Professional Documents
Culture Documents
BatteryCreekHS
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
FY2018
ADC2011
Roofrepairs
$91,250.00
$91,250.00
BatteryCreekHS
2010FP&C
Sealantismissing,removed,orfailingatnumerouscontroljoints
aroundthebuilding.Thesecontroljointsneedtoberecaulked.
$20,032.04
$20,032.04
BatteryCreekHS
2009FP&C
Clean&reptallstllintelsoverwindows
$23,270.12
$23,270.12
BatteryCreekHS
Recurring
PaintEntireBuildingInterior6yearplan
$356,751.64
$356,751.64
BatteryCreekHS
2010FP&C
Alloftheexpansionjointcoversatsecondfloormaincorridorhave
collapsedandfailed,resultinginadepressioninthefloor.
$13,354.69
$13,354.69
BatteryCreekHS
2010Principal
Replacefloorandbaseinpracticegymdenied06/12
$100,160.19
$100,160.19
BatteryCreekHS
Recurring
RefinishGymfloor
$46,741.42
$46,741.42
BatteryCreekHS
FCAP
Refinishallinteriordoors
$76,713.81
$76,713.81
BatteryCreekHS
2010FP&C
AtMultiPurposeRoom/AuxiliaryGymG113,theacousticsare
poorwithasignificantamountofreverberation.Recommend
$21,367.51
$21,367.51
BatteryCreekHS
2009FP&C
Replacefirealarmsystem;addressablepanel
$248,459.38
$248,459.38
BatteryCreekHS
Recurring
ResurfaceTenniscourts
$99,542.95
$99,542.95
BatteryCreekHS
2010FP&C
Thefencesurroundingtheballfieldsisshowingsporadicsignsof
rust.
$24,885.74
$24,885.74
BatteryCreekHS
Recurring
PaintCorridors3yearplan
$125,007.42
$125,007.42
BatteryCreekHS
2010FP&C
Therearefrisueswithsignagethroughouttheschool.ANSI/ADA
compliantsignageshouldbeinstalled/reinstalledthroughoutthe
$16,590.49
$16,590.49
BatteryCreekHS
Heery
ReplacealldoorhardwareinnoncompliancewithADA
$188,530.90
$188,530.90
BatteryCreekHS
2010FP&C
Allwaterheatersinthefacilityneedtobereplaced
$232,266.88
$232,266.88
BatteryCreekHS
2011Principal
Replacescoreboardsinmaingymandsmallgym
$92,077.23
$92,077.23
BatteryCreekHS
2010Principal
Replacescoreboardsbaseball/softball
$91,247.70
$91,247.70
BeaufortES
2009FP&C
CarRiderreplacelightpoles&fixtures
$41,692.29
$41,692.29
BeaufortES
2010Principal
Replacebuildingmarquee
$35,890.73
$35,890.73
BeaufortES
ADC2011
RoofReplacement
$2,448,769.38
$2,448,769.38
BeaufortES
2009FP&C
Officerefinishdoorfaces
$3,335.38
$3,335.38
$27,174.78
$27,174.78
$21,534.44
$21,534.44
$64,589.97
$64,589.97
BeaufortES
2012Principal
BeaufortES
2010FP&C
BeaufortES
Recurring
Addadditionalstoragebuildiingtothecampustohousecustodial
equipment
Caseworkatvariouslocationshavethefollowingconditions:
missinghardware;holesinplasticlaminate;doorssaggingornot
PaintCorridors3yearplan
Facility
Source
BeaufortES
2010Principal
BeaufortES
2010FP&C
BeaufortES
2010FP&C
BeaufortES
2010FP&C
BeaufortES
2010FP&C
BeaufortES
2010FP&C
BeaufortES
Requirements
Upgradebathroomsinallclassroomsandoffices.Remodelgroup
bathroomswithsinksandpartitions.
Atmanylocationsthroughouttheschool,thereisasingledrinking
fountain,offeringasingledrinkingheightinsteadoftheANSI/ADA
Anumberofroomshavesinksthatarenothandicappedaccessible.
OverallCost
FY2014
FY2015
FY2016
$107,672.20
$107,672.20
$57,425.17
$57,425.17
$21,534.44
$21,534.44
NoneofthesignageisinaccordancewithANSI/ADArequirements.
Manyspacesdonothaveanysignageatall.ANSI/ADAcompliant
BoysandGirlsgrouptoiletroomsaregenerallynotfully
handicappedaccessible.
CafeteriaStagehasacurtain,requiringthespacebeonehourfire
resistancerated.Theareahasadroppedceiling,socouldnot
$35,890.73
$35,890.73
$107,672.20
$107,672.20
$35,890.73
$35,890.73
2011Principal
NeedblindsinallclassroomsduetoglareonIWB(57CR's)
$122,746.31
$122,746.31
BeaufortES
2010FP&C
Allwaterheatersinthefacilityneedtobereplaced
$107,672.20
$107,672.20
BeaufortES
2009Principal
Provideradiantheatatfrontentry
$12,507.69
$12,507.69
BeaufortES
2010FP&C
Onlyonemeansofegress(32")fromthecourtyardisprovided.
Additionalmeansofegressneedtobeprovidedastheoccupant
$21,534.44
$21,534.44
BeaufortES
2009FP&C
PlayYardgates/replacewithirontubingstyle&panicbars
$8,338.46
$8,338.46
BeaufortMS
2009Principal
Replacefootballscoreboard
$28,699.81
$28,699.81
BeaufortMS
2012Principal
Replacebackboardsingym
$12,900.00
$12,900.00
BeaufortMS
2012Principal
Replacefenceatbackstopofbaseballfieldcomplex
$16,125.00
$16,125.00
$20,032.04
$20,032.04
Improvesecuritylightingatfootballfield
BeaufortMS
2010Principal
BeaufortMS
2009Principal
Fencingforallathleticareas(3,360LF)
$62,053.64
$62,053.64
BeaufortMS
2012Principal
Installsoundsysteminfootballstadium
$26,875.00
$26,875.00
BeaufortMS
ADC2011
Roofreplacement(perADC2011Study)
$1,863,445.31
$1,863,445.31
BeaufortMS
ADC2011
Roofrepairs
$205,862.50
$205,862.50
BeaufortMS
2012Maintenance
Replaceguttersanddownspoutsthroughtoutbuilding.Include
canopies.
$107,500.00
$107,500.00
BeaufortMS
2012Principal
InstallTrophycasesingymnasium
$17,200.00
$17,200.00
BeaufortMS
2011Principal
NeednewdisplaycasesbetweenCandDhallandbetweenFandG
hallsforart
$6,677.35
$6,677.35
BeaufortMS
Recurring
PaintCorridors3yearplan
$105,046.14
$105,046.14
BeaufortMS
2010Principal
AddBradleysinksingrouprestrooms
$66,773.46
$66,773.46
BeaufortMS
2010Principal
Replacesinksinadminarea
$3,338.67
$3,338.67
FY2017
FY2018
Facility
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
FY2018
BeaufortMS
2012Maintenance
InstalldropceilingandreplacethelightsintheDance/Dramaroom
(RoomH3)
BeaufortMS
2010Principal
ReplaceACTbetweenFandGwings
$10,016.02
$10,016.02
BeaufortMS
2011Principal
NeednewflooringinweightroomG1.
$10,683.75
$10,683.75
BeaufortMS
2012Principal
Providefurniturefor30computersinmediaartslab
$10,750.00
$10,750.00
BeaufortMS
2009FP&C
CafeReplacestagecurtain&repaintlowwallatfloor
$38,783.53
$38,783.53
BeaufortMS
2010Principal
Manydoorsneednewclosers.Severalclassroomdoorsare
damagedandwillnotcloseproperly.
$33,386.73
$33,386.73
BeaufortMS
2012Principal
ProvidesecuredstoragecabinetsforMedialab.
