5m

UNIDAD gal pza

CANTIDAD 0.010000 0.210000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL EXAMEN PARCIAL SALIDA DE AGUA FRIA DE 1/2" 3.00 Pto 0.3750 h/pto UNIDAD hh hh hh CANTIDAD 0.266700 2.666700 1.333333 COSTO 18.14 15.12 13.14 TOTAL COSTO 139.92 6.19 0.96 1.23 TOTAL COSTO 62.68 TOTAL TOTAL P.U. SUBTOTAL 4.84 40.32 17.52 62.68 SUBTOTAL 4.20 2.55 1.92 1.23 9.90 SUBTOTAL 1.88 1.88 74.46

MATERIALES PEGAMENTO P/TUBO PVC TUBO PVC AGUA S.P CLASE 10 " X 5m CODO PVC AGUA DOBLE CAMPAA S.P. " X 90 TEE PVC AGUA S.P. "

UNIDAD gal pza pza pza

CANTIDAD 0.030000 0.412000 2.000000 1.000000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL EXAMEN PARCIAL VALVULAS DE COMPUERTA DE BRONCE DE 1/2" 6.00 pza 0.7500 h/pza UNIDAD hh hh hh CANTIDAD 0.133300 1.333300 0.666700 COSTO 18.14 15.12 13.14 TOTAL COSTO 1.16 7.64 1.40 22.76 TOTAL COSTO 31.34 TOTAL SUBTOTAL 2.42 20.16 8.76 31.34 SUBTOTAL 0.12 15.28 2.80 22.76 40.96 SUBTOTAL 0.71 0.71 73.00

MATERIALES CINTA TEFLON UNION UNIVERSAL ACERO GALV. " NIPLE ACERO GALV. TIPO ISO -" X 1" VALVULA COMPUERTA PESADA BRONCE 250 LB "

UNIDAD pza pza pza pza

CANTIDAD 0.100000 2.000000 2.000000 1.000000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL RED DE DESAGUE DE 4" EN PVC m h/m CANTIDAD 0.040000 0.400000 0.800000 COSTO 18.14 15.12 11.86 TOTAL COSTO 137.10 19.11 TOTAL COSTO 16.26 TOTAL TOTAL P.U. SUBTOTAL 0.73 6.05 9.49 16.26 SUBTOTAL 1.37 6.69 8.06 SUBTOTAL 0.49 0.49 24.81

20.00 2.5000 UNIDAD hh hh hh

MATERIALES PEGAMENTO P/TUBO PVC TUBO PVC DESAGUE SAL 4" X 3m

UNIDAD gal pza

CANTIDAD 0.010000 0.350000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL
TUBERIA DE DESAGUE PVC SAL DE 2" PARA VENTILACION

20.00 2.5000 UNIDAD hh hh hh

m h/m CANTIDAD 0.040000 0.400000 0.800000 COSTO 18.14 15.12 11.86 TOTAL COSTO 137.10 7.48 TOTAL COSTO 16.26 TOTAL TOTAL P.U. SUBTOTAL 0.73 6.05 9.49 16.26 SUBTOTAL 1.37 2.62 3.99 SUBTOTAL 0.49 0.49 20.74

MATERIALES PEGAMENTO P/TUBO PVC TUBO PVC DESAGUE SAL 2" X 3m

UNIDAD gal pza

CANTIDAD 0.010000 0.350000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL RED DE DESAGUE DE 2" EN PVC m h/m CANTIDAD 0.040000 0.400000 0.800000 COSTO 18.14 15.12 11.86 TOTAL COSTO 137.10 7.48 TOTAL COSTO 16.26 TOTAL TOTAL P.U. SUBTOTAL 0.73 6.05 9.49 16.26 SUBTOTAL 1.37 2.62 3.99 SUBTOTAL 0.49 0.49 20.74

20.00 2.5000 UNIDAD hh hh hh

MATERIALES PEGAMENTO P/TUBO PVC TUBO PVC DESAGUE SAL 2" X 3m

UNIDAD gal pza

CANTIDAD 0.010000 0.350000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL SALIDA DE DESAGUE DE 4" pto h/pto CANTIDAD 0.200000 2.000000 2.000000 COSTO 18.14 15.12 11.86 TOTAL COSTO 137.10 19.11 5.33 34.21 8.61 TOTAL COSTO 57.59 TOTAL TOTAL P.U. SUBTOTAL 3.63 30.24 23.72 57.59 SUBTOTAL 4.11 6.69 5.49 35.24 8.87 60.40 SUBTOTAL 1.73 1.73 119.71

4.00 0.5000 UNIDAD hh hh hh

MATERIALES PEGAMENTO P/TUBO PVC TUBO PVC DESAGUE SAL 4" X 3m CODO PVC DESAGUE SAL 4" X 90" TRAMPA P PVC DESAGUE SAL 4" YEE PVC DESAGUE SAL 4"

UNIDAD gal pza pza pza pza

CANTIDAD 0.030000 0.350000 1.030000 1.030000 1.030000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL SALIDA DE DESAGUE DE 2" pto h/pto CANTIDAD 0.200000 2.000000 2.000000 COSTO 18.14 15.12 11.86 TOTAL COSTO 137.10 7.48 1.31 5.80 2.44 TOTAL COSTO 57.59 TOTAL TOTAL P.U. SUBTOTAL 3.63 30.24 23.72 57.59 SUBTOTAL 4.11 2.62 1.35 5.97 2.51 16.57 SUBTOTAL 1.73 1.73 75.88

4.00 0.5000 UNIDAD hh hh hh

MATERIALES PEGAMENTO P/TUBO PVC TUBO PVC DESAGUE SAL 2" X 3m CODO PVC DESAGUE SAL 2" X 90" TRAMPA P PVC DESAGUE SAL 2" YEE PVC DESAGUE SAL 2"

UNIDAD gal pza pza pza pza

CANTIDAD 0.030000 0.350000 1.030000 1.030000 1.030000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL CAJA DE REGISTRO DE ALBAILERIA DE 10" X 20" 4.00 pza 0.5000 h/pza UNIDAD hh hh hh CANTIDAD 0.200000 2.000000 2.000000 COSTO 18.14 15.12 11.86 TOTAL COSTO 38.00 35.00 41.00 14.45 4.35 3.02 571.43 5.70 TOTAL COSTO 57.59 TOTAL SUBTOTAL 3.63 30.24 23.72 57.59 SUBTOTAL 1.14 2.10 10.25 21.68 43.50 2.60 20.00 0.06 101.32 SUBTOTAL 1.73 1.73 160.63

MATERIALES ARENA FINA ARENA GRUESA PIEDRA CHANCADA DE " - " HUSO 67 CEMENTO PORTLAND TIPO I (BLS.:42.5 KG) ACERO LISO GDO. 60 PRECIO PROM. P/Kg CLAVO C/CABEZA P/CONSTRUCCION DE PROMEDIO LADRILLO ARCILLA KING KONG 18 HUECOS AGUA

