DIAMETRO mm 350 400 450 Pulg 14 16 18

AREA M^2 A 0.096 0.126 0.159

GASTO M^3/S Q 0.1334 0.1334 0.1334

VEL M/S V 1.39 1.06 0.84

IMASA CALCULO DEL DIAMETRO MAS ECONOMICO EN LINEAS DE CONDUCCION, PARA LA LOCALIDAD DE NOGALES, SONORA. LINEA POR BOMBEO, SITUACION DE PROYECTO - TRAMO REBOMBEO PORTEZUELOS A TANQUE HEROES II CALCULO DE LA POTENCIA LONG COEF CTE PERD ALTURA DESNIVEL DESNIVEL H tot Q Htot M FRICC MANNING FRICC SUCCION TOPOGRAFICO TOTAL L Q^2 n K Hf M M M M Q en lps 4,389.32 0.0178 0.009 0.23 17.60 4.00 12.49 16.49 34.09 4546.4 4,389.32 0.0178 0.009 0.11 8.63 4.00 12.49 16.49 25.12 3350.7 4,389.32 0.0178 0.009 0.06 4.61 4.00 12.49 16.49 21.10 2813.6

76 N N = 70 % 53 53 53

H.P. TEORICA 85.46 62.98 52.89

H.P. COMERCIAL 85.46 62.98 52.89

TIPO DE TUBERIA P.A.D. P.A.D. P.A.D.

CALCULO DEL GOLPE DE ARIETE PRESION DE TRABAJO DIAM ESPESOR VEL 145 V Ea d Ef e Ea d Ea d DE LA TUBERIA d e -----1 + ---KG/CM2 CM CM M/SEG Et e Et e 6 35.0 1.37 1.39 201.00 723450 13484 53.7 54.7 6 40.0 1.56 1.06 153.89 826800 15354 53.9 54.9 6 45.0 1.76 0.84 121.59 930150 17322 53.7 54.7 V = VELOCIDAD INICIAL DEL AGUA EN M/S Ea = MODULO DE ELASTICIDAD DEL AGUA (20,670 KG/CM2) Et = MODULO DE ELASTICIDAD DE LAS PAREDES DEL TUBO (PARA ACERO 2,100,000 KG/CM2) CALCULO DE COSTOS PRINCIPALES CONCEPTO DIAMETRO= 350 CLASE = 6 DIAMETRO= 400 CANTIDAD UNIDAD P.U. IMPORTE CANTIDAD UNIDAD DIAMETRO (M) 0.350 M 0.40 ANCHO ZANJA (M) 0.90 M 0.95 ALTURA PLANTILLA (M) 0.10 M 0.10 LONGITUD (M) 4389.32 M 4389.32 AREA TUBERIA 0.096 M2 0.126 EXCAVACION MATERIAL CLASE I M^3 0.00 M^3 EXCAVACION MATERIAL CLASE II 5333.02 M^3 68.50 365,312.13 5837.80 M^3 EXCAVACION MATERIAL CLASE III M^3 0.00 M^3 PLANTILLA APISONADA 395.04 M^3 66.52 26,277.98 416.99 M^3 RELLENO COMPACTADO BANCO 2145.45 M^3 21.43 45,977.00 2367.32 M^3 RELLENO A VOLTEO EXCAVACION 2370.23 M^3 4.84 11,471.93 2501.91 M^3 ATRAQUES DE CONCRETO F'c=150 Kg/cm2 M^3 0.00 M^3 SUMINISTRO E INSTALACION DE TUBERIA 4389.32 M 278.63 1,222,996.23 4389.32 M COSTO TOTAL DE CONDUCCION $ (5) 1,672,035.27 RESUMEN CARGO ANUAL DE BOMBEO $ (4) 251,208 185,142 155,467

Ea d (1 + ----)^.5 Et e 7.4 7.4 7.4

SOBREPRESION M 27.19 20.78 16.44

S.A.V. 80 % M 21.75 16.62 13.15

S.A.T. 20 % M 5.44 4.16 3.29

CARGA DE OPER M 30.09 21.12 17.10

PRESION TOTAL M 35.53 25.28 20.38

PARA P.A.D. = CLASE = P.U. 6 IMPORTE DIAMETRO= CANTIDAD 0.45 1.10 0.10 4389.32 0.159 7000.97 482.83 2923.10 2896.95 4389.32

9,842 450 UNIDAD

KG/CM2 CLASE = P.U. 6 IMPORTE

0.00 68.50 0.00 66.52 21.43 4.84 361.93

0.00 399,889.00 0.00 27,737.87 50,731.67 12,109.26 0.00 1,588,626.59 2,079,094.38

M^3 M^3 M^3 M^3 M^3 M^3 M^3 M

0.00 68.50 0.00 66.52 21.43 4.84 459.40

0.00 479,566.13 0.00 32,117.53 62,642.00 14,021.24 0.00 2,016,453.61 2,604,800.51

PRESION DE TRABAJO DE LA TUBERIA KG/CM2 6 6 6

DIAMETRO MM 350 400 450 PULG 14 16 18

H.P. (1) 85.5 63.0 52.9

K.W.H. (2) 63.73 46.97 39.44

COSTO POR HORA BOMBEO $ (3) 28.68 21.13 17.75

COSTO DE K.W.H. (C.K.W.H.)= $ 0.45 (2) = (1)*0.7457 (3) = (2)*C.K.W.H. (4) = (3)*8760 NOTA : EL DIAMETRO MAS ECONOMICO ESTA DADO POR EL MENOR COSTO DETERMINADO EN LA COLUMNA (7) N DE AOS = 15 i= 12.0% % ANUALIDAD = 0.134 i(1+i)^n Donde: i=% anual ANUALIDAD=-------n=N. de aos (1+i)^n-1