$8,062.50
$8,062.50
BeaufortMS
2012Maintenance
ReplaceSemcounitforgym
$43,000.00
$43,000.00
BeaufortMS
2012Maintenance
AddALCtokitchenwalkincoolerandfreezer
$10,750.00
$10,750.00
BeaufortMS
2011Principal
$3,338.67
$3,338.67
BeaufortMS
2012Principal
$43,068.88
$43,068.88
BeaufortMS
2012FP&C
Kitchendividingwall
$64,500.00
$64,500.00
BeaufortMS
2012Principal
Atomicclocksinhallway
$29,025.00
$29,025.00
BeaufortMS
2011Principal
NeednewfiredoorsatendofFhallandatthebeginningofGHall
$3,338.67
$3,338.67
BeaufortMS
2012Principal
Providewirelesscomputeraccessincafeteria
$3,225.00
$3,225.00
BeaufortMS
2012Principal
Installceilingmountedprojectorincafeteria
$8,600.00
$8,600.00
BeaufortMS
2012Principal
Install4flatscreenmonitorsincafeteria
$8,600.00
$8,600.00
BeaufortMS
2012Principal
installbackstagecurtainsongemandcafeteriastages
$32,250.00
$32,250.00
BeaufortMS
2012Principal
Replacevideoproductionequipment:Digitalvideomixer,
camcorderwithmicandheadphoneerminals
$21,500.00
$21,500.00
BeaufortMS
2012Principal
Replace120StudentDesks
$12,900.00
$12,900.00
BeaufortMS
2010Principal
Installiirrigationforbaseballandsoftballfields
$58,066.72
$58,066.72
BeaufortMS
2010Principal
Replacebaseballandsoftballdugouts
$66,361.97
$66,361.97
BeaufortMS
2010Principal
Providenewfitnessnaturetrailandoutdoorperformancearts
centerin4acresbehindstadium
$82,952.46
$82,952.46
BeaufortMS
2010Principal
Replacelightingaroundfootballandbaseballfields
$207,381.14
$207,381.14
BeaufortMS
ADC2011
Roofreplacements
$2,057,541.28
$2,057,541.28
NeedwiringforelectandoutletstoC&Dbreezeways(parent
alcoveandtoprovidelightingforrequesteddisplaycases)
Addadditionaloutlets(approx.12)inmainoffice,underdisplay
window,mediaspecialistsareaandvideostoragearea
$26,875.00
$26,875.00
Facility
BeaufortMS
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
FY2018
Heery
Replacecontroljointsealant
$34,184.17
$34,184.17
BeaufortMS
2010Principal
Replaceallcountertopsthroughoutschool(includeadmin,media
center,teacherworkrooms)
$41,476.23
$41,476.23
BeaufortMS
Recurring
PaintEntireBuildingInterior6yearplan
$434,996.51
$434,996.51
BeaufortMS
2009FP&C
Replaceexistingfoldingpart.@MProom24LF
$38,544.52
$38,544.52
BeaufortMS
Recurring
RefinishGymfloor
$58,066.72
$58,066.72
BeaufortMS
2010Principal
Replacerubberbasethroughoutschool
$24,885.74
$24,885.74
BeaufortMS
2010Principal
Replacegymbleachers
$165,904.91
$165,904.91
BeaufortHS
2009Principal
Needlockersandventilationinstadiumteamrooms
$72,155.40
$72,155.40
BeaufortHS
2012Principal
Addlightstomainentrance
$40,000.00
$40,000.00
BeaufortHS
2012Principal
Buildretainingwall@frontdrive
$75,000.00
$75,000.00
BeaufortHS
2009FP&C
ConcessionsBuildingnewdoor/roomsignsall
$10,823.31
$10,823.31
BeaufortHS
ADC2011
Roofrepairs
$237,250.00
$237,250.00
BeaufortHS
Recurring
PaintCorridors3yearplan
$94,541.68
$94,541.68
BeaufortHS
2012Maintenance
Replacetwosetsofentrancedoorsatthemaingymentrancefrom
themainhallway
$40,000.00
$40,000.00
BeaufortHS
2012Maintenance
Replace250gal.heater/boiler
$40,000.00
$40,000.00
BeaufortHS
2012Maintenance
Installsplitsystemincoachesofficenexttoauditorium
$7,500.00
$7,500.00
BeaufortHS
2012Principal
AirPurgyingsysteminlockerroomsinstallultravioletlights
$10,000.00
$10,000.00
BeaufortHS
2009Principal
Providenewpressboxatstadium
BeaufortHS
2009Principal
BeaufortHS
$376,481.39
$376,481.39
Providewrestling/matforwrestlingandcheerteams
$43,068.88
$43,068.88
Recurring
ResurfaceTenniscourts
$92,598.09
$92,598.09
BeaufortHS
2009Principal
Additionalbleachersatstadium(1,000to1,500)
$215,132.22
$215,132.22
BeaufortHS
Recurring
PaintEntireBuildingInterior6yearplan
$391,496.12
$391,496.12
BeaufortHS
Recurring
RefinishGymfloor
$54,015.55
$54,015.55
BeaufortHS
2012Principal
HVACinbasketballconcessionstand
$12,422.97
$12,422.97
BlufftonECC
ADC2011
Roofrepairs
$13,500.00
$13,500.00
Facility
Source
Requirements
OverallCost
BlufftonECC
Recurring
PaintCorridors3yearplan
$21,061.27
BlufftonECC
Recurring
PaintEntireBuildingInterior6yearplan
$87,214.48
Erosionissuesatbicycleracksatfrontofschoolandinparkinglot
formobilesatfrontofschool
PoorlightdistributionatthebusloopandgrassparkinglotUtility
providedlighting..
BlufftonES
2012Maintenance
BlufftonES
2010FP&C
BlufftonES
ADC2011
Roofrepairs
BlufftonES
Heery
BlufftonES
FY2014
FY2015
FY2016
FY2017
$21,061.27
$87,214.48
$12,000.00
$12,000.00
$59,999.99
$60,000.00
$109,500.00
$109,500.00
Replaceinsulatingsealsonglasswindows
$77,567.05
$77,567.05
2010FP&C
Thereisgeneralhardwaredisrepairatnumerousdoorsthroughout
theschoolandwhichneedsrepair.
$43,480.39
$43,480.39
BlufftonES
2011Principal
Newirrigationandlandscapingforallgroundareas.
BlufftonES
2012FP&C
BlufftonES
$115,747.61
$115,747.61
Paintfrontcanopy
$10,031.46
$10,031.46
Recurring
PaintCorridors3yearplan
$40,700.09
$40,700.09
BlufftonES
2012FP&C
ProvideCeramictileorEpoxyflooringrouptoiletrooms
$35,890.73
$35,890.73
BlufftonES
2012Principal
Repair/replacegymfloorrubberservice
$103,318.59
$103,318.59
BlufftonES
2010Principal
Fillinstorypitinlibrary
$23,149.52
$23,149.52
BlufftonES
2012Maintenance
BuildingwideHVACrenovation5yearplan
$1,242,296.88
$1,242,296.88
BlufftonES
2009Principal
ProvideadditionalconditioningofGym(HVAC)
$129,079.33
$129,079.33
BlufftonMS
2010FP&C
Developlandandconstructnewtrackfacility(combinewith$600k
from20108%appropriationtoBLMSconstruction)
BlufftonMS
2012Principal
Extendcanopy100feetinbuslooparea
BlufftonMS
2012Principal
BlufftonMS
$1,999,999.97
$2,000,000.00
$107,500.00
$107,500.00
Scrollingmarqueesign
$22,361.34
$22,361.34
ADC2011
Roofrepairs
$24,725.00
$24,725.00
BlufftonMS
Recurring
PaintCorridors3yearplan
$80,749.30
$80,749.30
BlufftonMS
2012Principal
Extendcanopy100feetinbuslooparea
$107,500.00
$107,500.00
BlufftonMS
2012Principal
Scrollingmarqueesign
$22,361.34
$22,361.34
BlufftonMS
ADC2011
Roofrepairs
$24,725.00
$24,725.00
BlufftonMS
Recurring
PaintCorridors3yearplan
$80,749.30
$80,749.30
BlufftonMS
Recurring
PaintEntireBuildingInterior6yearplan
$334,896.43
FY2018
$334,896.43
Facility
BlufftonMS
Source
Requirements
OverallCost
Recurring
RefinishGymfloor
BlufftonHS
2009FP&C
Replacefirealarmsystem;addressablepanel(consolidateon
SimplexPanel)
$202,234.38
BlufftonHS
2011FP&C
Additionalmobiles
$310,574.22
BlufftonHS
Recurring
ResurfaceTenniscourts
BlufftonHS
2011Principal
BlufftonHS
FY2014
FY2015
FY2016
$58,066.72
FY2017
FY2018
$58,066.72
$202,234.38
$621,148.44
$86,137.76
$86,137.76
Providedrainfromdepressedareaoutsideauditoriumentrance.