UNIDAD m3 m3 m3 bls kg kg mll m3

CANTIDAD 0.030000 0.060000 0.250000 1.500000 10.000000 0.860000 0.035000 0.010000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO EXAMEN PARCIAL REGISTRO ROSCADO DE BRONCE DE 2" 8.00 pza 1.0000 h/pza UNIDAD hh hh CANTIDAD 0.100000 1.000000 COSTO 18.14 15.12 TOTAL COSTO 8.55 3.18 12.68 TOTAL COSTO 16.93 TOTAL SUBTOTAL 1.81 15.12 16.93 SUBTOTAL 8.55 3.18 12.68 24.41 SUBTOTAL 0.51 0.51 30.12

MATERIALES REGISTRO ROSCADO DE BRONCE 2" CODO PVC DESAGUE SAL 2" X 90 TEE SANITARIA PVC DESAGUE SAL 2"

UNIDAD pza pza pza

CANTIDAD 1.000000 1.000000 1.000000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL REGISTRO ROSCADO DE BRONCE DE 4" 6.00 pza 0.7500 h/pza UNIDAD hh hh hh CANTIDAD 0.133300 1.333300 0.666700 COSTO 18.14 15.12 11.84 TOTAL COSTO 26.14 5.30 11.84 TOTAL COSTO 30.47 TOTAL TOTAL P.U. SUBTOTAL 2.42 20.16 7.89 30.47 SUBTOTAL 26.14 5.30 11.84 43.28 SUBTOTAL 0.91 0.91 74.67

MATERIALES REGISTRO ROSCADO DE BRONCE CROMADO 4" CODO PVC DESAGUE SAL 4" X 90 TEE SANITARIA PVC DESAGUE SAL 4"

UNIDAD pza pza pza

CANTIDAD 1.000000 1.000000 1.000000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL CENTRO DE LUZ 5.00 0.6250 UNIDAD hh hh hh pto h/pto CANTIDAD 0.160000 1.600000 1.600000 COSTO 18.14 15.12 11.84 TOTAL COSTO 1.29 3.90 2.45 2.35 0.16 0.54 0.27 TOTAL COSTO 46.04 TOTAL TOTAL P.U. SUBTOTAL 2.90 24.19 18.94 46.04 SUBTOTAL 11.61 3.90 0.25 3.53 0.16 1.62 0.27 21.33 SUBTOTAL 2.30 2.30 69.67

MATERIALES CABLE TW 12 AWG CAJA DE PASE OCTOGONAL F.G. LIVIANA 4" CINTA AISLANTE ELECTRICA TUBO PVC ELECTRICO SEL " X 3M CONEXIN A CAJA PVC ELECTRICA SEL " CURVA PVC ELECTRICA SEL " X 45 UNION PVC ELECTRICA SEL "

UNIDAD m pza pza pza pza pza pza

CANTIDAD 9.000000 1.000000 0.100000 1.500000 1.000000 3.000000 1.000000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.050000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL SALIDA PARA BRAQUETES 4.00 pza 0.5000 h/pza UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh 0.200000 2.000000 1.000000 18.14 15.12 11.84 TOTAL 3.63 30.24 11.84 45.71

MATERIALES ARTFAC. ALUMB. INTERIOR BRAQUETE ECONOMICO BE. 220 AF

UNIDAD CANTIDAD COSTO SUBTOTAL pza 1.000000 81.97 TOTAL 81.97 81.97

EQUIPOS HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL % MO 0.030000 45.71 TOTAL 0.69 0.69 128.36

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE

4.00 0.5000

pto h/pto

UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh 0.200000 2.000000 2.000000 18.14 15.12 11.84 TOTAL 3.63 30.24 23.68 57.55

MATERIALES CABLE TW 12 AWG TOMACORRIENTE DOBLE UNIVERSAL CAJA DE PASE RECTANGULAR F.G. LIVIANA 50 X 100mm TUBO PVC ELECTRICO SEL " X 3M CONEXIN A CAJA PVC ELECTRICA SEL " CURVA PVC ELECTRICA SEL " X 45 UNION PVC ELECTRICA SEL "

UNIDAD CANTIDAD COSTO SUBTOTAL m pza pza pza pza pza pza 16.000000 1.050000 1.050000 1.500000 2.000000 3.000000 1.000000 1.29 7.80 1.35 4.89 0.37 1.71 0.61 TOTAL 20.64 8.19 1.42 7.34 0.74 5.13 0.61 44.06

EQUIPOS HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL % MO 0.050000 57.55 TOTAL 1.44 1.44 103.05

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: EXAMEN PARCIAL SALIDA DE TIMBRE 2.00 pto 0.2500 h/pto UNIDA D hh hh hh CANTIDA D 0.400000 4.000000 2.000000 COST O 18.14 15.12 11.84 TOTAL COST O 4.50 4.89 0.37 1.71 0.61 TOTAL COST O 91.42 TOTAL SUBTOTA L 7.26 60.48 23.68 91.42 SUBTOTA L 4.50 29.34 0.74 3.42 1.22 39.22 SUBTOTA L 1.14 1.14 131.78

MANO DE OBRA CAPATAZ OPERARIO PEON

MATERIALES CAJA DE PASE CUADRADA F.G. 100 X 100 X 40mm TUBO PVC ELECTRICO SAP " X 3M CONEXIN A CAJA PVC ELECTRICA SAP " CURVA PVC ELECTRICA SAP " X 90 UNION PVC ELECTRICA SAP "

UNIDA D pza pza pza pza pza

CANTIDA D 1.000000 6.000000 2.000000 2.000000 2.000000

EQUIPOS HERRAMIENTA MANUAL

UNIDA D % MO

CANTIDA D 0.050000

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: EXAMEN PARCIAL TABLERO DE DISTRIBUCION 24 POLOS 1.00 pza 0.1250 h/pza UNIDA D hh hh hh CANTIDA D 8.000000 8.000000 4.000000 COST O 18.14 15.12 11.84 TOTAL COST O 314.0 0 TOTAL COST O 313.4 4 TOTAL SUBTOTA L 145.12 120.96 47.36 313.44 SUBTOTA L

MANO DE OBRA CAPATAZ OPERARIO PEON

MATERIALES TABLEROS ELECTRICO GABINETE METAL BARRA BRONCE 24 POLOS TRIFASICO

UNIDA D pza

CANTIDA D

1.000000

314.00 314.00 SUBTOTA L

EQUIPOS

UNIDA D % MO

CANTIDA D

HERRAMIENTA MANUAL

0.050000

15.67 15.67 643.11

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON EXAMEN PARCIAL ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 11.00 m2 1.3750 h/m2 UNIDAD hh hh hh hh CANTIDAD 0.110000 1.090000 1.310000 0.440000 COSTO 18.14 15.12 13.14 11.84 TOTAL COSTO 5.40 3.02 2.96 TOTAL COSTO 40.90 TOTAL TOTAL P.U. SUBTOTAL 2.00 16.48 17.21 5.21 40.90 SUBTOTAL 36.23 0.72 0.62 37.58 SUBTOTAL 1.23 1.23 79.71