CARGO ANUAL DE AMORTIZACION ( 15 AOS AL 12 % ANUAL) (6) 224,053 278,599 349,043 COSTO MINIMO ANUAL DE BOMBEO: (6) = (5)*ANUALIDAD (7) = (4)+(6)

COSTO TOTAL CONDUCCION m.l. (5) 1,672,035 2,079,094 2,604,801

COSTO ANUAL DE BOMBEO PARA 365 DIAS (7) 475,261

463,741
504,510 463,741

LA CEDULA DE LA TUBERIAS ANALIZADAS ES LA QUE COMERCIALMENTE SE AJUSTA MAS A LA PRESION TOTAL

IMASA

PROYECTO EJECUTIVO DE LAS LINEAS DE INTERCONEXION DE AGUA POTABLE PARA LA CIUDAD DE NOGALES, SONORA. FUNCIONAMIENTO A BOMBEO LINEA DE CONDUCCION "PORTEZUELOS-HEROES II" CALCULO HIDRAULICO : FUNCIONAMIENTO POR GRAVEDAD

TRAMO (M) INICIO FINAL

LONGITUD (M)

DIAMETRO (PULG) ( CM )

GASTO (LPS) TIPO PROPIO ACUMULADO TUBERIA

AREA ( M^2 )

VEL. (M/S)

Re

E/D

f S FRICCION FRICCION

Hf (M)

TRAMO REBOMBEO PORTEZUELOS - TANQUE HEROES II 0+000.00 2+000.00 2,000.00 16 2+000.00 4+000.00 2,000.00 16 4+000.00 4+389.32 389.32 16 SUMA PARCIAL 4,389.32

40 40 40

133.37

133.37 133.37 133.37

P.A.D. P.A.D. P.A.D.

0.1257 0.1257 0.1257

1.06 1.06 1.06

369,157 369,157 369,157

0.0015 0.0015 0.0015

0.000004 0.000004 0.000004

0.0138812 0.001990 0.0138812 0.001990 0.0138812 0.002003

3.98 3.98 0.78 8.74

SUMA PERDIDAS POR FRICCION (Hf):

8.74

DARCY-WEISBACH: Hf=f*(L/D)*(V2/2g) SWAMME Y JAIN: f=0.25(Log((E/D)/3.71)+(5.74/(Re)^0.9))^2) V=Q/A Re=(V*D)/

FORMULAS PERDIDAS MENORES


PB Pozo (% prdidas friccin):

VALOR:
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.74

LOCALES.(%prdidas friccin): Desc/Salida (% prd.friccin): Flotador (% prdidas friccin):

SUMA PERDIDAS MENORES(Hm): SUMA PERDIDAS TOTALES (HfT):

NOMENCLATURA
Hf = PERDIDAS DE ENERGIA "POR FRICCION" (M) f = COEFICIENTE DE "FRICCION", ADIMENSIONAL L = LONGITUD DE LA TUBERIA (M) D = DIAMETRO INTERNO DEL TUBO (M) V = VELOCIDAD MEDIA (M/S) g = ACELERACION DE LA GRAVEDAD (M/S^2) E = RUGOSIDAD ABSOLUTA DE LA TUBERIA (MM) Re = NUMERO DE REYNOLDS Q = GASTO (M3/S) A = AREA DE LA TUBERIA (M2) = VISCOCIDAD CINEMATICA DEL AGUA(M2/S) HT = CARGA TOTAL DE TRABAJO DE LA BOMBA He = CARGA ESTATICA (M) Hf = PERDIDAS POR FRICCION (M) Hm = PERDIDAS MENORES (M) Ha = PROFUNDIDAD DEL AGUA (M) P = POTENCIA REQUERIDA POR LA BOMBA (HP) & = PESO VOLUMETRICO DEL AGUA N = EFICIENCIA DE LA BOMBA

DATOS BASICOS
ESTRUCTURA PB POZO PB POZO PB POZO PB POZO TOPOGRAFIA REFERENCIA PROYECTO ELEV(M) VALORES DE LA RUGOSIDAD MATERIAL Cobre, PVC, Polietileno de Alta Densidad Fierro Fundido Nuevo Fierro Fundido Oxidado Acero Nuevo Acero Viejo Asbesto Cemento Concreto Liso Concreto Aspero
CONSTANTES DE CALCULO

NIVEL TERRENO NAT.MULTIPLE EJE DEL MULTIPLE NIVEL MINIMO DEL AGUA Ha=PROFUNDIDAD DEL AGUA TANQUE FINAL(Tf) NIVEL TERRENO NATURAL TANQUE FINAL(Tf) NIVEL MAXIMO DEL AGUA TANQUE FINAL(Tf) NIVEL MINIMO DEL AGUA PB POZO-Tf He=CARGA ESTATICA BOMBEO