$107,672.20
$107,672.20
2009Principal
Addparkinglotatrearofthebuildingforathletics
$225,000.00
$225,000.00
BlufftonHS
2010Principal
Needwalkstoconnectbikepathtoschoollockerrooms(oneforPE
andoneforathletics)
$21,534.44
$21,534.44
BlufftonHS
2012Principal
Replacefootballfieldscoreboard
$23,112.50
$23,112.50
BlufftonHS
2012Principal
Stadiumhalftimeroomexpansion
$173,343.75
$173,343.75
BlufftonHS
2012Principal
Renovatebaseballandsoftballcomplexrestroomsfacilities
$57,781.25
$57,781.25
BlufftonHS
2012Principal
Increasetheheightofthesoftballstadiumbackstop
$23,112.50
$23,112.50
BlufftonHS
2012FP&C
Reversepitchofcanopyoutsideofdanceroom,pitchawayfrom
building
$6,933.75
$6,933.75
BlufftonHS
ADC2011
Roofrepairs
$103,428.44
$103,428.44
BlufftonHS
2011Principal
Addadditionalbleacherstostadiumhomeandvisitorsstands
$251,235.13
$251,235.13
BlufftonHS
2012FP&C
Paintoutsideofbuildingwithelastomericcoating
$434,109.11
$434,109.11
BlufftonHS
2011FP&C
Additionalmobiles(3doubles)
$333,867.29
$333,867.29
BlufftonHS
2012FP&C
Resealconcreteflooorsunderauditoriumseats
$17,334.38
$17,334.38
BlufftonHS
Recurring
PaintCorridors3yearplan
$98,978.30
$98,978.30
BlufftonHS
2011Principal
Replacecarpetinoffices(frayedandworn)
$28,712.59
$28,712.59
BlufftonHS
2011Principal
Replacecarpetinmediacenter
$28,712.59
$28,712.59
BlufftonHS
2011Principal
Providekey/combinationlockcoresfor1600lockers
$45,940.14
$45,940.14
BlufftonHS
2012FP&C
Refurbishauditoriumseating(missing10)
$17,334.38
$17,334.38
BlufftonHS
2012FP&C
Clean/replaceaccousticalpanelincafeteria
$23,112.50
$23,112.50
BlufftonHS
2012Principal
RenovationofcurrentfitnessroomtoserveasSportsMedicine
classroom
$46,225.00
$46,225.00
BlufftonHS
2012Principal
Renovate"blackbox"to1or2artclassroomsandstorage
$92,450.00
$92,450.00
Facility
Source
Requirements
BlufftonHS
2011Principal
Increaselightinginatriumarea.Currentisinsufficient.
BlufftonHS
2011Principal
ProvidecatwalkforPAC(lightingaccess,etc).
BlufftonHS
2011Principal
BlufftonHS
OverallCost
FY2014
FY2015
FY2016
$35,890.73
$35,890.73
$107,672.20
$107,672.20
Providecurtainanddropcurtaininauditorium.
$86,137.76
$86,137.76
2012Principal
ReplacegymPAsystemingymandauxgym
$28,890.63
$28,890.63
BlufftonHS
2012Principal
Replacegymscoreboard
$23,888.87
$23,888.87
BlufftonHS
2012Principal
Gymfloortarp
$34,668.75
$34,668.75
BlufftonHS
2012Principal
NewAthleticlaundryroomwasher&dryer
$5,778.13
$5,778.13
BroadRiverES
ADC2011
RoofrepairsandreplacementsI
$666,500.00
$666,500.00
BroadRiverES
2010FP&C
ThepaintedCMUandpouredconcreteontheolderportionsofthe
buildingarebeginningtoflake,mostnotableattheKitchenarea,
$31,057.42
$31,057.42
BroadRiverES
Maintenance
Replacehardwareonexteriorclassroomdoors(37CR's)
$18,500.00
$18,500.00
BroadRiverES
Recurring
PaintCorridors3yearplan
$30,670.29
$30,670.29
$6,211.48
$6,211.48
$12,422.97
$12,422.97
BroadRiverES
2010FP&C
BroadRiverES
2010FP&C
BroadRiverES
2010FP&C
BroadRiverES
2010FP&C
BroadRiverES
Recurring
BroadRiverES
2010FP&C
BroadRiverES
2010FP&C
BroadRiverES
2012FP&C
BroadRiverES
ThestudentgrouptoiletslocatedintheRedHall,northofthe
ComputerLab140,arenotHCaccessiblle
ItappearsmanyoftheclassrmtoiletrmswereintendedtobeHC
accessiblebutarenot.Horiz.grabbarsarenotANSI/ADAheight
Caseworkatvariousareasofthebuildingexhibitedthefollowing
conditions:Saggingdoor;hingefailure;delamination;missing
Manyclassroomshaveolderteachercabinetswithdoorsthatoften
dontcloseproperly,whichhaveknobsforhandles,andwhich
FY2017
$77,165.08
$77,165.08
$15,433.02
$15,433.02
$127,007.26
$127,007.26
$15,433.02
$15,433.02
$30,866.03
$30,866.03
Kitchendividingwall
$74,537.81
$74,537.81
ADC2011
Roofreplacementii
$171,407.46
$171,407.46
CoosaES
2010Principal
Raiseareaarounddrainstokeepleavesfromaccumulatingover
grates.Frontparkinglotfloods.
$30,866.03
$30,866.03
CoosaES
2011Principal
Electronicmarqueeneededatschoolwithscrollingmessageboard.
$38,582.54
$38,582.54
CoosaES
2011Principal
Needcoveredawningfromexteriordoorsadjacenttothemedia
center,coveringthewalktotheexteriordoorsacrossfromthegym
$69,448.57
$69,448.57
CoosaES
2010Principal
Extendfrontcanopytotrafficcirclefor4yrolddismissal.
$38,582.54
$38,582.54
CoosaES
2010Principal
Provideawningfrombackoflibrarytodoublefrontdoorsinfront
ofcafeteria.
$61,732.06
$61,732.06
PaintEntireBuildingInterior6yearplan
Kitchenette550Ahasaresidentialstoveinitwithnoexhaust,but
withasignstatingthatnocookingistobedonethatproduces
Allwaterheatersinthefacilityneedtobereplaced.TheKitchen
waterheaterisinneedofimmediatereplacement
FY2018
Facility
Source
Requirements
CoosaES
2010Principal
Providewalking/exercisepatharoundschool,1/2milewithatleast
4exercisestations.
CoosaES
2009Principal
Providestoragebuilding.
CoosaES
ADC2011
CoosaES
OverallCost
FY2014
FY2015
FY2016
FY2017
$46,299.05
$46,299.05
$8,067.46
$8,067.46
Roofrepairs
$49,691.88
$49,691.88
2010FP&C
Thereismissingsealantatsomecontroljointsaroundthebuilding.
Jointsneedtoberecaulkedwheresealantismissing.
$13,581.05
$13,581.05
CoosaES
2009FP&C
Remove&replaceallCJsealantsbldgwide
$26,891.53
$26,891.53
CoosaES
Recurring
PaintCorridors3yearplan
$40,869.50
$40,869.50
CoosaES
2010Principal
ProvideBradleysinksforgrouprestrooms.
$61,732.06
$61,732.06
CoosaES
2010Principal
RelocatebreakroomtooldAPofficefornewbreakroom.
$38,582.54
$38,582.54
CoosaES
2010Principal
Needadditionalsoundpanelsingymandcefeteria.
$23,149.52
$23,149.52
CoosaES
2010Principal
Replacemultipurposeroomfloor.
$61,732.06
$61,732.06
CoosaES
2010Principal
Provideadditionalsoundpanelsinmusicroom
$11,574.76
$11,574.76
CoosaES
2012Maintenance
Repair/replacewoodflooringym
$31,057.42
$31,057.42
CoosaES
2012Principal
Adddoortoconnectmediacentertocomputerlab
$6,211.48
$6,211.48
CoosaES
2011Principal
Needadditionalshelvinginmediacenter.
$23,149.52
$23,149.52
$34,724.28
$34,724.28
$15,433.02
$15,433.02
$1,242,296.88
$1,242,296.88
Providehoodsystemforcooktopineachpod(3)asrequiredby
localfiremarshal
ThereisnodirectexhaustforthekilnintheKilnRoomlocatedoff
oftheArtClassroom205.
CoosaES
2010Principal
CoosaES
2010FP&C
CoosaES
2012Maintenance
BuildingwideHVACrenovation
CoosaES
2010Principal
Provideadditionalcoolingincomputerlabs.
$30,866.03
$30,866.03
CoosaES
2012Principal
Replacestagelighting
$33,550.66
$33,550.66
CoosaES
2011FP&C
Consolidatetwoboxfirealarmtooneboxsystem
$215,344.40
$215,344.40
CoosaES
2012Principal
Additionallightingattheplaygroundarea
$16,869.83
$16,869.83
CoosaES
2010Principal
Convertcounselor'sofficetorecordingstudioformmorning
announcements.
$30,866.03
$30,866.03
CoosaES
2009Principal
Screensandceilingmountedprojectors;conference&cafeteria
$26,891.53
$26,891.53
CoosaES
2011Principal
Upgradestagelighting,installdropdownmics,installcuratinslegs
$69,448.57
$69,448.57
CoosaES
2010Principal
Need6picnictablesineachgradearea(30total)
$23,149.52
$23,149.52
FY2018
Facility
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
CoosaES
2010Principal
Replacemediacenterfurnitureandcirculationdesk.Addadditional
shelvesforbookstorage.