MATERIALES MADERA TONILLO CLAVOS DE 3 ALAMBRE N 8

UNIDAD pza kg kg

CANTIDAD 6.710000 0.240000 0.210000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON OPERADOR DE EQUIPO LIVIANO EXAMEN PARCIAL CONCRETO PREMEZCLADO F'c = 175 Kg/CM2 100.00 m3 12.5000 h/m3 UNIDAD hh hh hh hh CANTIDAD 0.081000 0.320000 0.720000 0.160000 COSTO 18.14 15.12 13.14 17.39 TOTAL COSTO 208.80 TOTAL COSTO 412.8 5.53 18.55 TOTAL TOTAL P.U. SUBTOTAL 1.47 4.84 9.46 2.78 18.55 SUBTOTAL 208.80 208.80 SUBTOTAL 33.02 0.88 0.56 34.47 261.82

MATERIALES CONCRETO PREMEZCLADO F'c = 175 Kg/CM2

UNIDAD m3

CANTIDAD 1.000000

EQUIPOS BOMBA VIBRADORES DE 2" HERRAMIENTA MANUAL

UNIDAD hm hm % MO

CANTIDAD 0.080000 0.160000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ACARREO DE MATERIAL EXCEDENTE 6.00 m3 0.7500 h/m3 UNIDAD hh hh CANTIDAD 0.130000 1.330000 COSTO 18.14 11.84 TOTAL COSTO 18.11 TOTAL TOTAL P.U. SUBTOTAL 2.36 15.75 18.11 SUBTOTAL 0.54 0.54 18.65

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ENCOFRADO Y DESENCOFRADO 14.00 m2 1.7500 h/m2 UNIDAD hh hh hh hh CANTIDAD 0.080000 0.770000 0.990000 0.990000 COSTO 18.14 15.12 13.14 11.84 TOTAL COSTO 5.40 3.02 2.96 TOTAL COSTO 37.82 TOTAL TOTAL P.U. SUBTOTAL 1.45 11.64 13.01 11.72 37.82 SUBTOTAL 27.81 0.33 0.30 28.44 SUBTOTAL 1.13 1.13 67.40

MATERIALES MADERA TONILLO CLAVOS DE 2 ALAMBRE NEGRO N 16

UNIDAD p2 kg kg

CANTIDAD 5.150000 0.110000 0.100000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON EXAMEN PARCIAL
ENCOFRADO Y DESENCOF. NORMAL EN LOSAS MACIZAS

17.00 2.1250 UNIDAD hh hh hh hh

m2 h/m2 CANTIDAD 0.070000 0.670000 0.850000 0.360000 COSTO 18.14 15.12 13.14 11.84 TOTAL COSTO 5.40 3.02 2.96 TOTAL COSTO 26.83 TOTAL TOTAL P.U. SUBTOTAL 1.27 10.13 11.17 4.26 26.83 SUBTOTAL 32.02 0.42 0.30 32.74 SUBTOTAL 0.80 0.80 60.38

MATERIALES MADERA TONILLO CLAVOS DE 2 ALAMBRE NEGRO N 16

UNIDAD p2 kg kg

CANTIDAD 5.930000 0.140000 0.100000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL
CONCRETO EN MUROS TABIQUES Y PLACAS F'C= 175 KG/CM2

10.00 1.2500 UNIDAD hh hh hh hh hh

m3 h/m3 CANTIDAD 0.230000 2.000000 2.000000 10.270000 3.000000 COSTO 18.14 15.12 13.14 11.84 17.35 TOTAL COSTO 14.45 35.00 41.00 TOTAL COSTO 30.5 5.53 5.53 234.34 TOTAL TOTAL P.U. SUBTOTAL 4.17 30.24 26.28 121.60 52.05 234.34 SUBTOTAL 121.81 18.90 22.55 163.26 SUBTOTAL 30.50 5.53 5.53 7.03 48.59 446.19

MATERIALES CEMENTO PORTLAND TIPO I ARENA GRUESA PIEDRA CHANCADA "

UNIDAD bls m3 m3

CANTIDAD 8.430000 0.540000 0.550000

EQUIPOS MEZCLADORA DE 9-11 P3 VIBRADOR DE 2.0" 4HP WINCHE ELECTRICO HERRAMIENTA MANUAL

UNIDAD hm hm hm % MO

CANTIDAD 1.000000 1.000000 1.000000 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL
CONCRETO EN MUROS F'c=175 KG/m2 , CON 10 CM

27.00 3.3750 UNIDAD hh hh hh hh hh

m3 h/m3 CANTIDAD 0.120000 0.960000 0.640000 3.680000 0.960000 COSTO 18.14 15.12 13.14 11.84 17.35 TOTAL COSTO 14.45 35.00 41.00 TOTAL COSTO 30.5 5.53 5.53 85.33 TOTAL TOTAL P.U. SUBTOTAL 2.18 14.52 8.41 43.57 16.66 85.33 SUBTOTAL 121.81 18.90 22.55 163.26 SUBTOTAL 9.76 1.77 1.77 25.60 38.90 287.49

MATERIALES CEMENTO PORTLAND TIPO I ARENA GRUESA PIEDRA CHANCADA "

UNIDAD bls m3 m3

CANTIDAD 8.430000 0.540000 0.550000

EQUIPOS MEZCLADORA DE 9-11 P3 VIBRADOR DE 2.0" 4HP WINCHE ELECTRICO DE 2 TAMBORES HERRAMIENTA MANUAL

UNIDAD hm hm hm % MO

CANTIDAD 0.320000 0.320000 0.320000 0.300000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL MURO CON LADRILLO PANDERETA DE CUELLO 9.00 m2 1.1250 h/m2 UNIDAD hh hh hh CANTIDAD 0.112000 1.120000 0.784000 COSTO 18.14 15.12 11.84 TOTAL COSTO 14.45 35.00 3.02 0.56 TOTAL COSTO 5.4 28.25 TOTAL TOTAL P.U. SUBTOTAL 2.03 16.93 9.28 28.25 SUBTOTAL 1.79 0.63 0.07 16.80 19.29 SUBTOTAL 3.13 0.85 3.98 51.52