E (MM) 0.0015 0.005 1.500 0.04 0.10 0.025 0.16 2.00

75.00 9.81 n (M2/S)= T= 15 & = 1,000

N= g=

% m/s2 1.15E-06 C KG/M2

RESUMEN
SITIO ELEVACION (M) PIEZOMETRICA TERRENO 1,238.74 1,234.76 1,230.78 1,230.00 1,216.51 1,222.88 1,179.04 1,225.00 CARGA
DISP.( M )

UBICACION HT (M) REBOMBEO PORTEZUELOS

BOMBA P (HP)

0+000.00 2+000.00 4+000.00 4+389.32

22.23 11.88 51.74 5.00

ENTREGA EN TANQUE HEROES II

122753462.xls.ms_office

LUGAR: CONCEPTO: TRAMO : SUBTRAMO :

NOGALES, SONORA CALCULO DEL GOLPE DE ARIETE LINEA DE CONDUCCION "PORTEZUELOS-HEROES II" 0+000.00 A 4+389.32

CALCULO DE LA SOBREPRESION DATOS : TIPO TUBERIA : P.A.D. CLASE : 6.0 CAUDAL : 133.37 VELOCIDAD : 1.06 DIAMETRO : 40 AREA : 0.126 ESPESOR 1.56 Mod. Elasticidad del agua : Mod. Elasticidad del material : SOBREPRESION =

RD 26 kg/cm2 lps m/s cm m2 cm 20,670 9,842 20.78

kg/cm2 kg/cm2 m

RESUMEN PROFUNDIDAD DINAMICA = COTA INICIO = COTA DE DESCARGA = DIF. ENTRE SUCCION Y DESCARGA = PERDIDAS EN LA TUBERIA = PERDIDAS LOCALES = CARGA DINAMICA TOTAL = GASTO POR EQUIPO = 4.00 1216.51 1230.00 17.49 8.74 0.00 26.23 133.37 m m m m m m m lps =

8,002

lpm

SELECCIN DE LA CLASE DE LA TUBERIA CARGA DINAMICA TOTAL = 26.23 SOBREPRESION POR GOLPE DE A. = 20.78 SOBREPRESION ABVS. POR VALVULA (80 %) = SOBREPRESION ABVS. POR TUBERIA (20 %) = PRESION TOTAL DE TRABAJO = 26.39 PRESION DE TRABAJO DE TUBERIA = 60.00 m m 16.62 4.16 m m.c.a. m m < 26.39 OK

PROYECTO EJECUTIVO DE LAS LINEAS DE INTERCONEXION DE AGUA POTABLE PARA LA CIUDAD DE NOGALES, SONORA. LINEA DE CONDUCCION "PORTEZUELOS-HEROES II" CANTIDADES DE OBRA DE PROYECTO
DIAMETRO AREA TUBO M2 0.003 0.004 0.008 0.018 0.031 0.049 0.071 0.096 0.126 0.159 0.196 LONG. ANCHO ZANJA M 0.60 0.60 0.60 0.70 0.75 0.80 0.85 0.90 0.95 1.10 1.15 H1 HT PROF. TOTAL M 1.06 1.08 1.10 1.15 1.20 1.25 1.30 1.35 1.40 1.45 1.60 DESPALME DESYERBE EXCAV. PLANTILLA VOL. RELLENO TUBERIA MAT. BANCO M3 M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 551.58 0.00 0.00 551.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,367.32 0.00 0.00 2,367.32 RELLENO MAT. EXC. M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,501.91 0.00 0.00 2,501.91 ACARREOS

PULG. 2.5 3 4 6 8 10 12 14 16 18 20 SUMA

MM 60 75 100 150 200 250 300 350 400 450 500

M 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

M 1.06 1.08 1.10 1.15 1.20 1.25 1.30 1.35 1.40 1.45 1.60

M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 416.99 0.00 0.00 416.99

HAS 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.00

M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,420.81 0.00 0.00 5,420.81

M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 416.99 0.00 0.00 416.99

M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,335.89 0.00 0.00 3,335.89

0.00 0.00 0.00 4,389.32

4,389.32 12.87 M3

CONCRETO PARA ATRAQUES =

RESUMEN

122753462.xls.ms_office

PROYECTO EJECUTIVO DE LAS LINEAS DE INTERCONEXION DE AGUA POTABLE PARA LA CIUDAD DE NOGALES, SONORA. LINEA DE CONDUCCION "PORTEZUELOS-HEROES II" RESUMEN CANTIDADES DE TUBERIA
CONCEPTO UNIDAD CANTIDADES TOTAL
TUBERIA DE POLIETILENO DE ALTA DENSIDAD... RD21 DE 16" (400 mm) DE DIAMETRO ML RD26 DE 16" (400 mm) DE DIAMETRO ML TUBERIA DE ACERO.... CED. 40 DE 14" (350 mm) DE DIAMETRO SUMA TOTAL

247.76 4,141.56

ML ML 4,389.32

RESUMEN CANTIDADES DE OBRA


CONCEPTO UNIDAD CANTIDADES TOTAL
DESPLAME EXCAVACION EN ZANJA EN MATERIAL CLASE I 0% EN MATERIAL CLASE II 70% EN MATERIAL CLASE III 30% PLANTILLA APIZONADA LA 85 % PROCTOR RELLENO COMPACTADO AL 90 % PROCTOR CON MATERIAL DE BANCO RELLENO COMPACTADO AL 90 % PROCTOR CON MATERIAL SELECCIONADO PRODUCTO DE LA EXCAVACION ACARREOS CONCRETO PARA ATRAQUES f'c=100 kg/cm2 M3 M3 M3 M3 M3 M3 M3 416.99 0.00 3,794.57 1,626.24 416.99 2,367.32 2,501.91