CoosaES
ADC2011
Roofreplacement
DaufuskieIslandES
Recurring
PaintCorridors3yearplan
DaufuskieIslandES
2011FP&C
ReplaceclassroomHVACUnits
$55,558.85
$55,558.85
DaufuskieIslandES
ADC2011
Roofreplacement
$34,722.20
$34,722.20
DistrictEducationalServices
Center
ADC2011
Roofrepairs
$40,000.00
$40,000.00
DistrictLevel
2012FP&C
upgradeofbuildingsystemsforenergyefficiency
$200,000.00
$200,000.00
DistrictLevel
2012FP&C
UpgradePAsystemsthroughoutDistrict(Elementary/Middle=
$60K;HighSchools=$75K)1
$625,000.00
$625,000.00
DistrictLevel
2010FP&C
FurnitureReplacements(DistrictWide)
$450,000.00
$450,000.00
DistrictLevel
IT
InformationTechnologyRefresh
$2,637,673.05
$2,637,673.05
DistrictLevel
2011FP&C
PlaygroundEquipmentReplacements(DistrictWide)
$250,000.00
$250,000.00
DistrictLevel
2011FP&C
FY2015DistrictWideStormWaterManagementImprovements
(MaintenanceofBCSDownedponds,ditches,spillways)
$66,773.46
$66,773.46
DistrictLevel
Recurring
AnnualRoofInspection
$43,480.39
$43,480.39
DistrictLevel
Recurring
AnnualRoofInspection
$43,480.39
$43,480.39
DistrictLevel
Technology
FY2015ComputerReplacement
$2,576,200.00
$2,576,200.00
DistrictLevel
2012FP&C
UpgradePAsystemsthroughoutDistrict(Elementary/Middle=
$60K;HighSchools=$75K)1
$625,000.00
$625,000.00
DistrictLevel
2010FP&C
FurnitureReplacements(DistrictWide)
$450,000.00
$450,000.00
DistrictLevel
2011FP&C
PlaygroundEquipmentReplacements(DistrictWide)
$250,000.00
$250,000.00
DistrictLevel
2011FP&C
FY2016DistrictWideStormWaterManagementImprovements
(MaintenanceofBCSDownedponds,ditches,spillways)
$71,781.47
$71,781.47
DistrictLevel
Recurring
AnnualRoofInspection
$46,741.42
$46,741.42
DistrictLevel
Technology
FY2016ComputerReplacement
$2,576,200.00
$2,576,200.00
DistrictLevel
2012FP&C
UpgradePAsystemsthroughoutDistrict(Elementary/Middle=
$60K;HighSchools=$75K)1
$625,000.00
$625,000.00
DistrictLevel
2010FP&C
FurnitureReplacements(DistrictWide)
$450,000.00
$450,000.00
DistrictLevel
2011FP&C
PlaygroundEquipmentReplacements(DistrictWide)
$250,000.00
$250,000.00
DistrictLevel
2011FP&C
FY2017DistrictWideStormWaterManagementImprovements
(MaintenanceofBCSDownedponds,ditches,spillways)
$61,732.06
$61,732.06
$68,607.06
$68,607.06
$6,200.48
$6,200.48
$77,165.08
$77,165.08
FY2018
Facility
Source
Requirements
DistrictLevel
Recurring
AnnualRoofInspection
DistrictLevel
Technology
FY2017ComputerReplacement
DistrictLevel
2010FP&C
DistrictLevel
OverallCost
FY2014
FY2015
FY2016
FY2017
FY2018
$50,247.03
$50,247.03
$2,576,200.00
$2,576,200.00
FurnitureReplacements(DistrictWide)
$450,000.00
$450,000.00
2011FP&C
PlaygroundEquipmentReplacements(DistrictWide)
$100,000.00
$100,000.00
DistrictLevel
2011FP&C
FY2018DistrictWideStormWaterManagementImprovements
(MaintenanceofBCSDownedponds,ditches,spillways)
$82,952.46
$82,952.46
DistrictLevel
Recurring
5YearRoofAssessment
$92,598.09
$92,598.09
DistrictLevel
Technology
FY2018ComputerReplacement
$2,576,200.00
$2,576,200.00
JamesJ.DavisES
ADC2011
Roofrepairs
JamesJ.DavisES
Recurring
H.E.McCrackenMS
H.E.McCrackenMS
$6,450.00
$6,450.00
PaintCorridors3yearplan
$43,480.39
$43,480.39
2012FP&C
Solarhotwaterheater
$80,000.00
2012FP&C
Newpracticefieldfence
$17,334.38
$17,334.38
H.E.McCrackenMS
2011Principal
NeedsidewalksbetweenPEdoorsandfieldaswellasbetween
fieldandparkinglotthatconnectHEMMStoBLHS
$35,890.73
$35,890.73
H.E.McCrackenMS
2012FP&C
Irrigateandsodpracticefield
$40,446.88
$40,446.88
H.E.McCrackenMS
ADC2011
roofrepairs
$162,365.31
$162,365.31
H.E.McCrackenMS
2012FP&C
Rakeoutoldsealantjointsandprovidenewbackerrodsealant
aroundentirebuilding
$13,067.10
$13,067.10
H.E.McCrackenMS
2012FP&C
Replacewindowblinds
$69,337.50
$69,337.50
H.E.McCrackenMS
2012Principal
Installdoorinprinicpal'sofficeleadingtooutsideforquickeraccess
toalternativeprogram
$9,245.00
$9,245.00
H.E.McCrackenMS
2012Maintenance
Replaceentrancedoorframes
$11,556.25
$11,556.25
H.E.McCrackenMS
Recurring
PaintCorridors3yearplan
$62,199.48
$62,199.48
H.E.McCrackenMS
2010Principal
Modifylibrarybyexpandingexistingconferenceroomfornew
computer/researcharea.
$64,603.32
$64,603.32
H.E.McCrackenMS
2012FP&C
ReplacemediacentercarpetwithVCT.
$14,557.28
$14,557.28
H.E.McCrackenMS
2012Principal
Installwoodfloorinoldbandroom
$23,112.50
$23,112.50
H.E.McCrackenMS
2012FP&C
Newstagecurtain&accousticalpanelsincafetorium
$34,668.75
$34,668.75
H.E.McCrackenMS
2012Maintenance
AddALCtoKitchenwalkincoolerandfreezer
$11,556.25
$11,556.25
H.E.McCrackenMS
2012FP&C
ReplaceBardunitswithRTU's
$1,174,330.08
$1,174,330.08
$90,000.00
Facility
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
H.E.McCrackenMS
2012Maintenance
Replacedrinkingfountains
$11,556.25
$11,556.25
H.E.McCrackenMS
2012Principal
Stagecurtainneedstobereplaced
$23,112.50
$23,112.50
H.E.McCrackenMS
ADC2011
Roofreplacement
HiltonHeadECC
2010FP&C
Thesidewalksfromthepairofexitdoorsofthe500,400and300
WingCommonsRoom,andfromtheexitdoorsoffcorridoroutside
HiltonHeadECC
Recurring
PaintEntireBuildingInterior6yearplan
HiltonHeadECC
ADC2011
Roofrepairs
HiltonHeadECC
2012Principal
RoomsignsforPhaseII&III
HiltonHeadECC
2010Principal
HiltonHeadECC
$2,418,781.68
FY2017
FY2018
$2,418,781.68
$18,696.57
$18,696.57
$159,014.00
$159,014.00
$27,681.25
$27,681.25
$2,150.00
$2,150.00
Provideadditionalplaygroundequipmentforfrontplayground.
$26,709.38
$26,709.38
2010Principal
Providearrtificialsurfaceandtricycletrackfromplaygroundbehind
300pod.
$66,773.46
$66,773.46
HiltonHeadECC
Recurring
PaintCorridors3yearplan
$50,002.97
HiltonHeadIB(Red)
ADC2011
Roofrepairs
$24,725.00
$24,725.00
HiltonHeadIB(Red)
Recurring
PaintCorridors3yearplan
$32,206.55
$32,206.55
HiltonHeadIB(Red)
2012Principal
Renovatebathroomsoffoftheyellowcaf.
$19,261.84
$19,261.84
HiltonHeadIB(Red)
2012Principal
AddsoundpanelstoroomQ333&Q334.