MATERIALES CEMENTO PORTLAND TIPO I ARENA GRUESA CLAVOS DE 3" LADRILLO PANDERETA

UNIDAD bls m3 kg pz

CANTIDAD 0.124000 0.018000 0.022000 30.000000

EQUIPOS ANDAMIO DE MADERA HERRAMIENTA MANUAL

UNIDAD P2 % MO

CANTIDAD 0.580000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL MURO DE LADRILLO PANDERETA DE SOGA 12.00 m2 1.5000 h/m2 UNIDAD hh hh hh CANTIDAD 0.073000 1.734000 0.631000 COSTO 18.14 15.12 11.84 TOTAL COSTO 14.45 35.00 3.02 0.56 TOTAL COSTO 5.4 35.01 TOTAL TOTAL P.U. SUBTOTAL 1.32 26.22 7.47 35.01 SUBTOTAL 2.36 0.81 0.07 19.60 22.83 SUBTOTAL 3.13 1.05 4.18 62.02

MATERIALES CEMENTO PORTLAND TIPO I ARENA GRUESA CLAVOS DE 3" LADRILLO PANDERETA

UNIDAD bls m3 kg pz

CANTIDAD 0.163000 0.023000 0.022000 35.000000

EQUIPOS ANDAMIO DE MADERA HERRAMIENTA MANUAL

UNIDAD P2 % MO

CANTIDAD 0.580000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL TARRAJEO PRIMARIO O RAYADO 17.00 m2 2.1250 h/m2 UNIDAD hh hh hh CANTIDAD 0.057000 0.571000 0.286000 COSTO 18.14 15.12 11.84 TOTAL COSTO 14.45 3.02 38.00 TOTAL COSTO 5.4 5.2 13.05 TOTAL TOTAL P.U. SUBTOTAL 1.03 8.63 3.39 13.05 SUBTOTAL 1.69 0.07 0.61 2.37 SUBTOTAL 3.13 0.13 0.39 3.65 19.07

MATERIALES CEMENTO PORTLAND TIPO I CLAVOS DE 3" ARENA FINA

UNIDAD bls kg m3

CANTIDAD 0.117000 0.022000 0.016000

EQUIPOS ANDAMIO DE MADERA REGLA DE MADERA HERRAMIENTA MANUAL

UNIDAD P2 P2 % MO

CANTIDAD 0.580000 0.025000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL TARRAJEO EN INTERIORES 34.00 m2 4.2500 h/m2 UNIDAD hh hh hh CANTIDAD 0.063000 0.635000 0.278000 COSTO 18.14 15.12 11.84 TOTAL COSTO 14.45 3.02 38.00 TOTAL COSTO 5.4 5.2 14.04 TOTAL TOTAL P.U. SUBTOTAL 1.14 9.60 3.29 14.04 SUBTOTAL 1.69 0.07 0.61 2.37 SUBTOTAL 3.13 0.13 0.42 3.68 20.08

MATERIALES CEMENTO PORTLAND TIPO I CLAVOS DE 3" ARENA FINA

UNIDAD bls kg m3

CANTIDAD 0.117000 0.022000 0.016000

EQUIPOS ANDAMIO DE MADERA REGLA DE MADERA HERRAMIENTA MANUAL

UNIDAD P2 P2 % MO

CANTIDAD 0.580000 0.025000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL


CONTRAZOCALO CEMENTO H = 20 cm PULIDO

22.00 2.7500 UNIDAD hh hh hh

ml h/ml CANTIDAD 0.400000 0.400000 0.132000 COSTO 18.14 15.12 11.84 TOTAL COSTO 14.45 38.00 TOTAL COSTO 14.87 TOTAL TOTAL P.U. SUBTOTAL 7.26 6.05 1.56 14.87 SUBTOTAL 0.45 0.15 0.60 SUBTOTAL 0.45 0.45 15.91

MATERIALES CEMENTO PORTLAND TIPO I ARENA FINA

UNIDAD bls m3

CANTIDAD 0.031000 0.004000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL COLOCACION INODORO 4.00 pz 0.5000 h/pz UNIDAD hh hh hh CANTIDAD 0.400000 4.000000 2.000000 COSTO 18.14 15.12 11.84 TOTAL COSTO 91.42 TOTAL TOTAL P.U. SUBTOTAL 7.26 60.48 23.68 91.42 SUBTOTAL 2.74 2.74 94.16

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL


RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

7.00 0.8750 UNIDAD hh hh

m3 h/m3 CANTIDAD 0.110000 1.140000 COSTO 18.14 11.84 TOTAL COSTO 30.00 TOTAL COSTO 15.49 TOTAL TOTAL P.U. SUBTOTAL 2.00 13.50 15.49 SUBTOTAL 39.00 39.00 SUBTOTAL 0.46 0.46 54.96

MATERIALES MATERIAL PARA RELLENO

UNIDAD m3

CANTIDAD 1.300000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL NIVELACION INTERIOR Y COMPACTACION 120.00 m2 15.0000 h/m2 UNIDAD hh hh hh CANTIDAD 0.007000 0.067000 0.067000 COSTO 18.14 15.12 11.84 TOTAL COSTO 3.02 TOTAL COSTO 5.2 1.93 TOTAL TOTAL P.U. SUBTOTAL 0.13 1.01 0.79 1.93 SUBTOTAL 0.03 0.03 SUBTOTAL 0.16 0.06 0.21 2.18

MATERIALES CLAVOS DE 3"

UNIDAD kg

CANTIDAD 0.010000

EQUIPOS REGLA DE MADERA HERRAMIENTA MANUAL

UNIDAD P2 % MO

CANTIDAD 0.030000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ACERO EN SOBRECIMIENTO REFORZADO GRADO 60 280.00 kg 35.0000 h/kg UNIDAD hh hh hh CANTIDAD 0.004000 0.032000 0.032000 COSTO 18.14 15.12 13.14 TOTAL COSTO 2.96 3.50 TOTAL COSTO 4.2 0.98 TOTAL TOTAL P.U. SUBTOTAL 0.07 0.48 0.42 0.98 SUBTOTAL 0.18 3.75 3.92 SUBTOTAL 0.13 0.03 0.16 5.06

MATERIALES ALAMBRE NEGRO N 16 FIERRO CORRUGADO

UNIDAD kg kg

CANTIDAD 0.060000 1.070000

EQUIPOS CIZALLA HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.032000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ACERO GRADO 60 EN MUROS TABIQUES Y PLACAS 280.00 kg 35.0000 h/kg UNIDAD hh hh hh CANTIDAD 0.004000 0.032000 0.032000 COSTO 18.14 15.12 13.14 TOTAL COSTO 2.96 3.50 TOTAL COSTO 4.2 0.98 TOTAL TOTAL P.U. SUBTOTAL 0.07 0.48 0.42 0.98 SUBTOTAL 0.18 3.75 3.92 SUBTOTAL 0.13 0.03 0.16 5.06