M3 M3

3,335.89 12.87

122753462.xls.ms_office

LISTA DE PIEZAS ESPECIALES


SIMBOLO CONCEPTO VALVULA DE COMPUERTA DE VASTAGO FIJO DE... 4" (100 mm) DE DIAM. 12" (300 mm) DE DIAM. VALVULA BRONCE DE... 2" (50 mm) DE DIAM. VALVULA EXPULSORA DE AIRE, COMBINADA... DE 2" (50 mm), MODELO RENVAL RAV2/RE50 O SIMILAR TEE DE Fo. Fo. DE.. 12" X 3" (300 X 75 mm) DE DIAM. 12" X 4" (300 X 100 mm) DE DIAM. 12" X 12" (300 X 300 mm) DE DIAM. 14" X 3" (350 X 75 mm) DE DIAM. 14" X 4" (350 X 100 mm) DE DIAM. 16" X 4" (400 X 100 mm) DE DIAM. REDUCCION Fo. Fo. DE.. 4" X 2" (100 X 50 mm) DE DIAM. 14" X 12" (350 X 300 mm) DE DIAM. CODO DE 90 G., DE Fo. Fo. DE.. 14" (350 mm) DE DIAM. 16" (400 mm) DE DIAM. CODO DE 45 G., DE Fo. Fo. DE.. 12" (300 mm) DE DIAM. 14" (350 mm) DE DIAM. 16" (400 mm) DE DIAM. CODO DE 22.5 G., DE Fo. Fo. DE.. 12" (300 mm) DE DIAM. 14" (350 mm) DE DIAM. 16" (400 mm) DE DIAM. BRIDA ROSCADA DE Fo. Fo. DE.. 2" (50 mm) DE DIAM. 3" (75 mm) DE DIAM. PLATO QUIEBRACHORRO DE Fo. Fo.. NIPLE DE FIERRO GALVANIZADO CED. 40 DE.. 2" (50 mm) DE DIAM. DE 10 CM DE LARGO REDUCCION DE FIERRO GALVANIZADO DE.. 3" (75 mm) X 2" (50 mm) DE DIAM. BRIDA TERMINAL DE POLIETILENO DE ALTA DENSIDAD Y CONTRABRIDA METALICA CLASE 125 lbs, DE.. 12" (300 mm) DE DIAM. 14" (350 mm) DE DIAM. 16" (400 mm) DE DIAM. EMPAQUES DE PLOMO DE... 2" (50 mm) DE DIAM. UNIDAD CANTIDAD

PZA PZA

PZA

10

PZA

10

PZA PZA PZA PZA PZA PZA

19

PZA PZA

10

PZA PZA

PZA PZA PZA

28

PZA PZA PZA

33

PZA PZA PZA

10

PZA

20

PZA

PZA PZA PZA

119

PZA

10

122753462.xls.ms_office

LISTA DE PIEZAS ESPECIALES


SIMBOLO 3" (75 mm) DE DIAM. 4" (100 mm) DE DIAM. 12" (300 mm) DE DIAM. 14" (350 mm) DE DIAM. 16" (400 mm) DE DIAM. EMPAQUES DE NEOPRENO DE... 2" (50 mm) DE DIAM. 4" (100 mm) DE DIAM. 12" (300 mm) DE DIAM. 14" (350 mm) DE DIAM. 16" (400 mm) DE DIAM. CAJAS PARA OPERACIN DE VALVULAS, TIPO .... TIPO 1 TIPO 2 TIPO 11 CONTRAMARCO PARA CAJA DE OPERACION DE VALVULAS SENCILLO DE 0.90 M SENCILLO DE 1.10 M SENCILLO DE 1.80 M MARCO CON TAPA DE 50 X 50 CM DE 55 KG TORNILLOS DE... 16 mm X 64 mm (5/8" X 2 1/2") 16 mm X 64 mm (5/8" X 3") 22.2 mm X 101.6 mm (7/8" X 4") 25.4 mm X 114.3 mm (1" X 4 1/2") CONCEPTO UNIDAD PZA PZA PZA PZA PZA CANTIDAD 19

22

PZA PZA PZA PZA PZA

10 19

141

PZA PZA PZA

10 9

PZA PZA PZA PZA

10 9

19

PZA PZA PZA PZA

40 152 2,256

122753462.xls.ms_office

IMASA PRESUPUESTO BASE

NOMBRE:

PROYECTO EJECUTIVO DE LAS LINEAS DE CONDUCCION E INTERCONEXION PARA LA CIUDAD DE NOGALES, SONORA LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II PRECIO UNITARIO $

OBRA:

CLAVE DESCRIPCION

UNIDAD

CANTIDAD

IMPORTE $

TERRACERIAS
100300 DESPALME DE MATERIAL NO APTO P/CIMENTACION Y/O DESPLANTE DE TERRAPLENES Y EN BANCOS DE PRESTAMO DESPERDICIANDO EL MATERIAL. CON ACARREO A 40 MTS. EXCAVACION POR MEDIOS MECANICOS EN ZANJA ZONA "B", EN CLASE II EN SECO, MEDIDO EN BANCO, CON ACARREO LIBRE A 20.00 M. EXCAVACION DE 0.00 A 2.00 M. DE PROFUNDIDAD EXCAVACION POR MEDIOS MECANICOS EN ZANJA ZONA "B", EN CLASE III EN SECO, MEDIDO EN BANCO, CON ACARREO LIBRE A 20.00 M. EXCAVACION DE 0.00 A 2.00 M. DE PROFUNDIDAD PLANTILLA APISONADA AL 85% PROCTOR EN ZANJAS... CON MATERIAL PRODUCTO DE BANCO RELLENO EN ZANJAS... COMPACTADO AL 90% PROCTOR, CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90% PROCTOR, CON MATERIAL DE BANCO FABRICACION Y COLADO DE CONCRETO VIBRADO Y CURADO ... DE F'C = 100 KG/CM2 M3 12.87 937.69 12,068.07 ============= SUBTOTAL TERRACERIAS 545,314.62 M3 M3 2,501.91 2,367.32 43.26 62.18 108,232.63 147,199.96 M3 416.99 66.52 27,738.17 M3 1,626.24 76.78 124,856.20 M3 3,794.57 32.27 122,450.77 M3 416.99 6.64 2,768.81

100301 S/C

S/C S/C

S/C* 113000 113002 113100 113105 113106 403000 403001

INSTALACIONES
205000 205008 213000 213001 216000 216006 228100 228118 S/C S/C S/C INSTALACION DE TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE... DE 16" DE DIAMETRO INSTALACION DE PIEZAS ESPECIALES DE... FIERRO FUNDIDO INSTALACION DE VALVULAS DE SECCIONAMIENTO.... DE 102 MM (4") DE DIAMETRO INSTALACION DE PIEZAS ESPECIALES DE FIERRO GALVANIZADO CON... DOS ROSCAS 3" INSTALACION DE VALVULAS DE BRONCE DE.... DE 2" (50 mm) DE DIAMETRO INSTALACION DE VALVULA DE ADMISION Y EXPULSION DE AIRE COMBINADA MIXTA DE.. DE 2" DE DIAMETRO ROSCADA INSTALACION DE BRIDA TERMINAL DE POLIETILENO DE ALTA DENSIDAD Y CONTRABRIDA METALICA CLASE 125 lbs, DE... 16" (400 mm) DE DIAMETRO PZA 119.00 85.70 10,198.30 PZA 10.00 280.00 2,800.00 PZA 10.00 25.70 257.00 PZA 20.00 20.35 407.00 PZA 9.00 124.34 1,119.06 KG 15,126.00 2.59 39,176.34 M 4,389.32 18.44 80,939.06

S/C S/C

S/C

122753462.xls.ms_office

IMASA PRESUPUESTO BASE

NOMBRE:

PROYECTO EJECUTIVO DE LAS LINEAS DE CONDUCCION E INTERCONEXION PARA LA CIUDAD DE NOGALES, SONORA LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II PRECIO UNITARIO $

OBRA:

CLAVE DESCRIPCION

UNIDAD

CANTIDAD

IMPORTE $

============= SUBTOTAL INSTALACIONES 134,896.76

122753462.xls.ms_office

IMASA PRESUPUESTO BASE

NOMBRE:

PROYECTO EJECUTIVO DE LAS LINEAS DE CONDUCCION E INTERCONEXION PARA LA CIUDAD DE NOGALES, SONORA LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II PRECIO UNITARIO $

OBRA:

CLAVE DESCRIPCION

UNIDAD

CANTIDAD

IMPORTE $

SUMINISTROS
800500 COSTO DE ADQUISICION DE LA C.N.A. TUBERIA POLIETILENO DE ALTA DENSIDAD SEGN LISTA TIPO... RD 21 DE 16" DE DIAMETRO RD 26 DE 16" DE DIAMETRO SUMINISTRO DE PIEZAS ESPECIALES DE FIERRO FUNDIDO, (EXCLUYENDO EXTREMIDADES), EN OBRA DE 51 MM A 76 MM (2" A 3") DE DIAMETRO DE 101 MM A 303 MM (4" A 12") DE DIAMETRO DE 355 MM A 609 MM (14" A 24") DE DIAMETRO VALVULA DE ADMISION Y EXPULSION DE AIRE COMBINADA MIXTA DE 300 PSI, CUERPO DE HIERRO GRIS ASTM A-48 FLOTADOR DE ACERO INOXIDABLE PINTURA EPOXICA DE 2" DE DIAMETRO ROSCADA VALVULAS DE COMPUERTA VASTAGO FIJO DE (125 PSI) PUESTA EN OBRA DE 102 MM (4") DE DIAMETRO SUMINISTRO DE VALVULAS DE BRONCE DE.... DE 2" (50 mm) DE DIAMETRO SUMINISTRO DE TORNILLOS ... DE 16 MM X 64 MM (5/8" X 2 1/2") DE 16 MM X 76 MM (5/8" X 3") DE 25 MM X 114 MM (1" X 4 1/2") SUMINISTRO DE TUBERIA Y PIEZAS ESPECIALES DE FIERRO GALVANIZADO (HIERRO MALEABLE) CEDULA 40 POR INMERSION EN CALIENTE TIPO STANDARD CLASE 150 (10.5 KG/CM2) NIPLE HASTA 4" DE LONGITUD Y .... 2" DE DIAMETRO SUMINISTRO DE BRIDA TERMINAL DE POLIETILENO DE ALTA DENSIDAD Y CONTRABRIDA METALICA CLASE 125 lbs, DE... 16" (400 mm) DE DIAMETRO SUMINISTRO DE EMPAQUES DE NEOPRENO DE... DE 51 MM. (2") DE DIAMETRO DE 102 MM. (4") DE DIAMETRO DE 406 MM. (16") DE DIAMETRO PROTECCION ANTICORROSIVA PARA TUBERIAS .... SUP. INTERIOR CON PRIMARIO EPOXICO CATALIZADO Y ACABADO EPOXICO CATALIZADO DE ALTOS SOLIDOS, EJECUTADO EN OBRA. CAJAS TIPO PARA OPERACION DE VALVULAS TIPO 1 DE 0.70 X 0.70 M TIPO 2 DE 1.00 X 0.90 M SUMINISTRO E INSTALACION DE CONTRAMARCOS... SENCILLO DE 0.90 M. CON CANAL DE 100 MM. (4") SENCILLO DE 1.10 M. CON CANAL DE 100 MM. (4") PZA PZA 10.00 9.00 715.15 821.65 7,151.50 7,394.85 CAJA CAJA 10.00 9.00 891.09 1,497.71 8,910.90 13,479.39 M2 0.04 109.51 4.30 PZA PZA PZA 10.00 19.00 141.00 31.50 40.74 443.80 315.00 774.06 62,575.80 PZA 119.00 428.50 50,991.50 PZA 20.00 26.11 522.20 PZA PZA PZA 40.00 152.00 2,256.00 7.00 7.00 37.00 280.00 1,064.00 83,472.00 PZA 10.00 128.50 1,285.00 PZA 9.00 2,138.00 19,242.00 PZA 10.00 1,400.00 14,000.00 KG KG KG 180.00 110.00 14,836.00 22.51 19.45 22.85 4,051.80 2,139.50 339,002.60 M M 247.76 4,141.56 412.49 343.49 102,198.52 1,422,584.44