$16,125.00
$16,125.00
HiltonHeadIB(Red)
2012Principal
CafeteriaImprovementssoundpanels,teacherdiningpartition
$32,250.00
$32,250.00
HiltonHeadIB(Red)
2012Maintenance
ReplacerooftopHVACandSemco's
$1,075,000.00
$1,075,000.00
HiltonHeadIB(Red)
2012Maintenance
ReplacewaterfountainsQhall
$5,375.00
$5,375.00
HiltonHeadIB(Red)
2012FP&C
Kitchendividingwall
$64,500.00
$64,500.00
HiltonHeadIB(Red)
2012Principal
ReworkbuzzersystemandlobbiessotheRedbuildinglobby
functionsasprimarylobby
$26,875.00
$26,875.00
HiltonHeadIB(Red)
2012FP&C
Replacestoreroomfunctionlockswithclassroomfunctionlocks
$32,250.00
$32,250.00
HiltonHeadIB(Yellow)
ADC2011
Roofrepairs
$44,612.50
$44,612.50
HiltonHeadIB(Yellow)
Recurring
PaintCorridors3yearplan
$50,100.59
$50,100.59
HiltonHeadIB(Red)
2010Principal
Installnew42"highPVCfence(approx50ft)
HiltonHeadIB(Red)
Recurring
HiltonHeadIB(Red)
2011FP&C
$50,002.97
$8,295.25
$8,295.25
PaintEntireBuildingInterior6yearplan
$133,369.03
$133,369.03
ReplaceCarrierRTUheatpumps
$248,857.37
$248,857.37
Facility
Source
Requirements
HiltonHeadIB(Red)
2010Principal
Inexistingspace,constructnewcomputerlab.Computersand
furnitureexisting.
HiltonHeadIB(Yellow)
ADC2011
Roofreplacement
HiltonHeadIB(Yellow)
Recurring
PaintEntireBuildingInterior6yearplan
OverallCost
FY2014
FY2015
FY2016
FY2017
FY2018
$12,442.87
$12,442.87
$1,684,950.73
$1,684,950.73
$207,466.02
$207,466.02
HiltonHeadCreativeArts(Blue) 2012Principal
Repairandpaintcanopytobuses
$12,900.00
$12,900.00
HiltonHeadCreativeArts(Blue) 2010FP&C
Thereisalowpointatthenortheastcornerofthebuildingwhich
appearstofloodduringarain;noapparentsignofastormdrainin
$20,032.04
$20,032.04
HiltonHeadCreativeArts(Blue) 2012Principal
AddSpeedBumpsandCrosswalksalongBusDrive
$12,900.00
$12,900.00
HiltonHeadCreativeArts(Blue) 2011Principal
Constructwalkingpathontheplayground.
$16,025.63
$16,025.63
HiltonHeadCreativeArts(Blue) 2012Principal
Addcanopytofrontsidewalkforcarriderdropoffandpickup.
$215,000.00
$215,000.00
HiltonHeadCreativeArts(Blue) ADC2011
Roofrepairs
$33,862.50
$33,862.50
HiltonHeadCreativeArts(Blue) Recurring
PaintCorridors3yearplan
$59,642.67
$59,642.67
HiltonHeadCreativeArts(Blue) 2012Principal
Continuerestroomupgradewithsinks,doors,&mirrors
$21,500.00
$21,500.00
HiltonHeadCreativeArts(Blue) 2009Principal
ReconfigureAdministrativeofficearea;ergonomicspoor
$116,350.58
$116,350.58
HiltonHeadCreativeArts(Blue) 2012Principal
Refinishdancefloor
$8,062.50
$8,062.50
HiltonHeadCreativeArts(Blue) 2012Maintenance
Replacedoorsleadingfromhalltocafeteria
$4,300.00
$4,300.00
HiltonHeadCreativeArts(Blue) 2010Principal
Constructexteriorbuildingorremodelinteriorspacetostore
sceneryandcostumes(priority2)
$10,016.02
$10,016.02
HiltonHeadCreativeArts(Blue) 2009Principal
Constructshelving,storage&stepsfortheaterprops
$11,635.06
$11,635.06
HiltonHeadCreativeArts(Blue) 2012Principal
Createrecording/soundstageinmediacenter
$10,750.00
$10,750.00
HiltonHeadCreativeArts(Blue) 2011Principal
Completeupgradeofremainingstudentandstaffrestrooms.
$100,160.19
$100,160.19
HiltonHeadCreativeArts(Blue) 2012Maintenance
Replacewaterheatersinthepods
$21,500.00
$21,500.00
HiltonHeadCreativeArts(Blue) 2010Principal
Replacesoundsystemingym.
$26,709.38
$26,709.38
HiltonHeadCreativeArts(Blue) 2012Principal
Renovategymsprinklersystempiping.
$10,750.00
$10,750.00
HiltonHeadCreativeArts(Blue) 2012FP&C
Replacestoreroomfunctionlockswithclassroomfunctionlocks
$16,125.00
$16,125.00
HiltonHeadCreativeArts(Blue) 2012Principal
commercialorlargewasheranddryerforcostumestorageroom
$7,349.09
$7,349.09
HiltonHeadCreativeArts(Blue) 2009Principal
Replacebuildingmarquesign
HiltonHeadCreativeArts(Blue) Recurring
PaintEntireBuildingInterior6yearplan
$38,582.54
$38,582.54
$246,979.17
$246,979.17
Facility
Source
HiltonHeadCreativeArts(Blue) 2011Principal
HiltonHeadCreativeArts(Blue) 2011Principal
HiltonHeadCreativeArts(Blue) 2011Principal
Requirements
Replacecaseworkinofficeconferenceroomandofficereception
area.Needadditionalstorage.
Replacesinks,countertop,caseworkinallclassroomsand
workrooms(50CR@$2500)
RemovewallinTheaterandmakearea23classroomsbigand
convertintoblackboxtheater
OverallCost
FY2014
FY2015
FY2016
$16,590.49
$207,381.14
$207,381.14
$248,857.37
$248,857.37
ADC2011
Roofrepairs
$51,062.50
$51,062.50
HiltonHeadMS
2012Principal
Retileallbathrooms
$42,638.11
$42,638.11
HiltonHeadMS
Recurring
PaintEntireBuildingInterior6yearplan
$240,802.45
$240,802.45
HiltonHeadMS
2012Principal
Auditoriumstageneedstobestripped,sandedandrefinished.
$23,112.50
$23,112.50
HiltonHeadMS
2012FP&C
Kitchendividingwall
$69,337.50
$69,337.50
HiltonHeadMS
2012FP&C
Removablefenceforathleticfields
$5,778.13
$5,778.13
HiltonHeadMS
ADC2011
Roofreplacement
HiltonHeadHS
2012FP&C
Lightingonpathwayfromremoteparkinglottosoftballfield
$21,500.00
$21,500.00
HiltonHeadHS
2011Principal
Needsidewalktoconnectschoolandfieldhouse
$16,693.36
$16,693.36
HiltonHeadHS
2012Principal
Storagefacilityforgirlslacross
$80,625.00
$80,625.00
HiltonHeadHS
2012Principal
Updgradesoftballfacitlitiestomatchbaseball.(covereddugouts,
locablestorageattachedtodugout,lockerroomarea)
$107,500.00
$107,500.00
HiltonHeadHS
2010FP&C
Replacestadiumfieldlights
$279,516.80
$279,516.80
HiltonHeadHS
2010FP&C
Replacebaseballfieldlights
$167,710.08
$167,710.08
HiltonHeadHS
2011Principal
$10,016.02
$10,016.02
HiltonHeadHS
2011Principal
$40,064.07
$40,064.07
HiltonHeadHS
ADC2011
Roofrepairs
$82,775.00
$82,775.00
HiltonHeadHS
2010FP&C
ReplaceremainingblockofoldlockersonBHall
$53,418.77
$53,418.77
HiltonHeadHS
Recurring
PaintEntireBuildingInterior6yearplan
$244,628.13
$244,628.13
HiltonHeadHS
2012Principal
upgraderestroomsforADA(automaticflushvalves,signs,rails)
$64,500.00
$64,500.00
HiltonHeadHS
2012FP&C
$215,000.00
$215,000.00
$166,933.64
$166,933.64
$53,418.77
$53,418.77
HiltonHeadHS
2011Principal
HiltonHeadHS
2011Principal
Replace2x4ceilinggrid&tile
ScienceclassroomA111needsnewcaseworkandfuniture.Most
arenolongerfunctional.Otherroomshavebeenupgraded
MiscrepairsneededinVPAC.Carpetisworninsideseatingarea,
resealconcretefloors,touchuppaint.
FY2018
$16,590.49
HiltonHeadMS
Needstoragebuildingattrackforequipment(firemarshalwillnot
allowstorageunderbleachers)
Needtoreplacedeterioratingwindscreenaroundstadiumfencing
andunderbleachers.
FY2017
$2,203,136.80
$2,203,136.80
Facility
Source
Requirements
OverallCost
FY2014
FY2015
HiltonHeadHS
Recurring
RefinishGymfloor
$46,741.42
$46,741.42
HiltonHeadHS
2012FP&C
Repaircracksandstainsinterrazzofloorandbase
$26,875.00
$26,875.00
HiltonHeadHS
2012FP&C
ReplacemediacentercarpetwithVCT
$32,250.00
$32,250.00
HiltonHeadHS
2012Principal
Replacecarpetinmainadministrativearea
$26,875.00
$26,875.00
HiltonHeadHS
2012FP&C
ReplaceknobstylelockswithADAtype
$16,125.00
$16,125.00
HiltonHeadHS
2012FP&C
Replaceallinteriorwooddoorswithhollowmetal(400doors)
$215,000.00
$215,000.00
HiltonHeadHS
2012FP&C
Replaceaccousticalpanelsincafeteria
$21,500.00
$21,500.00
HiltonHeadHS
2012FP&C
Renovatereceptionistarea(replacewoodsoffitwithdrywall,place
drywallonwalls.)