MATERIALES ALAMBRE NEGRO N 16 FIERRO CORRUGADO

UNIDAD kg kg

CANTIDAD 0.060000 1.070000

EQUIPOS CIZALLA HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.032000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ACERO GRADO 60 EN VIGAS 280.00 kg 35.0000 h/kg UNIDAD hh hh hh CANTIDAD 0.004000 0.032000 0.032000 COSTO 18.14 15.12 13.14 TOTAL COSTO 2.96 3.50 TOTAL COSTO 4.2 0.98 TOTAL TOTAL P.U. SUBTOTAL 0.07 0.48 0.42 0.98 SUBTOTAL 0.18 3.75 3.92 SUBTOTAL 0.13 0.03 0.16 5.06

MATERIALES ALAMBRE NEGRO N 16 FIERRO CORRUGADO

UNIDAD kg kg

CANTIDAD 0.060000 1.070000

EQUIPOS CIZALLA HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.032000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ACERO GRADO 60 EN LOSAS ALIGERADAS 280.00 kg 35.0000 h/kg UNIDAD hh hh hh CANTIDAD 0.004000 0.032000 0.032000 COSTO 18.14 15.12 13.14 TOTAL COSTO 2.96 3.50 TOTAL COSTO 4.2 0.98 TOTAL TOTAL P.U. SUBTOTAL 0.07 0.48 0.42 0.98 SUBTOTAL 0.18 3.75 3.92 SUBTOTAL 0.13 0.03 0.16 5.06

MATERIALES ALAMBRE NEGRO N 16 FIERRO CORRUGADO

UNIDAD kg kg

CANTIDAD 0.060000 1.070000

EQUIPOS CIZALLA HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.032000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ACERO GRADO 60 EN LOSAS MACIZAS 280.00 kg 35.0000 h/kg UNIDAD hh hh hh CANTIDAD 0.004000 0.032000 0.032000 COSTO 18.14 15.12 13.14 TOTAL COSTO 2.96 3.50 TOTAL COSTO 4.2 0.98 TOTAL TOTAL P.U. SUBTOTAL 0.07 0.48 0.42 0.98 SUBTOTAL 0.18 3.75 3.92 SUBTOTAL 0.13 0.03 0.16 5.06

MATERIALES ALAMBRE NEGRO N 16 FIERRO CORRUGADO

UNIDAD kg kg

CANTIDAD 0.060000 1.070000

EQUIPOS CIZALLA HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.032000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL ACERO EN MURO DE ALBANILERIA ARMADA 280.00 kg 35.0000 h/kg UNIDAD hh hh hh CANTIDAD 0.004000 0.032000 0.032000 COSTO 18.14 15.12 13.14 TOTAL COSTO 2.96 3.50 TOTAL COSTO 4.2 0.98 TOTAL TOTAL P.U. SUBTOTAL 0.07 0.48 0.42 0.98 SUBTOTAL 0.18 3.75 3.92 SUBTOTAL 0.13 0.03 0.16 5.06

MATERIALES ALAMBRE NEGRO N 16 FIERRO CORRUGADO

UNIDAD kg kg

CANTIDAD 0.060000 1.070000

EQUIPOS CIZALLA HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.032000 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL


ENCOF. Y DESENCOF. EN MUROS TABIQUES Y PLACAS

12.00 1.5000 UNIDAD hh hh hh hh

m2 h/m2 CANTIDAD 0.100000 1.000000 1.200000 0.400000 COSTO 18.14 15.12 13.14 11.84 TOTAL COSTO 5.4 2.96 3.02 TOTAL COSTO 37.44 TOTAL TOTAL P.U. SUBTOTAL 1.81 15.12 15.77 4.74 37.44 SUBTOTAL 27.86 0.89 0.51 29.27 SUBTOTAL 1.12 1.12 67.83

MATERIALES MADERA TORNILLO ALAMBRE NEGRO N 8 CLAVO 3"

UNIDAD P2 kg kg

CANTIDAD 5.160000 0.300000 0.170000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL MURO DE LADRILLO DE SOGA KING KONG 12.00 m2 1.5000 h/m2 UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh 0.085000 0.846000 0.719000 18.14 15.12 11.84 TOTAL 1.54 12.79 8.51 22.85

MATERIALES CEMENTO PORTLAND TIPO I ARENA GRUESA CLAVOS DE 3" LADRILLO KIN KONG 18 HUECOS

UNIDAD CANTIDAD COSTO SUBTOTAL bls m3 kg mll 0.218000 0.031000 0.022000 0.050000 14.45 35.00 3.02 571.43 TOTAL 3.15 1.09 0.07 28.57 32.87

EQUIPOS ANDAMIO DE MADERA HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL P2 % MO 0.580000 0.030000 5.4 22.85 TOTAL 3.13 0.69 3.82 59.54

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO EXAMEN PARCIAL FALSO CIMIENTO m3 h/m3

25.00 3.1250

UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh hh hh 0.0640 0.6400 0.3200 2.5600 0.3200 18.14 15.12 13.14 11.84 17.35 TOTAL 1.16 9.68 4.20 30.31 5.55 50.90

MATERIALES PIEDRA GRANDE HORMIGON AGUA CEMENTO PORTLAND TIPO I (BLS.:42.5 KG)

UNIDAD CANTIDAD COSTO SUBTOTAL m3 m3 m3 bls 0.5200 0.7800 0.1620 2.9000 30.00 22.50 5.70 14.45 TOTAL 15.60 17.55 0.92 41.91 75.98

COMB. Y LUB. GASOLINA 84 OCTANOS (GRIFO LIMA) ACEITE MOTOR GASOLINA SAE 30W GRASA MULTIPLE EP

UNIDAD CANTIDAD COSTO SUBTOTAL gal gal lb 0.1200 0.0040 0.0080 11.70 57.00 5.80 TOTAL 1.40 0.23 0.05 1.68

EQUIPOS MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11 - 12P3 HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL hm % MO 0.3200 0.030000 30.5 50.90 TOTAL 9.76 1.53 11.29 139.85

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL
CONCRETO PREMEZCLADO F'c=100 SOBRECIMIENTOS

60.00 7.5000 UNIDAD hh hh hh hh hh

m3 h/m3 CANTIDAD 0.0133 0.2667 0.1333 0.5333 0.1333 COSTO 18.14 15.12 13.14 11.84 17.35 TOTAL COSTO 185.00 TOTAL COSTO 5.38 14.65 TOTAL TOTAL P.U. SUBTOTAL 0.24 4.03 1.75 6.31 2.31 14.65 SUBTOTAL 190.55 190.55 SUBTOTAL 0.72 0.44 1.16 206.36

MATERIALES CONCRETO PREMEZCLADO TIPO I FC=100Kg/cm2

UNIDAD m3

CANTIDAD 1.0300

EQUIPOS VIBRADOR DE CONCRETO 4HP 1.50 plg HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.1333 0.0300