800543 800556 800700

800701 800702 800703 8019 C0

8019C2 802200 802204 S/C S/C 801200 801201 801202 801205 805600

8056 S0 8056 S6 S/C

S/C S/C S/C S/C S/C 206400 206402

224000 224001 224002 224300 224301 224302

122753462.xls.ms_office

IMASA PRESUPUESTO BASE

NOMBRE:

PROYECTO EJECUTIVO DE LAS LINEAS DE CONDUCCION E INTERCONEXION PARA LA CIUDAD DE NOGALES, SONORA LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II PRECIO UNITARIO $

OBRA:

CLAVE DESCRIPCION 224400 224403 SUMINISTRO E INSTALACION DE MARCOS C/TAPA DE... FIERRO FUNDIDO DE 50 X 50 CM CON PESO DE 55 KG

UNIDAD

CANTIDAD

IMPORTE $

PZA

19.00

1,210.15

22,992.85 ============= 2,164,432.22

SUBTOTAL SUMINISTROS

ACARREOS
900000 ACARREO 1er. Km DE MATERIALES PETREOS, ARENA-GRAVA MATERIAL PRODUCTO DE EXCAVACION EN CAMION VOLTEO, DESCARGA A VOLTEO EN CAMINO... PLANO, TERRACERIAS, LOMERIO SUAVE, REVESTIDO, LOMERIO PRONUNCIADO PAVIMENTADO. ACARREO Kmts. SUBSECUENTES AL 1o., DE MATERIALES PETREOS ARENA, GRAVA, MAT. PROD. DE EXC. EN CAMION VOLTEO, EN CAMINO... PLANO, TERRACERIAS, LOMERIO SUAVE, REVESTIDO, LOMERIO PRONUNCIADO PAVIMENTADO.

900002

M3

3,335.89

6.47

21,583.21

900200

900202

M3/Km

30,023.01

2.94

88,267.65 =============

SUBTOTAL ACARREOS

109,850.86

LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II A) TERRACERIAS SUBTOTAL TERRACERIAS B) INSTALACION SUBTOTAL INSTALACIONES C) SUMINISTROS SUBTOTAL SUMINISTROS D) ACARREOS SUBTOTAL ACARREOS 109,850.86 ============= TOTAL (A)+(B)+(C)+(D) I.V.A. (10%) 2,954,494.45 295,449.45 ============= GRAN TOTAL NOTAS: LOS PRECIOS UNITARIOS SE OBTUVIERON DEL CATALOGO DE CONCEPTOS DE LA C.N.A. VERSION 2000, ZONA 3. LOS PRECIOS NO CONTEMPLADOS EN ESTE ULTIMO FUERON CONSULTADOS CON EL FABRICANTE. EL BANCO DE TIRO SE CONSIDERO A 10 KM. 3,249,943.90 2,164,432.22 134,896.76 545,314.62

122753462.xls.ms_office

GERENCIA : COMISION NACIONAL DEL AGUA COMISION NACIONAL DEL AGUA

LICITACION No.