$21,500.00
$21,500.00
HiltonHeadHS
2012Principal
Cabinet/shelvesinD105
$5,375.00
$5,375.00
HiltonHeadHS
2010FP&C
Removeexistingteacherinstructionstationsinks,fixtures,
appliances,exhausthoodsinClassroomY200(CulinaryArts).Install
$106,837.53
$106,837.53
HiltonHeadHS
2012FP&C
Improveaboveceilingelectricaltomeetcurrentelectricalcode
$268,750.00
$268,750.00
HiltonHeadHS
2012Maintenance
Replacewalkincoolerandfreezer
$150,500.00
$150,500.00
HiltonHeadHS
2011FP&C
Replacewalkincoolerandwalkinfreezerinkitchen.
$43,480.39
$43,480.39
HiltonHeadHS
2012FP&C
Addmagholdopenoncorridordoors
$12,900.00
$12,900.00
HiltonHeadHS
2012FP&C
ProvideArtwingcourtyardgatewithexitdevice
$5,375.00
$5,375.00
HiltonHeadHS
2012FP&C
Changestorefrontlockstostandard
$23,650.00
$23,650.00
HiltonHeadHS
2012Principal
FiberOptictofieldhouseforsporteventuse
$16,125.00
$16,125.00
HiltonHeadHS
2010Principal
BandUniforms(7yearreplacementcycle)
$66,773.46
$66,773.46
HiltonHeadHS
2011Principal
NeedblindsforclassroomduetoglareinIWB's.
$137,019.13
$137,019.13
HiltonHeadHS
2011Principal
$53,418.77
$53,418.77
HiltonHeadHS
Recurring
HiltonHeadHS
Recurring
PaintCorridors3yearplan
Lady'sIslandES
ADC2011
Roofrepairs
Lady'sIslandES
Recurring
Lady'sIslandES
2010FP&C
Neednewweightroomequipment(freeweightsandmachines).
Manyareoldandunsafe.
Renovatebaseball/softballfields:laserlevelinfields,tillsoil,and
sodevery6years
FY2016
FY2017
FY2018
$154,330.15
$154,330.15
$91,170.54
$91,170.54
$154,500.00
$154,500.00
PaintCorridors3yearplan
$27,000.02
$27,000.02
RampleadingfromtheCafeteriatotheStageisnothandicapped
accessible.ANSI/ADArequiredfloorclearancehasntbeen
$12,422.97
$12,422.97
Facility
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
Lady'sIslandES
2012Maintenance
Replaceoldboilerandupgradeelectricalpanelsbehindcafeteria
stage
Lady'sIslandES
2012Principal
3200s.f.buildingadditionforstorageoffofcafeteria
$434,803.91
$434,803.91
Lady'sIslandES
Recurring
PaintEntireBuildingInterior6yearplan
$111,805.38
$111,805.38
Lady'sIslandES
2012Principal
Harlequindancefloor
$43,480.39
$43,480.39
Lady'sIslandES
2010FP&C
Allwaterheatersneedtobereplaced.
$46,299.05
$46,299.05
Lady'sIslandES
2012Principal
ac/heatinginAPofficeandmediacenter
$31,057.42
$31,057.42
Lady'sIslandMS
2012Principal
Restructureoutdoorlecturetheatre
$52,689.00
$52,689.00
Lady'sIslandMS
2012Principal
Additionallightinginallparkingareasofcampus
$98,562.00
$98,562.00
Lady'sIslandMS
2011FP&C
Correctrustingstructureonbacksideofcanopyalongbuslot
(originalcanopy)
$21,646.62
$21,646.62
Lady'sIslandMS
ADC2011
Roofrepairs
$138,500.00
$138,500.00
Lady'sIslandMS
Recurring
PaintCorridors3yearplan
$67,502.37
$67,502.37
Lady'sIslandMS
2012Principal
Levelfloorbetweenkitchenandelectricalroom
$10,000.00
$8,923.00
Lady'sIslandMS
2012Principal
Renovatescienceclassrooms.Replaceceramictilesandcabinets.
$200,000.00
$200,000.00
Lady'sIslandMS
2010FP&C
Replacekitchenfloorwithepoxy
$132,896.88
$132,896.88
Lady'sIslandMS
Maintenance
Replace300gallonelectricwaterheateratgym
$55,903.36
$55,903.36
Lady'sIslandMS
ADC2011
RoofreplacementI
Lady'sIslandMS
2010Principal
Lady'sIslandMS
$50,000.00
$48,675.00
$687,379.73
$687,379.73
Correctdrainageinparkinglotinfrontof5thgradeclassrooms
$61,732.06
$61,732.06
2012Principal
Renovateparkinglot
$62,114.84
$62,114.84
Lady'sIslandMS
2010Principal
Paveexistingroadaroundtrackleadingtocafeteria
$69,448.57
$69,448.57
Lady'sIslandMS
2010Principal
Pavebusparkingarea
$115,747.61
$115,747.61
Lady'sIslandMS
2012Principal
Concessionstandforathleticfields
$310,574.22
$310,574.22
Lady'sIslandMS
2012Principal
23DigitalMessageBoards
$62,114.84
$62,114.84
Lady'sIslandMS
ADC2011
RoofreplacementII
$42,763.59
$42,763.59
Lady'sIslandMS
Recurring
Paintentirebuildinginterior6yearplan
$327,435.93
$327,435.93
Lady'sIslandMS
2010Principal
Upgradebathroomsnearfrontoffice(ventilationandada)
$23,149.52
$23,149.52
FY2018
Facility
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
Lady'sIslandMS
2010Principal
Upgradebathroomsnearmediacenter(ventilationandada)
$23,149.52
$23,149.52
Lady'sIslandMS
2010Principal
Renovategirl'slockerroom(restroom)areaingym
$38,582.54
$38,582.54
Lady'sIslandMS
2012Principal
Addrestroomstothecafeteria.Additiontobuilding.
$186,344.53
$186,344.53
Lady'sIslandMS
2010Principal
Upgradebathroomsnearguidance(ventilationandada)
$23,149.52
$23,149.52
Lady'sIslandMS
2012Maintenance
Replacelecturetheatreseating
$129,667.63
$129,667.63
Lady'sIslandMS
Recurring
RefinishGymfloor
$54,015.55
$54,015.55
Lady'sIslandMS
2010FP&C
Allwaterheatersinthefacilityneedtobereplaced.
$192,912.69
$192,912.69
Lady'sIslandMS
2012FP&C
Kitchendividingwall
$74,537.81
$74,537.81
Lady'sIslandMS
2009Principal
Replacefirealarmsystem;addressablepanel
$268,915.28
$268,915.28
Lady'sIslandMS
2010Principal
UpgraderoomC1705tocomputerlab(electandcabling),furniture
$92,598.09
$92,598.09
Lady'sIslandMS
2010Principal
Providetrophycasesformiddleschoolarea
$11,574.76
$11,574.76
Lady'sIslandMS
2010Principal
ProvideMarleydancefloorforgymstage
$23,149.52
$23,149.52
MaintenanceBuilding
ADC2011
Roofrepairs
MaintenanceBuilding
Heery
Buildingpainting
MaintenanceBuilding
2012Maintenance
Add10,000s.f.storagebuildingtowarehouse
MichaelC.RileyECC
ADC2011
MichaelC.RileyECC
$6,987.50
$6,987.50
$34,188.01
$34,188.01
$322,500.00
$322,500.00
Roofrepairs
$37,087.50
$37,087.50
Recurring
PaintCorridors3yearplan
$22,640.86
$22,640.86
MichaelC.RileyECC
2011Principal
ProvideblindsforeachclassroomduetoglareonIWB.
