Professional Documents
Culture Documents
)
S.No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
A
B D B A C A C C D B B D D C C A C A D B D A B C B
B
B C B A D B D A C A C D C D B B D C C A C A B B D
C
D C B B D C C A C A B D B B C B A D B D A C A C D
S.No.
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
A
B C A C B D B D D A C A D D C A C B C B A A B B B B B D C D
B
A A B C B C A C D D A C A D D B D B C A B C B B B B C D B D
C
C A D D B D B C A C B A A B C B C A C D D A B B B B B D C D
S.No.
General 56 D 57 A 58 B 59 C 60 A 61 D 62 C 63 D 64 A 65 C
Ability A A B B D D C C A A C C D D D D A A C C
NEW BATCHES FOR IES-2012/ GATE-2012/ PSUs2011 WILL START FROM 19/02/2011.
NTPC/ Power Grid/ ISRO Spl Batches to be started from 16/02/11 (EE/EC). For details, Visit office.
Office: R-14/91, 2ND FLOOR, SECTOR-14, RAJNAGAR, GHAZIABAD (0120-4354582, 09716545123, 09015733955)
www.engineerskudos.com