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO EXAMEN PARCIAL CONCRETO PARA VIGAS DE F'c= 280 KG/m2 25.00 m3 3.1250 h/m3 UNIDAD hh hh hh hh hh CANTIDAD 0.0640 0.6400 0.3200 2.5600 0.6400 COSTO 18.14 15.12 13.14 11.84 17.35 TOTAL COSTO 35 41 14.45 TOTAL COMB. Y LUB. GASOLINA 84 OCTANOS (GRIFO LIMA) ACEITE MOTOR GASOLINA SAE 30W GRASA MULTIPLE EP UNIDAD gal gal lb CANTIDAD 0.1200 0.0040 0.0080 COSTO 11.70 57.00 5.80 TOTAL COSTO 30.5 5.38 56.46 TOTAL TOTAL P.U. SUBTOTAL 1.16 9.68 4.20 30.31 11.10 56.46 SUBTOTAL 17.50 32.80 121.38 0.00 171.68 SUBTOTAL 1.40 0.23 0.05 1.68 SUBTOTAL 9.76 1.72 2.82 14.30 244.12

MATERIALES ARENA GRUESA PIEDRA CHANCADA DE " - " HUSO 67 CEMENTO PORTLAND TIPO I (BLS.:42.5 KG) AGUA

UNIDAD m3 m3 bls m3

CANTIDAD 0.5000 0.8000 8.4000 0.1800

EQUIPOS MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11 - 12P3 VIBRADOR DE CONCRETO 4HP 2.40 plg HERRAMIENTA MANUAL

UNIDAD hm hm % MO

CANTIDAD 0.3200 0.3200 0.0500

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL CONCRETO PREMEZCLADO F'c = 175 Kg/CM2 60.00 m3 7.5000 h/m3 UNIDAD hh hh hh hh hh CANTIDAD 0.0133 0.2667 0.1333 0.5333 0.1333 COSTO 18.14 15.12 13.14 11.84 17.35 TOTAL COSTO 208.8 TOTAL COSTO 5.38 14.65 TOTAL TOTAL P.U. SUBTOTAL 0.24 4.03 1.75 6.31 2.31 14.65 SUBTOTAL 212.98 212.98 SUBTOTAL 0.72 0.44 1.16 228.79

MATERIALES CONCRETO PREMEZCLADO TIPO I FC=175Kg/cm2

UNIDAD m3

CANTIDAD 1.0200

EQUIPOS VIBRADOR DE CONCRETO 4HP 1.50 plg HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.1333 0.0300

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL CONCRETO PREMEZCLADO F'C=175 kg/cm2 LOSA MASIZA 100.00 m3 12.5000 h/m3 UNIDAD hh hh hh hh hh CANTIDAD 0.0133 0.2667 0.1333 0.5333 0.1333 COSTO 18.14 15.12 13.14 11.84 17.35 TOTAL COSTO 208.8 TOTAL COSTO 5.38 14.65 TOTAL TOTAL P.U. SUBTOTAL 0.24 4.03 1.75 6.31 2.31 14.65 SUBTOTAL 212.98 212.98 SUBTOTAL 0.72 0.44 1.16 228.79

MATERIALES CONCRETO PREMEZCLADO TIPO I FC=175Kg/cm2

UNIDAD m3

CANTIDAD 1.0200

EQUIPOS VIBRADOR DE CONCRETO 4HP 1.50 plg HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 0.1333 0.0300

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL COLOCACION LAVATORIO DE PARED BLANCO 4.00 pz 0.5000 h/pz UNIDAD hh hh hh CANTIDAD 0.400000 4.000000 2.000000 COSTO 18.14 15.12 11.84 TOTAL COSTO 91.42 TOTAL TOTAL P.U. SUBTOTAL 7.26 60.48 23.68 91.42 SUBTOTAL 2.74 2.74 94.16

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL COLOCACION DE LAVADERO DE ACERO INOXIDABLE 4.00 pz 0.5000 h/pz UNIDAD hh hh hh CANTIDAD 0.400000 4.000000 2.000000 COSTO 18.14 15.12 11.84 TOTAL COSTO 91.42 TOTAL TOTAL P.U. SUBTOTAL 7.26 60.48 23.68 91.42 SUBTOTAL 2.74 2.74 94.16

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL COLOCACION LAVADERO DE GRANITO 4.00 pz 0.5000 h/pz UNIDAD hh hh hh CANTIDAD 0.400000 4.000000 2.000000 COSTO 18.14 15.12 11.84 TOTAL COSTO 91.42 TOTAL TOTAL P.U. SUBTOTAL 7.26 60.48 23.68 91.42 SUBTOTAL 2.74 2.74 94.16

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL


COLOCACION DUCHA SIMPLE

4.00 0.5000 UNIDAD hh hh hh

pz h/pz CANTIDAD 0.400000 4.000000 2.000000 COSTO 18.14 15.12 11.84 TOTAL COSTO 91.42 TOTAL TOTAL P.U. SUBTOTAL 7.26 60.48 23.68 91.42 SUBTOTAL 2.74 2.74 94.16

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL CONTRAPISO DE 50 mm 80.00 m2 10.0000 h/m2 UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh hh hh 0.030000 0.300000 0.100000 0.600000 0.1000 18.14 15.12 13.14 11.84 17.35 TOTAL 0.54 4.54 1.31 7.10 1.74 15.23

EQUIPOS MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11 - 12P3 REGLA DE MADERA HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL hm P2 % MO 0.1000 0.060000 0.030000 30.5 5.2 15.23 TOTAL 3.05 0.31 0.46 3.82 19.05

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL CONTRAPISO DE 35 mm 100.00 m2 12.5000 h/m2 UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh hh hh 0.024000 0.240000 0.080000 0.480000 0.0800 18.14 15.12 13.14 11.84 17.35 TOTAL 0.44 3.63 1.05 5.68 1.39 12.19

EQUIPOS MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11 - 12P3 REGLA DE MADERA HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL hm P2 % MO 0.0800 0.060000 0.030000 30.5 5.2 12.19 TOTAL 2.44 0.31 0.37 3.12 15.30

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON OPERADOR EQUIPO LIVIANO EXAMEN PARCIAL PISO DE CEMENTO PULIDO Y BRUADO 120.00 m2 15.0000 h/m2 UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh hh hh 0.032000 0.280000 0.670000 0.520000 0.0670 18.14 15.12 13.14 11.84 17.35 TOTAL 0.58 4.23 8.80 6.16 1.16 20.94

MATERIALES CEMENTO PORTLAND TIPO I ARENA GRUESA PIEDRA CHANCADA " ARENA FINA

UNIDAD CANTIDAD COSTO SUBTOTAL bls m3 m3 m3 0.450000 0.021000 0.027000 0.009000 14.45 35.00 41.00 38.00 TOTAL 6.50 0.74 1.11 0.34 8.69