$26,709.38
$26,709.38
MichaelC.RileyECC
2012FP&C
Provideacousticceilinginartandmusicroom
$69,875.00
$69,875.00
MichaelC.RileyECC
Recurring
PaintEntireBuildingInterior6yearplan
$93,755.57
MichaelC.RileyES
Heery
Monitorexistingpavementdamageandrepairasneeded
MichaelC.RileyES
2010Principal
MichaelC.RileyES
FY2018
$93,755.57
$153,982.68
$153,982.68
Provideexteriorhardsurfacebasketballcourttoplayground
$35,890.73
$35,890.73
2012Principal
TwobasketballcourtsbehindEwinginplayarea
$34,668.75
$34,668.75
MichaelC.RileyES
2012Principal
ReplacecaseworkinKhallwayclassroomsK101K105
$46,657.95
$46,657.95
MichaelC.RileyES
Recurring
PaintCorridors3yearplan
$40,556.86
$40,556.86
Facility
Source
Requirements
MichaelC.RileyES
2012Principal
Restroomrenovations(Fronthallway,mainhallway,Carea
hallway)
MichaelC.RileyES
2012Principal
MichaelC.RileyES
OverallCost
FY2014
FY2015
FY2016
$142,730.70
$142,730.70
Replacecomputerlabtablesanccasework:C108&C109
$41,602.50
$41,602.50
Heery
Replaceporcelaintileb/cofwearandage
$67,228.82
$67,228.82
MichaelC.RileyES
2012Principal
Replacecorridor(vct)glazedfloortilewithmarmoleum
coordinatewithFRPremoval
$144,453.13
$144,453.13
MichaelC.RileyES
2012Principal
Replaceclassroomdoors
$110,206.86
$110,206.86
MichaelC.RileyES
2012Principal
RemoveFRPwainscottingfromcorridorscoordinatewithVCT
replacement
$69,448.57
$69,448.57
MichaelC.RileyES
2012Maintenance
Replacekitchenhotwaterheaterandstoragetank
$46,225.00
$46,225.00
MichaelC.RileyES
2012Maintenance
AddALCtoKitchenwalkincoolerandfreezer
$11,556.25
$11,556.25
MichaelC.RileyES
2012Principal
Replacelightinginmultipurposeroom
$28,890.63
$28,890.63
MichaelC.RileyES
2012FP&C
Kitchendividingwall
$69,337.50
$69,337.50
MichaelC.RileyES
2012Maintenance
Replacewalkincoolerandfreezer
$161,787.50
$161,787.50
MichaelC.RileyES
2012Principal
Replaceblindsin32classrooms
$138,675.00
$138,675.00
MossyOaksES
ADC2011
Roofrepairs&replacementsII
$300,476.48
$300,476.48
MossyOaksES
2012Principal
Upgradeballfieldandgeneralplayarea,addwalkingtrack
$57,781.25
$57,781.25
MossyOaksES
2009FP&C
Neednewbackstopandfenceforballfield
$25,015.37
$25,015.37
MossyOaksES
2012Principal
Constructpermanentbrickoutdoorstoragebuildingtoreplace
temporarybuilding
$29,468.44
$29,468.44
MossyOaksES
2009FP&C
K'WingEastwalk/repairbreaks
$12,507.69
$12,507.69
MossyOaksES
ADC2011
Roofrepairs&replacementsI
$144,626.47
$144,626.47
MossyOaksES
2011Principal
NeedexteriordoorforRoomC3.OnlyCRwithnoexteriorexit.
$21,534.44
$21,534.44
MossyOaksES
Recurring
PaintCorridors3yearplan
$31,275.35
$31,275.35
$10,767.22
$10,767.22
$11,556.25
$11,556.25
Upgradecounterandaddshelvesinmainoffice.Spaceisinefficient
incurrentarrangement.
Repaircrackedceramicfloortilesatdoubledoorsonmainhallway
pastcafeteria
MossyOaksES
2011Principal
MossyOaksES
2012Maintenance
MossyOaksES
2009Principal
AddreardoorfromMusicRoom
$14,175.38
$14,175.38
MossyOaksES
2010FP&C
ThewaterheatersservingtheKitchenneedtobereplaced.
$50,247.03
$50,247.03
MossyOaksES
Heery
ReplacewornADAfixturesinrestrooms
$41,692.29
$41,692.29
FY2017
FY2018
Facility
Source
Requirements
OverallCost
FY2014
FY2016
OkatieES
2012Principal
Studentdropofflane
OkatieES
2012Principal
Concretepatiosoffofroomswithpaths
$11,556.25
$11,556.25
OkatieES
ADC2011
Roofrepairs
$32,357.50
$32,357.50
OkatieES
Recurring
PaintEntireBuildingInterior6yearplan
$129,807.60
$129,807.60
OkatieES
2012Principal
Replacecarpetincounselor'soffice,interventionistroomand
centerofbuilding;ReplacecarpetinfrontofficeswithVCT
$57,781.25
$57,781.25
OkatieES
2012Principal
Replaceremoveabledoorsinthecafeteriaandgym
$57,781.25
$57,781.25
OkatieES
2012FP&C
Removeoldwhiteboardsunderprometheanboardsreplace
whiteboardsafterremoval
$32,357.50
$32,357.50
PortRoyalES
ADC2011
Roofrepairs
$25,000.00
$25,000.00
PortRoyalES
2010Principal
Paintandsealexteriorofschool
$61,548.00
$61,548.00
PortRoyalES
2010Principal
ReplacecaseworkinC112andC201.
$9,317.23
$9,317.23
PortRoyalES
Recurring
PaintCorridors3yearplan
$22,541.62
$22,541.62
$11,180.67
$11,180.67
$9,317.23
$9,317.23
ReplacecabinetryinC201AandC201B.Cabinetsareseparatingand
maintenancecannolongerrepair.
Addsoundpanelstocafeteriatoimproveacoustics.Existingpanels
aredeteriorating.
$241,875.00
FY2015
FY2017
$241,875.00
PortRoyalES
2011Principal
PortRoyalES
2011Principal
PortRoyalES
2011Principal
NeeddrinkingfountaininfirstfloorChall(nonecurrently).
$9,317.23
$9,317.23
PortRoyalES
2009FP&C
Reinsulatecondensatelinesandcoatwithreflectivewhite
$8,658.65
$8,658.65
PortRoyalES
2012Maintenance
Installexhaustfansinstaffrestrooms(mainoffice,nurseoffice,
etc.)
$14,000.00
$14,000.00
PortRoyalES
ADC2011
RoofreplacementsI
$93,850.73
$93,850.73
PortRoyalES
2010Principal
Provideroofareabetweenbuldingforstudentlearningarea.
$115,747.61
$115,747.61
PortRoyalES
Recurring
PaintEntireBuildingInterior6yearplan
$93,343.18
$93,343.18
PortRoyalES
2010Principal
FlooringReplaceadminfloor,rubberbasethroughoutschool,
regroutrestroomfloors,replacestairtreads,replacefloorinB102,
$23,149.52
$23,149.52
PortRoyalES
2010Principal
Replacefailingfoldingpartitionwithpermanentwall.
$23,149.52
$23,149.52
PortRoyalES
2010Principal
Needadditionalofficeinadminarea(currentlyusingvault).
Relocatebreakroomandconverttooffice.
$38,582.54
$38,582.54
PortRoyalES
2010FP&C
Allwaterheatersneedtobereplaced.
$35,495.94
$35,495.94
PortRoyalES
ADC2011
RoofreplacementsII
$47,747.03
$47,747.03
PritchardvilleES
2012FP&C
Providegolfrange
$16,125.00
$16,125.00
FY2018
Facility
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
PritchardvilleES
ADC2011
Roofrepairs
$65,575.00
$65,575.00
PritchardvilleES
Recurring
PaintCorridors3yearplan
$55,344.33
$55,344.33
PritchardvilleES
2012FP&C
Providerubberrisersfor3staircases
$21,500.00
$21,500.00
PritchardvilleES
Recurring
PaintEntireBuildingInterior6yearplan
RedCedarES
2012Principal
irrigateandsodplaygroundarea
$42,561.00
$42,561.00
RedCedarES
ADC2011
Roofrepairs
$43,950.00
$43,950.00
RedCedarES
Recurring
PaintCorridors3yearplan
$49,142.95
$49,142.95
RedCedarES
2012Principal
newflooringformultipurposeroom
$60,059.00
$60,059.00
RedCedarES
2011Principal
Needbetterlandscapingatfrontentry.
RedCedarES
Recurring
PaintEntireBuildingInterior6yearplan
JosephS.ShanklinES
2012Principal
Improvelightingatbackparkingareanexttodumpstersby
cafeterialoadingdock
$21,646.62
$21,646.62
JosephS.ShanklinES
ADC2011
Roofrepairs
$64,500.00
$64,500.00
JosephS.ShanklinES
Recurring
PaintCorridors3yearplan
$35,001.57
$35,001.57
JosephS.ShanklinES
ADC2011
Roofreplacement
$764,258.35
$764,258.35
JosephS.ShanklinES
Recurring
PaintEntireBuildingInterior6yearplan
$144,942.57
$144,942.57
JosephS.ShanklinES
2009FP&C
UpgradeFirealarmSystem
$231,495.23
$231,495.23
RobertSmallsMS
2009FP&C
RepairdamagedCanopyPostsatBusRider
$6,274.69
$6,274.69
RobertSmallsMS
ADC2011
Roofrepairs
$622,390.73
$622,390.73
RobertSmallsMS
2012Maintenance
RepairstocastconcreteoverwindowledgeonDhall
$18,634.45
$18,634.45
RobertSmallsMS
2009FP&C
MainEntrytuckpointbrickabovelintel
$8,067.46
$8,067.46
RobertSmallsMS
2009Principal
ReplacedoorsatentrancebetweenGymandCafeteria
$8,067.46
$8,067.46
RobertSmallsMS
2009FP&C
WeightRm.refit/replacedoors/addvisionpanels
$13,445.76
$13,445.76
RobertSmallsMS
Recurring
PaintEntireBuildingInterior6yearplan
$278,748.97
$278,748.97
RobertSmallsMS
2011Principal
Needadditionalinteriordoorreplacement
$69,448.57
$69,448.57
RobertSmallsMS
2009Principal
Refurbishlockers
$71,710.74
$71,710.74
$254,644.75
FY2018
$254,644.75
$7,178.15
$7,178.15
$189,302.75
$189,302.75
Facility
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
FY2018
RobertSmallsMS
Recurring
RefinishGymfloor
$54,015.55
$54,015.55
RobertSmallsMS
2012FP&C
Addsoundpanelstocafeteria
$15,433.02
$15,433.02
RobertSmallsMS
2012Principal
Installblindsforallwindowsaboveledgeinclassrooms
$93,172.27
$93,172.27
RobertSmallsMS
2012FP&C
$124,229.69
$124,229.69
RobertSmallsMS
2012Maintenance
$31,057.42
$31,057.42
RobertSmallsMS
2010Principal
$11,574.76
$11,574.76
RobertSmallsMS
2012FP&C
Kitchendividingwall
$74,537.81
$74,537.81
RobertSmallsMS
2012Principal
Digitalclocksincafeteria,hallways,andmediacenterNoteCostis
foratomicclocks
$31,057.42
$31,057.42
RobertSmallsMS
2012Principal
Installmotorizedscreeninthecafeteria
$27,311.81
$27,311.81
RobertSmallsMS
ADC2011
Roofreplacement
$573,501.20
$573,501.20
ShellPointES
ADC2011
RoofreplacemntII
$36,198.48
$36,198.48
ShellPointES
Recurring
PaintCorridors3yearplan
$36,655.96
$36,655.96
ShellPointES
ADC2011
Roofreplacement
$709,467.98
$709,467.98
ShellPointES
ADC2011
RoofreplacementIII
$151,810.79
$151,810.79
St.HelenaECC
ADC2011
Roofrepairs
St.HelenaECC
Recurring
PaintCorridors3yearplan
St.HelenaES
ADC2011
Roofrepairs
St.HelenaES
Recurring
St.HelenaES
ContinueImprovementsmadein5thgradewingto67grade
wings.(Lockers,wallpainting,signage)
Replacewaterheater/boilerinthemechanicalroomabovethe
stagearea(unithasbeencondemned)
RoomB2FoodsLabneedsupdatingtomeetfiremarshal
requirements
$8,089.38
$8,089.38
$21,061.68
$21,061.68
$5,000.00
$5,000.00
PaintCorridors3yearplan
$49,034.32
$49,034.32
2012Principal
Sewerventalationissue
$15,000.00
$14,955.00
St.HelenaES
2009FP&C
PALgymupgradebleacherstoADAstandards
St.HelenaES
2009FP&C
PALgyminstallnewcurtains@stageworn
St.HelenaES
2009FP&C
PALgymrenovategymfloorsurface
St.HelenaES
2010Principal
ConstructnaturetrailSTEMneed.
St.HelenaES
Recurring
PaintEntireBuildingInterior6yearplan
St.HelenaES
2011Principal
UpgradecurrentclassroomtoScienceexplorationroomforSTEM.
$100,160.19
$100,160.19
$28,712.59
$28,712.59
$129,206.64
$129,206.64
$77,165.08
$77,165.08
$131,351.47
$131,351.47
$54,015.55
$54,015.55
Facility
St.HelenaES
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
2009Principal
Providenewmarqueesign
$26,891.53
$26,891.53
St.HelenaES
2009FP&C
RepairdamagedA/Clouvers;repairlouverframetowalladjacent
toE03
$14,879.98
$14,879.98
St.HelenaES
2012FP&C
Kitchendividingwall
$74,537.81
$74,537.81
WhaleBranchES
ADC2011
Roofrepairs
WhaleBranchES
2009FP&C
WhaleBranchES
$7,500.00
$7,500.00
Clean&repaintallsteellintelsmostaregalvanized
$21,646.62
$21,646.62
2009FP&C
Removeandreplacesealant@allexteriordoorsandwindowstyp.
$21,646.62
$21,646.62
WhaleBranchES
Recurring
PaintCorridors3yearplan
$32,761.97
$32,761.97
WhaleBranchES
2012Maintenance
ContinueAHUVAVreplacementinmainofficeareas
$50,000.00
$51,238.00
WhaleBranchES
2012Principal
Lightingimprovements
$25,000.00
$41,561.00
WhaleBranchES
Recurring
PaintEntireBuildingInterior6yearplan
$135,666.97
$135,666.97
WhaleBranchES
2009FP&C
GrouprestroomsreplaceCTwithepoxy
$123,464.12
$123,464.12
WhaleBranchES
2011Principal
Installnewclocksystem
$38,582.54
$38,582.54
WhaleBranchMS
2009FP&C
Renovateexpansionjointswithnewsealant@allsidewalk
conditions
$10,823.31
$10,823.31
WhaleBranchMS
ADC2011
Roofrepairs
$35,500.00
$35,500.00
WhaleBranchMS
2012FP&C
Fillopenspaceinsoffitsaroundgym
$30,000.00
$40,568.00
WhaleBranchMS
Recurring
PaintCorridors3yearplan
$53,823.23
$53,823.23
WhaleBranchMS
2010FP&C
MaincorridorisrampedbetweentheBWingandtheCWing.
Coderequiredhandrailshavenotbeenprovidedattherampand
$23,112.50
$23,112.50
WhaleBranchMS
2012Principal
Floormoldingreplacement
$15,893.95
$15,893.95
WhaleBranchMS
ADC2011
Roofreplacement(lowsloperoofareas)
$667,734.57
$667,734.57
WhaleBranchMS
2009Principal
ReplaceMediaCenterwindows
$134,457.64
$134,457.64
WhaleBranchMS
Recurring
PaintEntireBuildingInterior6yearplan
$222,881.45
$222,881.45
WhaleBranchMS
2010FP&C
$23,149.52
$23,149.52
WhaleBranchMS
2010FP&C
$38,582.54
$38,582.54
WhaleBranchMS
Recurring
RefinishGymfloor
$54,015.55
$54,015.55
WhaleBranchMS
2009Principal
Create45lifelabs
$179,276.85
$179,276.85
ThetoiletareaoftheBoysLockerRoomisnotfullyHCaccessible:
stalldooropensinwrongdirectionanddoesnotselfclose;novert
ThegrouptoiletsattheD,F,E,andAclassroomswingsarenotfully
HCaccessible:inadequatefloorspaceaturinal;flushvalveistoo
FY2018
Facility
Source
Requirements
OverallCost
FY2014
FY2015
FY2016
FY2017
WhaleBranchMS
2009Principal
Replacerestroomsinks
$115,747.61
$115,747.61
WhaleBranchMS
2012Maintenance
ReplaceDHSunitandHVACunitsingym
$124,229.69
$124,229.69
WhaleBranchEarlyCollegeHS
2012Principal
Relocatedouglegatedentrancefortrackclosertothefieldhouse
WhaleBranchEarlyCollegeHS
ADC2011
WhaleBranchEarlyCollegeHS
FY2018
$8,062.50
$8,062.50
Roofrepairs
$87,612.50
$87,612.50
Recurring
PaintCorridors3yearplan
$69,568.63
$69,568.63
WhaleBranchEarlyCollegeHS
2012FP&C
2ndActivityBus
$215,000.00
$215,000.00
WhaleBranchEarlyCollegeHS
2012Principal
Addlockingdevicetoalllockers.
$16,125.00
$16,125.00
WhaleBranchEarlyCollegeHS
Recurring
ResurfaceTenniscourts
$99,542.95
$99,542.95
WhaleBranchEarlyCollegeHS
Recurring
Renovatebaseball/softballfields:laserlevelinfields,tillsoil,and
sodevery6years
$154,330.15
$154,330.15
WhaleBranchEarlyCollegeHS
Recurring
Renovatefootballfield:recrown,sod,andrepairturfevery9years
$222,934.73
$222,934.73
WhaleBranchEarlyCollegeHS
Recurring
PaintEntireBuildingInterior6yearplan
$258,348.68
$258,348.68
WhaleBranchEarlyCollegeHS
Recurring
RefinishGymfloor
$58,066.72
$58,066.72
$76,878,730.91
$10,161,676.18