ANEXO

PARA:

LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II HOJA :

UBICACIN: CATALOGO DE CONCEPTOS, UNIDADES DE MEDICION, CANTIDADES DE LOS SERVICIOS, PRECIOS UNITARIOS PROPUESTOS E IMPORTES PARCIALES Y EL TOTAL DE LA PROPOSICION
NUMERO EN ORDEN PROGRESIVO CODIFICACION ESPECIFICACION CONCEPTO DE LOS SERVICIOS DESCRIPCION CANTIDAD UNIDAD IMPORTE ACUMULADO HOJA ANTERIOR: PRECIO UNITARIO CON NUMERO CON LETRA

DE :

IMPORTE PESOS

TERRACERIAS 100300 DESPALME DE MATERIAL NO APTO P/CIMENTACION Y/O DESPLANTE DE TERRAPLENES Y EN BANCOS DE PRESTAMO DESPERDICIANDO EL MATERIAL. CON ACARREO A 40 MTS. EXCAVACION POR MEDIOS MECANICOS EN ZANJA ZONA "B", EN CLASE II EN SECO, MEDIDO EN BANCO, CON ACARREO LIBRE A 20.00 M. EXCAVACION DE 0.00 A 2.00 M. DE PROFUNDIDAD EXCAVACION POR MEDIOS MECANICOS EN ZANJA ZONA "B", EN CLASE III EN SECO, MEDIDO EN BANCO, CON ACARREO LIBRE A 20.00 M. EXCAVACION DE 0.00 A 2.00 M. DE PROFUNDIDAD PLANTILLA APISONADA AL 85% PROCTOR EN ZANJAS... CON MATERIAL PRODUCTO DE BANCO RELLENO EN ZANJAS... COMPACTADO EXCAVACION AL 90% PROCTOR, CON MATERIAL PRODUCTO DE 2,501.91 M3 416.99 M3 1,626.24 M3 3,794.57 M3 416.99 M3

100301 S/C

S/C S/C

S/C* 113000 113002 113100 113105

113106 403000 403001

COMPACTADO AL 90% PROCTOR, CON MATERIAL DE BANCO FABRICACION Y COLADO DE CONCRETO VIBRADO Y CURADO ... DE F'C = 100 KG/CM2 SUBTOTAL TERRACERIAS

2,367.32

M3

12.87

M3

INSTALACIONES 205000 205008 213000 213001 216000 216006 228100 228118 S/C S/C INSTALACION DE TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE... DE 16" DE DIAMETRO INSTALACION DE PIEZAS ESPECIALES DE... FIERRO FUNDIDO INSTALACION DE VALVULAS DE SECCIONAMIENTO.... DE 102 MM (4") DE DIAMETRO INSTALACION DE PIEZAS ESPECIALES DE FIERRO GALVANIZADO CON... DOS ROSCAS 3" INSTALACION DE VALVULAS DE BRONCE DE.... DE 2" (50 mm) DE DIAMETRO 10.00 PZA 20.00 PZA 9.00 PZA 15,126.00 KG 4,389.32 M

GERENCIA : COMISION NACIONAL DEL AGUA COMISION NACIONAL DEL AGUA

LICITACION No.

ANEXO

PARA:

LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II HOJA :

UBICACIN: CATALOGO DE CONCEPTOS, UNIDADES DE MEDICION, CANTIDADES DE LOS SERVICIOS, PRECIOS UNITARIOS PROPUESTOS E IMPORTES PARCIALES Y EL TOTAL DE LA PROPOSICION
NUMERO EN ORDEN PROGRESIVO CODIFICACION ESPECIFICACION CONCEPTO DE LOS SERVICIOS DESCRIPCION CANTIDAD UNIDAD IMPORTE ACUMULADO HOJA ANTERIOR: PRECIO UNITARIO CON NUMERO CON LETRA

DE :

IMPORTE PESOS

S/C

INSTALACION DE VALVULA DE ADMISION Y EXPULSION DE AIRE COMBINADA MIXTA DE.. DE 2" DE DIAMETRO ROSCADA INSTALACION DE BRIDA TERMINAL DE POLIETILENO DE ALTA DENSIDAD Y CONTRABRIDA METALICA CLASE 125 lbs, DE... 16" (400 mm) DE DIAMETRO SUBTOTAL INSTALACIONES 119.00 PZA 10.00 PZA

S/C S/C

S/C

SUMINISTROS 800500 COSTO DE ADQUISICION DE LA C.N.A. TUBERIA POLIETILENO DE ALTA DENSIDAD SEGN LISTA TIPO... RD 21 DE 16" DE DIAMETRO RD 26 DE 16" DE DIAMETRO SUMINISTRO DE PIEZAS ESPECIALES DE FIERRO FUNDIDO, (EXCLUYENDO EXTREMIDADES), EN OBRA DE 51 MM A 76 MM (2" A 3") DE DIAMETRO DE 101 MM A 303 MM (4" A 12") DE DIAMETRO DE 355 MM A 609 MM (14" A 24") DE DIAMETRO VALVULA DE ADMISION Y EXPULSION DE AIRE COMBINADA MIXTA DE 300 PSI, CUERPO DE HIERRO GRIS ASTM A-48 FLOTADOR DE ACERO INOXIDABLE PINTURA EPOXICA DE 2" DE DIAMETRO ROSCADA VALVULAS DE COMPUERTA VASTAGO FIJO DE (125 PSI) PUESTA EN OBRA DE 102 MM (4") DE DIAMETRO SUMINISTRO DE VALVULAS DE BRONCE DE.... DE 2" (50 mm) DE DIAMETRO SUMINISTRO DE TORNILLOS ... DE 16 MM X 64 MM (5/8" X 2 1/2") DE 16 MM X 76 MM (5/8" X 3") DE 25 MM X 114 MM (1" X 4 1/2") SUMINISTRO DE TUBERIA Y PIEZAS ESPECIALES DE FIERRO GALVANIZADO (HIERRO MALEABLE) CEDULA 40 POR INMERSION EN CALIENTE TIPO STANDARD CLASE 150 (10.5 KG/CM2) NIPLE HASTA 4" DE LONGITUD Y .... 2" DE DIAMETRO 20.00 PZA 40.00 152.00 2,256.00 PZA PZA PZA 10.00 PZA 9.00 PZA 10.00 PZA 180.00 110.00 14,836.00 KG KG KG 247.76 4,141.56 M M