EQUIPOS MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11 - 12P3 REGLA DE MADERA HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL hm P2 % MO 0.0670 0.099000 0.030000 30.5 5.2 20.94 TOTAL 2.04 0.51 0.63 3.19 32.81

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL PISO DE CERAMICO 20 x 20 12.00 m2 1.5000 h/m2 UNIDAD CANTIDAD COSTO SUBTOTAL hh hh hh 0.089000 0.088900 0.444000 18.14 15.12 11.84 TOTAL 1.61 1.34 5.26 8.22

MATERIALES CEMENTO PORTLAND TIPO I CERAMICO 20 X 20 ARENA FINA

UNIDAD CANTIDAD COSTO SUBTOTAL bls m2 m3 0.262000 1.050000 0.027000 14.45 16.00 38.00 TOTAL 3.79 16.80 1.03 21.61

EQUIPOS REGLA DE MADERA HERRAMIENTA MANUAL

UNIDAD CANTIDAD COSTO SUBTOTAL P2 % MO 0.055000 0.030000 5.2 8.22 TOTAL 0.29 0.25 0.53 30.36

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL BRUAS EN MUROS 25.00 3.1250 UNIDAD hh hh hh ml h/ml CANTIDAD 0.030000 0.320000 0.110000 COSTO 18.14 15.12 11.84 TOTAL COSTO 6.69 TOTAL TOTAL P.U. SUBTOTAL 0.54 4.84 1.30 6.69 SUBTOTAL 0.20 0.20 6.89

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL EXAMEN PARCIAL PUERTA PRINCIPAL DE CEDRO DE 0.80 M DE ANCHO 32.00 m 4.0000 h/m2 UNIDAD hh hh hh CANTIDAD 0.400000 4.000000 4.000000 COSTO 18.14 15.12 13.14 TOTAL COSTO 3.02 5.40 1.00 22.70 TOTAL COSTO 4.29 3.91 120.30 TOTAL TOTAL P.U. SUBTOTAL 7.26 60.48 52.56 120.30 SUBTOTAL 0.23 91.80 1.10 2.72 95.85 SUBTOTAL 3.43 3.13 6.01 12.57 228.72

MATERIALES CLAVO C/CABEZA P/CONSTRUCCCION D. PROMEDIO MADERA CEDRO LIJA P/MADERA COLA SINTETICA

UNIDAD kg p2 hja gal

CANTIDAD 0.075000 17.000000 1.100000 0.120000

EQUIPOS CEPILLADORA SIERRA CIRCULAR HERRAMIENTA MANUAL

UNIDAD hm hm % MO

CANTIDAD 0.800000 0.800000 0.050000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL EXAMEN PARCIAL PUERTA CORREDIZA DE 1.80 X 1.80 M 32.00 m 4.0000 h/m2 UNIDAD hh hh hh CANTIDAD COSTO SUBTOTAL 0.800000 4.000000 2.000000 18.14 15.12 13.14 TOTAL 14.51 60.48 26.28 101.27

MATERIALES CLAVO C/CABEZA P/CONSTRUCCCION D. PROMEDIO MADERA CEDRO LIJA P/MADERA COLA SINTETICA

UNIDAD kg p2 hja gal

CANTIDAD COSTO SUBTOTAL 0.075000 25.400000 1.100000 0.120000 3.02 5.40 1.00 22.70 TOTAL 0.23 137.16 1.10 2.72 141.21

EQUIPOS CEPILLADORA ELECTRICA SIERRA CIRCULAR HERRAMIENTA MANUAL

UNIDAD hm hm % MO

CANTIDAD COSTO SUBTOTAL 0.800000 0.800000 0.030000 4.29 3.91 101.27 TOTAL 3.43 3.13 3.04 9.60 252.08

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL SALIDA DE INTERRUPTOR SIMPLE 4.00 pto 0.5000 h/pto UNIDAD hh hh hh CANTIDAD COSTO SUBTOTAL 0.200000 2.000000 2.000000 18.14 15.12 11.84 TOTAL 3.63 30.24 23.68 57.55

MATERIALES ALAMBRE TW 12 AWG INTERRUPTOR SIMPLE CAJA DE PASE RECTANGULAR F.G. LIVIANA 50 X 100mm CAJA DE PASE OCTOGONAL F.G. LIVIANA 4" CINTA AISLANTE ELECTRICA TUBO PVC ELECTRICO SAP " X 3M CONEXIN A CAJA PVC ELECTRICA SAP " CURVA PVC ELECTRICA SAP " X 45 UNION PVC ELECTRICA SAP "

UNIDAD m pza pza pza pza pza pza pza pza

CANTIDAD COSTO SUBTOTAL 8.000000 1.050000 1.050000 1.000000 0.100000 1.500000 1.000000 2.000000 1.000000 1.23 5.40 1.35 1.60 2.50 4.89 0.37 1.71 0.61 TOTAL 9.84 5.67 1.42 1.60 0.25 7.34 0.37 3.42 0.61 30.51

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD COSTO SUBTOTAL 0.030000 57.55 TOTAL 1.73 1.73 89.79

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL SALIDA DE INTERRUPTOR DOBLE 4.00 pto 0.5000 h/pto UNIDAD hh hh hh CANTIDAD COSTO SUBTOTAL 0.200000 2.000000 2.000000 18.14 15.12 11.84 TOTAL 3.63 30.24 23.68 57.55

MATERIALES ALAMBRE TW 12 AWG INTERRUPTOR DOBLE CAJA DE PASE RECTANGULAR F.G. LIVIANA 50 X 100mm CAJA DE PASE OCTOGONAL F.G. LIVIANA 4" CINTA AISLANTE ELECTRICA TUBO PVC ELECTRICO SAP " X 3M CONEXIN A CAJA PVC ELECTRICA SAP " CURVA PVC ELECTRICA SAP " X 45 UNION PVC ELECTRICA SAP "

UNIDAD m pza pza pza pza pza pza pza pza

CANTIDAD COSTO SUBTOTAL 16.000000 1.050000 1.050000 1.000000 0.100000 1.500000 2.000000 2.000000 1.000000 1.23 5.40 1.35 1.60 2.50 4.89 0.37 1.71 0.61 TOTAL 19.68 5.67 1.42 1.60 0.25 7.34 0.74 3.42 0.61 40.72

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD COSTO SUBTOTAL 0.030000 57.55 TOTAL 1.73 1.73 100.00

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON EXAMEN PARCIAL SALIDA DE INTERRUPTOR DE CONMUTACION 4.00 pto 0.5000 h/pto UNIDAD hh hh hh CANTIDAD COSTO SUBTOTAL 0.200000 2.000000 2.000000 18.14 15.12 11.84 TOTAL 3.63 30.24 23.68 57.55

MATERIALES ALAMBRE TW 12 AWG INTERRUPTOR CONMUTACION CAJA DE PASE RECTANGULAR F.G. LIVIANA 50 X 100mm CAJA DE PASE OCTOGONAL F.G. LIVIANA 4" CINTA AISLANTE ELECTRICA TUBO PVC ELECTRICO SAP " X 3M CONEXIN A CAJA PVC ELECTRICA SAP " CURVA PVC ELECTRICA SAP " X 45 UNION PVC ELECTRICA SAP "

UNIDAD m pza pza pza pza pza pza pza pza

CANTIDAD COSTO SUBTOTAL 16.000000 2.050000 2.050000 1.000000 0.100000 1.500000 2.000000 3.000000 1.000000 1.23 5.40 1.35 1.60 2.50 4.89 0.37 1.71 0.61 TOTAL 19.68 11.07 2.77 1.60 0.25 7.34 0.74 5.13 0.61 49.18

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD COSTO SUBTOTAL 0.030000 57.55 TOTAL 1.73 1.73 108.46

TOTAL P.U.

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA OPERARIO PEON EXAMEN PARCIAL LIMPIEZA GENERAL DE OBRA m2 h/m2 CANTIDAD 0.020000 0.200000 COSTO 15.12 11.84 TOTAL COSTO 2.67 TOTAL TOTAL P.U. SUBTOTAL 0.30 2.37 2.67 SUBTOTAL 0.13 0.13 2.80

40.00 5.0000 UNIDAD hh hh

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.050000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO OFICIAL PEON EXAMEN PARCIAL CONCRETO LIQUIDO PREMEZCLADO EN MUROS 8.00 m3 1.0000 h/m3 UNIDAD hh hh hh hh CANTIDAD 0.0133 0.2667 0.1333 0.5333 COSTO 18.14 15.12 13.14 11.84 TOTAL COSTO 250.73 TOTAL COSTO 12.34 TOTAL TOTAL P.U. SUBTOTAL 0.24 4.03 1.75 6.31 12.34 SUBTOTAL 255.74 255.74 SUBTOTAL 0.37 0.37 268.45

MATERIALES CONCRETO LIQUIDO PREMEZCLADO

UNIDAD m3

CANTIDAD 1.0200

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.0300

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA OPERARIO PEON EXAMEN PARCIAL VENTANA PRINCIPAL DE 1.80 X 0.90 M DE 2 HOJAS 2.50 m 0.3125 h/m2 UNIDAD hh hh CANTIDAD 3.200000 3.200000 COSTO 15.12 11.84 TOTAL COSTO 12.71 40 TOTAL COSTO 4.50 86.27 TOTAL TOTAL P.U. SUBTOTAL 48.38 37.89 86.27 SUBTOTAL 1.58 66.00 67.58 SUBTOTAL 14.40 4.31 18.71 172.57

MATERIALES SOLDADURA CELLOCORD P E6010 ANGULO ACERO NEGRO IGUAL 1" X 1" X " X 6m

UNIDAD kg pza

CANTIDAD 0.124400 1.650000

EQUIPOS EQUIPO DE SOLDAR HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 3.200000 0.050000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA OPERARIO PEON EXAMEN PARCIAL VENTANA POSTERIOR DE 1.20 X 0.90 M DE 2 HOJAS 2.50 m 0.3125 h/m2 UNIDAD hh hh CANTIDAD 3.200000 3.200000 COSTO 15.12 11.84 TOTAL COSTO 12.71 40 TOTAL COSTO 4.50 86.27 TOTAL TOTAL P.U. SUBTOTAL 48.38 37.89 86.27 SUBTOTAL 1.58 66.00 66.00 SUBTOTAL 14.40 4.31 4.31 156.59

MATERIALES SOLDADURA CELLOCORD P E6010 ANGULO ACERO NEGRO IGUAL 1" X 1" X " X 6m

UNIDAD kg pza

CANTIDAD 0.124400 1.650000

EQUIPOS EQUIPO DE SOLDAR HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 3.200000 0.050000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA OPERARIO PEON EXAMEN PARCIAL VENTANAS EN DORMITORIOS DE 1.50 X .90 M DE 2 HOJAS 2.50 m 0.3125 h/m2 UNIDAD hh hh CANTIDAD 3.200000 3.200000 COSTO 15.12 11.84 TOTAL COSTO 12.71 40 TOTAL COSTO 4.50 86.27 TOTAL TOTAL P.U. SUBTOTAL 48.38 37.89 86.27 SUBTOTAL 1.58 66.00 66.00 SUBTOTAL 14.40 4.31 4.31 156.59

MATERIALES SOLDADURA CELLOCORD P E6010 ANGULO ACERO NEGRO IGUAL 1" X 1" X " X 6m

UNIDAD kg pza

CANTIDAD 0.124400 1.650000

EQUIPOS EQUIPO DE SOLDAR HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 3.200000 0.050000

ANALISIS DE COSTO UNITARIO PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA OPERARIO PEON EXAMEN PARCIAL VENTANA CORREDIZA DE 1.55 X .90 M DE 2 HOJAS 2.50 m 0.3125 h/m2 UNIDAD hh hh CANTIDAD 3.200000 3.200000 COSTO 15.12 11.84 TOTAL COSTO 12.71 40 TOTAL COSTO 4.50 86.27 TOTAL TOTAL P.U. SUBTOTAL 48.38 37.89 86.27 SUBTOTAL 1.58 66.00 66.00 SUBTOTAL 14.40 4.31 4.31 156.59

MATERIALES SOLDADURA CELLOCORD P E6010 ANGULO ACERO NEGRO IGUAL 1" X 1" X " X 6m

UNIDAD kg pza

CANTIDAD 0.124400 1.650000

EQUIPOS EQUIPO DE SOLDAR HERRAMIENTA MANUAL

UNIDAD hm % MO

CANTIDAD 3.200000 0.050000

PROYECTO: DESCRIPCION: RENDIMIENTO EN 8 HRS: APORTE: MANO DE OBRA CAPATAZ OPERARIO PEON

ANALISIS DE COSTO UNITARIO EXAMEN PARCIAL MURO DE LADRILLO SILICO CALCAREO 7.50 m2 0.9375 h/m2 UNIDAD hh hh hh CANTIDAD 0.085000 0.846000 0.719000 COSTO 18.14 15.12 11.84 TOTAL COSTO 48.42 TOTAL COSTO 22.85 TOTAL TOTAL P.U. SUBTOTAL 1.54 12.79 8.51 22.85 SUBTOTAL 49.87 49.87 SUBTOTAL 0.69 0.69 73.40

MATERIALES LADRILLO SILICO CALCAREO

UNIDAD m2

CANTIDAD 1.030000

EQUIPOS HERRAMIENTA MANUAL

UNIDAD % MO

CANTIDAD 0.030000