Project: Location: Contract: Engineer: Filename: SC and Coordination

ETAP
6.0.0

Page: Date: SN:

1 03-06-2012 12345678 Normal

Study Case: SM-3PH

Revision: Base Config.:

Sequence-of-Operation Event Summary Report


Symmetrical 3-Phase Fault at LVSG-1. Time (ms)
142 500 1990 2070 8481 8561 CB-LVSG-M CB-MTS-1-M R-RMU-F1 CB-RMU-F1 R-RMU-M CB-RMU-M 0.890

ID

If (kA)
29.590 29.590 0.890

T1 (ms)
80.0 350 1990 80.0 8481 80.0

T2 (ms)
142 500 Phase Phase

Condition

Phase - OC1 - 51 Tripped by R-RMU-F1 Phase - OC1 - 51 Phase - OC1 - 51 Tripped by R-RMU-M Phase - OC1 - 51

Operating actions not included: 51V Voltage Control/Restraint, 67 Directional.