800543 800556 800700

800701 800702 800703 8019 C0

8019C2 802200 802204 S/C S/C 801200 801201 801202 801205 805600

8056 S0 8056 S6

GERENCIA : COMISION NACIONAL DEL AGUA COMISION NACIONAL DEL AGUA

LICITACION No.

ANEXO

PARA:

LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II HOJA :

UBICACIN: CATALOGO DE CONCEPTOS, UNIDADES DE MEDICION, CANTIDADES DE LOS SERVICIOS, PRECIOS UNITARIOS PROPUESTOS E IMPORTES PARCIALES Y EL TOTAL DE LA PROPOSICION
NUMERO EN ORDEN PROGRESIVO CODIFICACION ESPECIFICACION CONCEPTO DE LOS SERVICIOS DESCRIPCION CANTIDAD UNIDAD IMPORTE ACUMULADO HOJA ANTERIOR: PRECIO UNITARIO CON NUMERO CON LETRA

DE :

IMPORTE PESOS

S/C

SUMINISTRO DE BRIDA TERMINAL DE POLIETILENO DE ALTA DENSIDAD Y CONTRABRIDA METALICA CLASE 125 lbs, DE... 16" (400 mm) DE DIAMETRO SUMINISTRO DE EMPAQUES DE NEOPRENO DE... DE 51 MM. (2") DE DIAMETRO DE 102 MM. (4") DE DIAMETRO DE 406 MM. (16") DE DIAMETRO PROTECCION ANTICORROSIVA PARA TUBERIAS .... SUP. INTERIOR CON PRIMARIO EPOXICO CATALIZADO Y ACABADO EPOXICO CATALIZADO DE ALTOS SOLIDOS, EJECUTADO EN OBRA. CAJAS TIPO PARA OPERACION DE VALVULAS TIPO 1 DE 0.70 X 0.70 M TIPO 2 DE 1.00 X 0.90 M SUMINISTRO E INSTALACION DE CONTRAMARCOS... SENCILLO DE 0.90 M. CON CANAL DE 100 MM. (4") SENCILLO DE 1.10 M. CON CANAL DE 100 MM. (4") SUMINISTRO E INSTALACION DE MARCOS C/TAPA DE... FIERRO FUNDIDO DE 50 X 50 CM CON PESO DE 55 KG SUBTOTAL SUMINISTROS ACARREOS 19.00 PZA 10.00 9.00 PZA PZA 10.00 9.00 CAJA CAJA 0.04 M2 10.00 19.00 141.00 PZA PZA PZA 119.00 PZA

S/C S/C S/C S/C S/C 206400 206402

224000 224001 224002 224300 224301 224302 224400 224403

900000

ACARREO 1er. Km DE MATERIALES PETREOS, ARENA-GRAVA MATERIAL PRODUCTO DE EXCAVACION EN CAMION VOLTEO, DESCARGA A VOLTEO EN CAMINO... PLANO, TERRACERIAS, LOMERIO SUAVE, REVESTIDO, LOMERIO PRONUNCIADO PAVIMENTADO. ACARREO Kmts. SUBSECUENTES AL 1o., DE MATERIALES PETREOS ARENA, GRAVA, MAT. PROD. DE EXC. EN CAMION VOLTEO, EN CAMINO... PLANO, TERRACERIAS, LOMERIO SUAVE, REVESTIDO, LOMERIO PRONUNCIADO PAVIMENTADO. SUBTOTAL ACARREOS TOTAL (A)+(B)+(C)+(D) I.V.A. (10%) GRAN TOTAL PARA USO SUMA EL IMPORTE PARCIAL DE ESTA HOJA :

900002

3,335.89

M3

900200

900202

30,023.01

M3/Km

GERENCIA : COMISION NACIONAL DEL AGUA COMISION NACIONAL DEL AGUA

LICITACION No.

ANEXO

PARA:

LINEA DE CONDUCCION DEL REBOMBEO PORTEZUELOS AL TANQUE HEROES II HOJA :

UBICACIN: CATALOGO DE CONCEPTOS, UNIDADES DE MEDICION, CANTIDADES DE LOS SERVICIOS, PRECIOS UNITARIOS PROPUESTOS E IMPORTES PARCIALES Y EL TOTAL DE LA PROPOSICION
NUMERO EN ORDEN PROGRESIVO CODIFICACION ESPECIFICACION CONCEPTO DE LOS SERVICIOS DESCRIPCION CANTIDAD UNIDAD IMPORTE ACUMULADO HOJA ANTERIOR: PRECIO UNITARIO CON NUMERO CON LETRA

DE :

IMPORTE PESOS

EMPRESA

REPRESENTANTE LEGAL

EXCLUSIVO Y POSTERIOR DE LA C.N.A.

PROPOSICION QUE TIENE UN IMPORTE ACUMULADO : ESTA HOJA : ACUMULADO: